4 - CAMPS Industry Day.ppt
PPT presentation 836 KB Posted
- Solicitation number
- FA4452-12-R-0002
About this file
CAMPS PM Presentation
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headquarters Air Mobility Command Unrivaled Global Reach for America…ALWAYS!
Consolidated Air Mobility Planning System (CAMPS) Michael J Smith Program Manager 7 May 2012
| System Description |
| Functionalities |
| Interfaces |
| Locations |
| Suites |
| Architecture |
| Releases |
| Program Team |
Overview
CAMPS System Description AMC’s Primary C2 Requirements, Planning & Scheduling System
Global User Input for Airlift & A/R Requirements HQ Validation & Management of Requirements Worldwide Airlift & Tanker Mission Planning, Scheduling, Allocation (Tasking) Peacetime, Crisis/Contingency, and Wartime Operations
| Separate Unclassified And Classified Capabilities |
| Users: HQ AMC, TACC, AMC’s AMOSs, ACC’s AOS, USAFE AOC/AMD and PACAF AOC/AMD, SOUTHCOM, USPACOM, USTRANSCOM, and CENTCOM AOC/AMD (Al Udeid) |
| Combined Legacy Systems: |
Airlift - AMC Deployment Analysis System (ADANS) A/R - Combined Mating & Ranging Planning System (CMARPS)
CAMPS Functionalities Client-Server:
Channel (airline schedule) SAAM (Special Assignment Airlift Mission – VIP, charter) Barrelmaster (allocation of resources) Contingency/Exercise Planning (JOPES TPFDDs or ITARS) AE (Air Evacuation) Air Refueling (force level tools for A/R requests) Web-Based:
ARMS (Air Refueling Management System) SRS (SAAM Request System – submit, validate, approve) ITARS (Intra-Theater Airlift Request System – non-TPFDD) Special Use (client-server):
TSSAS (TPFDD input/analysis) CMARPS tools for A/R (GSICS, CMARP, ADIS, etc.)
AutoScheduler (“many requirements onto many missions”)
MAF C2 Systems - Strat & AOC Plans & Schedules
AMC
TACC
UNIT
AOC/AMD
GTN
GCCS/
JOPES
Consolidated Manifests and Movement Schedules & Movement Updates
TBMCS
Passenger/Cargo Manifests
TPFDD
Req’mts Flight Plans A/C Movement Info
JOINT
TPFDD/
ETMS Data
GDSS
Schedules, Pax/Cargo
CAMPS
GTN
Theater Airlift Missions
REQ’TS: ITARS & OTHER SOURCES
UNIT
C2IPS
GATES
ACFP
FORCE
& UNIT
GDSS
D-GATES
GATES
CAMPS
CAMPS
CAMPS
UNIT
C2IPS
REQ’TS: SAAM,
A/R, & ITARS
This diagram shows the major AMC C2 systems that work together to manage AMC requirements (passenger, cargo, and Air Refueling) and missions (plan, schedule, execute and report on airlift & air refueling missions).
The left-hand side displays the "levels" or echelons that are involved … Joint, HQ AMC (the Tanker Airlift Control Center—TACC), Unit or Deployed
| Joint Operation Planning and Execution System (JOPES) requirements are sent to AMC as TPFDD movement requirements. |
| TPFDD - Time Phased Force and Deployment Data |
| Consolidated Air Mobility Planning System (CAMPS) receives and manages the joint movement requirements along with other requirements that are input into CAMPS, either directly or via web tools. |
| Requirements are sent to HQ AMC's TACC (AMC’s AOC), or to the Air Mobility Division (AMD). |
| In CAMPS, requirements for AMC airlift and air refueling missions are planned, scheduled, assigned to a unit and weapon system for execution, and then sent to GDSS. |
| Global Decision Support System (GDSS) is used in the TACC to manage execution of the airlift and air refueling missions, at both force- and unit-levels. |
| The Advanced Computer Flight Plan (ACFP) system is used by aircrews and TACC or AMD planners to generate wind optimized flight plans. |
| In theater AOCs (AMDs), Theater Battle Management Core System (TBMCS) is used to manage the daily execution of air mobility and combat missions in the Air Tasking Order (ATO). |
| L-Band and Aircraft Communication Addressing & Reporting System-ACARS provide near real time reporting of airlift mission execution worldwide, including KC-135, C-17, and C-5 aircraft (and future C-130). |
| Global Air Transportation Execution System (GATES) is used to enter and track cargo and passenger information, which is also sent to the financial systems for billing purposes. GATES also passes cargo and passenger movement data to GTN to report on completed mobility movements. |
| In Global Transportation Network (GTN), the movement reporting is consolidated, and sent back to JOPES for overall joint reporting. |
LOCATIONS
Scott AFB
HQ AMC A3X/A3T/A9/FMF
18 AF TACC
USTRANSCOM
Travis AFB
15 AMOS
CAMPS Backup Hickam AFB
PACOM
PACAF AOC/AMD
Ramstein AFB
USAFE AOC/AMD
McGuire AFB
21 AMOS
Hurlburt Field MOS Det 1 Langley AFB
ACC AOS
AOC WX SPO
Al Udeid Combined AOC/AMD Miami FL
SOUTHCOM
Kuwait
CDDOC
Shaw AB
AFCENT
DM
612 AOC
Here’s a sampling of the major military Contingency and Humanitarian operations we’ve been involved in just over the last 2 to 3 years.
Simply put, we in AMC are extremely busy accomplishing our wartime mission everyday.
I would like to focus on the two pictured in the center, Operations NOBLE EAGLE, and ENDURING FREEDOM. (next slide)
CAMPS Suites Operational – Scott (and Alternate)
Unclassified – Channels, SAAMs, AirEvac, A/R, AE, Barrels, ITARS Classified (S) – Separate Suites:
Contingency (Operational/TACC), Deliberate Planning (A3X), Command Post Exercises (CPX/A3M), Force Structure/Analysis (A9) CAMPS Alternate location - Unclass and Class (S) Operational – Al Udeid
Classified (S) and Unclassified – Reqm’ts Mgt (ITARS) (+Plan/Schd)
| AMOS Suites (Deployable and Training – Travis, McGuire, Hurlburt) |
| Training |
‘Development Training’ (for New Release Training) ‘Operational Training’ (for Current System Training) Testing
Testbed (At Developer Site – Security Verification, Testing) – Off-net TestOld (for Current System Testing) MSITC, DCAS MSITC (System Interoperability Testing—SIT) Classified (S) Testing & Classified DCAS
Generic CAMPS Suite Architecture Applications (Web Services) Web Apps.
(SRS, ARMS,
ITARS, CAT,
Channels) Tape Backup Domain Controller Database [Oracle 10g] (Primary (RAC) & Backup in Replication) Audit Interface SMTP Gateway CAMPS Clients [Win XP, 2003] (Channel, SAAM, Barrel, A/R, CEP, AE, other components) Citrix (Win & Unix)
| CAMPS suites contain identical S/W, enabled for specific user groups or purposes. |
| Servers may have backups, depending on purpose/functionality. |
| Outbound Email: Sent from web, application, and Interface servers. |
| Inbound Email: Interface server. |
| Support Servers: System-wide Support for Management (Altiris, Antivirus, Monitoring, etc.) |
Other C2 Systems W U U W W U W U U
MAN
W - Windows U - Unix Home U Support Servers W
Future CAMPS Releases and Schedule Current
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FY 12
FY 13
FY 14
FY 15
FY 16
FY 17
FY 18
CAMPS 10.1.2a PKI (AUAB/Scott) Fielding to AUAB 10.1.2 Dec 12 – Jan 13
CAMPS 11.0
COTS/Tech Refresh
CAMPS 11.X
FY14
Sparta
CAMPS 10.1.3
MAR/TTN
CMARPS
Release Spring 2013
CAMPS 10.1.4
COTS / Enclave Migration of CAMPS Apps to Web Base and Web Services CAMPS 10.0 Patch 9 AOC Testing / Fielding May 2012
CAMPS 11.0
FY15 – FY16
FULL Enclave Development
DM
Stand Up Summer 2012 Fail Over Evaluation Summer 2012
This is a build slide using custom animations Base line is the center time line for GDSS II development, testing and fielding
| Spiral delivers |
| Spiral 6 16 Oct 02 |
| Spiral 6 CTO 15 Nov 02 |
| Spiral 7 16 Jan 03 |
| Spiral 8 16 Apr 03 |
| Spiral 8 CTO 16 May 03 |
| GAT 3 months |
| Beta Test 1.5 months |
| Fielding to begin Sep 03 |
| PMO specified GDSS II deliverables at the end Build 2) |
| Spiral 8, |
| Spiral 10 16 Oct 03 |
| Spiral 12 16 Apr 04 |
| IMT delivery and final integration (build 3) as shown |
| Lastly overlaid are scheduled Legacy GDSS releases |
| GPH 2.5b CTO 13 Sep |
| GDS 1.20e CTO 27 Sep |
| CDB 1.8d CTO est 15 Dec 02 |
CAMPS TEAM
Program Management Office (PMO) AMC/A6IM
Program Manager (PM) – Michael Smith DPM – Major Amanda Scoughton SPM – Ed Thoman (Scheduling) (ARINC) SPM – Barbara Cramer (IA) (ARINC) SPM – Suzanne Chase (Requirements) (ARINC) Engineering Lead – Mark Sink (ARINC) Technical Advisor – Trudy Kline (MITRE)
| System Manger (SM) – William (Dennis) Watts (375th) |
| Help Desk Lead – Lewis Harty (COMF) |
| IA Support – Jeff Irmler (375th) |
CAMPS Team – Part 2 Functional Manager (FM) – Chris McDonald (A3C)
CAMPS Rep – Heidi Kukowski (A3C) (CTR) Developer (SAIC)
PM – Mike Truax Lead Developer – Kris Anderson FSRs – Vince Haun and Tina Wallace AISS support
Lead Tester – Duane Forcade Lead Engineer – Hector Barlow CM – Bob Gentry Training – Joe Dructor
File details come from the government source that posted it. Updated .