FA3047-12-T-0010 Transformer Project Questions 1 through 9 pending Govt. response

Text of this file

802 CONS/LGCAB

FA3047-12-T-0010

Lackland AFB, TX

Replace Existing Transformer B6300, WO# 41977

QUESTIONS & ANSWERS (#1)

(22 Aug 12) Question 1: Will the contractor or the local utility company supply the new transformer, high voltage switch, and 45’ Class 2 pole with pole top hardware and terminations?

Government Response: PENDING RESPONSE Question 2: If the prospective contractor is to supply the new transformer, is there a more detailed specification for the new transformer than was provided in the SOW dated 11 August 2012?

Government Response: PENDING RESPONSE Question 3: Please provide a site plan of the project parking lot & mechanical yard of Building #6300.

Government Response: PENDING RESPONSE Question 4: Please provide a detail of an acceptable Transformer Pad construction from the Base Electric Company, showing dimensions, thickness, support beams, safety bollards that may be required.

Government Response: PENDING RESPONSE Question 5: Does the existing transformer contain PCB that will require hazardous disposal?

Government Response: PENDING RESPONSE Question 6: Please provide a contact for the LAFB Electric Company that we can coordinate the installation of the new power pole & shut down of the existing service.

Government Response: PENDING RESPONSE Question 7: Is there a detailed specification, regarding the high voltage switch for the transformer that can be provided?

Government Response: PENDING RESPONSE Question 8: During the site visit there was mention of the Base providing a temporary generator. Please confirm.

Government Response: PENDING RESPONSE Question 9: V/E – An isolation switch is not being installed, only +/- 50’ of overhead line is being removed and new transformer is being placed near existing service connection pole. There could be a cost and time savings using existing pole and stubbing out of transformer pad for future underground connection.

Government Response: PENDING RESPONSE

(END)

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .