FA3047-12-T-0010 Answers to Questions 1-7 for Transformer Project.

Text of this file

802 CONS/LGCAB

FA3047-12-T-0010

Lackland AFB, TX

Replace Existing Transformer B6300, WO# 41977

QUESTIONS & ANSWERS (#1)

(21 Aug 12) Question 1: Will the contractor or the local utility company supply the new transformer, high voltage switch, and 45’ Class 2 pole with pole top hardware and terminations?

Government Response: There is no electrical utility company at LAFB, only CES.

Contractor shall furnish all of the materials for this project. They will be removing a high voltage switch/transformer from the BLDG; the new work will require cutouts with fuses on the pole. See Amendment 0001 for FA3047-12-T-0010, Section J – Attachment 6, Typical Pole Installation 23 Aug 12.

Question 2: If the prospective contractor is to supply the new transformer, is there a more detailed specification for the new transformer than was provided in the SOW dated 11 August 2012?

Government Response: See Amendment 0001 for FA3047-12-T-0010, Section J – Attachment 5, Detail Spec Sheet 23 Aug 12.

Question 3: Please provide a site plan of the project parking lot & mechanical yard of Building #6300.

Government Response: See Amendment 0001 for FA3047-12-T-0010, Section J – Attachment 4, Existing and New B6300 Design dated 23 Aug 12.

Question 4: Please provide a detail of an acceptable Transformer Pad construction from the Base Electric company, showing dimensions, thickness, support beams, safety bollards that may be required.

Government Response: See Amendment 0001 for FA3047-12-T-0010, Section J – Attachment 1, Revised Statement of Work dated 24 Aug 12.

Question 5: Does the existing transformer contain PCB that will require hazardous disposal?

Government Response: The existing transformer is NON PCB.

Question 6: Please provide a contact for the LAFB Electric company that we can coordinate the installation of the new power pole & shut down of the existing service.

Government Response: Paragraph # 2.3 of the SOW have the contacts names and phone numbers.

Question 7: Is there a detailed specification, regarding the high voltage switch for the transformer,that can be provided?

Government Response: There is not a high voltage switch in the new installation; Cutouts are standard for this installation. See Amendment 0001 for FA3047-12-T-0010, Section J – Attachment 6, Typical Pole Installation dated 23 Aug 12.

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .