This solicitation is for a roof repair project at Building B160 on Columbus Air Force Base in Mississippi. The scope of work involves repairing the roof of the Base Exchange building. Interested contractors must submit proposals by the due date specified in Section L to be considered for award of a firm fixed price contract. Proposals should address the technical approach, past performance, and price in accordance with the evaluation factors in Section M. The solicitation provides instructions to offerors on contents and format requirements for the proposal. The winning contractor will be selected based on the best value determination using these evaluation factors. The closing date for proposals and other details are outlined in Section L of the solicitation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
Section A - Solicitation/Contract Form
FA302220R0002
Section B - Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
0001 Provide all plant, labor, material, equipment, and transportation to perform roof repair of the BX, building 160, IAW the attached Statement of Work for project OPP 103-0494.
Product Service Code: Z2JZ Firm Fixed Price
1.0 Lot
Section C - Description/Specifications/Statement of Work
Requirements Repair BX Roof at Columbus AFB, MS.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08 0001 Inspection and Acceptance Location
Both Destination Instructions: NA
DoDAAC: F1N3BC Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
14 CES CECC
AF BPN NO MILSBILLS PROCESSES
555 SIMLER BLVD STE 110
COLUMBUS, MS 39710 6010
United States
OfficeCode:
Charles Simko Telephone: 662-434-3017 Email: charles.simko@us.af.mil
Section F - Deliveries or Performance
0001 Delivery Schedule Ship To Address
Delivery Schedule From date of lead time event to completion of performance 140 Calendar Days Date of Award
Place of Performance
DoDAAC: F1N3BC Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
14 CES CECC
AF BPN NO MILSBILLS PROCESSES
555 SIMLER BLVD STE 110
COLUMBUS, MS 39710 6010
United States
OfficeCode:
Charles Simko Telephone: 662-434-3017 Email: charles.simko@us.af.mil
FoB Details
Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.247-34 F.o.b. Destination. 1991-11
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.201-7000 Contracting Officer's Representative 1991-12 252.204-7006 Billing Instructions. 2005-10 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12 252.236-7000 Modification Proposals--Price Breakdown 1991-12
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12 As prescribed in 232.7004(b), use the following clause: WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause- Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization. Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF). Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system. Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. (b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. (c) WAWF access. To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.beta.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site. (d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Web Based Training link on the WAWF home page at https://wawf.eb.mil/ (e) WAWF methods of document submission.
Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. (f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: (1) Document type. The Contractor shall submit payment requests using the following document type(s): (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. __Combo__ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. __Combo__ (Contracting Officer: Insert either Invoice 2in1 or the applicable invoice and receiving report document type(s) for fixed price line items for services.) (iii) For customary progress payments based on costs incurred, submit a progress payment request. (iv) For performance based payments, submit a performance based payment request. (v) For commercial item financing, submit a commercial item financing request. (2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract. (f) [Note: The Contractor may use a WAWF combo document type to create some combinations of invoice and receiving report in one step.] (3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system. Routing Data Table* | Field Name in WAWF || Data to be entered in WAWF | | Pay Official DoDAAC || __F87700__ | | Issue By DoDAAC || __FA3022__ | | Admin DoDAAC || __FA3022__ | | Inspect By DoDAAC || __F1N3BC__ | | Ship To Code || __F1N3BC__ | | Service Approver (DoDAAC) || __F1N3BC__ | | Service Acceptor (DoDAAC) || __F1N3BC__ | (4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable. (5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. (g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact. __Benjamin.raley@us.af.mil__ (2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed. (End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
5352.201-9101 Ombudsman
OMBUDSMAN (OCT 2019)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, AETC is the Deputy Director of Contracting, AFICA/KT (OL-AET), 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-7907 (DSN 487-7907); facsimile 210-652-8344 (DSN 487-8344). The alternate Ombudsman is the Chief, Clearance & Program Support Division, AFICA/KTC, 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-7075 (DSN 487-7075). Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.
Such inquiries shall be directed to the contracting officer.
(End of clause)
5352.242-9001 Common Access Cards (CAC) for Contractor Personnel
COMMON ACCESS CARDS (CAC) FOR CONTRACTOR PERSONNEL (OCT 2019)
COLUMBUS AFB INSTALLATION SECURITY REQUIREMENTS AND INFORMATION
1. Contractor Access to Columbus Air Force Base Installations
a. Background Checks: All contractor and subcontractor personnel requiring entry on Columbus AFB (CAFB) must submit to a local background check to include criminal history checks conducted by the 14th Security Forces Squadron (14 SFS).
Cooperation with the investigation is mandatory for entry to CAFB. Contractor personnel convicted of certain crimes will not be allowed to work on CAFB. Such crimes include, but are not limited to the following: espionage, sabotage, treason or terrorism; felony convictions; violent crimes against persons; sex crimes; drug crimes related to distribution or intent to distribute and firearms/explosives violations. Other grounds for exclusion from working on CAFB include, but are not limited to: inability to provide proof of U.S. citizenship or legal U.S. residency, outstanding warrants, individuals identified on Federal terrorist watch lists, and incarceration for any offense. Deviations from this guideline are permitted on a case by case basis as determined by 14 MSG/CC and/or the 14 FTW/CC.
Background checks will be considered valid for a period of twelve (12) months for contractors working on Columbus AFB without a break in service. In the event of any break in service, the contractor will have to resubmit a request for a background checkb. Base Pass/Background Check Procedures:
The following procedures apply to all base-issued passes and identification cards. To reduce wait time at the Visitor Control Center (VCC), requests for base access shall be submitted five duty days prior to event, allowing 14 SFS sufficient time to conduct background checks on all employees. All passes, with the exception of the Common Access Card (CAC) will be issued at the Visitors Center; *Note* the contractor must notify the visitor's center five duty days prior to event as to who is obtaining a CaC in order to issue the appropriate 30 day pass. To initiate a request for contractor/subcontractor employee access to Columbus AFB, the contractor shall submit the below information directly to the VCC (Bldg 99, Ph: (662) 434-7133).
Background checks can only be completed on personnel who have proper documentation at the VCC. If paperwork is not on file, background checks will be completed by Visitor Center personnel upon arrival of the individual requesting base entry.
(1) A release authorization form must be accomplished by each employee requesting installation entry; National Crime Information Center (NCIC) checks will be conducted for each employee accessing the installation.
(2) Defense Biometric Identification Data System (DBIDS) Request Letter (for template, contact your contract administrator or contracting officer).
1. A DBIDS Pass (if DBIDS is not operational, AF Form 75) will be issued to each employee. A Day Pass/Short Term Pass is for periods for 30 days or less. *Note* DBIDS Cards/passes will only be issued IAW AFMAN 31-113.
(3) If applying for a Common Access Card (CAC), a 30 day DBIDS pass will be issued in order to complete the CAC NACI security questionnaire process (IAW AFMAN 31-113,CaCs are required if contractor will have access to computer on the CAFB network or based upon the DoD Government sponsor's determination of the type and frequency of access required to DoD facilities). Contractors must contact the sponsoring unit's security manager to begin NACI process. (see 2. Personnel and Information Security Requirements below for additional information).
(4) Pass Issuance. The following must be presented to the Visitors Center by each employee at the time of pass issuance.
1. Two valid forms of ID (at least one form of US Government-issued ID and one form of photo ID)
2. For vehicle passes - a valid driver's license, vehicle registration and proof of insurance meeting the minimum Mississippi liability coverage.
3. Fingerprinting and/or biometric data collection on each employee will be conducted at the VCC prior to a pass being issued.
Failure to comply with the procedures will result in denial of access.
(5) Non-routine access requirements: Non-routine delivery drivers are drivers requiring access to the installation when necessary or called upon producing infrequent visits. This will be tracked by a database maintained by the Visitors Center.
Once the delivery driver has been validated by the delivery recipient they will be required to comply with the requirements in Paragraphs b(1) and b(4) above. The Visitors Center may then issue a DBIDS Pass or an AF Form 75 that will be valid only for the length of time required for the driver to make their delivery and depart the installation. Special priority WILL NOT be given upon arrival, but may be expedited to the maximum extent possible. Time-sensitive deliveries such as asphalt and concrete must have current drivers license, current insurance documentation and vehicle registration paperwork on hand prior to entering the Visitor Center as to assist in expediting the process. Proper pass issue and vehicle inspections will continue as security measures dictate. Access will not be allowed until the entire process has been completed successfully.
c. Credentials
(1) Contractors are not permitted to sponsor individuals on base. Retired DoD personnel and dependents who are employed by a contractor may not use their sponsorship privilege for the contractor or subcontractor's benefit; contractor employees must go through the regular process to obtain a pass to work on base.
(2) Contractor personnel must have a valid base credentials on them at all times while on the installation. After initial base credentials have been issued, the Contracting Officer's Representative (COR) shall be responsible for sponsoring contractors and subcontractor employees on the base and ensuring they have the appropriate credentials. If a day worker or other contractor/subcontractor employee reports to the Visitors Center for a short notice pass, the COR will be contacted, and if necessary report to the Visitors Center, to validate that the employee is authorized and obtain the required access.
d. Additional Contractor Responsibilities: Contractor/subcontractor employees shall report all lost, stolen or missing base issued passes or ID cards (AF Form 75, DBIDS cards/passes or Common Access Cards) to issuing agency immediately upon discovery. All passes/ID cards will be turned in, to issuing agency, at the completion of stated contract, termination of employee, barment from base, release from contract, and/or Government termination of contract. Failure to follow stated procedures may prevent contractor/subcontractor from further qualifying for base access. (1) Contractor and subcontractor personnel gaining access to the installation will conduct all work during the days and hours of Monday thru Friday, 7:30 AM to 4:30 PM, unless otherwise specified in the contract or as approved by the Contracting Officer. Contractor/subcontractor personnel will not be allowed to access other base facilities unless specified in the contract.
e. Entry to Restricted or Controlled Areas: When work under this contract requires unescorted entry to controlled, restricted or other areas designated sensitive by the installation commander, the contractor shall comply with AFI 31-101, Integrated Defense, DoD 5200.2-R and AFI 31-501, Personnel Security Program Management, requirements. Contractor or sub-contractors who require escorted or unescorted entry to controlled areas, must be added to the Entry Authority List (EAL) for that respective controlled area. Note* only contractors possessing a CAC card and approved by unit Commander are authorized unescorted access to controlled areas. EALs requiring unescorted access must be signed by the sponsoring unit's security manager verifying individuals have a minimum of a valid NACI security investigation. EALs will be signed by the owner/using commander and authenticated by Security Forces. These documents will be routed through the Security Forces S-5 office. Contractors shall produce and maintain EALs IAW AFI 31-101 chapter 7.
(1) Restricted Area Training: The Government controlled area monitors provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas. Air Force restricted and controlled areas are explained in AFI 31-101. The contractor security representative will coordinate with their COR in order for the respective Government controlled area monitor to provide the training.
(2) Implementation of local Procedures: Contractors shall implement local base procedures for entry to Air Force controlled/ restricted areas where contractor personnel will work. Local base procedures will be provided at the pre-performance briefing when required. Updates will be provided to the contractor as changes are made in the procedures.
(3) Operating Procedures: When specified in the contract, the contractor security representative shall develop written procedures for internal circulation control, protection of resources, and to regulate entry into Air Force controlled areas during normal, simulated and actual emergency operations. The procedures shall be written in accordance with AFI 31-101, The Physical Security Program, 14 FTW Antiterrorism Plan 10-245 and AFI 10-245, The Air Force Antiterrorism/Force Protection (AT/FP) Program Standards, and coordinated through the Security Forces S-5 office.
2. Personnel and Information Security Requirements The contractor shall coordinate with their COR for the below requirements as necessary. a. Common Access Card (CAC) Issuance: AFFARS 5352.242-9001, Common Access Cards (CACs) for Contractor Personnel is included in the terms and conditions of this contract (Section I or clause section). Any long term contract (defined in CAFB IDP 31-101, Columbus Air Force Base Integrated Defense Plan, Enclosure 1 to Tab A to Appendix 3 to Annex C, ID Vetting and Authorization Determinations, Para. g.(1)), meeting contractor CAC eligibility requirements IAW AFMAN 31-113, Installation Perimeter Access Control and any supplements must obtain a CAC card. Advance Fingerprints and a NACI investigation must be accomplished prior to being issued the CAC card. Note* Contractors must complete all CAC card requirements within 20 days of the contractor's start date. In accordance with AFI 31-501, Personnel Security Management, CAC card issuance and access to Automated Information Systems (AIS) will be prohibited until the biometric fingerprint data is returned favorable (usually takes a couple of weeks) and the initial SF 85/NACI is transmitted by the Information Protection office to the Office of Personnel Management. If the biometric fingerprint data results return unfavorable, the individual must wait until the Air Force Central Adjudication Facility makes a determination on their NACI investigation before being issued a CAC card.
The requesting activity's Government Trusted Agent will verify this information through the Information Protection office at 434-2603 before authorizing/approving CAC issuance and Government computer access via the Contractor Verification System (CVS). Once the contractor's information is approved in the CVS, they will go to the Military Personnel Section in building 730 to obtain their CAC.
(1) Advance fingerprint biometric data is conducted at the 14 FTW Information Protection office (Bldg 926, Rm 125) when the contractor/sub-contractor has completed their NACI security questionnaire.
(2) NACI background investigations are initiated in the Electronic Questionnaires for Investigations Processing (e-QIP) by the sponsoring agency security manager. Contractors must report to the unit security manager on their first work day to initiate the questionnaire. This questionnaire will be e-mailed to the contractor and may be accomplished from any computer with internet access. The 14 FTW/IP office reviews the questionnaire once completed by the contractor. The contractor will be contacted to report to the 14 FTW/IP office, provide a completed OF 306 Declaration of Federal Employment, and sign off on all release forms. Then the completed background investigation will be submitted to and investigated by the Office of Personnel Management.
b. Security Representative Appointment: Any contract longer than 6 months in duration and/or if personnel require access to Automated Information Systems and/or if personnel require access to work in or in close proximity to Air Force sensitive information/areas, the contractor shall designate a security representative for on-base contract performance. The security representative, working in concert with the security manager shall ensure employees receive initial and recurring training required by AFI 16-1404, Air Force Information Security Program.
c. Reporting Potential Threats: The contractor shall fully comply with AFI 71-101, Volume-1, Criminal Investigations, and Volume-2, Protective Service Matters. Contractor personnel shall immediately report any information or circumstances which they are aware may be a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their company's immediate supervisor upon initial on-base assignment and as required thereafter.
d. Reporting Suspicious Activity: Contractor/subcontractor employees working on classified, sensitive and/or high risk projects shall report any suspicious activity or suspicious contacts by personnel to the COR, the Office of Special Investigations (662)434-2852, 14th Flying Training Wing Information Protection office (14 FTW/IP) at (662) 434-2603 or the Government requesting activity's unit security manager. The Government requesting activity's unit security manager is also referred to herein as the security manager and will be identified in the contract.
e. Handling of Unattended Classified Information: Any person finding unattended classified information will immediately secure it in a GSA safe or maintain it on their person (do not open/read/examine) and contact 14 FTW Information Protection office and the COR. During non-duty hours, notify 14 SFS Emergency Communications Center at (662) 434-7128 and the
COR.
3. Physical Security
a. Key Control
(1) Establish Procedures: The contractor shall establish and implement key control procedures in their Quality Control Plan to ensure keys issued to the contractor by the Government are properly safeguarded and not used by unauthorized personnel.
The contractor shall not duplicate keys issued by the Government.
(2) Lost Keys: Lost keys shall be reported immediately to the CO. The Government replaces lost keys or performs re-keying. The contractor shall be responsible for the total cost of lost keys, re-keying or lock replacement; the cost may be deducted from the contractor's invoice. (3) Government Authorization: The contractor shall ensure its employees do not allow Government issued keys to be used by personnel other than current authorized contractor employees. Contractor employees shall not use keys to open work areas for personnel other than contract employees engaged in performance of duties unless authorized by the Government functional area chief.
(4) Lock Combinations. The contractor shall establish procedures to ensure lock combinations are not revealed to unauthorized persons and ensure the procedures are implemented. The contractor is not authorized to record lock combinations without written approval by the Government functional area chief. Records with written combinations to authorized secure storage containers or Secure Storage Rooms , shall be marked and safeguarded at the highest classification level as the classified material maintained inside the approved containers. The contractor shall comply with DoDM 5200.01 security requirements for changing combinations to storage containers used to maintain classified materials.
b. Alarm System Operations: Any construction contract that physically alters a building where alarm systems are present, will have the alarms tested and deemed fully operational by the security forces physical security representative before final acceptance. The contractor will work with their COR to coordinate this action. The security representative can be located in the S-5 office at 434-2595. Contractor actions that resulted in damage to a building's alarm system will be repaired or replaced by the contractor at no cost to the Government.
c. Building Alterations: Alterations to buildings that contain vaults, secure rooms, or open storage areas will ensure modifications are in compliance with DoDM 5200.01-V3, Information Security Program, Appendix to enclosure three. Civil Engineering and Information Protection must be notified to inspect these facilities and ensure compliance before final acceptance. Alterations to buildings that contained controlled areas will ensure modifications are in compliance with AFI 31-101, Integrated Defense. Civil Engineering and Security Forces S-5 section must be notified to inspect these facilities and ensure compliance before final inspection. The contractor will work with their COR to coordinate this action. The contractor will be held liable for failure to comply. Additional work required will be accomplished by the contractor at no cost to the Government.
4. CAFB Traffic Regulations / Vehicle Inspections
a. All personnel working on contractor projects including: contractor employees, subcontractors, suppliers, and surveyors shall fully comply with CAFB traffic regulations (AFMAN 31-116), Columbus Supplement to AFMAN 31-116 and any updates to base traffic regulations. All employees that drive onto the installation must have a valid driver's license, current vehicle registration and current proof of insurance. Instructions given by Security Forces personnel at base entry gates shall be complied with immediately. Security Forces use speed detection devices and citations will be issued to violators. Personnel who park on grass or seeded areas will be cited.
b. Contractor or subcontractor personnel shall adhere to vehicle inspections when entering and exiting the base and traffic laws as outlined in the Mississippi Code, DoD regulations, Air Force Instructions, and applicable AETC Supplements to include AFI 10-245, AFI 31-101, AFMAN 31-116, CAFB Sup to AFMAN 31-116 and CAFB Sup to 31-101 (IDP).
5. OPSEC/FOUO
Freedom of Information Act Program (FOIA): The contractor shall comply with DoD Regulation 5400.7/Air Force Supplement, DoD Freedom of Information Act Program, requirements. The regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding For Official Use Only (FOUO) material.
Operational Security (OPSEC): The contractor shall comply with Air Force Instruction 10-701, Operations Security (OPSEC).
This instruction along with DoD 5205.02, DoD Operations Security Program, sets policy and procedures for all Air Force Personnel (military and civilian) and supporting contractors in implementing, maintaining and executing OPSEC programs. It describes the OPSEC process and discusses integration of OPSEC into Air Force plans, operations and support activities.
Although the entire instruction discusses contractors in various spots, chapter 8 specifically calls out OPSEC requirements within contracts.
6. Records Management and Administrative Support The contractor shall ensure all records, files, documents and working papers provided by the Government and/or generated for the Government in the performance of this contract remain Government property and are maintained in accordance with established Federal Records Act, Public Law 81-754, and DoD. Government owned records will be segregated from the company-owned records. Actions to destroy Government records can only be based on authorized records disposition schedule located at https://www.my.af.mil/afrims/afrims/afrims/rims.cfm. If there is no disposition, records will be maintained until disposition is established. All reports, records, files, documents, maintenance policies/operating instructions and working papers shall be made available as they are requested by the Government QA Personnel or CO.
7. Additional Security Requirements In accordance with DoDM 5200.01 and AFI 16-1404, the contractor shall comply with AFMAN 33-282 - Computer Security (COMPUSEC), AFMAN 33-152-User Responsibilities and Guidance for Information Systems, AFI 33-200-Information Assurance (IA) Management, AFSSI 7700 - Emission Security (EMSEC), AFFSI 7702 and AFI 33-214 Volume 1-Emission Security Countermeasures Reviews ; applicable AFKAGs, AFIs, and AFSSIs for Communications Security (COMSEC) and AFM 33-283 instructions.
8. Antiterrorism/Force Protection
a. In accordance with AFI 10-245, Air Force Antiterrorism (AT) Standards, AFMAN 31-113, Installation Perimeter Access Control and applicable supplements the following requirements apply to this contract:
(1) Contractor personnel may be required to participate in installation Anti-Terrorism/Force Protection exercises.
(2) Contractor personnel will comply with the implementation of higher Force Protection Conditions and will ensure that subcontractors are in compliance as well.
(3) Antiterrorism (AT) Level I training is available to all contractor personnel. The Government will provide/make available AT Level I training/information at the contractor's request. This information can be provided through the 14 FTW contractors AT Level I awareness pamphlets/binders, through computer based training programs, or through the unit/installation Anti-terrorism Officer. To request training, contact the 14th Flying Training Wing Antiterrorism Officer, 14 SFS/S5X-AT at (662) 434-1260.
b. FPCON levels:
(1) FPCON NORMAL. This condition applies when a general global threat of possible terrorist activity exists and warrants a routine security posture. At a minimum, access control will be conducted at all DOD installations and facilities. What to Expect: Expect to see a routine security posture.
(2) FPCON ALPHA. (AF Modified) This condition applies when there is an increased general threat of possible terrorist activity against personnel or facilities, the nature and extent of which are unpredictable, and circumstances do not justify full implementation of FPCON BRAVO measures. However, it may be necessary to implement certain measures from higher FPCONs measures resulting from intelligence received or as a deterrent. The measures in this FPCON must be capable of being maintained indefinitely. What to Expect: Expect random vehicle checks and increased crime prevention efforts.
(3) FPCON BRAVO. Applies when an increased or more predictable threat of terrorist activity exists. Sustaining BRAVO measures for a prolonged period may affect operational capability and military-civil relationships with local authorities. What to Expect: Expect to see closer inspections of vehicles and deliveries, ID checks, and a greater presence of guards.
(4) FPCON CHARLIE. Applies when an incident occurs or intelligence is received indicating that some form of terrorist action or targeting against personnel or facilities is likely. Prolonged implementation of CHARLIE measures may create hardship and affect the activities of the unit and its personnel. What to Expect: Expect rigorous efforts to inspect vehicles and facilities; you may be required to evacuate the base, or you may not be allowed On-Base without escort.
(5) FPCON DELTA. Applies in the immediate area where a terrorist attack has occurred or when intelligence has been received that terrorist action against a specific location or person is imminent. FPCON DELTA is usually declared as a localized condition. FPCON DELTA measures are not intended to be sustained for an extended duration. What to Expect: If
On-Base, follow security forces instructions; you may be directed to evacuate or seek shelter, if Off-Base, you may be denied access until the incident has been taken care of and additional security measures will delay and interrupt normal routines.
c. The contractor shall ensure areas controlled by contractor employees comply with base operations plans/instructions for Force Protection Condition (FPCON) procedures, and local search/identification requirements. The contractor shall be responsible for the above FPCON requirements in all assigned facilities. In addition, in other shared occupancy buildings, the contractor shall assist (based on occupancy) with manning the building/facility Entry Control Point (ECP). The contractor shall safeguard all Government property, including controlled forms, provided for their use. At the close of each work period, Government training equipment, ground aerospace vehicles, facilities, support equipment, and other valuable materials shall be secured.
Instructions, regulations and forms can be obtained online at http://www.e-publishing.af.mil/ or by doing a general inquiry on any web-based search engine. If unable to obtain the applicable information, contact the 14th Contracting Squadron's contract administrator.
(End of clause)
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.202-1 Definitions. 2013-11 52.203-3 Gratuities. 1984-04 52.203-7 Anti-Kickback Procedures. 2014-05 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper
Activity.
2014-05
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
2007-09
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. 2010-10 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform
Employees of Whistleblower Rights.
2014-04
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation.
2017-01
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper.2011-05 52.204-7 System for Award Management. 2018-10 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. 2018-10 52.204-13 System for Award Management Maintenance. 2018-10 52.204-16 Commercial and Government Entity Code Reporting. 2016-07 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. 2015-11 52.215-8 Order of Precedence-Uniform Contract Format. 1997-10 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data. 2011-08 52.215-12 Subcontractor Certified Cost or Pricing Data. 2010-10 52.219-3 Deviation 2019- O0003
Notice of HUBZone Set-Aside or Sole Source Award (DEVIATION 2019-O0003)
2011-11
52.219-6 Deviation 2019- O0003
Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003) 2011-11
52.219-8 Utilization of Small Business Concerns. 2018-10 52.219-13 Notice of Set-Aside of Orders. 2011-11 52.219-14 Deviation 2019- O0003
Limitations on Subcontracting (DEVIATION 2019-O0003) 2017-01
52.222-3 Convict Labor. 2003-06 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. 2018-03 52.222-6 Construction Wage Rate Requirements. 2018-08 52.222-7 Withholding of Funds. 2014-05 52.222-8 Payrolls and Basic Records. 2018-08 52.222-9 Apprentices and Trainees. 2005-07 52.222-10 Compliance with Copeland Act Requirements. 1988-02 52.222-11 Subcontracts (Labor Standards). 2014-05 52.222-12 Contract Termination-Debarment. 2014-05 52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. 1988-02
52.222-15 Certification of Eligibility. 2014-05 52.222-19 Child Labor-Cooperation with Authorities and Remedies. 2019-10 52.222-21 Prohibition of Segregated Facilities. 2015-04 52.222-27 Affirmative Action Compliance Requirements for Construction. 2015-04 52.222-37 Employment Reports on Veterans. 2016-02 52.222-40 Notification of Employee Rights Under the National Labor Relations
Act.
2010-12
52.222-50 Combating Trafficking in Persons. 2019-01 52.222-54 Employment Eligibility Verification. 2015-10 52.222-55 Minimum Wages Under Executive Order 13658. 2015-12 52.222-62 Paid Sick Leave Under Executive Order 13706. 2017-01 52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts.
2013-09
52.223-5 Pollution Prevention and Right-to-Know Information. 2011-05 52.223-6 Drug-Free Workplace. 2001-05 52.223-17 Affirmative Procurement of EPA-designated Items in Service and
Construction Contracts.
2018-08
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. 2011-08 52.223-19 Compliance with Environmental Management Systems. 2011-05 52.223-21 Foams. 2016-06 52.225-13 Restrictions on Certain Foreign Purchases. 2008-06 52.227-1 Authorization and Consent. 2007-12 52.228-2 Additional Bond Security. 1997-10 52.228-5 Insurance-Work on a Government Installation. 1997-01 52.228-11 Pledges of Assets. 2018-08 52.228-12 Prospective Subcontractor Requests for Bonds. 2014-05 52.228-14 Irrevocable Letter of Credit. 2014-11 52.228-15 Performance and Payment Bonds-Construction. 2010-10 52.229-3 Federal, State, and Local Taxes. 2013-02 52.232-8 Discounts for Prompt Payment. 2002-02 52.232-9 Limitation on Withholding of Payments. 1984-04 52.232-11 Extras. 1984-04 52.232-17 Interest. 2014-05 52.232-18 Availability of Funds. 1984-04 52.232-23 Alternate I Assignment of Claims. 2014-05 52.232-23 Assignment of Claims. 2014-05 52.232-27 Prompt Payment for Construction Contracts. 2017-01 52.232-33 Payment by Electronic Funds Transfer-System for Award Management.2018-10 52.232-39 Unenforceability of Unauthorized Obligations. 2013-06 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 2013-12 52.233-1 Disputes. 2014-05 52.233-3 Protest after Award. 1996-08 52.233-4 Applicable Law for Breach of Contract Claim. 2004-10 52.236-2 Differing Site Conditions. 1984-04 52.236-3 Site Investigation and Conditions Affecting the Work. 1984-04 52.236-5 Material and Workmanship. 1984-04 52.236-6 Superintendence by the Contractor. 1984-04 52.236-7 Permits and Responsibilities. 1991-11 52.236-8 Other Contracts. 1984-04 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements.
1984-04
52.236-10 Operations and Storage Areas. 1984-04 52.236-11 Use and Possession Prior to Completion. 1984-04 52.236-12 Cleaning Up. 1984-04 52.236-13 Accident Prevention. 1991-11 52.236-14 Availability and Use of Utility Services. 1984-04 52.236-15 Schedules for Construction Contracts. 1984-04 52.236-17 Layout of Work. 1984-04 52.236-21 Specifications and Drawings for Construction. 1997-02 52.236-21 Alternate I Specifications and Drawings for Construction. 1997-02 52.236-25 Requirements for Registration of Designers. 2003-06 52.236-26 Preconstruction Conference. 1995-02 52.242-13 Bankruptcy. 1995-07 52.242-14 Suspension of Work. 1984-04
52.243-1 Alternate II Changes-Fixed-Price. - (Alternate II) 1987-08 52.243-4 Changes. 2007-06 52.244-5 Competition in Subcontracting. 1996-12 52.244-6 Subcontracts for Commercial Items. 2019-08 52.246-21 Warranty of Construction. 1994-03 52.249-2 Termination for Convenience of the Government (Fixed-Price). 2012-04 52.249-2 Alternate I Termination for Convenience of the Government (Fixed-Price). 2012-04 52.249-4 Termination for Convenience of the Government (Services) (Short
Form).
1984-04
52.249-10 Default (Fixed-Price Construction). 1984-04 52.253-1 Computer Generated Forms. 1991-01
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 2011-09 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-
Related Felonies.
2008-12
252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09 252.204-7003 Control of Government Personnel Work Product. 1992-04 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls. 2016-10 252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported
Cyber Incident Information.
2016-10
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2016-10
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. 2016-05 252.205-7000 Provision of Information to Cooperative Agreement Holders 1991-12 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the
Government of a Country that is a State Sponsor of Terrorism.
2019-05
252.219-7011 Notification to Delay Performance. 1998-06 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. 2010-12 252.223-7004 Drug-Free Work Force. 1988-09 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous
Materials.
2014-09
252.223-7008 Prohibition of Hexavalent Chromium. 2013-06 252.225-7001 Buy American and Balance of Payments Program. 2017-12 252.225-7002 Qualifying Country Sources as Subcontractors. 2017-12 252.225-7012 Preference for Certain Domestic Commodities. 2017-12 252.225-7016 Restriction on Acquisition of Ball and Roller Bearings. 2011-06 252.225-7048 Export-Controlled Items. 2013-06 252.225-7052 Restriction on the Acquisition of Certain Magnets and Tungsten. 2019-04 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic
Enterprises, and Native Hawaiian Small Business Concerns.
2019-04
252.232-7010 Levies on Contract Payments. 2006-12 252.232-7011 Payments in Support of Emergencies and Contingency Operations. 2013-05 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. 2013-06 252.242-7005 Contractor Business Systems. 2012-02 252.242-7006 Accounting System Administration. 2012-02 252.243-7001 Pricing of Contract Modifications. 1991-12 252.243-7002 Requests for Equitable Adjustment. 2012-12 252.244-7000 Subcontracts for Commercial Items 2013-06
FAR Clauses Incorporated by Full Text
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. 2019-08 As prescribed in 4.2105(b), insert the following clause: Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019) (a) Definitions. As used in this clause- "Covered foreign country" means The People's Republic of China. "Covered telecommunications equipment or services" means- (1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities); (2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities); (3) Telecommunications or video surveillance services provided by such entities or using such equipment; or (4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country. "Critical technology" means- (1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations; (2) Items included on the Commerce Control List set forth in Supplement No.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .