App_2_QASP_Evaluation_Checklist.pdf

PDF 29 KB Posted

Attached to
Joint Base San Antonio ICIDS III/IV Maintenance Service
Solicitation number
FA3016-17-T-0011
Issued by

About this file

Appendix 2 QASP Evaluation Checklist

View the file

Other files

File Type Posted
Atch_4__ICIDS_III_IV_Maintenance_PWS_Revised_29AUG17.doc DOC document
FA3016-17-T-0011_QA_Round_5.pdf PDF
Atch_2_CLIN_X002_Price_List_Revised_29AUG17.xlsx XLSX spreadsheet
FA3016-17-T-0011_Q&A_Round_4.pdf PDF
FA3016-17-T-0011_Q&A_Round_3.pdf PDF
FA3016-17-T-0011_Q&A_Round_2.docx DOCX document
FA3016-17-T-0011_COMBINED_SS_Amended_25AUG17.docx DOCX document
FA3016-17-T-0011_Q&A.docx DOCX document
Atch_3_Provision_and_Clauses.docx DOCX document
Atch_14_ICIDS_Test_and_Maintenace_Report_Template.pdf PDF
Atch_8_ICIDS_Installed_Alarms.docx DOCX document
Atch_12__ICIDS_Zones_Under_Warranty_Template.docx DOCX document
Atch_13__Replacement_Component_Warranty_List.docx DOCX document
Atch_11_DD_254.pdf PDF
Atch_10_Schedule_of_Insurance.docx DOCX document
Atch_2_CLIN_X002_Price_List.xlsx XLSX spreadsheet
Atch_5_Performance_Requirements_Summary.docx DOCX document
App_1_QASP_ICIDS_III_IV.docx DOCX document
Atch_7_FSH_ICIDS_List_of_Zones.docx DOCX document
FA3016-17-T-0011_COMBINED_SS.docx DOCX document
Atch_1_Schedule_of_Service.docx DOCX document
Atch_9_WD_15-5253_(Rev-3).docx DOCX document
Atch_6_Deliverables_Schedule.docx DOCX document
Atch_4__ICIDS_III_IV_Maintenance_PWS.doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PROGRAM (QASP) CHECKLIST

For

JBSA Integrated Commercial Intrusion Detection System (ICIDS) Maintenance Service Contract

Contracting Officer’s Representative:

Date:

Contract Number:

Purpose: This checklist is designed to track surveillance of the below listed Performance Objectives (PO) contained in the Performance Requirements Summary( PRS) of the Performance Work Statement (PWS) for the listed contract in accordance with the QASP.

1. Performance Objectives

PERFORMANCE OBJECTIVES

PO

Evaluated Performance Objective PWS

Paragraph Method of

Surveillance Performance Threshold

1. Inspection of Zone within one week of warranty expiration.

1.2 100% Inspection 100% Compliance

2. Equipment Maintenance/Repair

5.2 100% Inspection 100% Compliance

3. Preventative maintenance 5.3 100% Inspection 100% Compliance

4. Service Calls Phone Response

5.4 100% Inspection 100% Compliance

5. Service Calls Physical Response

5.4 100% Inspection 100% Compliance

6. Maintenance Service Request

(MSR)

5.5 100% Inspection 100% Compliance

7. Working Conditions 5.7 100% Inspection 100% Compliance

8. Rubbish and Debris Clean-up 5.8 100% Inspection 100% Compliance

2. Surveillance Checklist

SURVEILLANCE CHECKLIST

Performance Objective #

Alarm Zone Work Start Date

Completion Date

Maintenance Technician

Threshold

3. Surveillance Comments:

COR Name and Rank Signature

COR NAME:
DATE:
CONTRACT NUMBER:
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
PO#:
ALARM ZONE:
WORK START DATE:
COMPLETION DATE:
MAINTENANCE TECHNICIAN:
THRESHOLD:
COMMENTS:
COR NAME AND RANK:

File details come from the government source that posted it. Updated .