Q A Posting Update 04.xls
XLS spreadsheet 38 KB Posted
- Attached to
- Taiwan Aircraft Maintenance Federal contract opportunity
- Solicitation number
- FA3002-08-R-0012
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP
| RFP | ||||
| Tracking # | RFI Date | Subject Matter | Comment/Question | Response |
| R-00-018 | 28-Oct-08 | Atch 10, POP | Does the Government intend for the completed Attachment 10, Period of Performance, to be incorporated into the narrative of Subfactor 5, in response to paragraph 5.5.4? If so, does the Government intend for the offeror to include all 8 worksheets (7 contract years plus a summary of all periods), or just the summary of all periods? Provide instructions as to how and where the Government intends for the offerors to provide the Attachment 10 data. | Atch 10 information provided for all periods and included with information for Subfactor 5. Complete Attachment 10 Period of Performance for all periods and submit with information for Subfactor 5, Small Business Subcontracting Plan and SDB Participation Targets. |
| R-00-019 | 28-Oct-08 | RFP Sect L, Para 5.2.1. | Is the Government’s intent for the last sentence of RFP Section L, Paragraph 5.2.1, for the service provider to submit a “full Quality Control Plan” in accordance with the instructions of PWS paragraph 2.1.12.4? | Submit a full Quality Control Methodology in accordance with the instructions of Section L. A Quality Control Plan in accordance with paragraph 2.1.12.4. of the PWS, is required at the Pre-Performance Conference. |
| R-00-020 | 23-Oct-08 | RFP, Atch 6 | Based upon the government's answer to question R-00-015, in order for offerors to immediately send out additional questionnaires if necessary, would the government please clarify whether they are now requiring another Contracting Officer in addition to the: 1) Quality Assurance Person and/or Site Manager and 2) Administrative Contracting Officer (ACO) already required as points of contact by Attachment 6, paragraph F? | The Government requests the offerors send out Past Performance Questionnaires, Section J, Attachment 5 to each of the Points of Contact (POCs) identified in the Past Performance Volume. |
| R-00-021 | 29-Oct-08 | Atch 5 Past Performance Questionnaires | Should Attachment 5 questionnaires be provided to PoCs listed in the Past Performance Volume via Attachment 6? | The Government requests the offerors send out Past Performance Questionnaires, Section J, Attachment 5 to each of the Points of Contact (POCs) identified in the Past Performance Volume. |
| R-00-022 | Sect. B Clause | This Offeror is confused as to what goes into this table and how it is to be used in determining the values entered into Section B. This is the second time this question has been posed. Please do not merely repeat the information in Section B Clauses as the Offeror has read this data and it does not provide sufficient explanation as to how the table is to be filled out or how the information is to be used. Please explain in detail what goes into each part of the table and how that information will translate into entries in Section B CLINs X005. | No information is required by the offeror in the table (B-2). The price for the CLIN (X005) proportional to the Sortie Adjustment Rate, proposed by the offeror, is the projected annual labor rate increase per aircraft. This rate will be the basis of adjusting the contract cost by modification as shown in table B-2. | |
| As a follow-on to this question, please explain the Section B Sortie Adjustment Rate in CLIN 0005. Is the rate entered to be the total cost to support one sortie? Can we assume a quantity of one? | ||||
| R-00-023 | Sect. B Clause TAI Table | This offeror is confused as to what goes into this table and how the information is to be used in determining the values entered into Section B. This is the second time this question has been posed. Please do not merely repeat the information in Section B Clauses as the Offeror has read this data and it does not provide sufficient explanation as to how the table is to be filled out or how the information is to be used. Please explain in detail what goes into each part of the table and how that information will translate into entries in Section B CLINs X006. As a follow-on to this question, please explain the Section B TAI Adjustment Rate in CLIN 0006. Is the rate entered to be the annual cost to support one aircraft without an increase in total sorties? Can we assume a quantity of one? | No information is required by the offeror in the table (B-5). The information is provided during a contract modification, when required. The price for CLIN (X006) proportional to the Total Active Inventory (TAI) Adjustment Rate is the projected annual labor rate increase per aircraft. This rate will be the basis of adjusting the contract cost. | |
| R-00-024 | 30-Oct-08 | RFP, Atch 12 | Please indicate how to unlock this block or replace the sheet. | Excel was locked. New attachment will be added to correct this. |
| R-00-025 | 30-Oct-08 | RFP, para 4.0. and Attachment 4 | If the Base Period is 11 months, shouldn't the available manhours be something less then 2,080 hours? My calculations show 1,904. Please clarify. | The Base Period is divided into 2 separate parts. Mobilization, FY 09 - 10, for 176 hours. Full Performance, FY 09 - 10, for 1904 hours. The RFP and Attachment 4 will be updated accordingly. |
| R-00-026 | 4-Nov-08 | RFP, Atch 12 | Will this spreadsheet be posted with access to these cells or will contractor linked spreadsheets be acceptable? | Excel was locked. New attachment will be added to correct this. |
| R-00-027 | 5-Nov-08 | RFP, Atch 11 | Please advise if submittal of Attachment 11 under Section 5 of Volume II would be an acceptable location or if there is a designated location for this document. | Volume II, Section 5 would be an acceptable location. |
| R-00-028 | 4-Nov-08 | RFP, Subcontractor Info | If the subcontractor proprietary information is submitted to the Government under separate cover, to what level of detail should be recorded on Attachment 12, Schedule B Worksheets for Subcontractor? Should their total cost be shown as “Subcontractor Cost” only without breaking their line items out? This document is somewhat confusing, can further explanation be given as to what is required and to how to fill it out. Additionally, Section B – Supplies or Services and Prices should be the total price per year and should include Subcontractor cost, should this not match the Schedule B Worksheets in Attachment 12. | As a point of clarification, subcontractors are not “asked to submit separate documentation to the government under separate cover”. Paragraph 1.8 in Section L states, in part, “Subcontractors who will perform more than 20% of the work shall provide their price/cost proposal to the prime contractor for inclusion in Volume II, in a sealed package, if desired” (emphasis added). Attachment 12 is designed to consolidate the major subcontractor elements of cost/price with the prime contractor elements of cost/price to form the estimated overall elements of proposed prime contractor and subcontractor cost/price for the program. In the event the subcontractor chooses to submit the information in a sealed package due to proprietary concerns, the prime should include the information available to the prime (e.g., subcontractor total firm fixed price) and request the subcontractor complete the subcontractor portion of Attachment 12 and submit that information in his sealed package. |
The Section B – Supplies or Services and Prices proposed total price per year should include all costs/prices including subcontractor cost/price and should match the Schedule B Worksheets in Attachment 12 to the maximum extent practicable. Please note, in accordance with FAR 15.404-3, prime contractors should submit any information and/or rationale on how the subcontract price was evaluated by the prime to determine reasonableness and how the subcontractor cost/price is incorporated into the prime offeror’s overall proposal for the program.
R-00-029 4-Nov-08 RFP, PWS, TAS Para 5.4.3 requires the Automated Tool Accountability System (TAS) to be in place on contract start. To implement this program during the phase in period it will require complete control over the incumbent’s tools and special equipment, essentially causing a work stoppage or significant slow down. To implement the TAS in 30 days after contract start without generating this same work stoppage or slow down will require tools to be laser etched and the system to be implemented after normal duty hours when full access to tools and equipment can be gained. Please reconsider this requirement. Within 90 days after contract start would be more manageable. This has been changed to read: "5.4.3. The Offeror shall provide a methodology for fully implementing the tool accountability and control by the contract start date." Additionally, tools have already been etched.
Site Visit
| Site Visit - Generated Questions | ||||
| Tracking # | RFI Date | Subject Matter | Comment/Question | Response |
| SV-00-001 | 27-Oct-08 | Facility turn-in | How far away the actual facility is for engine turn-in? | 1.5 miles maximum |
| SV-00-002 | 27-Oct-08 | Distance | How far is the Base Gas Station from the Aircraft Maintenance Hangar? | .5 miles |
| SV-00-003 | 27-Oct-08 | Arm & De-Arm Area | Is there a designated Arm & De-Arm area for aircraft? If so, where is it located - or is it accomplished in the Parking Area? | For practice bombs, up/down load in parking area. Arm at end-of-runway (EOR). De-arm at EOR. Live bombs, up/download at Echo row. Arm and de-arm at EOR. |
| SV-00-004 | 27-Oct-08 | Last Chance Area | Is there a designated area for "last Chance" (prior to Launch) inspections, or is that function also accomplished in the parking area? | Last chance accomplished at EOR. North EOR .25 miles from parking area. South EOR 1.5 miles from parking area. |
| SV-00-005 | 27-Oct-08 | RFP Deliverables | Given the relatively short amount of time with the apparent proposal schedule, please clarity if these could be submitted prior to performance. | It's the contractor's option to submit what they feel is an adequate proposal. |
| SV-00-006 | 17-Oct-08 | Spares List | Will the Government provide a spares list, or parts utilization list based on current operations for the F-16? | A Spares List is identified/addressed in Appendix 3B. |