Q A Posting.xls

XLS spreadsheet 43 KB Posted

Attached to
Taiwan Aircraft Maintenance Federal contract opportunity
Solicitation number
FA3002-08-R-0012
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

The posting of Contractors Questions and the Answers.

View the file

Other files for this federal contract opportunity

Other files attached to Taiwan Aircraft Maintenance, newest first.
File Type Posted
SF30_Amen 0009_08-R-0012.pdf PDF
Atch 4 - FA3002-08-R-0012 - 24 Mar 09.xls XLS spreadsheet
FA3002-08-R-0012-0009.zip ZIP file
Amend 0008 FA3002-08-R-0012.zip ZIP file
Taiwan RFP Amendment 0007.pdf PDF
Additional R0012_Q A Posting_12_30_2008.xls XLS spreadsheet
R0012_Q A Posting_12_30_2008.xls XLS spreadsheet
Preproposal_ Slides Taiwan 3 Nov 08.ppt PPT presentation
Q A Posting Update 06.xls XLS spreadsheet
Updated Amendment 0005.zip ZIP file
Correction Letter FBO.doc DOC document
Q A Posting Update 05.xls XLS spreadsheet
Amendment 0005.zip ZIP file
Amendment 0004.zip ZIP file
Q A Posting Update 04.xls XLS spreadsheet
Taiwan RFP Amendment 0003.pdf PDF
Taiwan Pre-Proposal Conf Attendees Slides.zip ZIP file
Q A Posting Update 03.doc DOC document
LukeSitevisitContractorList27Oct2008.doc DOC document
Taiwan RFP Amendment 0002.zip ZIP file
Q A Posting Update 02.xls XLS spreadsheet
Q A Posting Update 01.xls XLS spreadsheet
Pre-Proposal Conf Info Amend 001.doc DOC document
Taiwan Pre-Proposal Information.zip ZIP file
Taiwan Site Visit Info.zip ZIP file
Amend 01 to FA3002-08-R-0012.pdf PDF
Atch 8 FA3002-08-R-0012.doc DOC document
Atch 3 FA302-08-R-0012.xls XLS spreadsheet
Atch 5 FA3002-08-R-0012.doc DOC document
Atch 11 FA3002-08-R-0012.pdf PDF
08-R-0012.doc DOC document
Atch 7 FA3002-08-R-0012.doc DOC document
PWS.zip ZIP file
Atch 2 FA3002-08-R-0012.pdf PDF
Atch 6 FA3002-08-R-0012.doc DOC document
Atch 4 - FA3002-08-R-0012.xls XLS spreadsheet
Atch 12 - Schedule B Worksheet 11 Sep 08.xls XLS spreadsheet
Atch 9 FA3002-08-R-0012.doc DOC document
RFP release info.doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP

RFPRFI DateSubject MatterComment/QuestionResponse
R-00-0012-Oct-08Pre-propsal Conf/Site VisitA pre-proposal conference/site visit is not identified in the solicitation.Yes. The pre-proposal conference will be held 3 Nov 08 at AETC CONS, 2021 First Street West, Bldg 854, Training Room, Randolph AFB TX, 78150-4302. Starting time 8:00 am. A site visit will held 27 Oct 08 at the 21st Fighter Squadron, 7255 N. Fighter Country Avenue, Bldg 447, Luke AFB AZ 85309. Starting time 1:00 pm.
R-00-0022-Oct-08Correct ReferenceWhich references are correct? If the CLIN structure is correct are we to add a 30 day transitation to our technical proposal tables? Please clarify.Please see RFP, Section F, POP & PLACE OF PERFORMANCE, page 31. The Base Period is for 12 months to include CLINs 0001-0007, CLIN 0001 is for 11 months of full performance. CLIN 0007 is for 1 month of Mobiization/Transition.
R-00-0032-Oct-08Small Business Subcontracting PlanIs it the Government's intent to include this information in the Technical volume and will the SB Plan and 8 page matrix be included in page count? Please clarify.Section L will be modified to exclude the Subcontracting Plan from the Technical Volume page count.
R-00-0042-Oct-08Technical Proposal Volume IIIDoes Section J, Attachment 4 count as port of the Technical Proposal (Volume III) page count?RFP Section L 1.11. states: Technical Proposal, Volume III, shall each be limited to 50 pages, excluding the Manpower Matrix and personnel resumes. Pages in excess of 50 will be removed and will not be evaluated.
R-00-0052-Oct-08Correct ReferenceThe last sentence in the above referenced paragraph refers to Section M, para 5.0 for characteristics or aspects in determining relevance, however, we could not find a para 5.0 in Section M. Please provide the correct reference.Noted the correct reference is Section M paragraph E. (2).
R-00-0062-Oct-08Quality Control & Safety Program requirementsWill the government consider a different methodology for addressing Quality Control and Safety Program requirements?The RFP requirements will remain unchanged in regards to Quality Control and Safety Program requirements at this time.
R-00-0072-Oct-08Type of procurementPlease confirm that this is an unrestricted procurement.This is Full and Open Competition
R-00-0082-Oct-08Base Period Man-HoursIs the Base Period 11 months and if so, should the Base Period Man Hourse be less than the 2,080 stated?Please see RFP, Section F, POP & PLACE OF PERFORMANCE, page 31. The Base Period is for 12 months to include CLINs 0001-0007, CLIN 0001 is for 11 months of full performance. CLIN 0007 is for 1 month of Mobiization/Transition.
R-00-0092-Oct-08Supporting Cost InformationWhat Section should all supporting cost information be placed?Noted. RFP will be amended to include Section 6 - All supporting cost information.
R-00-0102-Oct-08B-7 Transfer ClausePlease clarify below target price. Section B does not include a contract line item for transfer.Recommend changing B-7 Transfer clause to read: B-7 ACCEPTANCE INSPECTION AND TRANSFER PROGRAM, PWS paragraph 3.1.11.1 Implementation and management of the PWS paragraph 3.1.11.1, Acceptance Inspection and Transfer Program, shall be by direction of the contracting officer as required. Proposed firm fixed prices in response to contracting officer direction for preparing the aircraft and equipment for transfer back to the Foreign Military Sales (FMS) country shall include projected annual labor rate increases, as the labor rate increases will not be subject to annual adjustments under provisions of FAR 52.222-43. Firm fixed transfer prices proposed in response to direction by the contracting officer shall also include all applicable costs including G&A and profit since the acceptance inspection and transfer program is not a part of the target prices.
R-00-0092-Oct-08Submission of Small Business Subcontracting Plan & SF 294s & 295sRequest the Government allow the offerors to submit their Master Small Business Subcontracting Plans and SF 294s and SF 295s as attachments to Volume III and exclude them from the page count. Response to Section L paragraph 5.5 and all subsections would remain as part of the page count.Section L will be modified to exclude the Subcontracting Plan from the Technical Volume page count.
R-00-0103-Oct-08Microsoft Word & Times New Roman pitchRequest the requirement for Times New Roman 11 pitch be changed to Times New Roman 11 point, and the reference to Times New Roman 8 pitch be changed to Times New Roman 8 point.The requirement for Times New Roman 11 pitch is changed to Times New Roman 11 point and the reference to Times New Roman 8 pitch, is changed to Times New Roman 8 point.
R-00-0112-Oct-08RFP Attachment 12 WorksheetCan the worksheets be populated with proper formulas in those cells shaded in grey for both the Prime and Subcontractor Sortie and TAI Adj Rates?Yes, it is acceptable to populate the Sortie and TAI Adj Rates shaded cells as desired to reflect the intended rates to be evaluated for reasonableness. While populating the cost model, please ensure that the cost model formulas are calculating the total evaluated price as intended by the offeror.
R-00-0122-Oct-08Microsoft Word & Times New Roman pitchRequest the requirement for Times New Roman 11 pitch be changed to Times New Roman 11 point, and the reference to Times New Roman 8 pitch be changed to Times New Roman 8 point.The requirement for Times New Roman 11 pitch is changed to Times New Roman 11 point and the reference to Times New Roman 8 pitch, is changed to Times New Roman 8 point.
R-00-0139-Oct-08RFP Attachment 12 WorksheetCan the worksheets be populated with proper formulas in those cells shaded in grey for both the Prime and Subcontractor Sortie and TAI Adj Rates?Yes, it is acceptable to populate the Sortie and TAI Adj Rates shaded cells as desired to reflect the intended rates to be evaluated for reasonableness. While populating the cost model, please ensure that the cost model formulas are calculating the total evaluated price as intended by the offeror.

Cost Price

Cost Price
Tracking #RFI DateSubject MatterComment/QuestionResponse
C-00-0013-Oct-08RFP Sect. B Clause B-2 Sortie AdjustmentThis Offeror is confused as to what goes into these tables and how they are to be used in determining the values entered into Section B. Please explain in detail what goes into each table and how that information will translate into entries into Section B.Per Section B Clause B-2. SORTIE ADJUSTMENTS: a. The number of sorties listed in the workload data represents the Government's best estimate of the sorties to be flown per contract period. The contractor shall be responsible for support of all flying training requirements for assigned aircraft that may generate for 21st Fighter Squadron at Luke AFB AZ during the period of performance of this contract. b. For the basic and option periods, any difference between the contract award sorties specified in Section 3, Appendix 3A and the actual sorties flown will be reconciled by an adjustment to the contract in the form of a modification under the authority of the Changes clause and this clause, using the rates in the Sortie Adjustment CLIN X005. c. The sortie adjustment rate proposed shall include projected annual labor rate increases for all affected workers, service contract act covered and otherwise. Sortie adjustment rates will not be subject to annual adjustments under provisions of FAR 52.222-43. d. The following rates (to be provided by the Offeror) will be used when calculating sortie adjustments. Also the RFP will be amended to correct the chart under B2 and further explain the -/+7% Parameter.
be amended to correct the chart under B2 and further explain the -/+7% Parameter.

PWS

PWS
Tracking #RFI DateSubject MatterComment/QuestionResponse
PWS-00-0012-Oct-08Quality Control PlanIs a full Quality Control Plan required to be a part of the offeror's proposal?The RFP will be amended to coincide with the instructions in the PWS.
PWS-00-0022-Oct-08HolidaysPlease verify the number of holidays for this effort?The correct number should be 10. The PWS will be Amended.
PWS-00-0033-Oct-08Mission Capability rateIs the direction to use 81% MC for calculating the Aircraft Availability threshold a change from the standard currently applied at Luke AFB?The AETC Standard is not 79% and there has been no change. The AETC standard for the MC Rate for Luke FMS F-16 aircraft maintenance is 81%.
PWS-00-0043-Oct-08Use TAS to track all non-EAID Govt propertyDoes the Government intend for the Service Provider to use TAS to track all non-EAID Government property, including the furniture items listed inPWS Appendix 2EC? Additionally, does the Government require full implementation within 3 months of contract start(as specified in PWS paragraph 3.1.23.5.1) or within one year of contract start (as specified in the RFP, Section L, paragraph 5.4.3)?The PWS will be amended. Currently the TAS is not supported through the Web based system.
PWS-00-0053-Oct-08Remove paragraph 3.1.6.1.1, Host Database ManagerSince the Service Provider will not be the Host activity, suggest this paragraph be stricken from the PWS.This paragraph and Table 3.12. will be restated. Contractor will require a database representative for internal requirements.
PWS-00-0063-Oct-08Award Fee Clause paragraphsSince this solicitation does not contain an Award Fee Clause, and neither NMCM or NMCS are listed as Performance Thresholds, suggest paragraphs 3.1.12.2 & 3.1.12.3 be deleted in their entirety.These paragraphs will be modified to remove the Award Fee references. The NMCM and NMCS is a direct result in determining if the contractor or the Government is responsible when AA is not met.
PWS-00-0073-Oct-08PWS Appendix 2A and applicable AFI 21-101 paragraphsSuggest the far right column (Mandatory applicable Paragraphs) of Table 2A-1 be changed to read "See PWS paragraph 3.1.14.4."This paragraph will be amended as suggested.
PWS-00-0083-Oct-08User maintenance of PMEL equipment.Does the Government intend for the Service Provider to accomplish user maintenance of PMEL equipment, or has that task been assigned to the Host?The Government is not stating intentions of accomplishing user maintenance of PMEL equipment. These paragraphs do not address PMEL items. Not all "test and special equipment" are PMEL items.
PWS-00-0093-Oct-08Custodial maintenance of administrative officesWhat does the Government intend as the Service Provider's responsibility in regards to custodial maintenance of administrative offices, latrines/restrooms and common areas in buildings occupied by the Service Provider?Refer to PWS, Section 2-3, page 2-3-12, paragraph 2.3.6.13.
PWS-00-0103-Oct-08Consolidate all Service Provider vehicle requirementsSuggest all Service Provider vehicle requirements be consolidated into section 2.1.24.17 thru 2.1.24.30.In review. Consolidation is being considered. Not detrimental to the contract as written.
PWS-00-0113-Oct-08Rescind PWS paragraphs 2.1.24.29 & 2.3.11.7.Request paragraphs 2.1.24.29 & 2.3.11.7 be rescinded.Will consider incorporating paragraph 2.3.11.7. into paragraph 2.1.24.29., but will not rescind the requirement. However, the CO has the authority to allow a successor contractor to puchase vehicles from the incumbent contractor, with credits of the proceeds back to the current contract.
PWS-00-0123-Oct-08Correct title for Service Provider's quality functionWhich title for the Service Provider's quality function does the Government intend to be used for this solicitation: Quality Control, or Quality Assurance? Whichever title is determined, suggest a global search to ensure uniformity acoss both the RFP & PWS.The term QA and QC are synonymous. Most contractors prefer to use the term QC so as not to confuse their Quality Assurance with that of the Government Quality Assurance. Will consider changing QC to QA even though nothing changes in lieu of this pending modification.
PWS-00-0133-Oct-08Maintenance on engine removal/installation trailersDoes the Government intend for the Service Provider to accomplish maintenance on engine removal/installation trailers, or will these trailers be maintained by the Host AGE function,with service provider responsibilities limited to user maintenance?Limited to minor maintenance by the user. Maintaining and securing simply means providing care and security of the unit.
PWS-00-0143-Oct-08Pilot & Crewchief name decalsDoes the Government intend for the Service Provider to make, remove, and install pilot and crewchief name decals and distinguised visitor signs? If so, does the Government provide a Gerber stenciling machine (for the decals), and metal-working shop equipment (to make distinguished visitor signs).Yes to all.
PWS-00-0153-Oct-08Service Provider's MDSA functionWhat does the Government intend for the role and responsibilities of the Service Provider's MDSA function? Is the Service Provider's MDSA function responsible for all MDSA responsibilities in AFI 21-101 and AETCI 21-105, or that of a subordinate squadron? Does the Govt intend for the service provider to submit 21st FS 7501 logistics indicator data directly to HQ AETC/A4MMA and A4PM, or submit the data to the local QAE and 56th FW Maintenance Analysis Section for incorporation into the 56th FW 7501 report? Recommend the weekly logistics report be removed from paragraph 3.1.26.2, unless there is a HQ AETC memorandum for continuing the report for F-16 aircraft.After review, paragraph 3.1.26.1. will be amended to read "as applicable." Paragraph 3.1.26.1.2. will be deleted.
PWS-00-0163-Oct-08Misplaced PWS ParagraphRecommend the Government move paragraph 3.1.49.4 to section 2.1.20, Service Provider Mobilization/Changeover.Paragraph 3.1.49.4 will be deleted as it is a duplication of paragraph 2.1.7.11.
PWS-00-0173-Oct-08Location of Table 1-3.12Request the Government provide the location of Table 1-3.12 as cited in paragraph 3.1.51.3 so offerors may adequately determine the scope of the requirement.Paragraph 3.1.51.3. will be deleted.
PWS-00-0183-Oct-08Change Title of PWS Paragraph 3.2.2Suggest changing the title of this paragraph to "Government Quality Assurance Evaluator Surveillance Monthly thresholds".Concur with suggestion, even though the "Note" below the tables indicates it is a Government requirement.
PWS-00-0193-Oct-08Which Publications are valid requirements for this program.Which publications listed in Appendix 2A, Table 2A-1 are valid requirements for this specific program. In addition, does the Government intend to provide copies of applicable 56th FW, 56th MXG, and Luke AFB publications to offerors-these publications are not available through the Air Force E-Publishing web site.In review. Luke will provide the local OIs to be published.