Atch 12 - Schedule B Worksheet 11 Sep 08.xls

XLS spreadsheet 1 MB Posted

Attached to
Taiwan Aircraft Maintenance Federal contract opportunity
Solicitation number
FA3002-08-R-0012
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Schedule B Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Taiwan Aircraft Maintenance, newest first.
File Type Posted
SF30_Amen 0009_08-R-0012.pdf PDF
Atch 4 - FA3002-08-R-0012 - 24 Mar 09.xls XLS spreadsheet
FA3002-08-R-0012-0009.zip ZIP file
Amend 0008 FA3002-08-R-0012.zip ZIP file
Taiwan RFP Amendment 0007.pdf PDF
Additional R0012_Q A Posting_12_30_2008.xls XLS spreadsheet
R0012_Q A Posting_12_30_2008.xls XLS spreadsheet
Preproposal_ Slides Taiwan 3 Nov 08.ppt PPT presentation
Q A Posting Update 06.xls XLS spreadsheet
Updated Amendment 0005.zip ZIP file
Correction Letter FBO.doc DOC document
Q A Posting Update 05.xls XLS spreadsheet
Amendment 0005.zip ZIP file
Amendment 0004.zip ZIP file
Q A Posting Update 04.xls XLS spreadsheet
Taiwan RFP Amendment 0003.pdf PDF
Taiwan Pre-Proposal Conf Attendees Slides.zip ZIP file
Q A Posting Update 03.doc DOC document
LukeSitevisitContractorList27Oct2008.doc DOC document
Taiwan RFP Amendment 0002.zip ZIP file
Q A Posting Update 02.xls XLS spreadsheet
Q A Posting Update 01.xls XLS spreadsheet
Q A Posting.xls XLS spreadsheet
Pre-Proposal Conf Info Amend 001.doc DOC document
Taiwan Pre-Proposal Information.zip ZIP file
Taiwan Site Visit Info.zip ZIP file
Amend 01 to FA3002-08-R-0012.pdf PDF
Atch 8 FA3002-08-R-0012.doc DOC document
Atch 3 FA302-08-R-0012.xls XLS spreadsheet
Atch 5 FA3002-08-R-0012.doc DOC document
Atch 11 FA3002-08-R-0012.pdf PDF
08-R-0012.doc DOC document
Atch 7 FA3002-08-R-0012.doc DOC document
PWS.zip ZIP file
Atch 2 FA3002-08-R-0012.pdf PDF
Atch 6 FA3002-08-R-0012.doc DOC document
Atch 4 - FA3002-08-R-0012.xls XLS spreadsheet
Atch 9 FA3002-08-R-0012.doc DOC document
RFP release info.doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions, SchB

These instructions apply to each SchB worksheet, basic and all option periods.
Change formulas only as required to depict the intended proposed totals.
DO NOT CHANGE THE POSITION OF ANY SHEET
DO NOT DELETE ANY SHEET, ADD SHEEETs as needed.
PLEASE ENSURE EACH YEAR'S SHEETS HAVE MATCHING TOTAL AMOUNTS, and that the total evaluated price is as intended.
ALL ENTRIES YOU MAKE ARE TO BE MADE ONLY WITHIN THE BOXED AREAS.
All amounts entered on this Excel Sch B (including Mobilization costs details) are to be fully supported
and detailed by supporting schedules in the cost volume .Change prints as desired.
THE FOLLOWING CLIN IS FIRM FIXED PRICE (NON-TARGET)
UNITTOTAL
Mobilization/TransitionEnter the Price
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
Instructions:
F-16 Aircraft MaintEnter the Total Target Costs for F-16 Aircraft Maintenance for the specific period.
Total Target CostsEnter the total of the amounts for Target Costs above.
Target Profit Rate. . .Enter the proposed profit percent to be applied to Total Target Costs, e.g., 20%.
Target ProfitEnter the Profit Amount (Target Profit Rate x Total Target Costs).
Target PriceEnter the sum of Total Target Costs and Target Profit.
Ceiling Price Rate. . .Enter percent applied to Total Target Costs; not less than 100% + Profit Rate.
Ceiling Price . . .Enter the Ceiling Price (Ceiling Price Rate x Total Target Costs).
Share Percentages. . .GovernmentContractor
OverrunEnter Govt/Contractor percent shares (summing 100%) for cost underruns.
UnderrunEnter Govt/Contractor percent shares (summing 100%) for cost overruns.
Adjustment Rages
Sortie Adjustment RateEnter applicable rates.
TAI Adjustment RateEnter applicable rates.
Do Not Enter or Alter Amounts or Formulas in Gray-Shaded cells.

&CSCHEDULE B WORKSHEET

&LSource Selection Information - FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Instructions, SchB Wkst

SCHEDULE B WORKSHEET
Instructions: (All information provided will be by CLIN.)
Total Labor HoursEnter by CLIN. Subcontractors submitting a Cost Volume willl enter their hours. Prime enters all other hours.
Manyears PricedSubcontractors submitting a Cost Volume will enter their manyears. Prime enters all other manyears.
Direct Labor Costs & Fringe/BurdenSubcontractors submitting a Cost Volume will enter their labor related cost. Prime enters all other labor related costs.
Vehicle CostsSubcontractors submitting a Cost Volume will enter their vehicle costs. Prime enters all other vehicle costs.
Uniforms CostsSubcontractors submitting a Cost Volume will enter their uniform costs. Prime enters all other uniform costs.
Equipment and Tools CostSubcontractors submitting a Cost Volume will enter their equipment and tools costs. Prime enters all other equipment and tools costs.
Consumables CostSubcontractors submitting a Cost Volume will enter their consumables costs. Prime enters all other consumables costs.
All Other Dir CostsSubcontractors submitting a Cost Volume will enter their O.D.C.'s. Prime enters all other O.D.C.'s.
MiscellaneousSubcontractors submitting a Cost Volume will enter their miscellaneous or vendor costs. Prime enters all other miscellaneous or vendor costs.
Subcontract CostsSubcontractors submitting a Cost Volume will enter their subcontract costs. Prime enters all other subcontract costs.
G&ASubcontractors submitting a Cost Volume will enter their G&A costs. Prime enters all other G&A costs.
Target CostsThis is this CLIN's total of direct labor costs, vehicle costs, uniforms cost, O.D.C.'s and G&A costs.
Target ProfitSubcontractors submitting a Cost Volume willl enter their profit amount. Prime enters all other profit amounts.
Target PriceThis is this CLIN's total of target costs and profit.
Change prints as desired.
Do Not Enter or Alter Amounts or Formulas in Gray-Shaded cells.

&CSCHEDULE B WORKSHEET

&LSource Selection Information - FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Mobilization & Base Period

PART I - THE SCHEDULEMOBILIZATION &
SECTION BBASE PERIOD
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
ITEMUNITTOTAL
0007Mobilization/Transition$0.00Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
0001Base Period
FFPTarget Cost$ - 0
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
0002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
0003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
0004Vehicles$ - 0
FFP
0005Sortie Adjustment Rate$ - 0
FFP
0006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
0007Mobilization/Transition$0.00
0004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Mobilization Wksht

SCHEDULE B WORKSHEET
Mobilization/TransitionMobilization/TransitionMobilization/Transition
PrimeSubcontractPrime and Sub
Mobilization/TransitionMobilization/TransitionMobilization/TransitionMobilization/TransitionDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Vehicle Costs$0.00$0.00$0.00
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Total Costs$0.00$0.00$0.00
Profit Amount$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Base Wksht

SCHEDULE B WORKSHEET
BaseBaseBase
PrimeSubcontractPrime and Sub
BaseF-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
BaseVehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
BaseSortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours Base0.000.000.00
Manyears Priced Base0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
BaseTAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours Base0.000.000.00
Manyears Priced Base0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 1

PART I - THE SCHEDULE
SECTION BOption Period 1
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
1001Option Period 1
FFPTarget Cost$ - 0Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
1002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
1003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
1004Vehicles$ - 0
FFP
1005Sortie Adjustment Rate$ - 0
FFP
1006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
1004Vehicles$ - 0
TOTAL EVALUATED PRICE$ - 0

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 1 Wksht

SCHEDULE B WORKSHEET
Option 1Option 1Option 1
PrimeSubcontractPrime and Sub
Option 1F-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Option 1Vehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Option 1Sortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Option 1TAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 2

PART I - THE SCHEDULE
SECTION BOption Period 2
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
2001Option Period 2
FFPTarget Cost$ - 0Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM are Cost Reimbursable
2002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
2003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
2004Vehicles$ - 0
FFP
2005Sortie Adjustment Rate$ - 0
FFP
2006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
2004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 2 Wksht

SCHEDULE B WORKSHEET
Option 2Option 2Option 2
PrimeSubcontractPrime and Sub
Option 2F-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Option 2Vehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Option 2Sortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Option 2TAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 3

PART I - THE SCHEDULE
SECTION BOption Period 3
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
3001Option Period 3
FFPTarget Cost$ - 0Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
3002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
3003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
3004Vehicles$ - 0
FFP
3005Sortie Adjustment Rate$ - 0
FFP
3006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
3004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 3 Wksht

SCHEDULE B WORKSHEET
Option 3Option 3Option 3
PrimeSubcontractPrime and Sub
Option 3F-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Option 3Vehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Option 3Sortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Option 3TAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 4

PART I - THE SCHEDULE
SECTION BOption Period 4
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
4001Option Period 4
FFPTarget Cost$ - 0Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
4002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
4003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
4004Vehicles$ - 0
FFP
4005Sortie Adjustment Rate$ - 0
FFP
4006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
4004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 4 Wksht

SCHEDULE B WORKSHEET
Option 4Option 4Option 4
PrimeSubcontractPrime and Sub
Option 4F-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Option 4Vehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Option 4Sortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Option 4TAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY

&RFA3002-08-R-0012

Attachment 12 11 Sep 08

Option 5

PART I - THE SCHEDULE
SECTION BOption Period 5
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
5001Option Period 5
FFPTarget Cost$ - 0Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
5002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
5003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
5004Vehicles$ - 0
FFP
5005Sortie Adjustment Rate$ - 0
FFP
5006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
5004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 5 Wksht

SCHEDULE B WORKSHEET
Option 5Option 5Option 5
PrimeSubcontractPrime and Sub
Option 5F-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Option 5Vehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Option 5Sortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Option 5TAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 6

PART I - THE SCHEDULE
SECTION BOption Period 6
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
6001Option Period 6
FFPTarget Cost$ - 0Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%Must input an entry here
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%Must input entries here
Share Ratio Below Target0.00%0.00%Must input entries here
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
6002MICROPURCHASE NOT TO EXCEED$120,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
6003TRAVEL NOT TO EXCEED$300,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
6004Vehicles$ - 0
FFP
6005Sortie Adjustment Rate$ - 0
FFP
6006TAI Adjustment Rate$ - 0
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
6004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Option 6 Wksht

SCHEDULE B WORKSHEET
Option 6Option 6Option 6
PrimeSubcontractPrime and Sub
Option 6F-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs
Uniforms Costs$0.00$0.00$0.00
Equipment & Tools Cost$0.00$0.00$0.00
Consumables Cost$0.00$0.00$0.00
All Other Dir Costs$0.00$0.00$0.00
Miscellaneous Cost$0.00$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Option 6Vehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Option 6Sortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Option 6TAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden$0.00$0.00$0.00
Other Direct Costs$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Total All Periods

PART I - THE SCHEDULE
SECTION BTotal All Periods
SUPPLIES/SERVICES AND PRICES/COSTS
OFFEROR NAME:
B-1. SUPPLIES AND SERVICES TO BE FURNISHED
This CLIN includes, but is not limited to, all work associated with the maintenance, service, ground handling, launch, recovery, inspection and repair of all unit-assigned F-16 aircraft, engines, and associated mission support equipment in order to meet flying training, and aircrew/instructor qualification/currency requirements.
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
ITEMUNITTOTAL
0007Mobilization/Transition$0.00Do Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES:
X001Total All Periods
FFPTarget Cost$ - 0
Taiwan Air Force
FMS Case: TW-D-NHD
Target Costs$ - 0
Target Profit Rate (A PERCENT of Target Costs, e.g. 20%)0.00%
Target Profit Amount$ - 0
Target Price$0.00
Ceiling Price Rate (NLT 100% plus Target Profit Rate %, e.g. 120%)0.00%
Ceiling Price Amount (NOT LESS THAN TARGET PRICE)$0.00
Share Percentages for Cost Overruns and Underruns:GovernmentContractor
Share Ratio Above Target0.00%0.00%
Share Ratio Below Target0.00%0.00%
THE FOLLOWING CONTRACT LINE ITEM is Cost Reimbursable
X002MICROPURCHASE NOT TO EXCEED$840,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
X003TRAVEL NOT TO EXCEED$2,100,000.00
(Cost reimbursable basis only. G&A, Overhead, Profit or fee
are not allowed under this CLIN)
THE FOLLOWING CONTRACT LINE ITEM IS F.F.P. (NON-TARGET)
X004Vehicles$ - 0
FFP
X005Sortie Adjustment RateN/A
FFP
X006TAI Adjustment RateN/A
FFP
TOTAL EVALUATED PRICE MATRIX:
CEILING PRICE$0.0050%$0.00
TARGET PRICE$0.0030%$0.00
TEST FOR 5% OVERRUN10%$0.00
TEST FOR 5% UNDERRUN10%$0.00
WEIGHTED PRICE$0.00
0007Mobilization/Transition$0.00
X004Vehicles$ - 0
TOTAL EVALUATED PRICE$0.00

&L &R &LSource Selection Information- See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

Total Wkshts Basic & Options

SCHEDULE B WORKSHEET
TOTAL ALL PERIODSBasic & OptionsBasic & OptionsBasic & Options
PrimeSubcontractPrime and Sub
Basic & OptionsF-16 Aircraft MaintF-16 Aircraft MaintF-16 Aircraft MaintDo Not Enter or Alter Amounts or Formulas in Gray-Shaded Cells
Total Labor Hours0.000.000.00
Manyears Priced0.000.000.00
Direct Labor and Fringe/Burden0.000.00$0.00
Other Direct Costs
Uniforms Costs0.000.00$0.00
Equipment & Tools Cost0.000.00$0.00
Consumables Cost0.000.00$0.00
All Other Dir Costs0.000.00$0.00
Miscellaneous Cost0.000.00$0.00
Subcontract Costs0.000.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A0.000.00$0.00
G&A Percent0.00%0.00%0.00%
Target Costs$0.00$0.00$0.00
Target Profit0.000.00$0.00
Profit Percent0.00%0.00%0.00%
Target Price$0.00$0.00$0.00
Basic & OptionsVehicle CostsVehicle CostsVehicle Costs
List Costs Separately
& Calculate Total Price
Total Firm Fixed Price$ - 0
Basic & OptionsSortie Adj RateSortie Adj RateSortie Adj Rate
Labor Hours Base0.000.00
Manyears Priced Base0.000.00
Direct Labor and Fringe/Burden$0.00$0.00
Other Direct Costs$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00
Basic & OptionsTAI Adj RateTAI Adj RateTAI Adj Rate
Labor Hours Base0.000.00
Manyears Priced Base0.000.00
Direct Labor and Fringe/Burden$0.00$0.00
Other Direct Costs$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subcontract Costs$0.00$0.00
Cost before G&A$0.00$0.00$0.00
G&A$0.00$0.00
G&A Percent0.00%0.00%0.00%
Costs$0.00$0.00$0.00
Profit$0.00$0.00
Profit Percent0.00%0.00%0.00%
Total Firm Fixed Price$0.00$0.00$0.00

&C&A &LSource Selection Information-See FAR 2.101 and 3.104&CFOR OFFICIAL USE ONLY&RFA3002-08-R-0012 Attachment 12 11 Sep 08

File details come from the government source that posted it. Updated .