MACC RFI RESPONSE 24 MAY 2022.pdf
PDF 148 KB Posted
- Attached to
- Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA2823-22-R-0004
View the file
Other files for this federal contract opportunity
Show all 50
Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A from Amendment 002 Posting, due 20 May 2022. Posted 24 May 2022.
FA282322R0004
5/24/2022
Date Question No. Reference Question Response
5/16/2022 1 Revised SOW Section 3.9 Please confirm that a CHECLCO electric meter is not required No meter required. Refer to Section 3.2 G, and Section
3.9 in the Revised SOW.
5/16/2022 2 Revised SOW Section 3.9 Is a private utiliy meter to be provided? If so please provide make and model number.
No meter required. Refer to Section 3.2 G, and Section
3.9 in the Revised SOW.
5/16/2022 3 Revised SOW Section 3.9 Please confirm that a seaprate meter cabinet is required for the new electrical service.
No meter required. Refer to Section 3.2 G, and Section
3.9 in the Revised SOW.
5/16/2022 4 Attachment L1 (Revised) The revised 50 Division Cost Breakdown conflicts with many items included in the SOW and has not been updated for the revised SOW.
Please confirm that the Offers can delete the existing line items and the Offers will be responsible for providing the necessary level of detail in accordance with the Solicitation documents.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/16/2022 5 Attachment L1 (Revised) Please confirm that it is acceptable to limit pricing to provide lump sum pricing for major features of work only with sufficient detailed scope breakdown and quanities below to show clear understanding of the work.
See Section L Section 2.5.2.5.1, offerors should not utilize lump sum or total pricing when pricing each specification division. Failure to breakout major work elements within a specification division may result in an unfavorable evaluation. If utilizing lump sum or total pricing when pricing the specific division, Offerors should provide rationale on why the price cannot be broken out. The burden of proof for credibility of proposed pricing rests with the Offeror.
5/16/2022 6 Attachment L1 (Revised) Please confirm that the costs do not need to be broken down into labor, material, and equipment and that only scope quantities are required.
See Section L Section 2.5.2.5.1, offerors should not utilize lump sum or total pricing when pricing each specification division. Failure to breakout major work elements within a specification division may result in an unfavorable evaluation. If utilizing lump sum or total pricing when pricing the specific division, Offerors should provide rationale on why the price cannot be broken out. The burden of proof for credibility of proposed pricing rests with the Offeror.
5/16/2022 7 Attachment L1 (Revised) The revised form has different tabs highlighted red. Are Offers only supposed to compelte the highlight tabs?
Corrected. Previous highlights were irrelevant. Please use tabs you need to develop your proposal. Please ensure you use the Revised 50‐Div Workbook for Amendment 004.
5/16/2022 8 Attachment L1 (Revised) Division 03 includes 8‐inch and 6‐inch bollards. Please confirm which size is to be included in the project costs.
Unknown reference. Per Div 3 Worksheet, please consider 8‐inch bollards
5/16/2022 9 Attachment L1 (Revised) The detailed breakdown lists equipment however Offers may use different equipment. Please confirm that equipment line items can be deleted and it is the Offers responsibility for means and methods to perform the work.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/16/2022 10 Attachment L1 (Revised) Line items for equipment were provided by the USAF however, a column to extend the caluclation through is not. Again, recommend allowing Offers to delete line items and provide sufficient level of detail.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/16/2022 11 Attachment L1 (Revised) In Division 03, "Substructure" section includes a 1‐foot by 3‐foot strip footing? Is this an engineered design that the Government is responsible for? Again, recommend deleting the line items to allow Offers to provide sufficient accurate level of detail.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/16/2022 13 Attachment L1 (Revised) In Division 05 the gutters and downspouts are described as "Galvanized Steel" while the SOW states painted sheet metal. Please confirm that Kynar painted sheet metal gutters and downspouts are to be provided. Again, due to conflicts in the provided spreadsheet recommend allowing Offers to delete all lines and Offers provide the sufficient level of detail.
Painted galvanized metal. Please refer to Section 3.1 section c in the Revised SOW. Please also refer to the Revised 50‐Div workbook for Amendment 0004.
5/16/2022 14 Attachment L1 (Revised)
It appears that this sheet was attempted to be completed using an RS Means or similar estimating workbook. Is the AF prescriptively detailing the scope of work, equipment, and materials being used for each line items. The line items included are not accurate, do not reflect means and methods, and conflict with the SOW. If not, recommend deleting prepopulated lines and allow Offers to provide sufficient level of detail.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/16/2022 15 Revised SOW Section 3.4 Please confirm that red oxide primer or manufacturer's finish is acceptable for structural steel, z‐gurts, and purlins and that finish latex paint is not required.
Please refer to Section 3.4 section d, color must match existing. If the manufacturers finish is painted and matches existing, it is acceptable. Red‐oxide primer is not acceptable.
5/16/2022 17 Revised SOW Section 3.4 Numerous questions regarding the UXO were submitted but the responses did not adequately respond. It is clear that a UXO sweep is the responsibility of the Offers but what are the requirements? Is it limited to visual only? Magnetometer? What reports will be required? Please note that the Design Guidlines do not specify these requirements either.
IAW Section 3.13, UXO sweep is no longer required.
5/16/2022 18 Please confirm that spoils from excavation activities can be respread on site and do not need to be removed or disposed of off site.
IAW Section 3.2 section b and c of the revised SOW, respreading is acceptable.
5/16/2022 19 Revised SOW Section 3.2‐b.
The SOW stated that existing crushed aggregate is to be stockpiled and respread. Please confirm that this scope should be changed to provide new stone because the existing gravel will be containminated with existing soil when moved to a stockpile.
IAW Section 3.2 section b and c of the revised SOW, respreading is acceptable.
5/16/2022 20 Revised SOW 10.0 Communications Map
Please confirm that the existing communications located on the south side of the building are not required to be relocated for the installation of the leach field.
A dig‐permit is required after award and any lines that need to be relocated will be addressed at that time.
5/16/2022 21 Not applicable Can space within the existing facility be used as a temporary field office?
Location of field office will be negotiated in the Pre‐ Construction kickoff meeting.
5/16/2022 22 Revised SOW The updated SOW shows a requirement for a 480/277V disconnect to be installed to the new 480V panel. Please provide information on what equipment this disconnect is to serve and the electrical requirements of the equipment.
Please see Section 3.13 of the Revised SOW. The equipment is GFGI, Aircraft Ground Equipment (AGE).
5/16/2022 23 Revised SOW Is the government comfortable with a 100 amp 208Y/120V panel serving a 60 amp/3 pole receptacle, 30 amp/3 pole receptacle and all other 120V loads? Without knowing the actual loads, it appears the panel is undersized considering spare capacity is recommended.
Please refer to Section 3.9 in the Revised SOW.
There is no 60‐amp 3 pole receptacle.
5/16/2022 24 Revised SOW Is there a requirement to submit design documents (drawings and narratives) for the seed project proposal?
Refer to Section L, Submission requirements. No drawings are expected as a proposal submission.
5/16/2022 25 Revised SOW Will design documents for the seed project be allowed to be submitted?
Refer to Section L, Submission requirements. No drawings are expected as a proposal submission.
5/16/2022 26 Section L, 2.5.3.2 updated in Amendment 0002
RFI #102
Amendment 0002 added the statement "**Physically separated, but not autonomous from its parent base. For example, a project on Eglin MainBase would be considered geographically separate from a project on an Eglin outlying Range. For private projects a distance of at least 25‐miles."
Given this addition, please confirm offerors can still show concurrent project performance at two geographically separate bases (e.g., Fort Irwin, California and Fort Hood, Texas)? In other words concurrent, geographically separated projects are NOT required to be performed at separate geographic areas within the same parent base to meet the requirement at 2.5.3.2 (iii).
Corrected. Please refer to Section L 2.5.3.2. Physically separated bases. Physically separated, but not autonomous from its parent base (for example, a project on Eglin Main Base would be considered geographically separate from a project on an Eglin outlying Range). For private projects, a distance of at least 25‐miles.
5/18/2022 27 Attachment L1 (Revised) There is no tab or line items for Subsurface Investigation or Material testing. Where should these costs be provided?
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/18/2022 28 Attachment L1 (Revised) This is a design build project and therefore quantities are not final until the final design is provided. Please confirm that the line items in the sheet should demonstrate understanding of the scope versus detailed take‐off and existing line items can be removed.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/18/2022 29 Revised SOW Section 3.4.c Is there existing geotechnical information for the area for existing structure?
Any and all surveys are the responsibility of the contractor.
5/18/2022 30 Revised SOW Section 10 Is the existing communication shown direct bury or encased in concrete?
Condition unknown. A dig‐permit is required after award to confirm current conditions.
5/18/2022 31 Revised SOW Section 3.5.1 What are the compaction requirements for backfilling the abandoned 4x5x9 structre?
Needs to match adjacent conditions, not expected to be under future structure.
5/19/2022 32 Design Will the Government accept fast track design for a total of 3 deliverables? Bidder proposes going directly to 95% submittal in light of RFP's level of development. Please advise.
Please refer to Section 5.0 and 8.0 in the Revised SOW.
Offerors proposal must conform to all requirement documents.
5/19/2022 33 Attachment_L1_‐ _FTFA20RC02_50_Division_Cos t_Revised
Division 2 Existing Conditions: Please clarify Line Item #24 "Expansive Demo Crew Labor"; What discipline of Labor does this fall under?
Removal of gutters downspouts and electrical.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/19/2022 34 Attachment_L1_‐ _FTFA20RC02_50_Division_Cos t_Revised
Division 3 "Concrete Work" Line Item #15 "1'x3' Strip Footing 3000psi"; Where is this shown on the drawings for LF Quantity? Line Items #22 and #23 seem to be the same. Revised SOW (page 3) 3.0 calls for an internal slab to be 8' Wide x 12' Long by 2" Deep, please clarify as to these 2 Line Items.
Project is Design‐Build, strip‐footing will encompass the entire the perimeter.
5/19/2022 35 Attachment_L1_‐ _FTFA20RC02_50_Division_Cos t_Revised
Division 31 "Earthwork"; Line Item #46 and beyond is corrupted as to the totaling values on both this sheet and the Summary Sheet, please revise this sheet.
Corrected. See Revised 50‐Div workbook for Amed 004.
5/19/2022 36 DCE Worksheet Div 6 & L10 SOW In the L10 SOW the only mention of gypsum walls is in the bathroom enclosure. There are entries on the DCE Worksheet (Div 6) for interior finishes other than the bathroom enclosure that do not apply to this project. Please clarify.
The bathroom interior and exterior require gypsum board. 50‐Div has been updated accordingly.
5/19/2022 37 DCE Worksheet Div 12 & Div 22 Plastic Laminate Vanity Cabinet (Div 12) is listed as well as a wall hung bowl lavatory (Div 22). Which is it? Please Advise. Corrected. See Revised 50‐Div workbook for Amed 004.
5/19/2022 38 L10 SOW 3.1 c. Are the interior metal perforated panels pre‐finished OR painted?
IAW with Section 3.1 section c in the Revised SOW, these items should be painted.
5/19/2022 39 DDC Controls Please verify if there is an existing EMS or base control system that the new HVAC unit is required to be integrated with or is the new HVAC unit to be provided with a local microprocessor control and not integrate with any existing base control system.
IAW with Section 3.6 of the Revised SOW, the system is standalone.
5/19/2022 40
MACC RFI RESPONSE 13 MAY
2022 (MULTIPLE RESPONSES)
Numerous RFI responses (such as #141, 151, and 266) indicate that as‐builts have been provided in response to requests for compliance with the criteria of the existing building. None of the as‐builts indicate which codes, standards, and requirements the original building, nor previous addition, were designed to. Therefore, there is no information on the date/version of the limited criteria that have been identified.
Please specify the criteria that need to be met with regards to the existing building or remove the requirement.
See statement added to Section 3.0 of the Revised SOW.
Design and construction will be in accordance with the most recent UFC, UFGS, AFI, and other base required standards and guidance.
5/19/2022 41
MACC RFI RESPONSE 13 MAY
2022 (RESPONSE #140)
Response to RFI #140 indicates to look at Section 3.0 and 3.4 of Section H. There is no Section H with Section 3.0 and 3.4. Please confirm that this should be Section M. If so, please note that there are no "hurricane codes" identified in these sections. There are design requirements for the applicable wind speed. Typical "hurricane codes", such as Miami‐Dade, are not identified.
Please refer to Section 3.0 the addition will meet "Hurricane Code Requirments."
Also refer to Section 3.4, LETTER h, Design Loads in the Revised SOW. Unless noted otherwise, loads and load combinations shall be determined and applied in accordance with ASCE 7, as modified by UFC 3‐301‐01.
5/19/2022 42
MACC RFI RESPONSE 13 MAY
2022 (RESPONSE #146)
Response to RFI #146 does not indicate if the structure is empty of any liquids or what it was used for. Please confirm that the offerors shall assume there are no permitting, notifications, or special disposal requirements associated with the structure.
There is no liquid associated with the underground structure. Please refer to Section 3.5.1 in the Revised SOW that states the structure is non‐hazardous.
5/19/2022 43
MACC RFI RESPONSE 13 MAY
2022 (RESPONSES #148 AND
#196)
Response to RFIs #148 and #196 indicates that information on the 400HZ and portable power is included in revised Section M. There is no update to the information regarding these items and Table 3.13 still indicates the requirement. Please clarify.
Please refer to Section 3.13 CORRECTED. This equipment is GFGI. The only requirement is a disconnect. Refer to Section 3.9 in the Revised SOW.
5/19/2022 44
MACC RFI RESPONSE 13 MAY
2022 (RESPONSE #197)
In the response to RFI #197, the revised Section 3.9 in the revised SOW does not address whether the existing building FA system needs to be replaced. Please confirm.
IAW with Section 3.9 of the Revised SOW, the new fire alarm will be compatible with the existing system. Please also refer to Section 3.9 section c ‐ Bid Option CLIN 0003.
5/19/2022 45
MACC RFI RESPONSE 13 MAY
2022 (RESPONSE #200)
Response to RFI #200 states that a 6% design fee shall not be violated but appears to not match FAR, DFARS, GAO, and DOD regulations. The 6% statutory limitation is only for the preparation of "designs, plans, drawings, and specifications" and does not apply to supplemental services such as pre‐engineering, survey, design analysis services, etc. In references 10 USC 7540, 10 USC 9540, 10 USC DFARS 236.606‐70.
and as clarified by EP 715‐1‐7, 4‐13 (1), (c), (3), and 48 CFR 836.606‐71 there are costs outside the 6%. Please revise and clarify.
Each design cost should be identified in the 50‐Div on the appropriate tab and can be broken out into direct and indirect design costs, and should demonstrate that you are not violating the 6% requirement on the applicable items. The total cost of the design and all elements should then be entered as a total cost on the CLIN structure tab of the 50‐Div.
5/19/2022 46
EGLIN AFB DESIGN GUIDE (ATFP
REQUIREMENTS)
Eglin AFB Design guide including section 18.8.6 are outdated and includes ATFP requirements that are not accurately reflected in UFC 4‐010‐
01. For example, the requirements are stated that new buildings and existing buildings are required to comply with items (a) through (c) however, the building is exempt due to being low occupancy. Please confirm that the requirements of the Eglin AFB Design Guide are not applicable where they're covered by a more recent UFC.
Most current UFCs will apply. See additional statement in Section 3.0. Design and construction will be in accordance with the most recent UFC, UFGS, AFI, and other base required standards and guidance.
5/19/2022 47
MACC RFI RESPONSE 13 MAY
2022 (RESPONSE #325)
Response to RFI #325 states that the existing system is FA only. UFC 3‐600‐01 will require the installation of an MNS. Please confirm that all bidders should include the cost of installing a new FA/MNS throughout the existing and new addition.
No MNS required base on facility occupancy. Please Refer to Section 3.9 section c in the revised SOW for FA requirements. Please also refer to Section 3.9 section c ‐ Bid Option CLIN 0003.
5/19/2022 48
MACC RFI RESPONSE 13 MAY
2022 (RESPONSE #404)
Response to RFI #404 states that the A/E must be licensed in Florida. Please confirm that the contractor must also have a Florida Contractor's license.
Yes.
5/20/2022 49 RFI # 355 Is ASUS going to provide a published price for the plumbing utilities?
Yes. However, the information is not available at this time. Therefore, please estimate on your proposal accordingly.
5/20/2022 50 RFI # 355 What is the scope of work that is required to be performed by ASUS? All water distribution to the facility.
5/20/2022 51 Amendment 0002_Attachment L1_FTFA20RC02_50 Division Cost_Revised
The referenced document in Amendment 0002 did not include the CLIN Structure Proposal that was included in the original solicitation. Will a revised CLIN STRUCTURE Proposal form be issued considering the POP for CLIN 0001 has been adjusted?
Corrected. Please see revised 50‐Div workbook for Amed 0004.
5/20/2022 52 Revised SOW What is the eve height of the existing building? IAW Section 3.0, matching existing will be 30‐feet.
5/20/2022 53 Revised SOW What is the desired classification for the overhead crane? D, E, or F? Crane use will be moderate. Classified as a C.
5/20/2022 54 Revised SOW What is the flow rate (GPM) of water into the building? unknown
5/20/2022 55 Revised SOW What is the incoming water temperature? unknown
5/20/2022 56 Revised SOW What is the required chill water temperature? unclear question
5/20/2022 57 Revised SOW Should we provide a water or glycol system for the chilled water system? unclear question
5/20/2022 67 L10 Revised SOW Photo on page 17 indicates overhead door to remain, blower motor to be relocated, and personnel door. The north wall of the new addition will be in the center of this personnel door, what is the desired solution? Demo and infill, or demo and relocate?
Please refer to Section 3.6 of the revised SOW. Unclear quesstion, personnel door is not in the scope of this project.
5/20/2022 68
RFI responses regarding Stormwater Pond (RFI #s 71, 222, 224, 317, 383, 384, 385, 397, 425, 561, 592)
Please confirm if a stormwater management treatment pond is required? Below are references in Attachment L10 Statement of Work that are conflicting with the RFI responses stating to refer to Section 7. Plumbing (This question is a Civil matter) ‐See section 3.2 Site Development (Page 7) Paragraph B. last sentence states “A small stormwater treatment facility (pond) will be required to treat the new impervious runoff. Grading and Sodding will be required for the stormwater facility.”
‐ Section 3.2 Site Development (Page 8) Paragraph D Storm Drainage/Storm Water Management – last sentence “However, since the project is part of the larger development of Eglin AFB, a FDEP Environmental Permit will be required and a stormwater facility (pond) is required to be provided” ‐ See section 3.5 Civil (Page 13) first bullet point does not indicate a stormwater pond.
‐ See Section 3.7 Plumbing (Pgs. 18,19,20) no reference at all to a stormwater pond.
‐ See Section 3.13 Special Requirements (Chart on page 27) that states “a small stormwater management treatment pond will be required.
Refer to section 3.7 Plumbing for details” Again this is a CIvil matter, not Plumbing.
This project is Design‐Build, please refer to Section 3.7 in the Revised statement of work, specifically the figure on Page 20.
5/20/2022 69
RFI responses regarding Stormwater Pond (RFI #s 71, 222, 224, 317, 383, 384, 385, 397, 425, 561, 592)
Assuming a stormwater management treatment pond is required; does the stormwater retention have to account for the existing building?
Please refer to Section 3.2, section b. The new treatment pond will be required to treat the new impervious runoff.
5/20/2022 70
RFI repsponses regarding UXO Sweep (RFI #s 154, 173, 237, 285, 321, 337, 349, 379, 420, 447, 466 thru 476, 481 thru 490)
Please confirm depth should the UXO sweep be performed for the PEMB & Septic Field? IAW Section 3.13, UXO sweep is no longer required.
5/20/2022 71
RFI repsponses regarding UXO Sweep (RFI #s 154, 173, 237, 285, 321, 337, 349, 379, 420, 447, 466 thru 476, 481 thru 490)
Does the Government have any MMRP historical data of which the UXO Contractor should be aware while doing the UXO sweep? IAW Section 3.13, UXO sweep is no longer required.
5/20/2022 72
RFI repsponses regarding UXO Sweep (RFI #s 154, 173, 237, 285, 321, 337, 349, 379, 420, 447, 466 thru 476, 481 thru 490)
Please confirm the Government's expectations for the UXO contractor if UXO is found and identified for the following items:
1.) If not safe to move, blow in place/on site demolition? 2.) Removal to a holding area if considered safe to move? 3.) Call Eglin AFB for removal and disposal?
IAW Section 3.13, UXO sweep is no longer required.
5/20/2022 73 Please confirm whether the bidder needs to carry permit fees for the seed project or not. Permit fees are the responsibility of the contractor.
5/20/2022 74 Please confirm whether the bidder needs to carry inspection fees for the seed project or not. Inspection fees are the responsibility of the contractor.
5/20/2022 75 Please provide the revised Anticipated PoP duration for Design and build activities Please refer to Section 8.0 of the Revised SOW.
5/20/2022 76 To allow enough time to analyze all the RFI responses and revised scope of work, please grant a time extension of 2 weeks to submit the proposal
Proposals are due NLT 1200 on 8 June 2022 (per Amendment 004).
5/20/2022 77 Attachment L10 Revised SOW Section 3.7 indicates that the required septic tank is 500 gallons. Attachment L1 indicates pricing for a 1000 gallon septic tank. FDEP minimum septic tank sizing is 900 gallons. Please confirm which volume controls for pricing.
Corrected. Please refer figure in Section 3.7, Septic Tank and leach field detail.
5/20/2022 78 Attachment L10 Revised SOW Please confirm that Section 10, as well as provided As‐Builts, provide current location of existing utilities, and that paint markings in the field are not location of additional chilled water lines along West side of structure.
Section 10 and the As‐builts are the known locations of current utilities. A dig‐permit is required after award and any lines that need to be relocated will be addressed at that time. Paint markings observed are part of a different project and are being addressed and should not be considered in the scope of this project.
5/20/2022 79 Attachment L10 Revised SOW Best practice for a facility of this type is to provide an oil/water separator for environmental protection from harmful substances. Please confirm if an oil/water separator will be required as a part of this project.
Please refer to the Updated SOW, no OWS is considered.
5/20/2022 80 Attachment L10 Revised SOW Section 3.9 C
This is a follow‐up RFI which can have substantial cost impact on the project. Section 3.9 C in Attachment L10 Revised SOW does not clearly state if the existing Spectronics fire alarm system should be extended to cover the new system in the addition, or if the intent is to provide a new fire alarm system throughout the existing portion and the addition. Without clarification, the assumed approach will be to provide new fire alarm throughout the entire building, which will increase project cost. Please clarify specifically what approach should be taken.
IAW with Section 3.9 of the Revised SOW, the new fire alarm will be compatible with the existing system. Please also refer to Section 3.9 section c ‐ Bid Option CLIN 0003.
5/20/2022 81 On page 9 of the document entitled, “Attachment+L9+Supplemental+Info+Bldg+9460” There is a refence to Fire Protection systems (i.e., HEF) which I assume means high Expansion Foam and a Y in the next column. Does the new building require a High Expansion Foam System?
Attachment L9 was superseded by Amendment 002, and now has been completely replace with Attachment L11, Revised SOW Amed 004. No Fire Suppression System is required.
5/20/2022 82 Pages 12 and 22 (letter e) of the same document states no fire suppression is required due to the nature of the building. What is the actual requirement?
Attachment L9 was superseded by Amendment 002, and now has been completely replace with Attachment L11, Revised SOW Amed 004. No Fire Suppression System is required.
5/20/2022 83 Page 22 letter e refers to the fire water services as being none. High Expansion Foam Systems (HEF) will require water. What is the actual requirement?
Attachment L9 was superseded by Amendment 002, and now has been completely replace with Attachment L11, Revised SOW Amed 004. No Fire Suppression System is required.
5/20/2022 84 Are min. anti‐terrorism standards applicable to the project? Please refer to Section 3.11 in the Revised SOW.
5/20/2022 85 Can we use three (3) – 5‐ton split system in lieu of a single 15‐ton packaged Roof Top Unit?
This project is Design‐Build. Please refer to Section 3.6 section b of the Revised SOW. Rooftop unit is not specified.
5/20/2022 86 Please confirm that a local UMCS is not required, and stand‐alone Roof Top Unit or split system control are acceptable.
This project is Design‐Build. Please refer to Section 3.6 section b of the Revised SOW. Rooftop unit is not specified.
5/20/2022 87 It is understood that a new domestic water service line needs to be installed. Do we need to provide a building meter (does each building required to have a main meter by the utility company?). Is it required to have a new sub water meter (to connect to any future UMCS per UFC and probably with local read out for new design?)
Water meter will be provided by ASUS
5/20/2022 88 Per UFC, receptacle, lighting, and process electrical loads required to be separately metered. Since there won’t be a UMCS, are these sub meters required?
No meter required, please refer to Section 3.2 section g, and Section 3.9 in the Revised SOW.
5/20/2022 89 What’s the anticipated number of floor drains in the addition? Just one?
Please refer to Section 3.0, 3.1, and 3.7 of the Revised
SOW.
5/20/2022 90
Attachment L9 , Mechanical/Plumbing/Fire Protection requires “existing sanitary system will have new connections for the new facility.”
Attachment L9, PART IV Design Considerations / Sewer : The proposed addition to the existing facility will include a restroom and will be connected to a new on‐site decentralized wastewater disposal system. Please clarify if new sanitary line should connect to existing sanitary or a new septic tank is required.
Please refer to Section 3.7 of the Revised SOW.
Attachment L9 was superseded by Amendment 002, and now has been completely replace with Attachment L11, Revised SOW Amed 004.
5/20/2022 91 Can we use instantaneous hot water heater in lieu of a 10‐gallon electric water heater? Hot water heater manufacturer cannot ship any electric storage type water heater less than 12.2 kw as well as IECC requires that hot water source to be within 2 feet of the fixture connection.
Instantaneous water heater is not recommended due to well water supply.
5/23/2022 92 There are two CLINS how are we to use the FTFA20RC02_50+Division+cost_revised provided.
Corrected. See Revised 50‐Div workbook. All items should be listed in the 50‐Div worksheets, and specified on the CLIN breakout.
5/23/2022 93 3.13 3.13 Special Requirements: Please define “UXO sweep”. IAW Section 3.13, UXO sweep is no longer required.
5/23/2022 94 10.0 Utilities and Maps What munition item or net explosive weight (N.E.W.) was used to calculate the 1,250‐ft Blast Arc?
Not applicable. Use Blast Arc supplied in Section 10 in the Revised SOW.
5/23/2022 95 Is there a Current ESS for this project? Is one required? Who is responsible for the development cost?
Unclear. UXO sweep is no longer required. If referring to DDESB, then DDESB is required and will be started early in the design process. Any delays outside of the Contractor's control will be considered.
5/23/2022 96 What is the reason for UXO Support? What is the most probable (primary) munition? IAW Section 3.13, UXO sweep is no longer required.
5/23/2022 97 Which ordnance item is the Blast Arc on pg. 32 based on? Are Frag Data Sheets available for this item? Is the Blast Arc based on current building use or previous historical use and the basis for UXO Support?
Not applicable. Use Blast Arc supplied in Section 10 in the Revised SOW.
5/23/2022 98 The SOW does not reference a single regulation as it pertains to UXO/MEC/MPPEH response IAW Section 3.13, UXO sweep is no longer required.
5/23/2022 99 Which UXO project workplans, QC plans, and safety plans are required? IAW Section 3.13, UXO sweep is no longer required.
5/23/2022 100 If any UXO or MEC is encountered will AF EOD respond or is the UXO contractor responsible. IAW Section 3.13, UXO sweep is no longer required.
5/23/2022 101 Section L ‐ Section 2.5.1 Section I‐ The RFP states that the offeror shal fill‐in information for applicable clause. There is no information to be filled in for section I.
Should we still include with the proposal?
Yes
5/23/2022 102 Section L ‐ Section 2.5.2.5.2 Financial Reference Form‐ Does the government want a financial reference form for each member of a Joint Venture or from the Joint Venture entity.
From Joint Venture entity, as it is a stand alone company with its own CAGE Code.
5/23/2022 103
Section M‐ 2.3 Factor 3 Past Performance
If the offeror is proposing as a joint venture for this solicitation, can the offeror utiize the experience of a project that they completed as a different joint venture?
Offerors are allowed to provide technical experience as Joint Ventures, Prime Contractors, Subcontractors, etc. which allows offerors maximum opportunity to provide said tehcnical experience information. Please note evaluation criteria Factor 3 (Section M).
5/23/2022 104
Attachment L1 50 Division Cost
Many of the pre‐filled items of work are not how CSI specifies the work. For example, all of the finishes are on the Division 6 Carpentry tab rather than the Division 9 Finishes. Do you prefer we leave it on the incorrect tab or move it to the correct tab? Another example is the metal building. It is shown on the Division 5 Metals tab, but will be specified in Divison 13 Special Construction. There are several others. It may complicate the evaluation if items get moved around, but it makes it more difficult to confirm all scopes have been covered when they are in the worng place. Please advise.
See Section L Section 2.5.2.5.1 and per the Instructions on the 50‐Div, please leave current entries in sheet, but add any additional below the current list, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to.
5/23/2022 105 Page 13, Section 3.5 of the Revised SOW
This section indicates that roof drains are to collect storm water as a part of this project. Please clarify whether collection means underground piping, or if collection can occur through the use of shallow swales and channels to carry this run off to the new infiltration basin.
Roof gutters drain directly to ground surface. Water will sheet flow to stormwater pond.
5/23/2022 106
Attachment L2
Offeror's bank will not sign the Attachment L2. Is it acceptable to attach a bank's letter, providing the information of L2?
If the bank is not willing to sign L2, then L2 must be filled out with appropriate information and the Bank's letter providing the same information in their format must be attached. The Bank's letter must contain the same information to be considered valid.
5/23/2022 107 Is the existing fire alarm panel expandable for additional devices or able to be expanded to an additional panel?
IAW with Section 3.9 of the Revised SOW, the new fire alarm will be compatible with the existing system. Please also refer to Section 3.9 section c ‐ Bid Option CLIN 0003.
Bid Option has been included in case existing panel must be replaced.
5/23/2022 108 Is the existing fire alarm panel obsolete?
IAW with Section 3.9 of the Revised SOW, the new fire alarm will be compatible with the existing system. Please also refer to Section 3.9 section c ‐ Bid Option CLIN 0003.
Bid Option has been included in case existing panel must be replaced.
5/23/2022 109 What is/was the purpose of the existing 9’x5’x4’ underground structure that is to be removed?
Please refer to Section 3.5.1 in the Revised SOW.
(Underground Concrete Structure original purpose is unknown. The structure is filled with soil and confirmed by Eglin Environmental to be non‐hazardous )
5/23/2022 110 Attachment L10 Revised SOW Se Please clarify the intent of Section 3.9 C of Attachment L10 Revised SOW as it pertains to the fire alarm coverage strategy for the existing building and the addition. Shall the existing Spectronics Fire Alarm system be extended from the existing portion of the building to the addition? Or should a new fire alarm system be provided throughout the entire building? Please provide specific direction.
IAW with Section 3.9 of the Revised SOW, the new fire alarm will be compatible with the existing system. Please also refer to Section 3.9 section c ‐ Bid Option CLIN 0003.
5/23/2022 111 Attachment L1 (Revised) The CLIN tab was deleted from the sheet. Is a revised CLIN going to be issued? Corrected. See Revised 50‐Div workbook for Amed 004.
5/23/2022 112 Attachment L1 (Revised) The revised excel workbook does not have a line or tab for design, project staffing, or general conditions. Where should this provided?
Two rows for Design/Build (direct and indirect) are listed Division 1 on the Revised 50‐Div for Amed 004.
5/23/2022 113 Revised SOW 3.9 Electrical
The revised SOW included a one line drawing indicating the pathway of the new electrial feed for the new building and shown on the exterior around the south side. Please confirm that it is acceptable to run the feed through the interior of the existing building. This will be more cost effective.
Interior connection is acceptable.
5/23/2022 114 Revised SOW 3.6 Mechanical Please provide information for the existing air compressor, compressed air distribution size, compressed air piping material (Sch 80 Steel of Type K Copper)
Air Compressor model: Kaeser SFC 55 75HP, psig 110, Aluminum piping , pipe size varies