Instructions
| Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. |
| The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs. |
Summary
| CONSTRUCTION COST ESTIMATE | Date: | |
| | Fill Here |
| COMPANY | | |
| Fill Here | | |
| PROJECT | | | |
| Fill Here | | | |
| LOCATION | | PROJECT NO. | Fill Here |
| EGLIN AIR FORCE BASE, FLORIDA | | | |
| DIVISION | DESCRIPTION | % by | |
| Division | Division Total | | | |
| DIVISION 01 | GENERAL REQUIREMENTS | ERROR:#DIV/0! | - 0 | |
| DIVISION 02 | EXISTING CONDITIONS | ERROR:#DIV/0! | - 0 | |
| DIVISION 03 | CONCRETE WORK | ERROR:#DIV/0! | - 0 | FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| DIVISION 05 | METALS | ERROR:#DIV/0! | - 0 | | |
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | ERROR:#DIV/0! | - 0 | GC Overhead | 0.00% |
| | | | GC Protit | 0.00% |
| DIVISION 08 | OPENINGS | ERROR:#DIV/0! | - 0 | Sub Overhead | 0.00% |
| | | | Sub Profit | 0.00% |
| | | | Sales Tax | 0.00% |
| DIVISION 11 | EQUIPMENT | ERROR:#DIV/0! | - 0 | Risk/Bonding | 0.00% |
| DIVISION 12 | FURNISHINGS | ERROR:#DIV/0! | - 0 | | |
| | | | This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas | |
| DIVISION 22 | PLUMBING | ERROR:#DIV/0! | - 0 |
| DIVISION 23 | HEATING, VENTILATING AND A/C | ERROR:#DIV/0! | - 0 |
| DIVISION 24 | RESERVED | ERROR:#DIV/0! | - 0 |
DIVISION 26 ELECTRICAL ERROR:#DIV/0! - 0
| DIVISION 29 | RESERVED | ERROR:#DIV/0! | - 0 |
| DIVISION 30 | RESERVED | ERROR:#DIV/0! | - 0 |
| DIVISION 31 | EARTHWORK | ERROR:#DIV/0! | - 0 |
DIVISION 49 RESERVED ERROR:#DIV/0! - 0
HARD COST TOTAL ERROR:#DIV/0! - 0
| GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | - 0 |
| SUBTOTAL | | - 0 |
| GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | - 0 |
| SUBTOTAL | | - 0 |
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0% | - 0 |
| CONTRACT TOTAL | | $ - 0 |
&"Arial"&8&B SHEET &P OF &N
CLIN Structure
| CLIN STRUCTURE | | | | | |
| CLIN | Description | Unit of Issue | Unit Price | Total Amount | Anticipated PoP |
| 0001 | Design – All design costs shall be included on this CLIN and represent 100% design submittal | Job | | | 119 DAYS |
| 0002 | Build – All construction costs shall be included on this CLIN | Job | | | 272 DAYS |
Div1
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | | | | | | | |
| Contingency | | | | - 0 | | - 0 | - 0 |
| SIOH | | | | - 0 | | - 0 | - 0 |
| Design Build Fee | | | | - 0 | | - 0 | - 0 |
| UXO Sweep | | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div2
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXISTING CONDITIONS | | | | | | | |
| Demo Interior | | | | - 0 | | - 0 | - 0 |
| Seal Penetrations | | SF | | - 0 | | - 0 | - 0 |
| Demo HVAC | | | | - 0 | | - 0 | - 0 |
| Duckwork Independent Floor Parts | | | | - 0 | | - 0 | - 0 |
| Exhaust Fan with duct System 2500CFM | | EA | | - 0 | | - 0 | - 0 |
| Demo Electrical | | | | - 0 | | - 0 | - 0 |
| Master Television Antenna With Pole | | EA | | - 0 | | - 0 | - 0 |
| Demo Special Construction | | | | - 0 | | - 0 | - 0 |
| Remove Gutters and Downspouts | | LF | | - 0 | | - 0 | - 0 |
| Remove Transmitter and Antenna | | EA | | - 0 | | - 0 | - 0 |
| Expansive Demo Crew Labor | | HR | | - 0 | | - 0 | - 0 |
| Demo Sitework | | | | - 0 | | - 0 | - 0 |
| Demolish Mesh Reinf Concrete to 6" with Power Equipment | | CY | | - 0 | | - 0 | - 0 |
| Dump Charge | | CY | | - 0 | | - 0 | - 0 |
| 1.25 CY Wheel Loader | | HR | | - 0 | | - 0 | - 0 |
| 6CY Dump Truck | | | | - 0 | | - 0 | - 0 |
| Demo Electrical Utilities | | | | - 0 | | - 0 | - 0 |
| Disconnecting Switches, Single Pole Switches, 13 to 26kV, Remove | | EA | | - 0 | | - 0 | - 0 |
| Demo Building Site Work | | | | - 0 | | - 0 | - 0 |
| Demolish Mesh Reinf Concrete to 6" with Power Equipment | | CY | | - 0 | | - 0 | - 0 |
| Remove Catch Basin Manhole | | CY | | - 0 | | - 0 | - 0 |
| Remove 12" Diameter Concrete Pipe, Not Inc Excavation | | LF | | - 0 | | - 0 | - 0 |
| Dump Charge | | CY | | - 0 | | - 0 | - 0 |
| 1.25CY Wheel Loader | | HR | | - 0 | | - 0 | - 0 |
| Crawler Mounted 2CY Hyd Excavator | | HR | | - 0 | | - 0 | - 0 |
| Cat 225 1.5CY Soil/Sand Trenching | | CY | | - 0 | | - 0 | - 0 |
| 8CY Dump Truck | | HR | | - 0 | | - 0 | - 0 |
| 3CY Backfill W/Excavated Material | | CY | | - 0 | | - 0 | - 0 |
| Backfill Trencch Borrow Mat, Delivered Dumped | | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrtating Plate | | CY | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div3
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONCRETE WORK | | | | | | | |
| Substructure | | | | - 0 | | - 0 | - 0 |
| 1'x3' Strip Footing 3000psi | 0 | LF | | - 0 | | - 0 | - 0 |
| Spread Footing | 0 | CY | | - 0 | | - 0 | - 0 |
| Spread Footing Reinforced Steel | 0 | TON | | - 0 | | - 0 | - 0 |
| Spread Footing Column Bolts | 0 | EA | | - 0 | | - 0 | - 0 |
| 101.6mm(4") Mechanical Equipment pad | 0 | SF | | - 0 | | - 0 | - 0 |
| 610mm(24") Deep 2.44m X 2.13m (8'x7') Pit wall | 0 | LF | | - 0 | | - 0 | - 0 |
| Interiors | | | | - 0 | | - 0 | - 0 |
| Non Load Bearing Partician 8x6x16 Concrete | 0 | SF | | - 0 | | - 0 | - 0 |
| Non Load Bearing Partician 8x6x16 Concrete | 0 | SF | | - 0 | | - 0 | - 0 |
| Building Site Work | | | | - 0 | | - 0 | - 0 |
| 8" Bollards | 0 | EA | | - 0 | | - 0 | - 0 |
| 6" Structural Slab on Grade | 0 | SF | | - 0 | | - 0 | - 0 |
| 12" Structural Slab on Grade | 0 | SF | | - 0 | | - 0 | - 0 |
| Sidewalk | | | | - 0 | | - 0 | - 0 |
| Standard 6" Sidewalk W/Mesh, Formed | 0 | SF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div4
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div5
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | Fill Here | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| METALS | | | | | | | |
| Superstructure | | | | - 0 | | - 0 | - 0 |
| Structural Steel Frame , Hv Load, Small Span | 0 | TON | | - 0 | | - 0 | - 0 |
| Sml Span, Hv Load, Stl Frm, Mtl Joist | 0 | TON | | - 0 | | - 0 | - 0 |
| 1-1/2" Galvanized Metal Roof Deck, Open Type FP | 0 | SF | | - 0 | | - 0 | - 0 |
| Exterior Enclosure | | | | - 0 | | - 0 | - 0 |
| Metal Siding/ with Vinyal backed ends | 0 | SF | | - 0 | | - 0 | - 0 |
| 3/4" Metal Furing Strip | 0 | SF | | - 0 | | - 0 | - 0 |
| Fixed Blade Exteriore Louver with Baked Enamel Finish | 0 | SF | | - 0 | | - 0 | - 0 |
| Roofing | | | | - 0 | | - 0 | - 0 |
| Metal Roof W/Vinyal backed ends | 0 | SF | | - 0 | | - 0 | - 0 |
| (6") Wide Galvenized Steel Gutters & Downspouts | 0 | LF | | - 0 | | - 0 | - 0 |
| Interiors | | | | - 0 | | - 0 | - 0 |
| Metal Stud Partician 3-5/8" | 0 | SF | | - 0 | | - 0 | - 0 |
| Ribbed Metal Panel (22Ga) with 3-1/2 Batt Insulation | 0 | SF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div6
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WOOD, PLASTICS AND COMPOSITES | | | | | | | |
| Exterior Enclosure | | | | - 0 | | - 0 | - 0 |
| 5/8" Gypsum Board/ Installed/ Taped/ Finished | 0 | SF | | - 0 | | - 0 | - 0 |
| Paint and Gypsum Board Walls Using Roller | 0 | SF | | - 0 | | - 0 | - 0 |
| Interior Finishes | | | | - 0 | | - 0 | - 0 |
| 5/8" Gypsum Board on 7/8" Furing Channel | 0 | SF | | - 0 | | - 0 | - 0 |
| 5/8" FR Gypsum Board/ Installed/ Taped/ Finished | 0 | SF | | - 0 | | - 0 | - 0 |
| Paint to Gypsum Board Walls Using Roller | 0 | SF | | - 0 | | - 0 | - 0 |
| Concrete Floor Sealer | 0 | SF | | - 0 | | - 0 | - 0 |
| Concrete Floor Sealer with Base | 0 | SF | | - 0 | | - 0 | - 0 |
| 5/8" Gypsum WallBoard Ceiling, 1 Layer, Fire Rated | 0 | SF | | - 0 | | - 0 | - 0 |
| Paint Exposed Steel Joist and Roof Deck | 0 | SF | | - 0 | | - 0 | - 0 |
| Exterior Canopy W/Framing | 0 | SF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div7
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div8
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| OPENINGS | | | | | | | |
| Interior | | | | - 0 | | - 0 | - 0 |
| 3'x7' Hollow Metal Door | 0 | EA | | - 0 | | - 0 | - 0 |
| Exterior Enclosure | | | | - 0 | | - 0 | - 0 |
| 3'x7' Hollow Metal Door W/Frame | 0 | EA | | - 0 | | - 0 | - 0 |
| 20'x14' Metal Overhead Door | 0 | EA | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div9
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | Fill Here | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div10
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | Fill Here | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div11
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EQUIPMENT | | | | | | | |
| Services | | | | - 0 | | - 0 | - 0 |
| Overhead Bridge Crane 5 Ton | 0 | EA | | - 0 | | - 0 | - 0 |
| Bridge Crane Rail | 0 | LB | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div12
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FURNISHINGS | | | | | | | |
| Interiors | | | | - 0 | | - 0 | - 0 |
| Seal Penetrations Smoke/Fire | 0 | SF | | - 0 | | - 0 | - 0 |
| Toilet Accessories for Single Toilet | 0 | EA | | - 0 | | - 0 | - 0 |
| Wall Mounted Base Cabnet W/Doors | 0 | LF | | - 0 | | - 0 | - 0 |
| Pastic Laminated Wall Cabnet | 0 | LF | | - 0 | | - 0 | - 0 |
| Plastic laminated Vanity Cabinet-21" Deep.77 | 0 | LF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div13
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div14
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | Fill Here | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div15
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div16
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div20
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div21
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div22
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PLUMBING | | | | | | | |
| Plumbing | | | | - 0 | | - 0 | - 0 |
| Floor Mounted Water Closet | 0 | EA | | - 0 | | - 0 | - 0 |
| Wall Hung 18" by 15" White Single Bowl Lavatory | 0 | EA | | - 0 | | - 0 | - 0 |
| S.S Kitchen Sink, Single Bowl 25x22 | 0 | EA | | - 0 | | - 0 | - 0 |
| Janitor Sink Floor Type | 0 | EA | | - 0 | | - 0 | - 0 |
| Emergency Shower and Eyewash | 0 | EA | | - 0 | | - 0 | - 0 |
| Copper Pipe & Fittings (1/2" to 4 " Dia. Piping) | 0 | EA | | - 0 | | - 0 | - 0 |
| Valves & Hydrants | 0 | EA | | - 0 | | - 0 | - 0 |
| Domestic Hot Water Heater (30g) | 0 | EA | | - 0 | | - 0 | - 0 |
| Fiberglass 1-1/2" Pipe Insulation With Vapor Barrier | 0 | EA | | - 0 | | - 0 | - 0 |
| domestic water Supply Specialties 3/4" | 0 | EA | | - 0 | | - 0 | - 0 |
| waste Pipe & Fittings | 0 | EA | | - 0 | | - 0 | - 0 |
| C.I No Hub Vent Pipe System | 0 | EA | | - 0 | | - 0 | - 0 |
| Med & Hv duty Cast Iron floor Drains Adtl | 0 | EA | | - 0 | | - 0 | - 0 |
| Sanitary Sewer | | | | - 0 | | - 0 | - 0 |
| Heavy Duty Cast Iron Floor Drains | 0 | EA | | - 0 | | - 0 | - 0 |
| 8" PVC Pipe Sanitary | 0 | LF | | - 0 | | - 0 | - 0 |
| Precast CIP Base 4'x6' | 0 | EA | | - 0 | | - 0 | - 0 |
| Septic Tank Precast Concrete 1000 gallon Excluding or Piping | 0 | EA | | - 0 | | - 0 | - 0 |
| Septic tank Leaching Field Chambers Heavy Duty 13'x3'-9"x1'-6" Exclude Excatvation or Piping | 0 | EA | | - 0 | | - 0 | - 0 |
| Septic tanks, Gravel Fill, Run Off Bank 4' Exclude Excatvation or Piping | 0 | CY | | - 0 | | - 0 | - 0 |
| Septic Tanks, Crushed Stone, 3/4", Exclude Excatvation or Piping | 0 | CY | | - 0 | | - 0 | - 0 |
| Water Distribution | | | | - 0 | | - 0 | - 0 |
| Residential Water Heater and Hose Bibb Piping | 0 | EA | | - 0 | | - 0 | - 0 |
| Residential Valves and Hose Bibbs | 0 | EA | | - 0 | | - 0 | - 0 |
| Piping Water Distribution Polyvinyl Chloride 2" Dia, AWWA C900, Class 160, SDR26 | 0 | LF | | - 0 | | - 0 | - 0 |
| Water Supply Meter Domestic/Commercial Bronze Threaded Flange 160GPM 2" Dia | 0 | EA | | - 0 | | - 0 | - 0 |
| Backflow Preventer Corrosion Resistant Automatic Operation Threaded 2" Pipe Size | 0 | EA | | - 0 | | - 0 | - 0 |
| Valves Iron Body Gate OS&Y Flanged 125lb 2" | 0 | EA | | - 0 | | - 0 | - 0 |
| Underground Marking Tape, Vinyl, Aluminum Foil Core, Detachable 2" | 0 | LF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div23
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| HEATING, VENTILATING AND A/C | | | | | | | |
| HVAC | | | | - 0 | | - 0 | - 0 |
| 15T Condensing Unit W/Refridgerant Piping | 0 | EA | | - 0 | | - 0 | - 0 |
| Rfeturn Air Registar 24x18 | 0 | EA | | - 0 | | - 0 | - 0 |
| Ductwork Stack 1500FPM Commercial Building | 0 | LB | | - 0 | | - 0 | - 0 |
| Ductwork Stack 2500FPM Commercial Building | 0 | LB | | - 0 | | - 0 | - 0 |
| Bathroom Exhaust Fan 200CFM | 0 | EA | | - 0 | | - 0 | - 0 |
| Renovate 12x12 Ceil Diffuser W/Perf Face | 0 | EA | | - 0 | | - 0 | - 0 |
| Renovate 18" Rnd Ceil Diffuser W/Fixed pat | 0 | EA | | - 0 | | - 0 | - 0 |
| Electric Constrols, Heating & Venting System | 0 | EA | | - 0 | | - 0 | - 0 |
| VFD 3HP, NEMA1, ENCL, 460V-3PH | 0 | EA | | - 0 | | - 0 | - 0 |
| Compressed Air System for Maint. Shop | 0 | EA | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div24
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div25
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div26
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRICAL | | | | | | | |
| Electrical | | | | - 0 | | - 0 | - 0 |
| Underground 125 Amp Secondary | 0 | EA | | - 0 | | - 0 | - 0 |
| Panel Board 120V/208V 100A Mlo 24 Cir W/Bkr | 0 | EA | | - 0 | | - 0 | - 0 |
| Panel Board 277V/480V 100A Mlo 24 Cir W/Bkr | 0 | EA | | - 0 | | - 0 | - 0 |
| Panel Board 400V/600V 100A MCB 42 Cir W/Bkr | 0 | EA | | - 0 | | - 0 | - 0 |
| Duplex GFI Receptical Long Run | 0 | EA | | - 0 | | - 0 | - 0 |
| 120V 20Amp Quadroplex Receptical | 0 | EA | | - 0 | | - 0 | - 0 |
| Equipment Connections For Up to 10 HP | 0 | EA | | - 0 | | - 0 | - 0 |
| 120V 20Amp Single Pole Switch | 0 | EA | | - 0 | | - 0 | - 0 |
| 120V 20Amp 3 Way Switch | 0 | EA | | - 0 | | - 0 | - 0 |
| Motor Connections 460V 3HP | 0 | EA | | - 0 | | - 0 | - 0 |
| 150W Hps Flood Light Wall Mount | 0 | EA | | - 0 | | - 0 | - 0 |
| Exit light With Battery Backup | 0 | EA | | - 0 | | - 0 | - 0 |
| Fire Alarm Duct Smoke Detector | 0 | EA | | - 0 | | - 0 | - 0 |
| Renovate 3/4" RS Conduit W/Coupling & Support | 0 | EA | | - 0 | | - 0 | - 0 |
| Renovate 30A 3P Fused Disc. Sw. NEMA 1 240V | 0 | EA | | - 0 | | - 0 | - 0 |
| Surface Mtd Incandescent Cylinder | 0 | EA | | - 0 | | - 0 | - 0 |
| 4' 1 Lamp Recess Fluorescent | 0 | EA | | - 0 | | - 0 | - 0 |
| 4' 2 Lamp Suspnsn Mtd Ind Fluorescent | 0 | EA | | - 0 | | - 0 | - 0 |
| 4-Pair Telephone Outlet | 0 | EA | | - 0 | | - 0 | - 0 |
| Intrusion Detection System | 0 | OUT | | - 0 | | - 0 | - 0 |
| 18" x 3" Cable Tray | 0 | LF | | - 0 | | - 0 | - 0 |
| Exit Lighting | 0 | EA | | - 0 | | - 0 | - 0 |
| Building Grounding | 0 | EA | | - 0 | | - 0 | - 0 |
| Copper Grd Bus | 0 | LF | | - 0 | | - 0 | - 0 |
| Lighting protection System | 0 | EA | | - 0 | | - 0 | - 0 |
| Site Electrical Utilities | | | | - 0 | | - 0 | - 0 |
| Circuit Breaker, 3 Pole, 600V, 600Amp, Enclosed (NEMA1) | 0 | EA | | - 0 | | - 0 | - 0 |
| Wire Copper Stranded 600V #8 type XHHW in Raceway | 0 | LF | | - 0 | | - 0 | - 0 |
| Underground Electrical Distribution | 0 | | | - 0 | | - 0 | - 0 |
| MV/LV 750kVA Main Transformer 1200A Distrobution | 0 | EA | | - 0 | | - 0 | - 0 |
| Oil Filled Trandformer Pad Mounted 3 Phase 13.8kV Primary 480V Secondary 75kVA | 0 | EA | | - 0 | | - 0 | - 0 |
| Disconnecting Switches Single Pole Switches 13-26kV | 0 | EA | | - 0 | | - 0 | - 0 |
| 3/C Undgrd 15KV DB #6 W/Bare Grd, Wire | 0 | LF | | - 0 | | - 0 | - 0 |
| Sheilded cable Copper XLP Sheilding 15kV 350kcmil Excl Splicing & Termination | 0 | LF | | - 0 | | - 0 | - 0 |
| hand Holes Precst Concrete W/ Concrete Cover 2'x2'x3' Deep Excludes Excv & Backflow | 0 | EA | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div27
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div28
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div29
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div30
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div31
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EARTHWORK | | | | | | | |
| Sanitary Sewer Site Prep | | | | - 0 | | - 0 | - 0 |
| Dump Charge | 0 | CY | | - 0 | | - 0 | - 0 |
| Excavation Top Soil to Side | 0 | CY | | - 0 | | - 0 | - 0 |
| 1.25 CY Wheel Loader | 0 | HR | | - 0 | | - 0 | - 0 |
| 1.15CY Soil/Sand Trenching | 0 | CY | | - 0 | | - 0 | - 0 |
| 8CY Dump Truck | 0 | HR | | - 0 | | - 0 | - 0 |
| 3CY Backfill W/Excavated Material | 0 | CY | | - 0 | | - 0 | - 0 |
| 3CY deliverd and Dumped Backfill W/Sand | 0 | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrating Plate | 0 | CY | | - 0 | | - 0 | - 0 |
| Compact With Pogosticks | 0 | CY | | - 0 | | - 0 | - 0 |
| Sidewalks | | | | - 0 | | - 0 | - 0 |
| Remove Slab on Grade 4-6" | 0 | SF | | - 0 | | - 0 | - 0 |
| Rough Grading D6 Dozer | 0 | SY | | - 0 | | - 0 | - 0 |
| Fine Grade Hand | 0 | SY | | - 0 | | - 0 | - 0 |
| Fine Grage (120G) 2 Passes | 0 | SY | | - 0 | | - 0 | - 0 |
| Curb/ Sidewalk ExcavationHaul Off Spoil 1 Mile | 0 | CY | | - 0 | | - 0 | - 0 |
| Delivered and Dumped- Hand Backfill, W/Sand | 0 | CY | | | | | |
| Compact Soil W/Vibrating Plate | 0 | CY | | | | | |
| Site Electrical Utilities | | | | | | | |
| Dump Charge | 0 | CY | | | | | |
| 1.25 CY Wheel Loader | 0 | HR | | | | | |
| 2.5CY Soil/Sand Trenching | 0 | CY | | | | | |
| 8CY Dump Truck | 0 | HR | | | | | |
| 3CY Backfill W/Excavated Material | 0 | CY | | | | | |
| Compact Soil W/Vibrating Plate | 0 | CY | | | | | |
| Compact With Pogosticks | 0 | CY | | | | | |
| Water Distribution | | | | | | | |
| Cat 225 1.5CY Soil Sand Trenching | 0 | CY | | | | | |
| Backfill W/Excavated Material | 0 | CY | | | | | |
| Compact Soil W/Vibrating Plate | 0 | CY | | | | | |
| Compact With Pogosticks | 0 | CY | | | | | |
| Clear and Grub | | | | | | | |
| Light Brush W/O Grub, Clearing | 0 | ACRE | | | | | |
| Dozer 200HP D7 Grubbing and Stacking | 0 | CY | | | | | |
| Dump Charge | 0 | CY | | | | | |
| 7CY Wheel Loader | 0 | HR | | | | | |
| Borrow Subgrade Load & Haul 5 Mile Spreading | 0 | CY | | | | | |
| 35 Ton Off Highway Truck | 0 | HR | | | | | |
| Compacted Borrowed Subgrade, 4Lifts | 0 | BCY | | | | | |
| Site Improvements | | | | | | | |
| Gravel 90% Sand Base 10% | 0 | CY | | | | | |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div32
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div33
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div34
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div35
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div36
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div37
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div38
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div39
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div40
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div41
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div42
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div43
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div44
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div45
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div46
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| Fill Here | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| Fill Here | | | Fill Here | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| 0 | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |