Attachment L1-50 Divisions Cost Estimate (DCE) Worksheet 033122.xlsx

XLSX spreadsheet 467 KB Posted

Attached to
Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA2823-22-R-0004
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC), newest first.
File Type Posted
ATTACHMENT 4 - SECTION L_Revised_06072022_Amed008.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0008.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_Amed007.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0007.pdf PDF
MACC RFI RESPONSE 24 MAY 2022 CORRECTED 26 MAY 2022.pdf PDF
MACC RFI RESPONSE 13 MAY 2022 CORRECTED 26 MAY 2022.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0005.pdf PDF
MACC RFI RESPONSE 24 MAY 2022.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_Amed004.docx DOCX document
SOLICITATION AMENDMENT FA2823-22-R-0004-0004.pdf PDF
Attachment L11 Revised SOW for B9460_Amed004.pdf PDF
Attachment L1 - FTFA20RC02_50 Division Cost_Revised_Amed 004.xlsx XLSX spreadsheet
SOLICITATION AMENDMENT FA2823-22-R-0004-0003.pdf PDF
Attachment L1 - FTFA20RC02_50 Division Cost_Revised.xlsx XLSX spreadsheet
MACC RFI Form.xlsx XLSX spreadsheet
ATTACHMENT 5 - SECTION M_Rev051322.pdf PDF
ATTACHMENT 4 - SECTION L_Revised051322.pdf PDF
Attachment L10 Revised SOW for B9460.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0002.pdf PDF
MACC RFI RESPONSE 13 MAY 2022.pdf PDF
EXISTING BLDG 9460 DRAWINGS.pdf PDF
EXISTING BLDG 9460 ORIGINAL ADDITION DRAWINGS.pdf PDF
SiteVisitSignInSeetB9460_04272022_Redacted.pdf PDF
EXISTING BLDG 9460 ELECTRICAL DRAWINGS.pdf PDF
RFI RESPONSE 27 APRIL 2022.pdf PDF
Attachment L9 Supplemental Info Bldg 9460.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0001.pdf PDF
Solicitation - FA2823-22-R-0004.pdf PDF
Attachment L7 Past Performance Customer Questionnaire 033122.pdf PDF
Attachment L4 Consent Form 033122.docx DOCX document
Attachment L2-Financial Reference Worksheet 033122.pdf PDF
ATTACHMENT 1B - TYNDALL DESIGN GUIDE MAR 2022.pdf PDF
ATTACHMENT 1A - EGLIN DESIGN GUIDE FEB 2019.pdf PDF
ATTACHMENT 5 - SECTION M 033122.pdf PDF
Attachment L5 Past Performance Information 033122.docx DOCX document
Attachment L4 Consent Form 033122.pdf PDF
Attachment L2-Financial Reference Worksheet 033122.docx DOCX document
ATTACHMENT 3A - Okaloosa County Wage Determination 022522.pdf PDF
ATTACHMENT 1 - MACC SOW FINAL_033122.pdf PDF
Solicitation - FA2823-22-R-0004.pdf PDF
Attachment L8 Additional Information FA2823-22-F-XXXX (TBD) 11 APR 2022.pdf PDF
Attachment L6 Cover Letter Example 033122.docx DOCX document
Attachment L3 Technical Experience Reference 033122.pdf PDF
Attachment L3 Technical Experience Reference 033122.docx DOCX document
ATTACHMENT 1C - HURLBURT FIELD IFS DEC 2018.pdf PDF
Attachment L6 Cover Letter Example 033122.pdf PDF
Attachment L5 Past Performance Information 033122.pdf PDF
ATTACHMENT 4 - SECTION L_033122.pdf PDF
ATTACHMENT 3B - Bay County Wage Determination 022522.pdf PDF
ATTACHMENT 2 MACC ORDERING GUIDE_03302022.pdf PDF
Show all 50

Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs.

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
Fill Here
LOCATIONPROJECT NO.Fill Here
EGLIN AIR FORCE BASE, FLORIDA
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTSERROR:#DIV/0!- 0
DIVISION 02EXISTING CONDITIONSERROR:#DIV/0!- 0
DIVISION 03CONCRETE WORKERROR:#DIV/0!- 0FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

DIVISION 05METALSERROR:#DIV/0!- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITESERROR:#DIV/0!- 0GC Overhead0.00%
GC Protit0.00%
DIVISION 08OPENINGSERROR:#DIV/0!- 0Sub Overhead0.00%
Sub Profit0.00%
Sales Tax0.00%
DIVISION 11EQUIPMENTERROR:#DIV/0!- 0Risk/Bonding0.00%
DIVISION 12FURNISHINGSERROR:#DIV/0!- 0
This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 22PLUMBINGERROR:#DIV/0!- 0
DIVISION 23HEATING, VENTILATING AND A/CERROR:#DIV/0!- 0
DIVISION 24RESERVEDERROR:#DIV/0!- 0

DIVISION 26 ELECTRICAL ERROR:#DIV/0! - 0

DIVISION 29RESERVEDERROR:#DIV/0!- 0
DIVISION 30RESERVEDERROR:#DIV/0!- 0
DIVISION 31EARTHWORKERROR:#DIV/0!- 0

DIVISION 49 RESERVED ERROR:#DIV/0! - 0

HARD COST TOTAL ERROR:#DIV/0! - 0

GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%- 0
SUBTOTAL- 0
GENERAL CONTRACTOR'S PROFIT(Fill in%)0%- 0
SUBTOTAL- 0
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0%- 0
CONTRACT TOTAL$ - 0

&"Arial"&8&B SHEET &P OF &N

CLIN Structure

CLIN STRUCTURE
CLINDescriptionUnit of IssueUnit PriceTotal AmountAnticipated PoP
0001Design – All design costs shall be included on this CLIN and represent 100% design submittalJob119 DAYS
0002Build – All construction costs shall be included on this CLINJob272 DAYS

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
Contingency- 0- 0- 0
SIOH- 0- 0- 0
Design Build Fee- 0- 0- 0
UXO Sweep- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
Demo Interior- 0- 0- 0
Seal PenetrationsSF- 0- 0- 0
Demo HVAC- 0- 0- 0
Duckwork Independent Floor Parts- 0- 0- 0
Exhaust Fan with duct System 2500CFMEA- 0- 0- 0
Demo Electrical- 0- 0- 0
Master Television Antenna With PoleEA- 0- 0- 0
Demo Special Construction- 0- 0- 0
Remove Gutters and DownspoutsLF- 0- 0- 0
Remove Transmitter and AntennaEA- 0- 0- 0
Expansive Demo Crew LaborHR- 0- 0- 0
Demo Sitework- 0- 0- 0
Demolish Mesh Reinf Concrete to 6" with Power EquipmentCY- 0- 0- 0
Dump ChargeCY- 0- 0- 0
1.25 CY Wheel LoaderHR- 0- 0- 0
6CY Dump Truck- 0- 0- 0
Demo Electrical Utilities- 0- 0- 0
Disconnecting Switches, Single Pole Switches, 13 to 26kV, RemoveEA- 0- 0- 0
Demo Building Site Work- 0- 0- 0
Demolish Mesh Reinf Concrete to 6" with Power EquipmentCY- 0- 0- 0
Remove Catch Basin ManholeCY- 0- 0- 0
Remove 12" Diameter Concrete Pipe, Not Inc ExcavationLF- 0- 0- 0
Dump ChargeCY- 0- 0- 0
1.25CY Wheel LoaderHR- 0- 0- 0
Crawler Mounted 2CY Hyd ExcavatorHR- 0- 0- 0
Cat 225 1.5CY Soil/Sand TrenchingCY- 0- 0- 0
8CY Dump TruckHR- 0- 0- 0
3CY Backfill W/Excavated MaterialCY- 0- 0- 0
Backfill Trencch Borrow Mat, Delivered DumpedCY- 0- 0- 0
Compact Soil W/Vibrtating PlateCY- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div3

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
Substructure- 0- 0- 0
1'x3' Strip Footing 3000psi0LF- 0- 0- 0
Spread Footing0CY- 0- 0- 0
Spread Footing Reinforced Steel0TON- 0- 0- 0
Spread Footing Column Bolts0EA- 0- 0- 0
101.6mm(4") Mechanical Equipment pad0SF- 0- 0- 0
610mm(24") Deep 2.44m X 2.13m (8'x7') Pit wall0LF- 0- 0- 0
Interiors- 0- 0- 0
Non Load Bearing Partician 8x6x16 Concrete0SF- 0- 0- 0
Non Load Bearing Partician 8x6x16 Concrete0SF- 0- 0- 0
Building Site Work- 0- 0- 0
8" Bollards0EA- 0- 0- 0
6" Structural Slab on Grade0SF- 0- 0- 0
12" Structural Slab on Grade0SF- 0- 0- 0
Sidewalk- 0- 0- 0
Standard 6" Sidewalk W/Mesh, Formed0SF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div4

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div5

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
Superstructure- 0- 0- 0
Structural Steel Frame , Hv Load, Small Span0TON- 0- 0- 0
Sml Span, Hv Load, Stl Frm, Mtl Joist0TON- 0- 0- 0
1-1/2" Galvanized Metal Roof Deck, Open Type FP0SF- 0- 0- 0
Exterior Enclosure- 0- 0- 0
Metal Siding/ with Vinyal backed ends0SF- 0- 0- 0
3/4" Metal Furing Strip0SF- 0- 0- 0
Fixed Blade Exteriore Louver with Baked Enamel Finish0SF- 0- 0- 0
Roofing- 0- 0- 0
Metal Roof W/Vinyal backed ends0SF- 0- 0- 0
(6") Wide Galvenized Steel Gutters & Downspouts0LF- 0- 0- 0
Interiors- 0- 0- 0
Metal Stud Partician 3-5/8"0SF- 0- 0- 0
Ribbed Metal Panel (22Ga) with 3-1/2 Batt Insulation0SF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div6

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
Exterior Enclosure- 0- 0- 0
5/8" Gypsum Board/ Installed/ Taped/ Finished0SF- 0- 0- 0
Paint and Gypsum Board Walls Using Roller0SF- 0- 0- 0
Interior Finishes- 0- 0- 0
5/8" Gypsum Board on 7/8" Furing Channel0SF- 0- 0- 0
5/8" FR Gypsum Board/ Installed/ Taped/ Finished0SF- 0- 0- 0
Paint to Gypsum Board Walls Using Roller0SF- 0- 0- 0
Concrete Floor Sealer0SF- 0- 0- 0
Concrete Floor Sealer with Base0SF- 0- 0- 0
5/8" Gypsum WallBoard Ceiling, 1 Layer, Fire Rated0SF- 0- 0- 0
Paint Exposed Steel Joist and Roof Deck0SF- 0- 0- 0
Exterior Canopy W/Framing0SF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div8

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
Interior- 0- 0- 0
3'x7' Hollow Metal Door0EA- 0- 0- 0
Exterior Enclosure- 0- 0- 0
3'x7' Hollow Metal Door W/Frame0EA- 0- 0- 0
20'x14' Metal Overhead Door0EA- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div10

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div11

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
Services- 0- 0- 0
Overhead Bridge Crane 5 Ton0EA- 0- 0- 0
Bridge Crane Rail0LB- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div12

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
Interiors- 0- 0- 0
Seal Penetrations Smoke/Fire0SF- 0- 0- 0
Toilet Accessories for Single Toilet0EA- 0- 0- 0
Wall Mounted Base Cabnet W/Doors0LF- 0- 0- 0
Pastic Laminated Wall Cabnet0LF- 0- 0- 0
Plastic laminated Vanity Cabinet-21" Deep.770LF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div13

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div14

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div15

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div16

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div20

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div21

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div22

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
Plumbing- 0- 0- 0
Floor Mounted Water Closet0EA- 0- 0- 0
Wall Hung 18" by 15" White Single Bowl Lavatory0EA- 0- 0- 0
S.S Kitchen Sink, Single Bowl 25x220EA- 0- 0- 0
Janitor Sink Floor Type0EA- 0- 0- 0
Emergency Shower and Eyewash0EA- 0- 0- 0
Copper Pipe & Fittings (1/2" to 4 " Dia. Piping)0EA- 0- 0- 0
Valves & Hydrants0EA- 0- 0- 0
Domestic Hot Water Heater (30g)0EA- 0- 0- 0
Fiberglass 1-1/2" Pipe Insulation With Vapor Barrier0EA- 0- 0- 0
domestic water Supply Specialties 3/4"0EA- 0- 0- 0
waste Pipe & Fittings0EA- 0- 0- 0
C.I No Hub Vent Pipe System0EA- 0- 0- 0
Med & Hv duty Cast Iron floor Drains Adtl0EA- 0- 0- 0
Sanitary Sewer- 0- 0- 0
Heavy Duty Cast Iron Floor Drains0EA- 0- 0- 0
8" PVC Pipe Sanitary0LF- 0- 0- 0
Precast CIP Base 4'x6'0EA- 0- 0- 0
Septic Tank Precast Concrete 1000 gallon Excluding or Piping0EA- 0- 0- 0
Septic tank Leaching Field Chambers Heavy Duty 13'x3'-9"x1'-6" Exclude Excatvation or Piping0EA- 0- 0- 0
Septic tanks, Gravel Fill, Run Off Bank 4' Exclude Excatvation or Piping0CY- 0- 0- 0
Septic Tanks, Crushed Stone, 3/4", Exclude Excatvation or Piping0CY- 0- 0- 0
Water Distribution- 0- 0- 0
Residential Water Heater and Hose Bibb Piping0EA- 0- 0- 0
Residential Valves and Hose Bibbs0EA- 0- 0- 0
Piping Water Distribution Polyvinyl Chloride 2" Dia, AWWA C900, Class 160, SDR260LF- 0- 0- 0
Water Supply Meter Domestic/Commercial Bronze Threaded Flange 160GPM 2" Dia0EA- 0- 0- 0
Backflow Preventer Corrosion Resistant Automatic Operation Threaded 2" Pipe Size0EA- 0- 0- 0
Valves Iron Body Gate OS&Y Flanged 125lb 2"0EA- 0- 0- 0
Underground Marking Tape, Vinyl, Aluminum Foil Core, Detachable 2"0LF- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div23

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
HVAC- 0- 0- 0
15T Condensing Unit W/Refridgerant Piping0EA- 0- 0- 0
Rfeturn Air Registar 24x180EA- 0- 0- 0
Ductwork Stack 1500FPM Commercial Building0LB- 0- 0- 0
Ductwork Stack 2500FPM Commercial Building0LB- 0- 0- 0
Bathroom Exhaust Fan 200CFM0EA- 0- 0- 0
Renovate 12x12 Ceil Diffuser W/Perf Face0EA- 0- 0- 0
Renovate 18" Rnd Ceil Diffuser W/Fixed pat0EA- 0- 0- 0
Electric Constrols, Heating & Venting System0EA- 0- 0- 0
VFD 3HP, NEMA1, ENCL, 460V-3PH0EA- 0- 0- 0
Compressed Air System for Maint. Shop0EA- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div24

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div25

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div26

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
Electrical- 0- 0- 0
Underground 125 Amp Secondary0EA- 0- 0- 0
Panel Board 120V/208V 100A Mlo 24 Cir W/Bkr0EA- 0- 0- 0
Panel Board 277V/480V 100A Mlo 24 Cir W/Bkr0EA- 0- 0- 0
Panel Board 400V/600V 100A MCB 42 Cir W/Bkr0EA- 0- 0- 0
Duplex GFI Receptical Long Run0EA- 0- 0- 0
120V 20Amp Quadroplex Receptical0EA- 0- 0- 0
Equipment Connections For Up to 10 HP0EA- 0- 0- 0
120V 20Amp Single Pole Switch0EA- 0- 0- 0
120V 20Amp 3 Way Switch0EA- 0- 0- 0
Motor Connections 460V 3HP0EA- 0- 0- 0
150W Hps Flood Light Wall Mount0EA- 0- 0- 0
Exit light With Battery Backup0EA- 0- 0- 0
Fire Alarm Duct Smoke Detector0EA- 0- 0- 0
Renovate 3/4" RS Conduit W/Coupling & Support0EA- 0- 0- 0
Renovate 30A 3P Fused Disc. Sw. NEMA 1 240V0EA- 0- 0- 0
Surface Mtd Incandescent Cylinder0EA- 0- 0- 0
4' 1 Lamp Recess Fluorescent0EA- 0- 0- 0
4' 2 Lamp Suspnsn Mtd Ind Fluorescent0EA- 0- 0- 0
4-Pair Telephone Outlet0EA- 0- 0- 0
Intrusion Detection System0OUT- 0- 0- 0
18" x 3" Cable Tray0LF- 0- 0- 0
Exit Lighting0EA- 0- 0- 0
Building Grounding0EA- 0- 0- 0
Copper Grd Bus0LF- 0- 0- 0
Lighting protection System0EA- 0- 0- 0
Site Electrical Utilities- 0- 0- 0
Circuit Breaker, 3 Pole, 600V, 600Amp, Enclosed (NEMA1)0EA- 0- 0- 0
Wire Copper Stranded 600V #8 type XHHW in Raceway0LF- 0- 0- 0
Underground Electrical Distribution0- 0- 0- 0
MV/LV 750kVA Main Transformer 1200A Distrobution0EA- 0- 0- 0
Oil Filled Trandformer Pad Mounted 3 Phase 13.8kV Primary 480V Secondary 75kVA0EA- 0- 0- 0
Disconnecting Switches Single Pole Switches 13-26kV0EA- 0- 0- 0
3/C Undgrd 15KV DB #6 W/Bare Grd, Wire0LF- 0- 0- 0
Sheilded cable Copper XLP Sheilding 15kV 350kcmil Excl Splicing & Termination0LF- 0- 0- 0
hand Holes Precst Concrete W/ Concrete Cover 2'x2'x3' Deep Excludes Excv & Backflow0EA- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div27

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div28

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div29

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div30

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div31

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
Sanitary Sewer Site Prep- 0- 0- 0
Dump Charge0CY- 0- 0- 0
Excavation Top Soil to Side0CY- 0- 0- 0
1.25 CY Wheel Loader0HR- 0- 0- 0
1.15CY Soil/Sand Trenching0CY- 0- 0- 0
8CY Dump Truck0HR- 0- 0- 0
3CY Backfill W/Excavated Material0CY- 0- 0- 0
3CY deliverd and Dumped Backfill W/Sand0CY- 0- 0- 0
Compact Soil W/Vibrating Plate0CY- 0- 0- 0
Compact With Pogosticks0CY- 0- 0- 0
Sidewalks- 0- 0- 0
Remove Slab on Grade 4-6"0SF- 0- 0- 0
Rough Grading D6 Dozer0SY- 0- 0- 0
Fine Grade Hand0SY- 0- 0- 0
Fine Grage (120G) 2 Passes0SY- 0- 0- 0
Curb/ Sidewalk ExcavationHaul Off Spoil 1 Mile0CY- 0- 0- 0
Delivered and Dumped- Hand Backfill, W/Sand0CY
Compact Soil W/Vibrating Plate0CY
Site Electrical Utilities
Dump Charge0CY
1.25 CY Wheel Loader0HR
2.5CY Soil/Sand Trenching0CY
8CY Dump Truck0HR
3CY Backfill W/Excavated Material0CY
Compact Soil W/Vibrating Plate0CY
Compact With Pogosticks0CY
Water Distribution
Cat 225 1.5CY Soil Sand Trenching0CY
Backfill W/Excavated Material0CY
Compact Soil W/Vibrating Plate0CY
Compact With Pogosticks0CY
Clear and Grub
Light Brush W/O Grub, Clearing0ACRE
Dozer 200HP D7 Grubbing and Stacking0CY
Dump Charge0CY
7CY Wheel Loader0HR
Borrow Subgrade Load & Haul 5 Mile Spreading0CY
35 Ton Off Highway Truck0HR
Compacted Borrowed Subgrade, 4Lifts0BCY
Site Improvements
Gravel 90% Sand Base 10%0CY
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div32

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div33

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div34

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div35

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div36

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div37

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div38

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div39

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div40

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div41

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div42

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div43

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div44

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div45

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div46

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .