Attachment L3 Technical Experience Reference 033122.pdf

PDF 900 KB Posted

Attached to
Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA2823-22-R-0004
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC), newest first.
File Type Posted
SOLICITATION AMENDMENT FA2823-22-R-0004-0008.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_06072022_Amed008.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0007.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_Amed007.pdf PDF
MACC RFI RESPONSE 24 MAY 2022 CORRECTED 26 MAY 2022.pdf PDF
MACC RFI RESPONSE 13 MAY 2022 CORRECTED 26 MAY 2022.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0005.pdf PDF
MACC RFI RESPONSE 24 MAY 2022.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_Amed004.docx DOCX document
SOLICITATION AMENDMENT FA2823-22-R-0004-0004.pdf PDF
Attachment L11 Revised SOW for B9460_Amed004.pdf PDF
Attachment L1 - FTFA20RC02_50 Division Cost_Revised_Amed 004.xlsx XLSX spreadsheet
SOLICITATION AMENDMENT FA2823-22-R-0004-0003.pdf PDF
MACC RFI Form.xlsx XLSX spreadsheet
ATTACHMENT 5 - SECTION M_Rev051322.pdf PDF
ATTACHMENT 4 - SECTION L_Revised051322.pdf PDF
Attachment L10 Revised SOW for B9460.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0002.pdf PDF
MACC RFI RESPONSE 13 MAY 2022.pdf PDF
Attachment L1 - FTFA20RC02_50 Division Cost_Revised.xlsx XLSX spreadsheet
EXISTING BLDG 9460 ORIGINAL ADDITION DRAWINGS.pdf PDF
EXISTING BLDG 9460 DRAWINGS.pdf PDF
SiteVisitSignInSeetB9460_04272022_Redacted.pdf PDF
EXISTING BLDG 9460 ELECTRICAL DRAWINGS.pdf PDF
RFI RESPONSE 27 APRIL 2022.pdf PDF
Attachment L9 Supplemental Info Bldg 9460.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0001.pdf PDF
Solicitation - FA2823-22-R-0004.pdf PDF
ATTACHMENT 5 - SECTION M 033122.pdf PDF
Attachment L5 Past Performance Information 033122.docx DOCX document
Attachment L4 Consent Form 033122.pdf PDF
Attachment L2-Financial Reference Worksheet 033122.docx DOCX document
ATTACHMENT 3A - Okaloosa County Wage Determination 022522.pdf PDF
ATTACHMENT 1 - MACC SOW FINAL_033122.pdf PDF
Solicitation - FA2823-22-R-0004.pdf PDF
Attachment L8 Additional Information FA2823-22-F-XXXX (TBD) 11 APR 2022.pdf PDF
Attachment L6 Cover Letter Example 033122.docx DOCX document
Attachment L3 Technical Experience Reference 033122.docx DOCX document
Attachment L1-50 Divisions Cost Estimate (DCE) Worksheet 033122.xlsx XLSX spreadsheet
ATTACHMENT 1C - HURLBURT FIELD IFS DEC 2018.pdf PDF
Attachment L7 Past Performance Customer Questionnaire 033122.pdf PDF
Attachment L4 Consent Form 033122.docx DOCX document
Attachment L2-Financial Reference Worksheet 033122.pdf PDF
ATTACHMENT 1B - TYNDALL DESIGN GUIDE MAR 2022.pdf PDF
ATTACHMENT 1A - EGLIN DESIGN GUIDE FEB 2019.pdf PDF
Attachment L6 Cover Letter Example 033122.pdf PDF
Attachment L5 Past Performance Information 033122.pdf PDF
ATTACHMENT 4 - SECTION L_033122.pdf PDF
ATTACHMENT 3B - Bay County Wage Determination 022522.pdf PDF
ATTACHMENT 2 MACC ORDERING GUIDE_03302022.pdf PDF
Show all 50

Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L3 – Technical Experience Project Reference (Present as many projects as requested by the agency in the

RFP)

EXAMPLE PROJECT KEY NUMBER

Project No.

PROJECT SAMPLE REFERENCE FOR:

Prime Joint Venture Teaming Partner Designer of Record

TITLE AND LOCATION (City and State) Contract No. Task Order (if applicable)

DoD Agency or Private/Commercial Entity: Project

Title:

Location (i.e. Eglin AFB, Hurlburt AFB, Tyndall

AFB)COMPLETE THE TYPE OF PROJECT INFORMATION

Divisions/Trades Included as part of the Scope of Project:

Electrical Carpentry Insulation Roofing Plumbing

Flooring (Tile) Cement/Concrete Work Flooring (Carpet/Laminate)

Fire Suppression HVAC Repair/Installation Dry Wall/Ceiling Installation

HazMat Abatement Remediation (Asbestos/Mold/Lead-based Paint)

Other (Explain):

Disciplines Included as part of the Scope of Project:

Architectural Structural Mechanical Fire Protection

Electrical Civil Work Other (explain):

PROJECT INFORMATION

Award Date Completion Date Period of Performance (Actual)

Award Amount Final Contract Amount Project Size (Sq. Ft) to

If Final Amount is different from Contract Amount, please explain reason.

If PoP had to be extended beyond original PoP on Award, please explain reason.

Project Owner Point Of Contact Name Point Of Contact (Email & Telephone Number)

Enter Owner (i.e. 96 CES;

Eglin AFB)

Enter validated/current POC Enter validated/current information

k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. Include a description of the design-effort.

Provide a detailed description of the work your firm self-performed on this project.

Provide a detailed description of challenges faced, actions taken, and results achieved.

Project No:
Award DateRow1:
Completion DateRow1:
Award AmountRow1:
Final Contract AmountRow1:
Project Size Sq FtRow1:
If Final Amount is different from Contract Amount please explain reasonRow1:
If PoP had to be extended beyond original PoP on Awardee please explain reasonRow1:
Enter Owner ie 502 CES JBSA Lackland:
Enter validatedcurrent POC:
Enter validatedcurrent information:
k Provide a detailed description of the project and the relevancy to the project requirements of this RFP Include a description of the designeffortRow1:
Provide a detailed description of what work your firm selfperformed on this projectRow1:
Provide a detailed description of challenges faces actions taken and result achievedRow1:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Date31_af_date:
Date32_af_date: