| Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. |
| The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs. |
Summary
| CONSTRUCTION COST ESTIMATE | Date: | |
| | Fill Here |
| COMPANY | | |
| 796 CEG | | |
| PROJECT | | | |
| FTFA 20RC02 Munitions Test Facility | | | |
| LOCATION | | PROJECT NO. | FTFA20RC02 |
| EGLIN AIR FORCE BASE, FLORIDA | | | |
| DIVISION | DESCRIPTION | % by | |
| Division | Division Total | | | |
| DIVISION 01 | GENERAL REQUIREMENTS | ERROR:#DIV/0! | - 0 | |
| DIVISION 02 | EXISTING CONDITIONS | ERROR:#DIV/0! | - 0 | |
| DIVISION 03 | CONCRETE WORK | ERROR:#DIV/0! | - 0 | FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| DIVISION 04 | MASONRY | ERROR:#DIV/0! | - 0 | | |
| DIVISION 05 | METALS | ERROR:#DIV/0! | - 0 | | |
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | ERROR:#DIV/0! | - 0 | GC Overhead | 0.00% |
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | ERROR:#DIV/0! | - 0 | GC Protit | 0.00% |
| DIVISION 08 | OPENINGS | ERROR:#DIV/0! | - 0 | Sub Overhead | 0.00% |
| DIVISION 09 | FINISHES | ERROR:#DIV/0! | - 0 | Sub Profit | 0.00% |
| DIVISION 10 | SPECIALTIES | ERROR:#DIV/0! | - 0 | Sales Tax | 0.00% |
| DIVISION 11 | EQUIPMENT | ERROR:#DIV/0! | - 0 | Risk/Bonding | 0.00% |
| DIVISION 12 | FURNISHINGS | ERROR:#DIV/0! | - 0 | | |
| DIVISION 13 | SPECIAL CONSTRUCTION | ERROR:#DIV/0! | - 0 | This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas | |
| DIVISION 14 | CONVEYING EQUIPMENT | ERROR:#DIV/0! | - 0 | | |
| DIVISION 15 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 16 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 20 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 21 | FIRE SUPRESSION | ERROR:#DIV/0! | - 0 | | |
| DIVISION 22 | PLUMBING | ERROR:#DIV/0! | - 0 | | |
| DIVISION 23 | HEATING, VENTILATING AND A/C | ERROR:#DIV/0! | - 0 | | |
| DIVISION 24 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 25 | INTEGRATED AUTOMATION | ERROR:#DIV/0! | - 0 | | |
| DIVISION 26 | ELECTRICAL | ERROR:#DIV/0! | - 0 | | |
| DIVISION 27 | COMMUNICATIONS | ERROR:#DIV/0! | - 0 | | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | ERROR:#DIV/0! | - 0 | | |
| DIVISION 29 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 30 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 31 | EARTHWORK | ERROR:#DIV/0! | - 0 | | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | ERROR:#DIV/0! | - 0 | | |
| DIVISION 33 | UTILITIES | ERROR:#DIV/0! | - 0 | | |
| DIVISION 34 | TRANSPORTATION | ERROR:#DIV/0! | - 0 | | |
| DIVISION 35 | WATERWAYS AND MARINE CONSTRUCTION | ERROR:#DIV/0! | - 0 | | |
| DIVISION 36 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 37 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 38 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 39 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 40 | PROCESS INTEGRATION | ERROR:#DIV/0! | - 0 | | |
| DIVISION 41 | MATERIAL PROCESING AND HANDLING EQUIPMENT | ERROR:#DIV/0! | - 0 | | |
| DIVISION 42 | PROCESS HEATING, COOLING AND DRYING EQUIPMENT | ERROR:#DIV/0! | - 0 | | |
| DIVISION 43 | PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | ERROR:#DIV/0! | - 0 | | |
| DIVISION 44 | POLLUTION CONTROL EQUIPMENT | ERROR:#DIV/0! | - 0 | | |
| DIVISION 45 | INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT | ERROR:#DIV/0! | - 0 | | |
| DIVISION 46 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 47 | RESERVED | ERROR:#DIV/0! | - 0 | | |
| DIVISION 48 | ELECTRICAL POWER GENERATION | ERROR:#DIV/0! | - 0 | | |
| DIVISION 49 | RESERVED | ERROR:#DIV/0! | - 0 | | |
HARD COST TOTAL ERROR:#DIV/0! - 0
| GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | - 0 |
| SUBTOTAL | | - 0 |
| GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | - 0 |
| SUBTOTAL | | - 0 |
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0% | - 0 |
| CONTRACT TOTAL | | $ - 0 |
&"Arial"&8&B SHEET &P OF &N
Div1
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | | | | | | | |
| Contingency | | | | - 0 | | - 0 | - 0 |
| Design Build Fee | | | | - 0 | | - 0 | - 0 |
| UXO Sweep | | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | | - 0 |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div2
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXISTING CONDITIONS | | | | | | | |
| Demo Interior | | | | - 0 | | - 0 | - 0 |
| Seal Penetrations | | SF | | - 0 | | - 0 | - 0 |
| Demo HVAC | | | | - 0 | | - 0 | - 0 |
| Duckwork Independent Floor Parts | | | | - 0 | | - 0 | - 0 |
| Exhaust Fan with duct System 2500CFM | | EA | | - 0 | | - 0 | - 0 |
| Demo Electrical | | | | - 0 | | - 0 | - 0 |
| Master Television Antenna With Pole | | EA | | - 0 | | - 0 | - 0 |
| Demo Special Construction | | | | - 0 | | - 0 | - 0 |
| Remove Gutters and Downspouts | | LF | | - 0 | | - 0 | - 0 |
| Remove Transmitter and Antenna | | EA | | - 0 | | - 0 | - 0 |
| Expansive Demo Crew Labor | | HR | | - 0 | | - 0 | - 0 |
| Demo Sitework | | | | - 0 | | - 0 | - 0 |
| Demolish Mesh Reinf Concrete to 6" with Power Equipment | | CY | | - 0 | | - 0 | - 0 |
| 1.25 CY Wheel Loader | | HR | | - 0 | | - 0 | - 0 |
| 6CY Dump Truck | | | | - 0 | | - 0 | - 0 |
| Demo Electrical Utilities | | | | - 0 | | - 0 | - 0 |
| Disconnecting Switches, Single Pole Switches, 13 to 26kV, Remove | | EA | | - 0 | | - 0 | - 0 |
| Demo Building Site Work | | | | - 0 | | - 0 | - 0 |
| Demolish Mesh Reinf Concrete to 6" with Power Equipment | | CY | | - 0 | | - 0 | - 0 |
| Remove Catch Basin Manhole | | CY | | - 0 | | - 0 | - 0 |
| Remove 12" Diameter Concrete Pipe, Not Inc Excavation | | LF | | - 0 | | - 0 | - 0 |
| Dump Charge | | CY | | - 0 | | - 0 | - 0 |
| 1.25CY Wheel Loader | | HR | | - 0 | | - 0 | - 0 |
| Crawler Mounted 2CY Hyd Excavator | | HR | | - 0 | | - 0 | - 0 |
| Cat 225 1.5CY Soil/Sand Trenching | | CY | | - 0 | | - 0 | - 0 |
| 8CY Dump Truck | | HR | | - 0 | | - 0 | - 0 |
| 3CY Backfill W/Excavated Material | | CY | | - 0 | | - 0 | - 0 |
| Backfill Trencch Borrow Mat, Delivered Dumped | | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrtating Plate | | CY | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div3
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONCRETE WORK | | | | | | | |
| Substructure | | | | - 0 | | - 0 | - 0 |
| 1'x3' Strip Footing 3000psi | | LF | | - 0 | | - 0 | - 0 |
| Spread Footing | | CY | | - 0 | | - 0 | - 0 |
| Spread Footing Reinforced Steel | | TON | | - 0 | | - 0 | - 0 |
| Spread Footing Column Bolts | | EA | | - 0 | | - 0 | - 0 |
| (4") Mechanical Equipment pad | | SF | | - 0 | | - 0 | - 0 |
| (2'x8'x12') Reinforced Concrete | | SF | | - 0 | | - 0 | - 0 |
| Interiors | | | | - 0 | | - 0 | - 0 |
| Non Load Bearing Partician 8x6x16 Concrete | | SF | | - 0 | | - 0 | - 0 |
| Non Load Bearing Partician 8x6x16 Concrete | | SF | | - 0 | | - 0 | - 0 |
| Building Site Work | | | | - 0 | | - 0 | - 0 |
| 8" Bollards | | EA | | - 0 | | - 0 | - 0 |
| 6" Structural Slab on Grade | | SF | | - 0 | | - 0 | - 0 |
| Sidewalk | | | | - 0 | | - 0 | - 0 |
| Standard 6" Sidewalk W/Mesh, Formed | | SF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div4
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MASONRY | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div5
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | FTFA20RC02 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| METALS | | | | | | | |
| Superstructure | | | | - 0 | | - 0 | - 0 |
| Structural Steel Frame , Hv Load, Small Span | | TON | | - 0 | | - 0 | - 0 |
| Sml Span, Hv Load, Stl Frm, Mtl Joist | | TON | | - 0 | | - 0 | - 0 |
| 1-1/2" Galvanized Metal Roof Deck, Open Type FP | | SF | | - 0 | | - 0 | - 0 |
| Exterior Enclosure | | | | - 0 | | - 0 | - 0 |
| Metal Siding/ with Vinyal backed ends | | SF | | - 0 | | - 0 | - 0 |
| 3/4" Metal Furing Strip | | SF | | - 0 | | - 0 | - 0 |
| Roofing | | | | - 0 | | - 0 | - 0 |
| Metal Roof W/Vinyal backed ends | | SF | | - 0 | | - 0 | - 0 |
| (6") Wide Galvenized Steel Gutters & Downspouts | | LF | | - 0 | | - 0 | - 0 |
| Exterior Canopy W/Framing | | SF | | - 0 | | - 0 | - 0 |
| Interiors | | | | - 0 | | - 0 | - 0 |
| Metal Stud Partician 3-5/8" | | SF | | - 0 | | - 0 | - 0 |
| Ribbed Metal Panel (22Ga) with 3-1/2 Batt Insulation | | SF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div6
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WOOD, PLASTICS AND COMPOSITES | | | | | | | |
| Bathroom Enclosure | | | | - 0 | | - 0 | - 0 |
| 5/8" Gypsum Board/ Installed/ Taped/ Finished | | SF | | - 0 | | - 0 | - 0 |
| Paint and Gypsum Board Walls Using Roller | | SF | | - 0 | | - 0 | - 0 |
| Interior Finishes | | | | - 0 | | - 0 | - 0 |
| 5/8" Gypsum Board on 7/8" Furing Channel | | SF | | - 0 | | - 0 | - 0 |
| 5/8" FR Gypsum Board/ Installed/ Taped/ Finished | | SF | | - 0 | | - 0 | - 0 |
| Paint to Gypsum Board Walls Using Roller | | SF | | - 0 | | - 0 | - 0 |
| 5/8" Gypsum WallBoard Ceiling, 1 Layer, Fire Rated | | SF | | - 0 | | - 0 | - 0 |
| Paint Exposed Steel Joist and Roof Deck | | SF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div7
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| THERMAL AND MOISTURE PROTECTION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div8
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| OPENINGS | | | | | | | |
| Interior | | | | - 0 | | - 0 | - 0 |
| 3'x7' Hollow Metal Door W/ Frame/ Hardware | | EA | | - 0 | | - 0 | - 0 |
| Exterior Enclosure | | | | - 0 | | - 0 | - 0 |
| 3'x7' Hollow Metal Door W/Frame/Hardware | | EA | | - 0 | | - 0 | - 0 |
| 12'x14' Insulated Metal Coiling Door | | EA | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div9
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | FTFA20RC02 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FINISHES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div10
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | FTFA20RC02 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIALTIES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div11
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EQUIPMENT | | | | | | | |
| Overhead Bridge Crane 5 Ton | | EA | | - 0 | | - 0 | - 0 |
| Bridge Crane Rail | | lb | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div12
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FURNISHINGS | | | | | | | |
| Interiors | | | | - 0 | | - 0 | - 0 |
| Seal Penetrations Smoke/Fire | | SF | | - 0 | | - 0 | - 0 |
| Toilet Accessories for Single Toilet | | EA | | - 0 | | - 0 | - 0 |
| Vanity Base Cabnet W/Doors/Sink | | LF | | - 0 | | - 0 | - 0 |
| Wall Mounted Mirror | | LF | | - 0 | | - 0 | - 0 |
| Soap, Paper Towel, Toilet Paper Dispensors | | LF | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div13
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIAL CONSTRUCTION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div14
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | FTFA20RC02 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONVEYING EQUIPMENT | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div15
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div16
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div20
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div21
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FIRE SUPRESSION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div22
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PLUMBING | | | | | | | |
| Floor Mounted Water Closet | | EA | | - 0 | | - 0 | - 0 |
| Wall Hung 18" by 15" White Single Bowl Lavatory | | EA | | - 0 | | - 0 | - 0 |
| S.S Kitchen Sink, Single Bowl 25x22 | | EA | | - 0 | | - 0 | - 0 |
| Janitor Sink Floor Type | | EA | | - 0 | | - 0 | - 0 |
| Emergency Shower and Eyewash | | EA | | - 0 | | - 0 | - 0 |
| Copper Pipe & Fittings (1/2" to 4 " Dia. Piping) | | EA | | - 0 | | - 0 | - 0 |
| Valves & Hydrants | | EA | | - 0 | | - 0 | - 0 |
| Domestic Hot Water Heater (30g) | | EA | | - 0 | | - 0 | - 0 |
| Fiberglass 1-1/2" Pipe Insulation With Vapor Barrier | | EA | | - 0 | | - 0 | - 0 |
| domestic water Supply Specialties 3/4" | | EA | | - 0 | | - 0 | - 0 |
| waste Pipe & Fittings | | EA | | - 0 | | - 0 | - 0 |
| C.I No Hub Vent Pipe System | | EA | | - 0 | | - 0 | - 0 |
| Med & Hv duty Cast Iron floor Drains Adtl | | EA | | - 0 | | - 0 | - 0 |
| Sanitary Sewer | | | | - 0 | | - 0 | - 0 |
| Heavy Duty Cast Iron Floor Drains | | EA | | - 0 | | - 0 | - 0 |
| 8" PVC Pipe Sanitary | | LF | | - 0 | | - 0 | - 0 |
| Precast CIP Base 4'x6' | | EA | | - 0 | | - 0 | - 0 |
| Septic Tank Precast Concrete 1000 gallon Excluding or Piping | | EA | | - 0 | | - 0 | - 0 |
| Septic tank Leaching Field Chambers Heavy Duty 13'x3'-9"x1'-6" Exclude Excatvation or Piping | | EA | | - 0 | | - 0 | - 0 |
| Septic tanks, Gravel Fill, Run Off Bank 4' Exclude Excatvation or Piping | | CY | | - 0 | | - 0 | - 0 |
| Septic Tanks, Crushed Stone, 3/4", Exclude Excatvation or Piping | | CY | | - 0 | | - 0 | - 0 |
| Water Distribution | | | | - 0 | | - 0 | - 0 |
| Residential Water Heater and Hose Bibb Piping | | EA | | - 0 | | - 0 | - 0 |
| Residential Valves and Hose Bibbs | | EA | | - 0 | | - 0 | - 0 |
| Piping Water Distribution Polyvinyl Chloride 2" Dia, AWWA C900, Class 160, SDR26 | | LF | | - 0 | | - 0 | - 0 |
| Water Supply Meter Domestic/Commercial Bronze Threaded Flange 160GPM 2" Dia | | EA | | - 0 | | - 0 | - 0 |
| Backflow Preventer Corrosion Resistant Automatic Operation Threaded 2" Pipe Size | | EA | | - 0 | | - 0 | - 0 |
| Valves Iron Body Gate OS&Y Flanged 125lb 2" | | EA | | - 0 | | - 0 | - 0 |
| Underground Marking Tape, Vinyl, Aluminum Foil Core, Detachable 2" | | LF | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div23
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| HEATING, VENTILATING AND A/C | | | | | | | |
| HVAC | | | | - 0 | | - 0 | - 0 |
| 15T Condensing Unit W/Refridgerant Piping | | EA | | - 0 | | - 0 | - 0 |
| Rfeturn Air Registar 24x18 | | EA | | - 0 | | - 0 | - 0 |
| Ductwork Stack 1500FPM Commercial Building | | LB | | - 0 | | - 0 | - 0 |
| Ductwork Stack 2500FPM Commercial Building | | LB | | - 0 | | - 0 | - 0 |
| Bathroom Exhaust Fan 200CFM | | EA | | - 0 | | - 0 | - 0 |
| Renovate 12x12 Ceil Diffuser W/Perf Face | | EA | | - 0 | | - 0 | - 0 |
| Renovate 18" Rnd Ceil Diffuser W/Fixed pat | | EA | | - 0 | | - 0 | - 0 |
| Electric Constrols, Heating & Venting System | | EA | | - 0 | | - 0 | - 0 |
| VFD 3HP, NEMA1, ENCL, 460V-3PH | | EA | | - 0 | | - 0 | - 0 |
| Compressed Air System | | EA | | - 0 | | - 0 | - 0 |
| Test and Balance of HVAC System | | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div24
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div25
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| INTEGRATED AUTOMATION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div26
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRICAL | | | | | | | |
| Electrical | | | | - 0 | | - 0 | - 0 |
| Panel Board 120V/208V 100A Mlo 24 Cir W/Bkr | | EA | | - 0 | | - 0 | - 0 |
| Panel Board 277V/480V 200A Mlo 24 Cir W/Bkr | | EA | | - 0 | | - 0 | - 0 |
| Duplex GFI Receptical Long Run | | EA | | - 0 | | - 0 | - 0 |
| Equipment Connections For Up to 10 HP | | EA | | - 0 | | - 0 | - 0 |
| 120V 20Amp Single Pole Switch | | EA | | - 0 | | - 0 | - 0 |
| 120V 20Amp 3 Way Switch | | EA | | - 0 | | - 0 | - 0 |
| 120V 20Amp 4 Way Switch | | EA | | - 0 | | - 0 | - 0 |
| Motor Connections 460V 3HP | | EA | | - 0 | | - 0 | - 0 |
| 150W Hps Flood Light Wall Mount | | EA | | - 0 | | - 0 | - 0 |
| Exit light With Battery Backup | | EA | | - 0 | | - 0 | - 0 |
| Fire Alarm Duct Smoke Detector | | EA | | - 0 | | - 0 | - 0 |
| Renovate 3/4" RS Conduit W/Coupling & Support | | EA | | - 0 | | - 0 | - 0 |
| Renovate 30A 3P Fused Disc. Sw. NEMA 1 240V | | EA | | - 0 | | - 0 | - 0 |
| Surface Mtd Incandescent Cylinder | | EA | | - 0 | | - 0 | - 0 |
| 4' 1 Lamp Recess Fluorescent | | EA | | - 0 | | - 0 | - 0 |
| 4' 2 Lamp Suspnsn Mtd Ind Fluorescent | | EA | | - 0 | | - 0 | - 0 |
| 4-Pair Telephone Outlet | | EA | | - 0 | | - 0 | - 0 |
| Intrusion Detection System | | OUT | | - 0 | | - 0 | - 0 |
| 18" x 3" Cable Tray | | LF | | - 0 | | - 0 | - 0 |
| Exit Lighting | | EA | | - 0 | | - 0 | - 0 |
| Building Grounding | | EA | | - 0 | | - 0 | - 0 |
| Copper Grd Bus | | LF | | - 0 | | - 0 | - 0 |
| Lighting protection System | | EA | | - 0 | | - 0 | - 0 |
| 30KVA Transformer 480V/208V | | EA | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div27
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| COMMUNICATIONS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div28
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRONIC SAFETY AND SECURITY | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div29
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div30
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div31
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EARTHWORK | | | | | | | |
| Sanitary Sewer Site Prep | | | | - 0 | | - 0 | - 0 |
| Excavation Top Soil to Side | | CY | | - 0 | | - 0 | - 0 |
| 1.25 CY Wheel Loader | | HR | | - 0 | | - 0 | - 0 |
| 1.15CY Soil/Sand Trenching | | CY | | - 0 | | - 0 | - 0 |
| 8CY Dump Truck | | HR | | - 0 | | - 0 | - 0 |
| 3CY Backfill W/Excavated Material | | CY | | - 0 | | - 0 | - 0 |
| 3CY deliverd and Dumped Backfill W/Sand | | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrating Plate | | CY | | - 0 | | - 0 | - 0 |
| Compact With Pogosticks | | CY | | - 0 | | - 0 | - 0 |
| Sidewalks | | | | - 0 | | - 0 | - 0 |
| Remove Slab on Grade 4-6" | | SF | | - 0 | | - 0 | - 0 |
| Rough Grading D6 Dozer | | SY | | - 0 | | - 0 | - 0 |
| Fine Grade Hand | | SY | | - 0 | | - 0 | - 0 |
| Fine Grage (120G) 2 Passes | | SY | | - 0 | | - 0 | - 0 |
| Curb/ Sidewalk ExcavationHaul Off Spoil 1 Mile | | CY | | - 0 | | - 0 | - 0 |
| Delivered and Dumped- Hand Backfill, W/Sand | | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrating Plate | | CY | | - 0 | | - 0 | - 0 |
| Site Electrical Utilities | | | | - 0 | | - 0 | - 0 |
| 1.25 CY Wheel Loader | | HR | | - 0 | | - 0 | - 0 |
| 2.5CY Soil/Sand Trenching | | CY | | - 0 | | - 0 | - 0 |
| 8CY Dump Truck | | HR | | - 0 | | - 0 | - 0 |
| 3CY Backfill W/Excavated Material | | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrating Plate | | CY | | - 0 | | - 0 | - 0 |
| Compact With Pogosticks | | CY | | - 0 | | - 0 | - 0 |
| Water Distribution | | | | - 0 | | - 0 | - 0 |
| Cat 225 1.5CY Soil Sand Trenching | | CY | | - 0 | | - 0 | - 0 |
| Backfill W/Excavated Material | | CY | | - 0 | | - 0 | - 0 |
| Compact Soil W/Vibrating Plate | | CY | | - 0 | | - 0 | - 0 |
| Compact With Pogosticks | | CY | | - 0 | | - 0 | |
| Clear and Grub | | | | | | | - 0 |
| Light Brush W/O Grub, Clearing | | ACRE | | | | 0.00% | - 0 |
| Dozer 200HP D7 Grubbing and Stacking | | CY | | | | 0.00% | - 0 |
| Dump Charge | | CY | | | | 0.00% | - 0 |
| 7CY Wheel Loader | | HR | | | | | $ - 0 |
| Borrow Subgrade Load & Haul 5 Mile Spreading | | CY | | | | | |
| 35 Ton Off Highway Truck | | HR | | | | | |
| Compacted Borrowed Subgrade, 4Lifts | | BCY | | | | | |
| Site Improvements | | | | | | | |
| Gravel 90% Sand Base 10% | | CY | | | | | |
Div32
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div33
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| UTILITIES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div34
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| TRANSPORTATION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div35
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WATERWAYS AND MARINE CONSTRUCTION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div36
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div37
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div38
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div39
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 0.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div40
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | Fill Here | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| FTFA 20RC02 Munitions Test Facility | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| EGLIN AIR FORCE BASE, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| 796 CEG | | | FTFA20RC02 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS INTEGRATION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |