Attachment L1 - FTFA20RC02_50 Division Cost_Revised_Amed 004.xlsx

XLSX spreadsheet 628 KB Posted

Attached to
Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA2823-22-R-0004
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC), newest first.
File Type Posted
ATTACHMENT 4 - SECTION L_Revised_06072022_Amed008.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0008.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_Amed007.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0006.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0005.pdf PDF
MACC RFI RESPONSE 13 MAY 2022 CORRECTED 26 MAY 2022.pdf PDF
MACC RFI RESPONSE 24 MAY 2022 CORRECTED 26 MAY 2022.pdf PDF
MACC RFI RESPONSE 24 MAY 2022.pdf PDF
Attachment L11 Revised SOW for B9460_Amed004.pdf PDF
ATTACHMENT 4 - SECTION L_Revised_Amed004.docx DOCX document
SOLICITATION AMENDMENT FA2823-22-R-0004-0004.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0003.pdf PDF
Attachment L1 - FTFA20RC02_50 Division Cost_Revised.xlsx XLSX spreadsheet
SOLICITATION AMENDMENT FA2823-22-R-0004-0002.pdf PDF
MACC RFI RESPONSE 13 MAY 2022.pdf PDF
MACC RFI Form.xlsx XLSX spreadsheet
ATTACHMENT 5 - SECTION M_Rev051322.pdf PDF
ATTACHMENT 4 - SECTION L_Revised051322.pdf PDF
Attachment L10 Revised SOW for B9460.pdf PDF
EXISTING BLDG 9460 DRAWINGS.pdf PDF
SiteVisitSignInSeetB9460_04272022_Redacted.pdf PDF
EXISTING BLDG 9460 ELECTRICAL DRAWINGS.pdf PDF
EXISTING BLDG 9460 ORIGINAL ADDITION DRAWINGS.pdf PDF
RFI RESPONSE 27 APRIL 2022.pdf PDF
Attachment L9 Supplemental Info Bldg 9460.pdf PDF
SOLICITATION AMENDMENT FA2823-22-R-0004-0001.pdf PDF
Solicitation - FA2823-22-R-0004.pdf PDF
Attachment L7 Past Performance Customer Questionnaire 033122.pdf PDF
Attachment L4 Consent Form 033122.docx DOCX document
Attachment L2-Financial Reference Worksheet 033122.pdf PDF
ATTACHMENT 1B - TYNDALL DESIGN GUIDE MAR 2022.pdf PDF
ATTACHMENT 1A - EGLIN DESIGN GUIDE FEB 2019.pdf PDF
Attachment L6 Cover Letter Example 033122.pdf PDF
Attachment L5 Past Performance Information 033122.pdf PDF
ATTACHMENT 4 - SECTION L_033122.pdf PDF
ATTACHMENT 3B - Bay County Wage Determination 022522.pdf PDF
ATTACHMENT 2 MACC ORDERING GUIDE_03302022.pdf PDF
Attachment L8 Additional Information FA2823-22-F-XXXX (TBD) 11 APR 2022.pdf PDF
Attachment L6 Cover Letter Example 033122.docx DOCX document
Attachment L3 Technical Experience Reference 033122.pdf PDF
Attachment L3 Technical Experience Reference 033122.docx DOCX document
Attachment L1-50 Divisions Cost Estimate (DCE) Worksheet 033122.xlsx XLSX spreadsheet
ATTACHMENT 1C - HURLBURT FIELD IFS DEC 2018.pdf PDF
ATTACHMENT 5 - SECTION M 033122.pdf PDF
Attachment L5 Past Performance Information 033122.docx DOCX document
Attachment L4 Consent Form 033122.pdf PDF
Attachment L2-Financial Reference Worksheet 033122.docx DOCX document
ATTACHMENT 3A - Okaloosa County Wage Determination 022522.pdf PDF
ATTACHMENT 1 - MACC SOW FINAL_033122.pdf PDF
Solicitation - FA2823-22-R-0004.pdf PDF
Show all 50

Northwest Florida Air Force (NWF-AF) Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to add additional rows to each spreadsheet, as needed. If the contractor feels items listed on a particular division should be moved to a different division, they should leave the item in its original location and annotate the division it is moved to. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs.

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
FTFA 20RC02 Munitions Test Facility
LOCATIONPROJECT NO.FTFA20RC02
EGLIN AIR FORCE BASE, FLORIDA
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTSERROR:#DIV/0!- 0
DIVISION 02EXISTING CONDITIONSERROR:#DIV/0!- 0
DIVISION 03CONCRETE WORKERROR:#DIV/0!- 0FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

DIVISION 04MASONRYERROR:#DIV/0!- 0
DIVISION 05METALSERROR:#DIV/0!- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITESERROR:#DIV/0!- 0GC Overhead0.00%
DIVISION 07THERMAL AND MOISTURE PROTECTIONERROR:#DIV/0!- 0GC Protit0.00%
DIVISION 08OPENINGSERROR:#DIV/0!- 0Sub Overhead0.00%
DIVISION 09FINISHESERROR:#DIV/0!- 0Sub Profit0.00%
DIVISION 10SPECIALTIESERROR:#DIV/0!- 0Sales Tax0.00%
DIVISION 11EQUIPMENTERROR:#DIV/0!- 0Risk/Bonding0.00%
DIVISION 12FURNISHINGSERROR:#DIV/0!- 0
DIVISION 13SPECIAL CONSTRUCTIONERROR:#DIV/0!- 0This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 15RESERVEDERROR:#DIV/0!- 0
DIVISION 16RESERVEDERROR:#DIV/0!- 0
DIVISION 20RESERVEDERROR:#DIV/0!- 0
DIVISION 21FIRE SUPRESSIONERROR:#DIV/0!- 0
DIVISION 22PLUMBINGERROR:#DIV/0!- 0
DIVISION 23HEATING, VENTILATING AND A/CERROR:#DIV/0!- 0
DIVISION 24RESERVEDERROR:#DIV/0!- 0
DIVISION 25INTEGRATED AUTOMATIONERROR:#DIV/0!- 0
DIVISION 26ELECTRICALERROR:#DIV/0!- 0
DIVISION 27COMMUNICATIONSERROR:#DIV/0!- 0
DIVISION 28ELECTRONIC SAFETY AND SECURITYERROR:#DIV/0!- 0
DIVISION 29RESERVEDERROR:#DIV/0!- 0
DIVISION 30RESERVEDERROR:#DIV/0!- 0
DIVISION 31EARTHWORKERROR:#DIV/0!- 0
DIVISION 32EXTERIOR IMPROVEMENTSERROR:#DIV/0!- 0
DIVISION 33UTILITIESERROR:#DIV/0!- 0
DIVISION 34TRANSPORTATIONERROR:#DIV/0!- 0
DIVISION 35WATERWAYS AND MARINE CONSTRUCTIONERROR:#DIV/0!- 0
DIVISION 36RESERVEDERROR:#DIV/0!- 0
DIVISION 37RESERVEDERROR:#DIV/0!- 0
DIVISION 38RESERVEDERROR:#DIV/0!- 0
DIVISION 39RESERVEDERROR:#DIV/0!- 0
DIVISION 40PROCESS INTEGRATIONERROR:#DIV/0!- 0
DIVISION 41MATERIAL PROCESING AND HANDLING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 42PROCESS HEATING, COOLING AND DRYING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 43PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENTERROR:#DIV/0!- 0
DIVISION 44POLLUTION CONTROL EQUIPMENTERROR:#DIV/0!- 0
DIVISION 45INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 46RESERVEDERROR:#DIV/0!- 0
DIVISION 47RESERVEDERROR:#DIV/0!- 0
DIVISION 48ELECTRICAL POWER GENERATIONERROR:#DIV/0!- 0
DIVISION 49RESERVEDERROR:#DIV/0!- 0

HARD COST TOTAL ERROR:#DIV/0! - 0

GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%- 0
SUBTOTAL- 0
GENERAL CONTRACTOR'S PROFIT(Fill in%)0%- 0
SUBTOTAL- 0
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0%- 0
CONTRACT TOTAL$ - 0

&"Arial"&8&B SHEET &P OF &N

CLIN Structure

CLIN STRUCTURE

CLINDescriptionUnit of IssueUnit PriceTotal AmountAnticipated PoP
0001Design – All design costs shall be included on this CLIN and represent 100% design submittalJob181 DAYS
0002Build – All construction costs shall be included on this CLINJob272 DAYS
0003Bid Option – New Fire Alarm PanelJob60 DAYS

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
Contingency- 0- 0- 0
Design Build Fee- 0- 0- 0
UXO Sweep- 0- 0- 0
Direct Design Fee- 0- 0- 0
Indirect Design Fee- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
Demo Interior- 0- 0- 0
Seal PenetrationsSF- 0- 0- 0
Demo HVAC- 0- 0- 0
Duckwork Independent Floor Parts- 0- 0- 0
Exhaust Fan with duct System 2500CFMEA- 0- 0- 0
Demo Electrical- 0- 0- 0
Master Television Antenna With PoleEA- 0- 0- 0
Demo Special Construction- 0- 0- 0
Remove Gutters and DownspoutsLF- 0- 0- 0
Remove Transmitter and AntennaEA- 0- 0- 0
Expansive Demo Crew LaborHR- 0- 0- 0
Demo Sitework- 0- 0- 0
Demolish Mesh Reinf Concrete to 6" with Power EquipmentCY- 0- 0- 0
1.25 CY Wheel LoaderHR- 0- 0- 0
6CY Dump Truck- 0- 0- 0
Demo Electrical Utilities- 0- 0- 0
Disconnecting Switches, Single Pole Switches, 13 to 26kV, RemoveEA- 0- 0- 0
Demo Building Site Work- 0- 0- 0
Demolish Mesh Reinf Concrete to 6" with Power EquipmentCY- 0- 0- 0
Remove Catch Basin ManholeCY- 0- 0- 0
Remove 12" Diameter Concrete Pipe, Not Inc ExcavationLF- 0- 0- 0
Dump ChargeCY- 0- 0- 0
1.25CY Wheel LoaderHR- 0- 0- 0
Crawler Mounted 2CY Hyd ExcavatorHR- 0- 0- 0
Cat 225 1.5CY Soil/Sand TrenchingCY- 0- 0- 0
8CY Dump TruckHR- 0- 0- 0
3CY Backfill W/Excavated MaterialCY- 0- 0- 0
Backfill Trencch Borrow Mat, Delivered DumpedCY- 0- 0- 0
Compact Soil W/Vibrtating PlateCY
- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div3

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
Substructure- 0- 0- 0
1'x3' Strip Footing 3000psiLF- 0- 0- 0
Spread FootingCY- 0- 0- 0
Spread Footing Reinforced SteelTON- 0- 0- 0
Spread Footing Column BoltsEA- 0- 0- 0
(4") Mechanical Equipment padSF- 0- 0- 0
(2'x8'x12') Reinforced ConcreteSF- 0- 0- 0
Interiors- 0- 0- 0
Non Load Bearing Partician 8x6x16 ConcreteSF- 0- 0- 0
Non Load Bearing Partician 8x6x16 ConcreteSF- 0- 0- 0
Building Site Work- 0- 0- 0
8" BollardsEA- 0- 0- 0
6" Structural Slab on GradeSF- 0- 0- 0
Sidewalk- 0- 0- 0
Standard 6" Sidewalk W/Mesh, FormedSF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div4

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div5

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
Superstructure- 0- 0- 0
Structural Steel Frame , Hv Load, Small SpanTON- 0- 0- 0
Sml Span, Hv Load, Stl Frm, Mtl JoistTON- 0- 0- 0
1-1/2" Galvanized Metal Roof Deck, Open Type FPSF- 0- 0- 0
Exterior Enclosure- 0- 0- 0
Metal Siding/ with Vinyal backed endsSF- 0- 0- 0
3/4" Metal Furing StripSF- 0- 0- 0
Roofing- 0- 0- 0
Metal Roof W/Vinyal backed endsSF- 0- 0- 0
(6") Wide Painted Galvenized Steel Gutters & DownspoutsLF- 0- 0- 0
Exterior Canopy W/FramingSF- 0- 0- 0
Interiors- 0- 0- 0
Metal Stud Partician 3-5/8"SF- 0- 0- 0
Ribbed Metal Panel (22Ga) with 3-1/2 Batt InsulationSF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div6

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
Bathroom Exterior Enclosure- 0- 0- 0
5/8" Gypsum Board/ Installed/ Taped/ FinishedSF- 0- 0- 0
Paint and Gypsum Board Walls Using RollerSF- 0- 0- 0
Bathroom Interior Finishes- 0- 0- 0
5/8" Gypsum Board on 7/8" Furing ChannelSF- 0- 0- 0
5/8" FR Gypsum Board/ Installed/ Taped/ FinishedSF- 0- 0- 0
Paint to Gypsum Board Walls Using RollerSF- 0- 0- 0
5/8" Gypsum WallBoard Ceiling, 1 Layer, Fire RatedSF- 0- 0- 0
Paint Exposed Steel Joist and Roof DeckSF- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div8

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
Interior- 0- 0- 0
3'x7' Hollow Metal Door W/ Frame/ HardwareEA- 0- 0- 0
Exterior Enclosure- 0- 0- 0
3'x7' Hollow Metal Door W/Frame/HardwareEA- 0- 0- 0
12'x14' Insulated Metal Coiling DoorEA- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div10

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div11

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
Overhead Bridge Crane 5 TonEA- 0- 0- 0
Bridge Crane Raillb- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div12

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
Interiors- 0- 0- 0
Seal Penetrations Smoke/FireSF- 0- 0- 0
Toilet Accessories for Single ToiletEA- 0- 0- 0
Vanity Base Cabnet W/Doors/SinkLF- 0- 0- 0
Wall Mounted MirrorLF- 0- 0- 0
Soap, Paper Towel, Toilet Paper DispensorsLF- 0- 0- 0
Wash Basin SinkEA- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div13

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div14

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div15

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div16

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div20

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div21

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div22

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
Floor Mounted Water ClosetEA- 0- 0- 0
Wall Hung 18" by 15" White Single Bowl LavatoryEA- 0- 0- 0
S.S Kitchen Sink, Single Bowl 25x22EA- 0- 0- 0
Janitor Sink Floor TypeEA- 0- 0- 0
Emergency Shower and EyewashEA- 0- 0- 0
Copper Pipe & Fittings (1/2" to 4 " Dia. Piping)EA- 0- 0- 0
Valves & HydrantsEA- 0- 0- 0
Domestic Hot Water Heater (30g)EA- 0- 0- 0
Fiberglass 1-1/2" Pipe Insulation With Vapor BarrierEA- 0- 0- 0
domestic water Supply Specialties 3/4"EA- 0- 0- 0
waste Pipe & FittingsEA- 0- 0- 0
C.I No Hub Vent Pipe SystemEA- 0- 0- 0
Med & Hv duty Cast Iron floor Drains AdtlEA- 0- 0- 0
Sanitary Sewer- 0- 0- 0
Heavy Duty Cast Iron Floor DrainsEA- 0- 0- 0
8" PVC Pipe SanitaryLF- 0- 0- 0
Precast CIP Base 4'x6'EA- 0- 0- 0
Septic Tank Precast Concrete 1000 gallon Excluding or PipingEA- 0- 0- 0
Septic tank Leaching Field Chambers Heavy Duty 13'x3'-9"x1'-6" Exclude Excatvation or PipingEA- 0- 0- 0
Septic tanks, Gravel Fill, Run Off Bank 4' Exclude Excatvation or PipingCY- 0- 0- 0
Septic Tanks, Crushed Stone, 3/4", Exclude Excatvation or PipingCY- 0- 0- 0
Water Distribution- 0- 0- 0
Residential Water Heater and Hose Bibb PipingEA- 0- 0- 0
Residential Valves and Hose BibbsEA- 0- 0- 0
Piping Water Distribution Polyvinyl Chloride 2" Dia, AWWA C900, Class 160, SDR26LF- 0- 0- 0
Water Supply Meter Domestic/Commercial Bronze Threaded Flange 160GPM 2" DiaEA- 0- 0- 0
Backflow Preventer Corrosion Resistant Automatic Operation Threaded 2" Pipe SizeEA- 0- 0- 0
Valves Iron Body Gate OS&Y Flanged 125lb 2"EA- 0- 0- 0
Underground Marking Tape, Vinyl, Aluminum Foil Core, Detachable 2"LF
- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div23

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
HVAC- 0- 0- 0
15T Condensing Unit W/Refridgerant PipingEA- 0- 0- 0
Rfeturn Air Registar 24x18EA- 0- 0- 0
Ductwork Stack 1500FPM Commercial BuildingLB- 0- 0- 0
Ductwork Stack 2500FPM Commercial BuildingLB- 0- 0- 0
Bathroom Exhaust Fan 200CFMEA- 0- 0- 0
Renovate 12x12 Ceil Diffuser W/Perf FaceEA- 0- 0- 0
Renovate 18" Rnd Ceil Diffuser W/Fixed patEA- 0- 0- 0
Electric Constrols, Heating & Venting SystemEA- 0- 0- 0
VFD 3HP, NEMA1, ENCL, 460V-3PHEA- 0- 0- 0
Compressed Air SystemEA- 0- 0- 0
Test and Balance of HVAC System- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div24

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div25

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div26

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
Electrical- 0- 0- 0
Panel Board 120V/208V 100A Mlo 24 Cir W/BkrEA- 0- 0- 0
Panel Board 277V/480V 200A Mlo 24 Cir W/BkrEA- 0- 0- 0
Duplex GFI Receptical Long RunEA- 0- 0- 0
Equipment Connections For Up to 10 HPEA- 0- 0- 0
120V 20Amp Single Pole SwitchEA- 0- 0- 0
120V 20Amp 3 Way SwitchEA- 0- 0- 0
120V 20Amp 4 Way SwitchEA- 0- 0- 0
Motor Connections 460V 3HPEA- 0- 0- 0
150W Hps Flood Light Wall MountEA- 0- 0- 0
Exit light With Battery BackupEA- 0- 0- 0
Fire Alarm Duct Smoke DetectorEA- 0- 0- 0
Renovate 3/4" RS Conduit W/Coupling & SupportEA- 0- 0- 0
Renovate 30A 3P Fused Disc. Sw. NEMA 1 240VEA- 0- 0- 0
Surface Mtd Incandescent CylinderEA- 0- 0- 0
4' 1 Lamp Recess FluorescentEA- 0- 0- 0
4' 2 Lamp Suspnsn Mtd Ind FluorescentEA- 0- 0- 0
4-Pair Telephone OutletEA- 0- 0- 0
Intrusion Detection SystemOUT- 0- 0- 0
18" x 3" Cable TrayLF- 0- 0- 0
Exit LightingEA- 0- 0- 0
Building GroundingEA- 0- 0- 0
Copper Grd BusLF- 0- 0- 0
Lighting protection SystemEA- 0- 0- 0
30KVA Transformer 480V/208VEA- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div27

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div28

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div29

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div30

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div31

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
Fill HereCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
Sanitary Sewer Site Prep- 0- 0- 0
Excavation Top Soil to SideCY- 0- 0- 0
1.25 CY Wheel LoaderHR- 0- 0- 0
1.15CY Soil/Sand TrenchingCY- 0- 0- 0
8CY Dump TruckHR- 0- 0- 0
3CY Backfill W/Excavated MaterialCY- 0- 0- 0
3CY deliverd and Dumped Backfill W/SandCY- 0- 0- 0
Compact Soil W/Vibrating PlateCY- 0- 0- 0
Compact With PogosticksCY- 0- 0- 0
Sidewalks- 0- 0- 0
Remove Slab on Grade 4-6"SF- 0- 0- 0
Rough Grading D6 DozerSY- 0- 0- 0
Fine Grade HandSY- 0- 0- 0
Fine Grage (120G) 2 PassesSY- 0- 0- 0
Curb/ Sidewalk ExcavationHaul Off Spoil 1 MileCY- 0- 0- 0
Delivered and Dumped- Hand Backfill, W/SandCY- 0- 0- 0
Compact Soil W/Vibrating PlateCY- 0- 0- 0
Site Electrical Utilities- 0- 0- 0
1.25 CY Wheel LoaderHR- 0- 0- 0
2.5CY Soil/Sand TrenchingCY- 0- 0- 0
8CY Dump TruckHR
3CY Backfill W/Excavated MaterialCY
Compact Soil W/Vibrating PlateCY
Compact With PogosticksCY
Water Distribution
Cat 225 1.5CY Soil Sand TrenchingCY
Backfill W/Excavated MaterialCY
Compact Soil W/Vibrating PlateCY
Compact With PogosticksCY
Clear and Grub
Light Brush W/O Grub, ClearingACRE
Dozer 200HP D7 Grubbing and StackingCY
Dump ChargeCY
7CY Wheel LoaderHR
Borrow Subgrade Load & Haul 5 Mile SpreadingCY
35 Ton Off Highway TruckHR
Compacted Borrowed Subgrade, 4LiftsBCY- 0- 0- 0
Site Improvements- 0- 0- 0
Gravel 90% Sand Base 10%CY- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div32

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div33

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div34

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div35

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div36

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div37

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div38

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div39

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFTFA20RC02
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

Div40

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
FTFA 20RC02 Munitions Test FacilityCODE A (No design completed)