RFI_-RFC_FORM_20150420.doc
DOC document 52 KB Posted
- Attached to
- COMM Fiber Optics Cabling Survey Federal contract opportunity
- Solicitation number
- F5A3CF8219AW01
About this file
RFI Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_QA-2_Dated_27Aug18.pdf | ||
| RFI_QA-1_Dated_21Aug18.pdf | ||
| Combined_Synopsis_Solicitation_-_F5A3CF8219AW01-COMM_Survey__Rev1.pdf | ||
| F5A3CF8219AW01-Sign_in_Sheet-16Aug18.pdf | ||
| F5A3CF8219AW01_COMM_Engineering_Survey_SOW_Rev1.pdf | ||
| F5A3CF8219AW01_COMM_Engineering_Survey_SOW.pdf | ||
| Combined_Synopsis_Solicitation_-_F5A3CF8219AW01-COMM_Survey.pdf | ||
| F53CF8219AW01-NAS_Fort_Worth_JRB_Outside_Cable_Plant-Drawings.pdf | ||
| Confined_Space_Program_Reqrmnts.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO:
| RFI NO: |
| DATE (YYYYMMDD) |
| SUBJECT: |
| DRAWING REFERENCE/ DETAIL: |
| ATTACHMENT SENT UNDER SEPARATE COVER(__) |
| RESPONSE NEEDED BY: |
REQUEST:
PROPOSED SOLUTION (If applicable:
TO(Contracting Officer): 301 CONF/LGC
FROM (Contractor):
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND TITLE |
| SIGNATURE: |
FOR GOVERNMENT USE ONLY
FROM CONTRACTING
TO:(Base Civil Engineering): Don W. Meadows (__)
For Evaluation and Action
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND TITLE |
| SIGNATURE: |
RFI RESPONSE / CLARIFICATION (refer to page 2)
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
TO:(AF Contractiing Office)
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND TITLE |
| SIGNATURE: |
TO:(Contractor)
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND TITLE |
| SIGNATURE: |
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate
A change order will be required?
YES
NO
There will be an increase in the cost of the project?
YES
NO
Reviewer:
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND TITLE |
| SIGNATURE: |
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
File details come from the government source that posted it.