This is a Cost Proposal Matrix for Project BR-30-2602, GTRI 1906 - 430 South Hawks Project, a construction project at Georgia Institute of Technology in Atlanta, Georgia. The matrix serves as a guide for contractors preparing cost proposals and designates where the Owner wishes costs to be allocated across six primary categories: Site Supervision & Management, Site Office Expense, Safety & Security, Cleaning, General Equipment, and Bonds & Insurance, along with miscellaneous items. The document uses an "X" designation to indicate which cost categories should be included in contractor proposals, with notations such as "NA," "Incl.," and specific dollar amounts identifying items that are not applicable, already included elsewhere, or pre-determined by the Owner.
The cost matrix establishes a projected fee of $1,231,000 based on a $46 million Guaranteed Maximum Price (GMP). Various line items are marked as either Construction Fee, General Conditions, or Cost of Work By Others, with several items pre-populated with $0 values or designated as the responsibility of the Architect or to be included in other cost categories. Notable fixed costs include $30,000 allocated to the Safety Engineer under General Conditions. The matrix provides comprehensive guidance on overhead, equipment, personnel, temporary facilities, insurance, bonding, testing, permits, and miscellaneous project-related expenses that contractors must account for in their proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Egnyte Upload Instructions.pdf | ||
| Exhibit G _ Proposer_s Disclosure Statement.doc | DOC document | |
| Exhibit C _ DB Fee Proposal.docx | DOCX document | |
| Exhibit B _ Contractor Affidavit.docx | DOCX document | |
| Exhibit A _ Certification Form.docx | DOCX document | |
| Exhibit D _ Precon Cost and Expenses.xlsx | XLSX spreadsheet | |
| Exhibit E _ General Conditions Breakdown.xlsx | XLSX spreadsheet | |
| _GIT BR_30_2602 DB GTRI 1906_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal Matrix
| PROJECT COST MATRIX | ||||||||
| The spaces marked with an "X" below indicate where the Owner wishes to allocate costs for the project. Please follow this as a guide in preparing your cost proposal for the project. | ||||||||
| Project No. BR-30-2602, GTRI 1906 - 430 South Hawks Project | ||||||||
| Georgia Institute of Technology, Atlanta, Georgia | ||||||||
| I. Site Supervision & Management: | Construction Fee | General Conditions | Cost of Work | By Others | ||||
| Project Executive | X | |||||||
| Corporate Executives | X | |||||||
| Legal Services | X | |||||||
| Senior Project Mgr. | X | $0 | $0 | 0 | $0 | |||
| Project Mgr. | X | $0 | $0 | 0 | $0 | |||
| Project Supt. | X | $0 | $0 | 0 | $0 | |||
| Asst. Project Supt. | X | $0 | $0 | 0 | $0 | |||
| Area Supt. | X | NA | ||||||
| Secretary | X | $0 | $0 | 0 | $0 | |||
| Project Engineer | X | $0 | $0 | 0 | $0 | |||
| Engineer or Eng. Company | X | $0 | $0 | |||||
| Cost Control | X | $0 | $0 | |||||
| Safety Engineer | X | 0 | $30,000 | |||||
| Scheduling | X | $0 | $0 | 0 | $0 | |||
| Purchasing | X | 0 | $0 | |||||
| Project Accountant | X | Incl. | ||||||
| Rodman | X | Incl. | ||||||
| $0 | $0 | 0 | $0 |
| II. Site Office Expense: | Construction Fee | General Conditions | Cost of Work | By Others | ||||
| Job Office Trailer Rent | X | NA | ||||||
| Office Jobsite Build Out | X | $0 | $0 | 0 | $0 | |||
| Office Jobsite Set-up | X | $0 | $0 | 0 | $0 | |||
| Temp. Const. Trailer/Storage | X | NA | ||||||
| Office Furniture | X | Incl. Below | ||||||
| Office Machines/Equip. | X | $0 | $0 | 0 | $0 | |||
| Copy Machines/Maintenance | X | Incl. Above | ||||||
| Office Supplies | X | $0 | $0 | 0 | $0 | |||
| Janitor/San. Supplies | X | $0 | $0 | |||||
| Postage & Shipping | X | $0 | $0 | 0 | $0 | |||
| First Aid/Med. Treat. | X | $0 | $0 | |||||
| Telephone System | X | $0 | $0 | 0 | $0 | |||
| Phone Installation | X | 0 | $0 | |||||
| Phone Charges | X | 0 | $0 | |||||
| Phone Charges-Long Dist. | X | By Arch. | ||||||
| Radio Communications | X | $0 | $0 | 0 | $0 | |||
| Radio Maintenance | X | Incl. | ||||||
| Computer-PCS | X | $0 | $0 | 0 | $0 | |||
| Computers | X | Incl. | ||||||
| Software | X | $0 | $0 | 0 | $0 | |||
| MIS Charges | X | 0 | $0 | |||||
| Temp. Electric-Office | X | |||||||
| Security-Office | X | |||||||
| Water - Field Office | X |
| 0 | $0 | |||||||
| III. Safety & Security: | Construction Fee | General Conditions | Cost of Work | By Others | ||||
| Safety Incentives | X | NA | ||||||
| Watchman/Guard Ser. | X | 0 | $0 | |||||
| Traffic Control | X | $0 | $0 | 0 | $0 | |||
| Safety Equipment | X | $0 | $0 | 0 | $0 | |||
| Rainwear/Hardhats, etc. | X | 0 | $0 | |||||
| Drug Testing | X | $0 | $0 | 0 | $0 | |||
| Fences & Gates | X | 0 | $0 | |||||
| Fire Protection, Extinquishers, Barrels | X | 0 | $0 | |||||
| Covered Walkways | X | 0 | $0 | |||||
| Roadway Maintenance | X | $0 | $0 | |||||
| Sidewalk Barricades | X | $0 | $0 | |||||
| Safety Railings | X | $0 | $0 | |||||
| Opening Closures | X | |||||||
| Weather Protection | X | |||||||
| Ladders & Stailrs | X |
| IV. Cleaning: | Construction Fee | General Conditions | Cost of Work | By Others | ||||
| Trash Bin Rent/Haul | X | Incl. | ||||||
| Trash Chutes/Hoppers | X | $0 | $0 | 0 | $0 | |||
| Dump Fees/Hauling | X | $0 | 0 | $0 | ||||
| Dust Barricades | X | 0 | $0 | |||||
| Daily Cleaning | X | |||||||
| Final Cleanup-Building | X | |||||||
| Window/Skylight Cleaning | X |
| $0 | 0 | $0 | ||||||
| V. General Equipment: | Construction Fee | General Conditions | Cost of Work | By Others | $0 | 0 | $0 | |
| Small Tools/Expendables | X | $0 | $0 | 0 | $0 | |||
| Survey Equipment | X | Incl. | ||||||
| Hoist/Operator | X | 0 | $0 | |||||
| Hoist Service | X | $0 | $0 | 0 | $0 | |||
| Erect/Dismantle Hoist | X | 0 | $0 | |||||
| Temp. Elev. & Operator | X | $0 | 0 | $0 | ||||
| Rapair Cab/Temp. Elev. | X | $0 | 0 | $0 | ||||
| Protect Perm. Elevator | X | |||||||
| Fuel/Oil/Grease | X | |||||||
| Forklift Rental | X | |||||||
| Contractor Equipment License | X | |||||||
| Contractor Equipment Permits | X | |||||||
| Tower Crane Service | X | |||||||
| Erect/Dismantle Crane | X | |||||||
| Crane Rental/Operator | X | |||||||
| Construction Equipment | X |
| VI. Bonds & Insurance: | Construction Fee | General Conditions | Cost of Work | By Others | |
| Perform. & Payment Bonds | X | ||||
| Workers Comp. Insurance | X | ||||
| Liability Insurance | X | ||||
| Fed. & State Unemployment | X | ||||
| FICA | X | ||||
| Builders Risk Insurance | X | ||||
| $1,231,000 |
| Projected Fee (Based on $46 Million GMP) | ERROR:#REF! | |
| Builders Risk Insurance | X |
| VII. Miscellaneous: | Construction Fee | General Conditions | Cost of Work | By Others | ||
| CM General Overhead Cost | X | |||||
| CM Profit Margin | X | |||||
| Costs Over GMP | X | |||||
| Project Staff Living Expenses | X | |||||
| Executive Travel | X | |||||
| Air Fare | X | |||||
| Car Rental | X | |||||
| Hotel | X | |||||
| Meals | X | |||||
| Project Staff Moving Expenses | X | |||||
| Warranty Work | X | |||||
| Off-Site Parking | X | |||||
| Ceremony Expense | X | |||||
| Vehicle for On-Site Project Manager | X | |||||
| Vehicle for On-Site Superintendent | X | |||||
| Vehicle Repairs/Maintenance | X | |||||
| Water - Coolers | X | |||||
| Water Barrels | X | |||||
| Ice Machine | X | |||||
| Ice and/or Cups | X | |||||
| Temporary Toilets Install | X | |||||
| Temporary Toilets | X | |||||
| Cold Weather Protection | X | |||||
| Temp. Heat for Bldg. | X | |||||
| Job Signs | X | |||||
| Progress Photos | X | |||||
| Extra Plans & Specs. | X | |||||
| Blueprint/Photostat. | X | |||||
| Temp. Electric -Building | X | |||||
| Building Permit | X | |||||
| Plan Check Fees | X | |||||
| Temporary Roads | X | |||||
| Project Taxes | X | |||||
| Moving Coordination & Costs for Project | X | |||||
| Materials Incorporated Into the Building | X | |||||
| Corrective Work | X | |||||
| Punchlist Work | X | |||||
| Advertising for Bids | X | |||||
| Soils Testing & Investigation | X | |||||
| Construction Materials Testing | X | 0 | $0 | |||
| Special Inspections | X | |||||
| Water Connection Fees | X | |||||
| Sanitary Connection Fees | X | |||||
| Storm Connection Fees | X | |||||
| Gas Service Fees | X | |||||
| Power Service Fees | X | |||||
| Impact Fee | X |
&"Arial,Bold"&16&UAttachment A
&D &T &P
Sheet2
Sheet3
File details come from the government source that posted it. Updated .