This is a Design Builder (DB) Fee Proposal document for the 430 South Hawks Project (Project No. BR-30-2602, GTRI 1906) at Georgia Institute of Technology. The proposal outlines the compensation structure for design-build services, which include design consultants' services, pre-construction consulting, and construction services. The contract is structured to establish fixed fees for each phase of work, with the Design Builder responsible for completing all requirements within established time limits as detailed in the Contract Documents and General Requirements.

The compensation model consists of three primary fee components: a Design Consultants Fee for basic design services and construction administration, a Pre-Construction Fee representing gross profit for pre-construction consulting services, and a Construction Fee representing gross profit for construction services. Additionally, the proposal establishes maximum overhead cost allowances, including separate categories for Pre-Construction Costs and Expenses and Construction Overhead Costs. All overhead costs and expenses are inclusive of direct and incidental expenses, with specific maximum amounts to be documented in attachments to the proposal. The Design Builder must complete and submit the fee amounts and overhead cost documentation to be considered for award of the contract.

View the file

Other files

File Type Posted
Egnyte Upload Instructions.pdf PDF
Exhibit F _ Project Cost Matrix.xlsx XLSX spreadsheet
Exhibit G _ Proposer_s Disclosure Statement.doc DOC document
Exhibit B _ Contractor Affidavit.docx DOCX document
Exhibit A _ Certification Form.docx DOCX document
Exhibit D _ Precon Cost and Expenses.xlsx XLSX spreadsheet
Exhibit E _ General Conditions Breakdown.xlsx XLSX spreadsheet
_GIT BR_30_2602 DB GTRI 1906_final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 of Exhibit C

Project No. BR-30-2602, GTRI 1906 - 430 South Hawks Project Georgia Institute of Technology

DESIGN BUILDER (DB) FEE PROPOSAL

1. DB’S FEE:

Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.

A. DESIGN CONSULTANTS FEE:

Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:

TOTAL

Design Fee (fixed fee)

B. PRECONSTRUCTION FEE:

Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:

TOTAL

Pre-Construction Fee (fixed fee)

C. CONSTRUCTION FEE:

Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.

TOTAL

Construction Fee (fixed fee)

2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:

The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .

AMOUNT

A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)

B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)

Total Maximum Overhead Cost (Sum of A & B)

DB Firm Name

By:__________________________________________________________ Signature of DB Officer

Title of DB Officer

File details come from the government source that posted it. Updated .