Exhibit F Environmental Monitoring Locations Figure.pdf

PDF 685 KB Posted

Attached to
Captain Jack Mill Superfund Site O & M
Solicitation number
RFP FAAA 2026000184 4
Issued by
Denver County, Denver City, Colorado

About this file

Exhibit F is an environmental monitoring site layout document for the Captain Jack Superfund Site located in Ward, Colorado, prepared for the State of Colorado on behalf of Denver County and Denver City. The document provides a comprehensive site map identifying 21 distinct monitoring locations including four groundwater monitoring wells (MW1-MW4), 11 surface water sampling stations (SW-01 through SW-11), and 21 seeps distributed across the site with specified latitude and longitude coordinates. The figure illustrates the locations of historical mine workings, including the Big 5 Tunnel, Dew Drop Mine, and Niwot Crosscut, as well as two archaeological sites (Switzerland Trail and Camp Francis). Additional features mapped include borehole and electrical resistivity tomography (ERT) array locations, a water quality monitoring system, access roads, and the extent of seep surveys across the 8,944 to 9,144-foot elevation range. The site layout incorporates a note prohibiting vehicular traffic within the Camp Francis Archaeological Site except in emergency situations.

The monitoring locations and site infrastructure depicted in this exhibit directly support the operations and maintenance contract for the Captain Jack Mill Superfund Site, which runs from May 1, 2026, through April 30, 2027. The contract, solicited on April 30, 2026, with proposals due May 13, 2026, requires contractor implementation of 12-month sampling activities, operation of permanent and temporary water treatment systems, site-wide maintenance, and technical support across all identified monitoring locations. Contractors must provide labor across 13 specified position categories at firm hourly rates with material costs reimbursed based on documented actual purchases under a hybrid fixed-price and cost-reimbursable structure. All contractors must comply with federal provisions including Davis-Bacon Act prevailing wage requirements, Byrd Anti-Lobbying Amendment certifications for contracts exceeding $100,000, and Clean Air Act and Federal Water Pollution Control Act compliance for contracts exceeding $150,000.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nov 12, 2020EJL

Notes:

1. No vehicular traffic allowed within Camp Francis Archaeological Site except in case of an emergency.

SITE LAYOUT

CAPTAIN JACK SUPERFUND SITE

WARD, COLORADO

Monitoring Well or Borehole Location

Water Quality Monitoring System

Surface Water Sampling Locations

Historical Mine

Original Seep Locations Locations of seeps present before valve closure

New Seep Locations Locations of seeps present after valve closure

Borehole – ERT Array Location

Surveyed Big 5 Tunnel Location

Assumed Big 5 Tunnel Location

Dew Drop Mine Workings Location Estimate

Niwot Crosscut Location Estimate

Switzerland Trail Archaeological Site Approximate Location

Camp Francis Archaeological Site Approximate Boundary

Shallow ERT Array Approximate location (Walsh)

Access Roads

8,944 – 9,144 Extent of Seep Surveys

LEGEND:

Figure 1

File details come from the government source that posted it. Updated .