Exhibit E Water Elevation Profile Figure.pdf

PDF 114 KB Posted

Attached to
Captain Jack Mill Superfund Site O & M
Solicitation number
RFP FAAA 2026000184 4
Issued by
Denver County, Denver City, Colorado

About this file

Exhibit E Water Elevation Profile Figure

This document is a technical exhibit submitted to the State of Colorado for the Captain Jack Mill Superfund Site Operations and Maintenance contract in Ward, Colorado. The exhibit presents a water elevation profile figure dated January 3, 2025, prepared by EJL, depicting water levels recorded in October 2024 across the mine complex and surrounding infrastructure. The figure illustrates the spatial and vertical relationships between 21 monitoring locations distributed across the site, including groundwater monitoring wells (MW1-MW3), mine portals (Dew Drop Portal at 9,246 feet and Big Five Adit Portal at 8,940 feet), mine workings (Niwot #1-#3, Midway #1-#2), treatment infrastructure (PB #1 and PB #2 vaults, recirculation controls, settling ponds), and surface features (Left Hand Creek, Peak to Peak Highway, tailings pile, and limestone stockpile). Water elevation measurements from October 2024 and September 2024 are documented at specific locations, ranging from 9,099 feet to 9,113 feet above mean sea level, with particular emphasis on the recirculation system between PB #1 and DD #3 operating at 0.5 percent gradient and a 7.5 HP submersible pump. The figure includes notational references indicating hydraulic connections between Dew Drop #3, CDOT Row #2, and the New California Raise, and identifies unknown mine workings intersected by several monitoring wells.

The water elevation profile serves as a foundational technical reference for the site's hydrological baseline and treatment system design. The data provided enables contractors performing O&M services to understand existing water levels, system capacity, and the distribution of mine water throughout the site's complex geology, which ranges in elevation from approximately 8,900 feet to 9,500 feet above mean sea level. The distance measurements from portal reference points and specific water elevation data at monitored locations establish baseline conditions necessary for ongoing sampling, analysis, and optimization of the permanent and temporary water treatment operations specified in the contract statement of work.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

WATER LEVELS – October 2024

CAPTAIN JACK MILL SUPERFUND SITE

WARD, COLORADO

Figure 2

By: EJL Date: 01/03/2025

9500'

9450'

9400'

9350'

9300'

9250'

9200'

9150'

9100'

9050'

9000'

8950'

8900'

8850'

0' 0'

EL

EV

AT

IO

N (F

EE

T

AB

O

VE

M

EA

N

S

EA

L

EV

EL

)UNKNOWN VOID(S)

NIWOT #3

NIWOT #1

NIWOT #2

MIDWAY #2

MIDWAY #1

(NOT ON

CENTER-LINE)

DEW DROP

PORTAL

9,246'

DEW DROP #2

(NOT IN

WORKINGS)

DEW DROP #3

DEW DROP #1

(NOT IN

WORKINGS)

TO NIWOT CROSSCUT

AND COLUMBIA VEIN

RECIRCULATION

PIPELINE

PEAK TO PEAK HWY

(HWY 72)

CDOT ROW #1

(NOT IN

WORKINGS)

CDOT ROW #2

NEW CALIFORNIA RAISE

MW #3

(NOT IN WORKINGS)

PB #1 VAULT

RECIRC CONTROLS

PB #2 VAULT

ERT & POWER

MW #2

(NOT IN WORKINGS)

MW #1

(NOT IN WORKINGS)

BIG FIVE ADIT PORTAL

8940'

UPPER SETTLING POND

LOWER

SETTLING POND

LEFT HAND CREEK

DISTANCE FROM PORTAL (FEET)

TAILINGS PILE

BULKHEAD (3" & 12" PIPELINES)

APPROXIMATE

LIMESTONE STOCKPILE

(~221')

EXISTING ORE PILE

UPWELLING LOCATION

976' TO ORE PILE TOE

NO DATA

AVAILABLE

NOTE:

1.) DEW DROP #3, CDOT ROW #2, AND THE NEW CALIFORNIA RAISE (NCR)

ARE HYDRAULICALLY CONNECTED.

2.) MIDWAY #2, NIWOT #1 - #3 INTERSECT UNKNOWN MINE WORKINGS.

3.) TUNNEL WIDTH IS TYPICALLY 9' - 10'.

ROW#1

9,113.23'

(mm/dd/yy)

ROW#1

9,080.66'

(mm/dd/yy)

EXAMPLE:

- LOCATION

- ELEVATION OF MINE WATER amsl

- (DATE SAMPLED)

ROW2

9,070.8'

(10/25/24)

PB1

Water Elevation

9,069.0' (10/25/2024)

BULKHEAD FLOOR @ 8,944.4'

0.5%

PB #1 7.5 HP

SUBMERSIBLE PUMP

MID2

9,070.7' (9/20/24)

RECIRCULATION SYSTEM

BETWEEN PB1 AND DD3

Total Depth 9,251.3'

Total Depth 8,966.7'

Total Depth 9,021.0'

NIW1

9,071.2'

(9/20/24)

NIW2

9,072.6' (9/20/24)

MW3

9,103.4' (9/20/24)

NIW3

DRY

(9/20/24)

DD3

9,070.8'

(10/25/24)

MID1

9,099.4'

(9/20/24)

File details come from the government source that posted it. Updated .