Exhibit C _ DB Fee Proposal.docx

DOCX document 25 KB Posted

Attached to
GCSU BR-65-2601-DB Baseball/Softball Complex Upgrades
Solicitation number
PE-47200-RFQ-2026-000000110
Issued by
Barrow County, Georgia

About this file

This is a Design Builder Fee Proposal document for Project No. BR-65-2601, Basketball/Softball Complex Upgrades at Georgia College and State University. The proposal outlines the compensation structure for the Design Builder (DB) who will provide comprehensive services including basic design services, construction administration, pre-construction consulting, and construction services. The project encompasses multiple fee categories structured as fixed fees across distinct phases of work, with the Design Builder responsible for completing all contract requirements within established time limits.

The compensation model consists of three primary fixed fee components: a Design Consultants Fee covering basic design and construction administration services, a Preconstruction Fee representing gross profit for pre-construction consulting services, and a Construction Fee representing gross profit for construction services. Additionally, the proposal establishes maximum allowable amounts for Pre-construction Costs and Expenses and Construction Overhead Costs, which are inclusive of all direct and incidental expenses and are detailed in separate attachments. These overhead amounts exclude the pre-construction and construction fees themselves, providing a comprehensive cost framework that separates profit margins from reimbursable expenses across the project phases.

View the file

Other files

File Type Posted
GCSU BR_65_2601 DB RFQ_RFP.pdf PDF
Exhibit E _ General Conditions Breakdown.xlsx XLSX spreadsheet
Exhibit F _ Project Cost Matrix.xlsx XLSX spreadsheet
Exhibit D _ Precon Cost and Expenses.xlsx XLSX spreadsheet
Egnyte Upload Instructions.pdf PDF
BR_65_2601 Addendum No_ 2.pdf PDF
GCSU BR_65_2601 Addendum No_ 1.pdf PDF
GCSU_BR_65_2601 DB_NOIA.pdf PDF
Exhibit B _ Contractor Affidavit.docx DOCX document
GCSU BR_65_2601 DB shortlist_gpr.pdf PDF
Exhibit G _ Proposer_s Disclosure Statement.doc DOC document
BR_65_2601 DB AWARD.docx DOCX document
Exhibit A _ Certification Form.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 of Exhibit C

Project No. BR-65-2601, Basketball/Softball Complex Upgrades Georgia College and State University

DESIGN BUILDER (DB) FEE PROPOSAL

1. DB’S FEE:

Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.

A. DESIGN CONSULTANTS FEE:

Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:

TOTAL

Design Fee (fixed fee)

B. PRECONSTRUCTION FEE:

Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:

TOTAL

Pre-Construction Fee (fixed fee)

C. CONSTRUCTION FEE:

Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.

TOTAL

Construction Fee (fixed fee)

2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:

The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .

AMOUNT

A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)

B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)

Total Maximum Overhead Cost (Sum of A & B)

DB Firm Name

By:__________________________________________________________ Signature of DB Officer

Title of DB Officer