Exhibit B - Project Plans.docx
DOCX document 16 KB Posted
- Attached to
- TRANSITIONAL LIVING FACILITY HVAC REPLACEMENT
- Solicitation number
- ARFQ 0512 WSH2700000005 1
- Issued by
- Kanawha County, West Virginia
About this file
Exhibit B - Project Plans is a specifications document for a Transitional Living Facility HVAC Replacement project in West Virginia. The project requires the contractor to remove existing HVAC equipment and install replacement units, specifically Trane Model 5TXCC009AS3HCA air handler/DX units paired with Trane Model 5TTR5036A1 condensing units, and two installations of Trane Model 5TXCD010AS3HCA air handler/DX units paired with Trane Model 5TTR5060A1 condensing units. All specified equipment allows for "or equal" substitutions, which must be presented with supporting data for approval or disapproval during the question and answer period. The contractor must remove all existing ductwork and replace it with a combination of insulated rigid round duct and flexible ductwork, with flexible supply duct limited to a maximum of five feet from the main trunk line. All rigid and flexible duct must match the size of existing duct, and rigid duct insulation must comply with the Duct Insulation schedule outlined in Exhibit C.
The contractor is additionally responsible for connecting the new units to the existing control system and testing for proper operation. The specifications emphasize equipment replacement and ductwork installation as the primary scope of work, with no pricing terms, set-asides, incumbent information, or funding details provided in this document. Site visits and bidder meetings, if applicable, would be detailed in other contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WV73 Drug Free Affidavit.pdf | ||
| Exhibit C.pdf | ||
| Bid Bond Instructions.pdf | ||
| WV72 Drug Free Coversheet.pdf | ||
| Bid Bond Form.pdf | ||
| WV36.pdf | ||
| BondLaborMat.pdf | ||
| TCA.pdf | ||
| Purchasing Affidavit.pdf | ||
| Final_ARFQ_0512_WSH2700000005_1_WV_ARFQ_FORM.PDF | ||
| Exhibit A - Pricing Page.xlsx | XLSX spreadsheet | |
| BondPerform.pdf | ||
| WV43.pdf | ||
| HIPPA-BAA.pdf | ||
| OSAFederalFundsContractClauseAddendum.pdf | ||
| RFQ Specifications.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B – PROJECT PLANS
· HVAC Replacement Specifications
· Contractor shall remove existing HVAC equipment and replace the units with the following:
· Trane Model 5TXCC009AS3HCA “or equal” Air Handler/DX and Trane Model 5TTR5036A1 Condensing unit “or equal”.
· Trane Model 5TXCD010AS3HCA “or equal” Air Handler/DX and Trane 5TTR5060A1 Condensing Unit “or equal”.
· Trane Model 5TXCD010AS3HCA “or equal” Air Handler/DX and Trane Model 5TTR5060A1 Condensing unit “or equal”.
“Or equal” shall be presented with data to be approved or disapproved during the question and answer period.
· Contractor shall remove all existing duct work and replace it with a combination of insulated rigid round duct and flexible duct work.
· All flexible supply duct shall be limited to maximum of 5 feet from the main trunk line.
· All rigid and flexible duct shall match size of existing duct.
· All rigid duct shall be insulated in accordance with Duct Insulation schedule Exhibit C.
· Contractor shall connect new units to existing control system and test for proper operation.