EXHIBIT 2.1 – PRICING SCHEDULE.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Program Administration Services for TOC Economic Development Program Pilot Fund
Solicitation number
PS140683(2)
Issued by
California

About this file

This pricing schedule document contains labor cost estimates for multiple first/last mile (FLM) planning contracts involving the Los Angeles County Metropolitan Transportation Authority (Metro) and various local agencies, including the City of Los Angeles Department of Transportation (LADOT) and County of Los Angeles. The document outlines detailed scope deliverables across six primary task categories: project management and control, assessment of existing conditions, community engagement activities, interagency coordination, product review processes, and final project product development. Projects are identified for five specific transit stations: Western/Slauson, Sepulveda, LAX/Aviation, Culver City, and East Los Angeles Civic Center, with the ICE North Hollywood to Pasadena Bus Rapid Transit Project representing a separate planning initiative. The primary contracts include required tasks with associated labor hour allocations ranging from 257 to 383 hours per project, supplemented by optional tasks for 15%-level design work at select stations. Deliverables include existing conditions analysis maps and geodatabases, community engagement events with translation services, technical walk audits, interagency coordination meeting documentation, conceptual design plans, project cost estimates, and detailed implementation schedules.

All labor costs are calculated at a uniform billing rate of $65 per hour with an overhead multiplier of 150 percent applied to direct labor expenses. The Metro Active Transport project components total $284,276.50 in direct costs, with optional design tasks estimated at $35,534.00, yielding a combined grand total of $319,811.00. Other direct costs include event expenses, printing, materials fabrication, and community engagement logistics, ranging from $1,500 to $5,000 per project component. An 8 percent transportation fee is assessed across all task budgets. A separate funding structure sheet indicates Year 1, Year 2, and Year 3 allocations with option years, though specific dollar amounts and funding sources are minimal, showing placeholder values of $2.00 for the grand totals on that sheet, suggesting incomplete information or a template structure for future budgeting phases.

View the file

Other files

File Type Posted
4B - Attachment 4B - Pricing Schedul.xlsx XLSX spreadsheet
FORM 5 - BIDDERS LIST FORM.pdf PDF
FORM 2 - AFFIDAVIT.pdf PDF
EXHIBIT 2 - FORM 60 INSTRUCTIONS - PROFESSIONAL SERVICES COST_PRICE SUMMARY.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS.pdf PDF
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS (RESERVED).pdf PDF
EXHIBIT 5 - PROPOSAL LETTER.pdf PDF
EXHIBIT 3B PROPOSAL CONTENTS.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
EXHIBIT A - SCOPE OF SERVICES.pdf PDF
EXHIBIT H - INSURANCE.pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (Non-Fed).pdf PDF
EXHIBIT 12 - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT 11 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY PROPOSER (RESERVED).pdf PDF
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
FORM 3 - BUSINESS DATA SHEET.pdf PDF
EXHIBIT 2 - FORM 60 - PROFESSIONAL SERVICES COST_PRICE SUMMARY.xls XLS spreadsheet
EXHIBIT I - RESERVED.pdf PDF
EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE (RESERVED).pdf PDF
PS140683(2)_0_US (7).pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
FORM 6 - SBE-DVBE REGULAR DEALER DIST.pdf PDF
FORM 1 - SBE-DVBE SUBS & SUPPLIERS.pdf PDF
FORM 4 - SBE-DVBE AFFIRMATION.pdf PDF
EXHIBIT 3A EVALUATION CRITERIA.pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICE

North Hollywood to Pasadena Bus Rapid Transit Project
First/Last Mile Planning
Contract Number:
Contract / Phase:
Date:
TaskDescriptionLaborTask TotalNotes / Cost Assumptions%% of Total Hours
HoursAvg. RateLabor
(unburdened)Cost
Task 1Project Management and Control
Task 1.5Project Meetings85$ 65$ 5,525.00$ 5,525.00Three (3) consultant staff to attend fifteen (15) meetings at 1 hour each (TOTAL: 45 hours);
Pre- and post-meeting preparation (TOTAL: 40 hours).3.92%
Task XFIRST/LAST MILE PLANNING2,083
Task X.1Public Agency Coordination during FLM Planning120$ 65$ 7,800.00$ 7,800.00Two (2) consultant staff to attend sixteen (16) meetings at one (1) hour each (TOTAL: 32 hours);

Pre- and post-meeting preparation (TOTAL: 32 hours);

Draft & final public agency coordination memo including summarizing comments & responses (TOTAL: 56 hours).5.54%
Task X.2Community-Based Organization Partnership300$ 65$ 19,500.00$ 19,500.00Preparation and participation from two (2) consultant staff in kick-off meeting with Metro and CBO partner (TOTAL: 5 hours);

Preparation and participation from two (2) consultant staff in Project Chartering process (TOTAL: 5 hours);

Draft and final memo outlining CBO approach to community engagement (TOTAL: 25 hours);

Draft and final memo outlining lessons learned and recommendations for community engagement and CBO coordination (TOTAL: 25 hours).

Community-based organization partnership (TOTAL: 240 hours)15.82%
Task X.3Station Identification20$ 65$ 1,300.00$ 1,300.00Draft and final station identification memo (TOTAL: 20 hours);
Labor hours for local agency staff interviews accounted for in Task X.1.15.27%
Task X.4Existing Conditions Analysis680$ 65$ 44,200.00$ 44,200.000.55%
Task X.4.1Data Compilation and Review200$ 65$ 13,000.00$ 13,000.00Data compilation and review for four (4) stations at forty (40) hours each (TOTAL: 160 hours);

Draft and final memo summarizing key findings, maps, data (40 hours total).

Task X.4.2 Review Plans & Projects 120 $ 65 $ 7,800.00 $ 7,800.00 Summarize related plans/projects for four (4) stations at thirty (30) hours each (TOTAL: 120 hours);

Labor hours for local agency staff interviews accounted for in Task X.1.13.84%
Task X.4.3Safety Analysis Tool120$ 65$ 7,800.00$ 7,800.00Summarize safety hotspot data for four (4) stations at thirty (30) hours each (TOTAL: 120 hours).31.37%
Task X.4.4Micromobility Planning40$ 65$ 2,600.00$ 2,600.00Review and incorporate recommendations into planning process (TOTAL: 40 hours).9.23%
Task X.4.5Technical Walk Audits200$ 65$ 13,000.00$ 13,000.00Three (3) consultant staff to conduct four (4) walk audits at four (4) hours each (TOTAL: 48 hours);
Pre- and post-walk audit prep including two (2) memos and walk audit application configuration (TOTAL: 152 hours)5.54%
Task X.5Layout Pathway Network100$ 65$ 6,500.00$ 6,500.00Production of draft pathway network maps at twenty-five (25) hours per station, inclusive of 0.5 mile and 3 mile maps (TOTAL: 100 hours);
Labor hours for local agency staff interviews accounted for in Task X.1.5.54%
Task X.6Community Engagement during FLM Planning343$ 65$ 22,295.00$ 22,295.001.85%
Task X.6.1Community Engagement Activities, Events, and Surveys331$ 65$ 21,515.00$ 21,515.00Two (2) consultant staff to attend & participate at four (4) community engagement events at four (4) hours for each event including one (1) hour for setup/teardown (TOTAL: 32 hours);

Engagement materials preparation, survey content development, and fabrication of demonstration projects (TOTAL: 250 hours);

One (1) consultant staff to participate in four (4) existing community meetings, if needed (TOTAL: 4 hours);

Draft & final community engagement memo (TOTAL: 45 hours).9.23%
Task X.6.2Preview of FLM Plan Recommendations12$ 65$ 780.00$ 780.00One (1) consultant staff participation at four (4) community meetings at one (1) hour for each meeting (TOTAL: 4 hours);
Preparation for four (4) community meetings (TOTAL: 8 hours).4.61%
Task X.7Data Analysis and Finalization of Pathway Network and Project Ideas350$ 65$ 22,750.00$ 22,750.00Final data analysis, finalization of pathway network maps, production of conceptual design illustrations (TOTAL: 350 hours).16.14%
Task X.8Project List, Cost Estimates, and Local Agency Review90$ 65$ 5,850.00$ 5,850.00Individual descriptions / notes in Tasks X.8.1, X.8.2, and X.8.3.4.15%
Task X.8.1Project List30$ 65$ 1,950.00$ 1,950.00Production of project lists (TOTAL: 30 hours).1.38%
Task X.8.2Cost Estimates30$ 65$ 1,950.00$ 1,950.00Production of cost estimates (TOTAL: 30 hours).1.38%
Task X.8.3Local Agency Review30$ 65$ 1,950.00$ 1,950.00Responding to comments and modifying work product (TOTAL: 30 hours).1.38%
Task X.9Final FLM Plan80$ 65$ 5,200.00$ 5,200.00Finalization of FLM Plan and production of slide deck (TOTAL: 80 hours).3.69%
Total Direct Labor2,168$ 65$ 140,920.00$ 140,920.00
Labor Overhead (150%)$ 211,380.00
Other Direct Costs (event costs and printing)$ 15,000.00Materials, fabrication, and printing for community engagement events
Transportation
Fee (8%)$ 28,184.00
TOTAL ESTIMATE$ 395,484.00
OPTIONAL TASKS
LaborTask TotalNotes% of Total Hours
DescriptionHoursAvg. RateLabor
(unburdened)Cost
Task 1.7.1.3Community Walk Audits200$ 65$ 13,000.00$ 13,000.00Two (2) consultant staff to conduct four (4) walk audits at four (4) hours each (TOTAL: 32 hours);
Pre- and post-walk audit prep including developing and facilitating three (3) training sessions, one (1) addendum to memo, and walk audit application configuration (TOTAL: 168 hours).8%
Total Direct Labor200$ 65$ 13,000.00$ 13,000.00
Labor Overhead (150%)$ 19,500.00
Other Direct Costs (event costs and printing)$ 1,500.00
Transportation
Fee (8%)$ 2,600.00
Optional Task Total Estimate$ 23,600.00
GRAND TOTAL (REQUIRED AND OPTIONAL TASKS)
GRAND TOTAL$419,084

2,368

Costs per project-with notes

Metro Active Transport (MAT) First/Last Mile Independent Cost Estimate
Stations: Western/Slauson, Sepulveda, LAX/Aviation, Culver City, East LA Civic Center
Contract Number:
Contract/ Phase:
Date: DECMEBER 6, 2021 (corresponding to SOW dated 12/2/2021)
LaborNotes
DescriptionHoursAvg. RateLaborTask Total
(unburdened)Cost
Task 1Overall Project Management16$ 65$ 1,040$ 1,0408 monthly meetings with Metro staff for cross-project coordination (across all 5 projects from Task 2-6). 2 hours per meeting with only strictly necessary staff (mainly Deborah) from consultant team (1 hour per meeting with 1 hour for prep/team debrief). The costs for these overall coordination meetings will be split among the 5 projects.
Task 2.1W/S: Project Mangagment and Control16$ 65$ 1,040$ 1,040
2.1.1Project Management Plan – Schedule
(project management plan)2One (1) project schedule (gantt chart).

One (1) draft & review by Metro PM.

2.1.2Project Team Meetings
(attendance and materials for up to 8 meetings )12Up to one (1) consultant staff per meeting. Assumes one (1) hour meetings with half (0.5) hour of meeting prep. Monthly meeting with city agency staff (8)

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

2.1.3Quality Assurance/Quality Control Approach2
Task 2.2W/S: Assessment of Existing Conditions68$ 65$ 4,420$ 4,420One (1) memo summarizing all subtasks in Task 2.2.

One (1) draft & review by Metro PM.

2.2.1 Data analysis 20 One (1) set of existing conditions maps including street grid, high vehicular speed streets, walk shed, collisions data, points of interest, population density, employment density, land use, tree canopy.

Metro PM (city) to provide consultant with FLM base map template.

Summarize data analysis with narrative and maps, to be included in overall existing conditions memo (Task 2.2)

Consultant to package all individual GIS files/layers into a geodatabase and provide to Metro PM.

2.2.2 Technical walk-audits 16 Up to two (2) consultant staff to conduct walk audits. Assume four (4) hours each to conduct walk audits, then eight (8) hours to summarize findings.

Configuration of the walk audit app (if needed)

Summarize findings with photographs, and audit notes, to be included in overall existing conditions memo (Task 2.2).

2.2.3Map-based charette20Up to three (3) consultant staff to conduct map-based charette. Assumes six (6) hours for attending the charette (2 hrs/staff), then fourteen (14) hours for summarizing findings/data collected.
2.2.4Assessment of permitting conditions4
2.2.5Research of current and planned projects in area8One (1) matrix summarizing the related plans and projects within the 0.5-mile radius including, at a minimum: title, description, geographic area, dates/schedule, status, contact person, analysis of how it would impact FLM improvements; and any opportunities to streamline or combine implementation efforts.

One (1) draft & review by Metro PM.

Task 2.3 W/S: Development of Community Engagement 97 $ 65 $ 6,305 $ 6,305 One (1) memo summarizing all subtasks in Task 2.3.

One (1) draft & review by Metro PM.

2.3.1 Public Participation Plan worksheet 2 One (1) public participation plan worksheet. Assumes two (2) hours of filling out PPP worksheet.

One (1) draft & review by Metro PM.

2.3.2 Kick Off event 10 Up to two (2) consultant staff attendance at kick-off event.

Assumes seven (7) hours on event prepation and three (3) hours for staff attendance at event (1.5 hrs/staff).

One (1) agenda and one (1) meeting minutes.

One (1) draft & review by Metro PM.

2.3.3 Other community engagement activities 73 Assumes two (2) events at two (2) hours each. One is the core communty workshop activity, the other is a report-back, after a 5% concept plan has been developed and reviewed by local jursidictions (after Task 2.5) This is separate from the kick-off event, the charette during "existing conditions assessment".

Event preparation (15 hours/event) = 30 hours Language translation (5 hours/event) =10 hours Staff attendance/facilitation (4 staff/event) = 16 hours (inclusive of translators) Summarize community input received from event = 17 hours

2.3.4Web content for project landing page12Content for project landing page (to be hosted by StreetsLA), which may include project description and purpose, funding source information, project timeline, project deliverables as they are developed, and other relevant project information (photos, maps, etc.). Assumes eight (8) hours of content preparation in English; four (4 hours) for any Spanish translation
Task 2.4W/S: Interagency Coordination (up to 2 meetings)8$ 65$ 520$ 520Schedule and attend up to two (2) meetings with local agency staff and elected officials.

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

Task 2.5 W/S: Interagency Review of Products 18 $ 65 $ 1,170 $ 1,170 One (1) matrix summarizing Metro, local agency, and other relevant public agency staff comments to work products.

Modify work products based on comments, as needed.

Task 2.6 W/S: Development of Final Project Products 50 $ 65 $ 3,250 $ 3,250 Project list

Detailed project schedule with clearly identified steps and roles for the remainder of the project.

Detailed budget for the future project activities in the remainder of the project.

5% concept-level plans and Street Mixes

Total Direct Labor257$ 65$ 16,705$ 16,705
Labor Overhead (150%)$ 25,057.50
Other Direct Costs (event costs and printing)$3,500
Transportation
Fee (8%)$ 3,341.00
Task Total Estimate$ 48,603.50
Task 3.1Sepulveda: Project Mangagement and Control16$ 65$ 1,040$ 1,040
3.1.1Project Management Plan – Schedule2One (1) project schedule (gantt chart).

One (1) draft & review by Metro PM.

3.1.2 Project Team Meetings 12 Up to two (2) consultant staff per meeting. Assumes one (1) hour meetings with half (0.5) hour of meeting prep. Monthly meeting with agency staff (8);

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

3.1.3Quality Assurance/Quality Control Approach2
Task 3.2Sepulveda: Assessment of Existing Conditions60$ 65$ 3,900$ 3,900One (1) memo summarizing all subtasks in Task 3.2.

One (1) draft & review by Metro PM.

3.2.1 Data Compilation and Review 20 One (1) set of existing conditions maps including street grid, high vehicular speed streets, walk shed, collisions data, points of interest, population density, employment density, land use, tree canopy.

Metro PM to provide consultant with FLM base map template.

Summarize data analysis with narrative and maps, to be included in overall existing conditions memo (Task 2.2)

Consultant to package all individual GIS files/layers into a geodatabase and provide to Metro PM.

3.2.2Charette20Up to three (3) consultant staff to conduct map-based charette. Assumes six (6) hours for attending the charette (2 hrs/staff), then fourteen (14) hours for summarizing findings/data collected.
3.2.3Review Caltrans Permitting Requirements4
3.2.4Caltrans Memorandum of Understanding4
3.2.5Right-of-Way Relinquishments4
3.2.6Review Plans and Projects8One (1) matrix, to be included in overall existing conditions memo (Task 3.2), summarizing the related plans and projects within the 0.5-mile radius including, at a minimum: title, description, geographic area, dates/schedule, status, contact person, analysis of how it would impact FLM improvements; and any opportunities to streamline or combine implementation efforts.
Task 3.3Sepulveda: Development of Community Engagement97$ 65$ 6,305$ 6,305
3.3.1Public Participation Plan Worksheet2One (1) public participation plan worksheet.

One (1) draft & review by Metro PM.

3.3.2 Kick-Off Community Engagement Event 10 Up to two (2) consultant staff attendance at kick-off event.

Assumes seven (7) hours on event prepation and three (3) hours for staff attendance at event (1.5 hrs/staff).

One (1) agenda and one (1) meeting minutes.

One (1) draft & review by Metro PM.

3.3.3 Community Engagement Activities 73 Assumes two (2) events at two (2) hours each. One is the core communty workshop activity, the other is a report-back, after a 5% concept plan has been developed and reviewed by local jursidictions (after Task 3.5) This is separate from the kick-off event, the charette during "existing conditions assessment".

Event preparation (15 hours/event) = 30 hours Language translation (5 hours/event) =10 hours Staff attendance/facilitation (4 staff/event) = 16 hours (inclusive of translators) Summarize community input received from event = 17 hours

3.3.4Web Content12Content for project landing page (to be hosted by StreetsLA), which may include project description and purpose, funding source information, project timeline, project deliverables as they are developed, and other relevant project information (photos, maps, etc.). Assumes eight (8) hours of content preparation; four (4) hours for Spanish translation
Task 3.4Sepulveda: Interagency Coordination10$ 65$ 650$ 650Schedule and attend up to two (2) meetings with local agency staff and elected officials.

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

Task 3.5 Sepulveda: Interagency Review of Products 20 $ 65 $ 1,300 $ 1,300 One (1) matrix summarizing Metro, local agency, and other relevant public agency staff comments to work products.

Modify work products based on comments, as needed.

Task 3.6 Sepulveda: Development of Final Project Products 50 $ 65 $ 3,250 $ 3,250 Project list

Detailed project schedule with clearly identified steps and roles for the remainder of the project.

Detailed budget for the future project activities in the remainder of the project.

5% concept-level plans and Street Mixes

Total Direct Labor253$ 65$ 16,445$ 16,445
Labor Overhead (150%)$ 24,668
Other Direct Costs (event costs, survey, and printing)$ 3,500
Transportation
Fee (8%)$ 3,289
Task Total Estimate$ 47,902$58,617 from Board Attachment
Task 4.1LAX: Project Mangagement and Control16$65$1,040$1,040$58,617 from Board Attachment
4.1.1Project Management Plan – Schedule2One (1) project schedule (gantt chart).

One (1) draft & review by Metro PM. One (1) project schedule (gantt chart).

One (1) draft & review by Metro PM.

4.1.2 Project Team Meetings 12 Up to two (2) consultant staff per meeting. Assumes one (1) hour meetings with half (0.5) hour of meeting prep.

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM. Up to two (2) consultant staff per meeting. Assumes one (1) hour meetings with half (0.5) hour of meeting prep. Monthly meeting with agency staff (8);

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

4.1.3Quality Assurance/Quality Control Approach2
Task 4.2LAX: Assessment of Existing Conditions76$65$4,940$4,940One (1) memo summarizing all subtasks in Task 4.2.

One (1) draft & review by Metro PM.

4.2.1 Data Compilation and Review 20 One (1) set of existing conditions maps including street grid, high vehicular speed streets, walk shed, collisions data, points of interest, population density, employment density, land use, tree canopy.

Metro PM to provide consultant with FLM base map template.

Summarize data analysis with narrative and maps, to be included in overall existing conditions memo (Task 1.2)

Consultant to package all individual GIS files/layers into a geodatabase and provide to Metro PM. One (1) set of existing conditions maps including street grid, high vehicular speed streets, walk shed, collisions data, points of interest, population density, employment density, land use, tree canopy.

Metro PM to provide consultant with FLM base map template.

Summarize data analysis with narrative and maps, to be included in overall existing conditions memo (Task 4.2)

Consultant to package all individual GIS files/layers into a geodatabase and provide to Metro PM.

4.2.2 Walk Audits 16 Up to two (2) consultant staff to conduct walk audits. Assume four (4) hours each to conduct walk audits, then eight (8) hours to summarize findings.

Configuration of the walk audit app (if needed)

Summarize findings with photographs, and audit notes, to be included in overall existing conditions memo (Task 1.2). Up to two (2) consultant staff to conduct walk audits. Assume four (4) hours each to conduct walk audits, then eight (8) hours to summarize findings.

Configuration of the walk audit app (if needed)

Summarize findings with photographs, and audit notes, to be included in overall existing conditions memo (Task 4.2).

4.2.3Charette20Up to three (3) consultant staff to conduct map-based charette. Assumes six (6) hours for attending the charette (2 hrs/staff), then fourteen (14) hours for summarizing findings/data collected.
4.2.4Permitting Review4
4.2.5Assessment of MOU4
4.2.6Right-of-Way Relinquishments4
4.2.7Review of Plans and Projects8One (1) matrix, to be included in overall existing conditions memo (Task 4.2), summarizing the related plans and projects within the 0.5-mile radius including, at a minimum: title, description, geographic area, dates/schedule, status, contact person, analysis of how it would impact FLM improvements; and any opportunities to streamline or combine implementation efforts.
Task 4.3LAX: Development of Community Engagement103$65$6,695$6,695
4.3.1Public Participation Plan Worksheet2One (1) public participation plan worksheet. Assumes two (2) hours of filling out PPP worksheet.

One (1) draft & review by Metro PM. One (1) public participation plan worksheet. Assumes two (2) hours of filling out PPP worksheet.

One (1) draft & review by Metro PM.

4.3.2 Kick-Off Community Engagement Event 10 Up to two (2) consultant staff attendance at kick-off event.

Assumes seven (7) hours on event prepation and three (3) hours for staff attendance at event (1.5 hrs/staff).

One (1) agenda and one (1) meeting minutes.

One (1) draft & review by Metro PM. Up to two (2) consultant staff attendance at kick-off event.

Assumes seven (7) hours on event prepation and three (3) hours for staff attendance at event (1.5 hrs/staff).

One (1) agenda and one (1) meeting minutes.

One (1) draft & review by Metro PM.

4.3.3 Community Engagement Activities 79 "Assumes three (3) events- two at two (2) hours each; one at one (1) hour - for institutional stakeholders. For the 2 hour meetings, one is the core communty workshop activity, the other is a report-back, after a 5% concept plan has been developed and reviewed by local jursidictions (after Task 4.5) This is separate from the kick-off event, the charette during ""existing conditions assessment"". The institutional stakeholder meeting will not require Spanish translation.

Event preparation (15 hours/event) for 2hour events= 30 hours Language translation (5 hours/event) for 2 hour events =10 hours Staff attendance/facilitation (4 staff/event) for 2 hour event = 16 hours (inclusive of translators) Event preparation and staffing for 1 hour event (assumes 2 staff) = 4 hours Summarize community input received from events = 19 hours

4.3.4Web Content12Content for project landing page (to be hosted by StreetsLA), which may include project description and purpose, funding source information, project timeline, project deliverables as they are developed, and other relevant project information (photos, maps, etc.). Assumes eight (8) hours of content preparation; four (4) hours for Spanish translation
Task 4.4LAX: Interagency Coordination14$65$910$910Schedule and attend up to two (2) meetings with local agency staff and elected officials.

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

Task 4.5 LAX: Interagency Review of Products 20 $65 $1,300 $1,300 One (1) matrix summarizing Metro, local agency, and other relevant public agency staff comments to work products.

Modify work products based on comments, as needed.

Task 4.6 LAX: Development of Final Project Products 50 $65 $3,250 $3,250 Project list

Detailed project schedule with clearly identified steps and roles for the remainder of the project.

Detailed budget for the future project activities in the remainder of the project.

5% concept-level plans and Street Mixes

Total Direct Labor279$65$18,135$18,135
Labor Overhead (150%)$27,203
Other Direct Costs (event costs, survey, and printing)$3,500
Transportation
Fee (8%)$3,627
Task Total Estimate$52,465$58,617 from Board Attachment
Task 5.1CC: Project Mangagement and Control16$65$1,040$1,040
5.1.1Project Management Plan – Schedule
(project management plan)2One (1) memo summarizing all subtasks in Task 5.2.

One (1) draft & review by Metro PM.

5.1.2Project Team Meetings
(attendance and materials for up to 8 meetings )12One (1) set of existing conditions maps including street grids, pedestrian shed, high vehicular speed streets, collision data, movements in key project intersections, and points of interest.

Metro PM to provide consultant with FLM base map template.

Summarize data analysis with narrative and maps, to be included in overall existing conditions memo (Task 5.2)

Consultant to package all individual GIS files/layers into a geodatabase and provide to Metro PM.

5.1.3 Quality Assurance/Quality Control Approach 2 Up to two (2) consultant staff to conduct walk audits. Assume four (4) hours each to conduct walk audits, then eight (8) hours to summarize findings.

Configuration of the walk audit app (if needed)

Summarize findings with photographs, and audit notes, to be included in overall existing conditions memo (Task 5.2).

Task 5.2CC: Assessment of Existing Conditions52$65$3,380$3,380
5.2.1Data collection and Analysis20
5.2.2Technical walk-audits16
5.2.3Review Caltrans Permitting Requirements4
5.2.4Caltrans Memorandum of Understanding4
5.2.5Review of Right-of-Way Relinquishments4
5.2.6Establishment of baseline and metrics4documentation of pre- and post-project conditions and outcomes. These metrics should be aligned with data deriving from 5.2.1.
Task 5.3CC: Community Engagement156$65$10,140$6,630
5.3.1Public Participation Plan worksheet2One (1) public participation plan worksheet. Assumes two (2) hours of filling out PPP worksheet.

One (1) draft & review by Metro PM.

5.3.2Outreach, materials development90Event preparation (15 hours/event) = 45 hours (see 5.3.5 for details- 3 events) Language translation- Spanish + one other (10 hours/event) = 30 hours (5 hours per language) additional materials prep for surveys, feedback portal on LADOT livable streets website, tabling, etc = 10 hours scheduling for outreach/engagement activities, coordination with LADOT = 5 hours
5.3.3Outreach, promotion5Promote project flyers and survey completion and awareness of the planning effort through email notices, LADOT blog post(s), and social media promotions.
5.3.4Outreach, event logistics5Book meeting venues, send invites and lead meetings in consultation with LADOT.
5.3.5Design workshops, documentation, and analysis54we are assuming 3 events. 2 will be similar to those in Tasks 2 & 3 (core community feedback workshop, a report-back at 5%, and then another meeting for design alternatives) Assumes three (3) events at two (2) hours each. One is the core communty workshop activity, the other is a report-back, after a 5% concept plan has been developed and reviewed by local jursidictions (after Task 5.5), and one to consider design alternatives for 15%.

Staff attendance/facilitation (4 staff/event) = 24 hours (inclusive of translators) Summarize community input received from events = 30 hours" Task 5.4 CC: Interagency Coordination 10 $65 $650 $650 Schedule and attend up to two (2) meetings with local agency staff and elected officials.

One (1) agenda and one (1) meeting minutes per meeting.

One (1) draft & review by Metro PM.

Task 5.5 CC: Interagency Review of Products 15 $65 $975 $975 "One (1) matrix summarizing Metro, local agency, and other relevant public agency staff comments to work products.

Modify work products based on comments, as needed. "

Task 5.6CC: Development of Final Project Products82$65$5,330$5,330●Preliminary and final recommended conceptual plans of connectivity and safety improvements and associated project list of detailed, defined project elements including their specific locations and descriptions.
●Technical feasibility studies of proposed project elements including data collection, traffic control warrant studies, and delay and diversion analyses. For treatments needing to meet warrants for official Traffic Control Reports, Contractor shall collect relevant data and conduct data analyses to determine whether proposed elements meet required thresholds. In some circumstances, Contractor may be requested to prepare draft reports for LADOT.
●Exhibits including visualizations, cross sections and conceptual design drawings.
●Conceptual engineering & cost estimates associated with the elements in the project list (at the level of 15% design).
●Recommendations and technical guidance for implementation strategy, including construction funding and project phasing if applicable.
●Detailed project schedule with clearly identified steps and roles for the remaining project phases through construction.
●Detailed budget including rough order of magnitude cost estimates for the future project activities and phases through construction.
Total Direct Labor331$65$21,515$21,515
Labor Overhead (150%)$32,272.50
Other Direct Costs (event costs and printing)$5,000.00for 3 events, inclusive of 15% design
Transportation
Fee (8%)$4,303.00
Task Total Estimate$63,090.50$90,000 from Board attachment
Task 6.1ELA: Community Engagement383$ 65$ 24,895$ 24,895Provide the design and literature for a mobile friendly project website that Public Works will host. (80)

Create online and hardcopy surveys to obtain feedback on ways to improve the local economy, livability, and transportation around the East Los Angeles Civic Center. (50)

Establish email distribution lists from past projects, information gathering at community outreach events, and new requests from the project website. (20)

Post flyers in the neighborhood and/or door-to-door flyers (such as Walking Man). (20)

Develop and send out postcards to notify residents and owners for the two workshops within the ½ mile project area. (20)

6.1.1Community Involvement Strategy406 meetings or events (24), presentation (20), summary (20)includes attendance for up to 8 meetings with County (1.5 hours each - 1 hour mtg; 0.5 hr prep), so it went from 40 to 52 hrs
6.1.2General Engagement190two, 4 hour workshops X 3 staff (24), presentation and materials (30), summary (15), publicity (20)
6.1.3Stakeholder Input64
6.1.4Public Workshops89
Total Direct Labor383$ 65$ 24,895$ 24,895surveys, flyers, post cards
Labor Overhead (150%)$ 37,342.50
Other Direct Costs (event costs and printing)$ 5,000.00
Transportation
Fee (8%)$ 4,979.00
Task Total Estimate$ 72,216.50
TOTALS FOR TASKS 1-6
Direct Labor$ 97,695

tc={E570575E-3D8B-4231-B99E-6598830F3EFE}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

note this doesn't include task 1

Labor Overhead$ 146,542.50$ 146,542.50
Other Direct Costs$ 20,500.00
Transportation
Fee$ 19,539.00$ 19,539.00
TOTAL$ 284,276.50
OPTIONAL TASKS
Labor
DescriptionHoursAvg. RateLaborTask Total
(unburdened)Cost
Optional Tasks$ 65
A15%-level Design for Western/Slauson Station96$ 65$ 6,240$ 6,240- 2 community engagement events: 1 for feedback on design alternatives and 1 for report back when 15% design is completed. Event preparation for 2hour events (including countermeasure prototypes/renderings for first meeting) = 40 hours Language translation (5 hours/event) for 2 hour events =10 hours

Staff attendance/facilitation (4 staff/event) for 2 hour event = 16 hours (inclusive of translators) Summarize community input received from first event = 10 hours Final project deliverables (20 hours) Project list with detailed,defined elements; 15% layout plan (feasibility), quantity take-offs, countermeasure prototypes, renderings. StreetsLA will provide all the unit-costs and therefore the consultant would only be responsible for the take-offs for quantities needed. StreetsLA will also review the QTOs from the consultant to make sure it is done correctly.

B15%-level Design for G Line Sepulveda Station116$ 65$ 7,540$ 7,540has more because of the eval (compared to WS and LAX); assume additional 20 hours
C15%-level Design for LAX/Aviation Station96$ 65$ 6,240$ 6,240
Total Direct Labor308$ 195$ 20,020$ 20,020
Labor Overhead (150%)$ 30,030.00
Other Direct Costs (event costs and printing)$1,500
Transportation
Fee (8%)$ 4,004.00
Optional Task Total Estimate$ 35,534.00
GRAND TOTAL (TASKS 1-5 AND OPTIONAL TASKS)
GRAND TOTAL$319,811Task Total

note this doesn't include task 1

Sheet 1

Year 1Year 2Year 3Option Year 1Option Year 2
Task No.DescriptionHoursAmount ($)HoursAmount ($)HoursAmount ($)HoursAmount ($)HoursAmount ($)
1Program Administration
2Fund Implementation and Tracking
3Technical Assistance and Marketing Plan
4Fund Reporting and Auditing
5Fund Close-Out Plan
Subtotal0$ - 00$ - 00$ - 00$ - 00$ - 0
Subtotal Other Direct Costs (ODCs)$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00
Subtotal Travel Costs$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00$ 1.00
Grand Total (Tasks 1- 5 ODCs, and Travel)$ 2.00$ 2.00$ 2.00$ 2.00$ 2.00
Total of Price Schedule shall match the Total Estimated Price of Form 60.
DETAILS FOR PRIME AND SUBCONTRACTOR(S) TO BE INCLUDED ON FORM 60s.

&"Arial,Bold"EXHIBIT 2.1 – PRICING SCHEDULE RFP No. PS140683(2) Program Administration Services for the Transit Oriented Communities Economic Development Program Pilot Investment Fund

File details come from the government source that posted it. Updated .