EXECUTED_Exhibit_U_CMAR_GMP_1_DeadHorseRanch.pdf

PDF 6 MB Posted

Attached to
Master Agreement AZ|CTR066685
Contract number
CTR066685
Issued by
Arizona

About this file

This document is a Construction Manager at Risk (CMAR) Guaranteed Maximum Price (GMP) Amendment between the State of Arizona Department of Administration, General Services Division, and Concord General Contracting, Inc. The project involves water and wastewater improvements at Dead Horse Ranch State Park, located in Cottonwood, Arizona. Key parties include the State of Arizona, Concord General Contracting, Kimley-Horn, EPS Group, Entellus, Inc., and various subcontractors and suppliers.

The GMP Amendment establishes a total project cost of $3,864,697.00 for construction services at Dead Horse Ranch State Park. The scope includes multiple components such as sewer system upgrades, electrical work, site utilities, valve replacements, water well replacement, and installation of a new CXT building with restroom facilities. The project involves demolition of existing infrastructure, installation of new water and sewer lines, electrical systems, and site improvements. The contract includes a 5% owner-controlled contingency and accounts for sales tax. Subcontractor bids cover various specialized areas including site utilities, electrical work, concrete, surveying, and specific infrastructure components. The project is funded through ARPA (American Rescue Plan Act) and is set to improve water and wastewater systems at the state park.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT U

CONSTRUCTION MANAGER AT RISK

GUARANTEED MAXIMUM PRICE

(GMP1) AMENDMENT

State of Arizona General Services Division

1400 W. Washington St., Ste. B200 Phoenix, AZ 85007

APP Contract No. CTR0066685 Agreement No. 1

Date of Agreement:

December 11, 2023

Agency Project No:

PCS-22-132

Statutory Review No: PCS-22-132 Project Name: ARPA W & WW Upgrades - DEAD HORSE RANCH

Construction Manager at Risk GMP Amendment

REV 02072023

The State of Arizona, (DEPARTMENT OF ADMINISTRATION, GENERAL SERVICES DIVISION), and (CONCORD GENERAL CONTRACTING, INC., hereby amend the Agreement to establish a Guaranteed Maximum Price.

Project Sites Address:

Agency:

Agency Address:

Agency’s Representative Email:

Telephone Number:

Agency Procurement Officer:

Email:

Telephone Number:

Design Professional Firm:

Design Professional of Record Email:

Telephone Number:

Design Professional Firm:

Design Professional of Record Email:

Telephone Number:

Design Professional Firm:

Design Professional of Record:

Email:

Telephone Number:

Contractor Name:

Contractor Address:

Contractor Project Manager:

Email:

Telephone Number:

Cattail Cove, Alamo Lake, River Island, Buckskin Mountain, Lake Havasu City, and Deadhorse Ranch State Parks

Department of Administration, General Services Division 1400 W. Washington St., Ste. B200 Phoenix, AZ 85007

Britt Olachea britt.olachea@azdoa.gov

(602) 552-3355

Crista Clevenger crista.clevenger@azdoa.gov

(602) 489-9116

Kimley-Horn Ray Montoya ray.montoya@kimley-horn.com

(520) 730-4558

EPS Group Mike LoTempio mike.lotempio@epsgroupinc.com

(602) 828-9662

Entellus, Inc.

Will Janiga wjaniga@entellus.com

(480) 298-5266

Concord General Contracting 2240 W. Broadway Rd., Suite 105 Mesa, AZ 85202

Jason Beaver jbeaver@concordinc.com

(480) 258-1361 c or (480) 962-8080 o

DocuSign Envelope ID: 89197F68-8860-48AA-8733-541B122B86FF mailto:ray.montoya@kimley-horn.com

GUARANTEED MAXIMUM PRICE

(GMP 1) AMENDMENT

State of Arizona General Services Division

1400 W. Washington St., Ste. B200 Phoenix, AZ 85007

APP Contract No. CTR0066685 Agreement No. 1

Date of Agreement:

December 11, 2023

Agency Project No:

PCS-22-132

Statutory Review No: PCS-22-132 Project Name: ARPA W & WW Upgrades - DEAD HORSE RANCH

Construction Manager at Risk GMP Amendment

REV 02072023

1.0 CONSTRUCTION SERVICES GUARANTEED MAXIMUM PRICE

1. This Amendment # 1 establishes a Guaranteed Maximum Price (“GMP”) and Construction Phase Fee for Construction Services and incorporates such terms into the Agreement, making the Agreement effective for Construction Phase Services:

a. The Guaranteed Maximum Price (“GMP”) for Construction Services, as defined under the Agreement for Dead Horse State Park, shall be Fourteen Thousand Four Hundred Sixty-Seven Dollars and no cents ($3,864,697.00).

2. Attached to this Amendment and incorporated herein is an itemized statement of the GMP organized by line items, allowances, contingencies, alternates, the Construction Manager’s Fee, and any other items that comprise the GMP.

3. Summary of Agreement Total:

Original Exhibit A Agreement PreConstruction DeadHorseRanch

Previous Amendments: $

This GMP 1 Amendment Dead Horse Ranch $ 3,864,697.00

Total (Including this Amendment) $ 3,880,727.00

$ 16,030.00

GUARANTEED MAXIMUM PRICE

(GMP1) AMENDMENT

State of Arizona General Services Division

1400 W. Washington St., Ste. B200 Phoenix, AZ 85007

APP Contract No. CTR0066685 Agreement No. 1

Date of Agreement:

December 11, 2023

Agency Project No:

PCS-22-132

Statutory Review No: PCS-22-132 Project Name: ARPA W & WW Upgrades - DEAD HORSE RANCH

Construction Manager at Risk GMP Amendment

REV 02072023

IN WITNESS WHEREOF, STATE OF ARIZONA, DEPARTMENT OF ADMINISTRATION, acting by and through the Agency procurement authority, and CONTRACTOR in connection with the Project, have executed this Agreement as of the date set forth in the date of Agreement signed by the authorized Agency Procurement Officer.

CONTRACTOR: CONCORD GENERAL CONTRACTING, INC.

(Typed Name)

(Signature)

(Title)

(Date)

STATE OF ARIZONA, DEPARTMENT OF ADMINISTRATION:

(Typed Name)

(Signature)

(Title)

(Date)

END OF CONSTRUCTION MANAGER AT RISK GUARANTEED MAXIMUM PRICE AMENDMENT

DocuSign Envelope ID: 89197F68-8860-48AA-8733-541B122B86FF

Jason Beaver

Vice President/COO

12-Dec-23 | 1:04 PM EST

12-Dec-23 | 10:18 AM PST

Construction Procurement Manager

Crista Clevenger

ENGAGE.

BUILD.

DELIVER.

DEAD HORSE RANCH STATE PARK

Water and Wastewater Improvement

PROJECT NO. PCS-22-132

GMP Estimate (Revised 4) November 30, 2023

TABLE OF CONTENTS

TAB 1

TAB 2

TAB 3

� TAB 4SUBCONTRACTOR BIDS

CLARIFICATIONS

SCHEDULE OF VALUES

ESTIMATE LETTER

Estimate Letter

TAB 1

November 21, 2023

Dead Horse Ranch State Park Water and Wastewater Improvements Attn: Britt Olachea 675 Dead Horse Ranch Rd Cottonwood, AZ 86326

RE: GMP Estimate

Dear Britt:

Attached is our package for the GMP estimate of the Dead Horse Ranch State Park water and wastewater improvements. This GMP estimate represents the drawings, specifications, and the results of our site investigation during preconstruction. The estimate presented in this package represents a budget for the project based off the current information.

We have included a schedule of values, estimate spreadsheet, written narrative, as well as subcontractor bids.

We look forward to continuing working with the project team on this exciting project. If you have any questions or need further information, please feel free to contact me at any time.

Sincerely, Concord General Contracting, Inc.

Jason Beaver Derick Aidoo Vice President/COO Director of Estimating

Attachments

Schedule of Values

TAB 2

11/30/2023

GMP Estimate (Revised 4)

PCS-22-132 Dead Horse Ranch State Park 675 Dead Horse Ranch Rd.

Cottonwood, AZ 86326

Item

DIVISION 01 - GENERAL REQUIREMENTS

1 Material Testing - Allowance $5,000 Concord

2 Utilities Locator - Allowance $15,000 Concord

3 Temporary Portable Toilets 33 total - (22 Standard, 11 ADA & 12 Hand Wash) $44,500 All American Waste Services

4 Layout & Surveying $38,218 Southwestern

DIVISION 02 - EXISTING CONDITIONS

5 Abatement Demolition $4,850 Comprehensive Risk Services

DIVISION 06 - WOODS & PLASTICS

6 Rough Carpentry - Well House Repairs $1,500 Concord

DIVISION 07 - THERMAL & MOISTURE PROTECTION

7 Caulking & Sealants $4,300 Concord

DIVISION 10 - SPECIALTIES

8 Signage - Valve Signs Allowance $24,750 Concord

DIVISION 13 - SPECIAL CONSTRUCTION

9 CXT Building $309,900 CXT / RSC AZ

DIVISION 26 - ELECTRICAL

10 Electrical / Lift Station Controls / Demolition $422,881 Sam Nichols Electrical

11 Electrical - Temporary Power / Lighting $28,800 Concord

DIVISION 31 - EARTHWORK & PAVING

13 Dust Control $7,500 Concord

DIVISION 32 - EXTERIOR IMPROVEMENTS

14 Landscaping - Vegetation Replacement Allowance $25,000 Concord

15 Temporary Fencing $31,450 Concord

DIVISION 33 - SITE UTILITIES

16 Site Utilities - Sewer System $1,245,915 Pat Bern 17 Site Utilities - Entrance Dumpstation $47,616 Pat Bern 18 Site Utilities - Valves and Vaults $468,292 Pat Bern 19 Site Utilities - CXT piping / Water System $135,943 Pat Bern

20 Site Utilities - Water Well Replacement $61,833 Pat Bern 21 Lift Station Commisioning Allowance $25,000 Concord

22 Subtotal - A $2,948,248

23 General Conditions $298,694

24 Performance & Payment Bond $32,341

25 General Liability Insurance 1.0% $29,482 Subtotal - A

26 Builders Risk Insurance 0.3% $8,845 Subtotal - A

27 Contractors Fee 5.25% $154,783 Subtotal - A

28 Subtotal - B $3,472,394

29 Sales Tax - (Cottonwood, AZ) 7.05% $244,891 Subtotal - B

30 SUBTOTAL - C $3,717,284

31 Owner Controlled Continguency - Construction 5.0% $147,412 Subtotal - A

32 TOTAL $3,864,697

Alternates

1 $647,614

$4,512,310

Sub-Contractor

Ranger Residence & Maint. Shop Sewer System - (6" PVC SDR, Manhole, Abandon Existing Septic, 24" steel casing pipe, Cleanouts, connect to lift station, remove and replace asphalt) - ADD

UPDATED TOTALS WITH ALTERNATES

BidDescription Of Work

Clarifications

TAB 3

Cottonwood, Arizona

11/21/2023

CLARIFICATIONS

1. This “GMP Estimate” is based on the drawings provided by Entellus Engineering stamp dated

7/17/2023, site walk and RFP by ADOA PM Britt Olachea.

2. Includes General Contractor General Liability.

3. Includes Builders Risk Insurance for the value of new work.

4. Includes a performance and payment bond.

5. Excludes inspection fees, tap fees, agency fees, bonds, and special inspection charges.

6. Excludes water and sewer development fees.

7. Excludes building permit and plan check fees.

8. Excludes any variance application fees, and architectural / engineering filling fees.

9. Excludes all furniture, fixtures & equipment (FFE) not listed.

10. Excludes SRP/APS development fees.

11. Excludes special system monitoring.

12. Excludes phone line.

13. Includes all low voltage work.

14. Excludes installation of a security system.

15. Excludes all building and interior signage other than code required and building address signage.

16. Excludes Painting CXT building or any other existing building painting.

17. Excludes fire alarm and fire sprinkler for CXT building.

NARRATIVE SCOPE OF WORK

Architecture and Engineering

• Does not include SRP/APS, architectural, structural engineering, landscape, civil engineering, mechanical, electrical design, and fees.

Regulatory Requirements

• Project design and construction shall conform to all state and local regulations. General Liability Insurance, Workmen’s Compensation will be maintained for the duration of the project.

Construction Closeout

• The project site will be left free from debris and materials related to the work performed on this project.

• Any training will be provided to the owner as specified.

• A complete set of project record documents to include Owner’s manuals, warranties, and as built drawings per ADOA closeout requirements.

DIVISION 1 - GENERAL REQUIREMENTS

General Conditions

• Includes a full-time superintendent, project manager, office staff support, barricades, barriers, telephones, and portable toilets. The utility charges used during construction to be paid by the Owner. (See general conditions breakdown)

Quality Control

• Material testing allowance of $5,000 included.

• Utilities locator allowance of $15,000 included.

• Survey and layout for new construction.

• Site Control

• Lift Station

• Water Valve Replacement locations

• Vault

• Restroom (1 set of stakes)

• Electric Lines

• Day use area Force Main – Construction Staking and As-built point collection.

• Cabin Loop Restroom to Lift Station – Construction Staking and As-built point collection.

• Raven Loop Sewer Line – Construction Staking and As-built point collection.

• Quail Loop Sewer Line – Construction Staking and As-built point collection.

Temporary Restroom – Provided During Water Shutdown at Park

• Includes 33 total portable toilets.

• (22) standards and (11) ADA portable toilets.

• Includes (12) Hand washing stations.

DIVISION 2 – EXISTING CONDITIONS

Abatement

• Remove all caulking from door frames per EMC2 report.

• Includes waste transportation and disposal fees.

• Includes compliance of all OSHA and EPA regulations.

• Excludes oversight

DIVISION 3 - CONCRETE

Site Concrete

• Remove and replace concrete curb.

• New 4” concrete sidewalk.

• Concrete patches.

DIVISION 6 – WOODS & PLASTICS

Rough Carpentry

• Includes well house repairs after installation of pump.

DIVISION 7 – THERMAL MOISTURE PROTECTION

Caulking & Sealants

• Concrete sidewalk joints.

• Expansion joints sidewalk to CXT building.

DIVISION 10 - SPECIALTIES

Signage

• Provide and install valve signs and post allowance is included.

• Owner to provide standard sign detail.

DIVISION 13 – SPECIAL CONCSTRUCTION

CXT Building

• Furnish and install custom building including restroom, shower, concession, storage, and combination configuration.

• Includes connection to utilities.

• Wall and roof texture.

• Porch / wing wall.

• Insulation and heaters.

• Plumbing fixtures.

• Restroom accessories.

• Skylight in restroom.

• Exterior mounted ADA drinking fountain w/ Can skirt.

• Restroom to meet ADOA CXT standards.

• Includes installation of exterior ADA sink.

• Colors will be verify during submittal with Park.

DIVISION 26 - ELECTRICAL

Electrical

Lift Station

• Includes underground conduit and conductors from existing panel to new packaged lift station.

• Includes lift station control panel.

• Includes level floats and connections to motor.

• Includes control panel stand.

CXT/Day Use Restroom

• Includes underground conduit and conductors from existing feed to new prepackaged restroom building per plans.

Water & Well System

• Includes underground conduit and conductors for new heat trace branch circuit, outlet, heat trace connectors at valve A, B, C & Well house.

• Includes ground boxes.

• Includes connecting a new well pump to existing feeder and reconnecting new flow meter.

• Includes cutting, removal, excavating and replacement of existing asphalt.

DIVISION 31 – EARTHWORK & PAVING

Earthwork & Paving / Demolition

• Demo rocks, concrete, wooden fence, wash station, yard hydrant.

• Demo water service.

• Demo existing restroom building for new CXT.

• Clear and grub for new CXT building, lift station, and disturbed utilities area.

• Rough grade site for new CXT building pad, lift station, road, disturbed utilities areas.

• Remove and replace paving as required.

Termite Control

• Apply termite pretreatment underneath the new CXT building.

Dust Control

• Water truck and water costs to maintain dust throughout construction.

Landscaping

• Including vegetation removal and replacement allowance.

• Replacement shrubs.

• Hydroseed native vegetation where required.

Site Utilities (Per Plans and Site Walk)

• Sewer Demo wet well and salvage pump. Remove electrical panel.

Septic abandonment.

Verify sewer laterals.

Includes 4” SDR 35 and 6” SDR 35.

Install one lift RC509 precast concrete pump station with internal valve vault.

Package lift station with integral valve vault.

Includes manholes.

Includes ARV and meter boxes.

Includes cleanouts and double cleanouts.

Includes cleanouts with vaults.

Includes core into existing manhole.

Install 24” steel casing pipe.

Connect to existing drain lines.

Install drop sewer connection.

• Water

Demo wash station, yard hydrant and water service.

Install waterline service to building.

Install 2” copper waterline.

Install 2” backflow.

Install air release valve.

• Entrance Dump Station

Demo standpipe and yard hydrant.

Install 4” standpipe remote water tower.

Connect water service.

Includes yard hydrant and water service.

• Valves and Vaults

Remove and replace 4” and 6” gate valve.

Remove and replace fire hydrant.

Install vacuum breaker.

Install valve assemblies above ground.

Demo existing valve vault B & C.

Install air release valve.

• Water Well Replacement

Demo existing pump discharge.

Includes well video. See attached quote by Empire Pump.

Install submersible pump & airlift development.

Installation of well head and tie into existing 3” PVC pipe.

Include STS-RITE 70GPM 5HP 12STG4 cast-iron liquid end.

Includes 4” 5HP 3W 230V 1PH Pentek Submersible motor.

Install 2 ½” Galv pipe T&C.

Includes Mccrometer MW503 3” flange meter.

Includes Chlorine injection system.

Includes industries check valve.

• Add Alternate – Ranger Residence & Maintenance Shop Sewer System

Remove cleanouts.

Includes septic abandon/connection.

Install 6” SDR 35.

Install manhole.

Includes drop sewer.

Connect to existing lift station.

Includes 4” vertical realignment.

Install 24’ steel casing.

Subcontractor Bids

TAB 4

SUBCONTRACTOR BID LIST

ADOA - Dead Horse State Park Water & Wastewater Improvements - Bidder List

1/9

Concord General Contracting

ADOA - Dead Horse State Park Water & Wastewater

Improvements

Name Email Phone Cell Status

Frost Engineering --

Rick Frost rick.frost@frost-structural.com +1 928-776-4757 -- Invited

Heritage Land Survey +1 928-567-9170

Clint Gillespie cgillespie@heritage-ls.com +1 928-567-9170 -- Invited

Morgan Dubs morgan.heritagesurvey@gmail.com -- -- Invited

Material Testing & Inspections, LLC +1 928-515-1986

Scott Mosley smosley.mti@gmail.com +1 928-499-8714 -- Invited

Mohave Engineering Assoc. +1 928-753-2627

Donna Crouse dcrouse@meaiaz.com +1 928-753-2627 -- Invited

Dustin Jean djean@meaiaz.com +1 928-753-2627 -- Invited

Nexus Southwest LLC +1 928-778-5101

Adam Haywood adamhaywood32@gmail.com -- -- Invited

Patrick Haywood phaywood207@gmail.com +1 928-778-5101 -- Invited

Quality Control Group --

John Shelton jwshelton1@cableone.net +1 928-533-6054 N/A Invited

01 45 23: Testing and Inspecting Services Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

02 21 00: Surveys Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

2/9

APL Surveying --

Lee Johnson apls@frontiernet.net +1 928-505-2570 -- Invited

Granite Basin Engineering --

Kaline Hutchinson kaline@granitebasinengineering.com +1 928-717-0171 -- Invited

Tom Liuzzo tom@granitebasinengineering.com +1 928-717-0171 -- Invited

Heritage Land Survey +1 928-567-9170

Clint Gillespie cgillespie@heritage-ls.com +1 928-567-9170 -- Invited

Morgan Dubs morgan.heritagesurvey@gmail.com -- -- Invited

Landmark Engineering & Surveying Inc. --

Tod Graham tgraham@landmarkes.com +1 928-282-7104 -- Viewed

Lyon Engineering & Development --

Scott Lyon slyon@cableone.net +1 928-776-1750 -- Invited

Lyon Engineering & Surveying, Inc. --

Paige Robbins paigerobbins@lyonengineering.com +1 928-776-1750 -- Invited del Sturgis delsturgis@lyonengineering.com +1 928-776-1750 -- Viewed

Meridian LAND Surveyors --

Brad Smith brad@meridianlandsurveyors.com +1 928-772-8390 -- Invited

Nexus Southwest LLC +1 928-778-5101

Adam Haywood adamhaywood32@gmail.com -- -- Invited

Patrick Haywood info@nexus-sw.net +1 928-778-5101 -- Invited

3/9

SEC --

Eric Burke eburke@sec-landmgt.com -- -- Invited

Mark Farr mfarr@sec-landmgt.com -- -- Invited

SECinc --mark farr markf@sec-landmgt.com -- -- Viewed

SWI --

Mark Polydoros mpolydoros@swiaz.com +1 928-541-0443 +1 928-899-7779 Invited

Southwestern Environmental Consultants --

Krishan Ginige kginige@sec-landmgt.com +1 928-202-6310 -- Viewed

Melissa DeTar mdetar@sec-landmgt.com +1 928-340-4205 -- Invited

Sunrise Engineering, Inc. +1 928-277-8440

Dave Dirren ddirren@sunrise-eng.com +1 928-474-4404 -- Invited

Yavapai Surveying, LLC --

S. Timothy yava@cableone.net +1 928-772-6842 -- Invited

Elite Performance Concrete --

Coby Cook coby@eliteperformanceconcrete.com +1 928-821-0793 -- Invited

Fisher Concrete LLC --john fisher johnnyfisher777@gmail.com +1 928-308-3136 -- Invited

Frontier Concrete --

-- froconcrete@yahoo.com -- -- Invited

03 30 00: Cast-in-Place Concrete Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

4/9

Hanson Aggregates --

Eddie Fullerton eddie.fullerton@lehighhanson.com +1 480-215-5202 -- Invited

J Co Contracting --

Cambria Cluff cambria@jcocontracting.com +1 928-277-4617 -- Invited

Mike Nay (vendor) mikenay@jcocontracting.com +1 949-795-7424 -- Viewed

Steven Villone steve.villone@jcocontracting.com +1 928-710-3828 +1 928-710-3828 Invited

Mahan Concrete Construction --

Steve Mahan bigmahan@hotmail.com +1 928-301-1087 -- Invited

Masonry & More --

-- jeff@masonryandmoreconcrete.com -- -- Viewed

PCI Masonry And Concrete --

Roy Pena pcimasonryandconcrete@gmail.com +1 928-713-3844 -- Invited

Ridder Concrete, Inc. --

Ed Ridder ridderconcrete@yahoo.com +1 928-445-1666 -- Invited

Rivera Masonry Inc. --

Al Rivera dnallc@aol.com +1 623-245-1212 -- Invited

Sedona Concrete llc --

Eric Kleine sedonaconcrete@yahoo.com +1 928-821-2769 -- Invited

Stewart Concrete --

-- john@stewartconcrete.com -- -- Invited

5/9

Taz Concrete --

Heather Tinnelly taz@tazconcrete.net +1 928-453-1838 -- Viewed

#1 Arizona Electric LLC --

Andrew Ganas 1arizonaelectricllc@gmail.com -- -- Invited

Amped Electrical LLC +1 928-308-5052

Tony Ange tony@amped-electrical.com +1 928-308-5052 -- Invited

Arizona Wide Electric --

Alan Workman aworkman751@gmail.com +1 928-646-3059 +1 602-708-0855 Invited

Janet Trujeque azwideelect@msn.com +1 928-646-3059 -- Invited

Grant Electric --

Estimating grantelectricaz@gmail.com +1 928-202-9072 -- Invited

Jenco, Inc. +1 480-607-9797

Jeffery Nihart jnihart@jencoinc.com +1 269-244-0199 -- Invited

Kris Geltch kgeltch@jencoinc.com +1 602-540-4345 -- Invited

Ryan Aalgaard raalgaard@jencoinc.com -- -- Invited

Klostermeier electric --

Jared Klostermeier klostermeierconstruction@gmail.com +1 928-230-4812 -- Viewed

Morrell Electric +1 928-487-5224

Brian Morrell morrellelectric@gmail.com +1 928-487-5224 -- Invited

Sam Nichols Electrical Inc. --

David McAtlin david@samnicholselectrical.com +1 928-855-4121 -- Viewed

26 00 00: Electrical Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

6/9

Thomas Electrical +1 602-268-8620

Ben Perkins bperkins@thomaselectricalinc.com -- -- Viewed

Estimating Department estimating@thomaselectricalinc.com -- -- Invited

Verde Elite Electric Llc --

Shay Steadman verdeeliteelectric@gmail.com +1 928-308-1688 -- Invited

Wang Electric Systems, LLC +1 602-324-5350

Max Debber max@wangelectric.com +1 602-288-6393 -- Viewed

Pat Garcia patg@wangelectric.com +1 602-288-6390 -- Invited

Yavapai Mechanical, LLC --

Jeremy Rushton jrushton@ypeinc.com +1 928-776-7025 -- Invited

Randy Garman rgarman@ypeinc.com +1 928-776-0692 -- Viewed

AZ Patch and Seal --

Dan Kelly azpatchnseal@gmail.com +1 602-686-2900 -- Invited

Asphalt Paving & Supply --

Ben Dilcher bdilcher@nicnd.com +1 928-772-6363 ext. 230 -- Invited

Cisco Excavation, LLC --

Angela Gabaldon angelargabaldon@gmail.com +1 505-306-7705 -- Invited

Cisco Gabaldon cgconstruction2010@gmail.com +1 928-639-0808 +1 928-310-4438 Invited

Copperstate Paving & Construction LLC +1 928-445-0931

David Ramsey estimating@copperstatepaving.com +1 928-445-0931 +1 928-899-8862 Invited

31 00 00 : Earthwork Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

7/9

Earth Resources Corporation +1 928-775-2795

Gary Shurtz gary@ercarizona.com +1 928-713-5177 -- Viewed

Fann Contracting, Inc. +1 928-778-0170

Fann Contracting Estimating estimating@fanncontracting.com +1 928-778-0170 -- Viewed

LB Contracting LLC --

Larry Bryant lbryant@lbcontractingaz.com +1 928-277-1634 +1 928-713-4002 Invited

Longfellow Excavating LLC --

Josh Longfellow longfellowgroup@gmail.com +1 928-300-3792 +1 928-821-4745 Invited

Pioneer Earthmovers, Inc. --

-- sales@pioneerearthmovers.com -- -- Invited

Sandra Ca sandy@pioneerearthmovers.com +1 928-854-5035 -- Invited

Reay Brothers Excavation --

Jacob Reay reaybros@hotmail.com +1 928-300-8161 -- Viewed

Yavapai Contracting LLC --

Jared O'Brien yavapaicontracting@gmail.com +1 928-830-6563 -- Invited

American Fence Company +1 928-772-6320

Kip Garasha kip.garasha@americanfence.com +1 928-772-6320 -- Viewed

Leonard Maier leonard.maier@americanfence.com +1 928-772-6320 +1 928-713-6429 Viewed

Armor Fence And Masonry, Inc. +1 928-453-1006

Jesse Crawley armorfenceco@yahoo.com +1 928-453-1006 -- Viewed

Jesse Crawley admin@armorfenceandmasonry.com +1 928-453-1006 -- Viewed

32 31 00: Fences and Gates Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

8/9

Hot AZ Hell Welding and Fabrication LLC --

Cole Moreland cole@hotazhellwelding.net +1 928-458-3144 -- Invited

Hot Az Hell Welding & Fabrication, LLC +1 928-713-4749

Jacquelyn Moreland jackie@hotazhellwelding.net +1 928-713-4749 -- Invited

J&B Striping LLC --

Jeff Bee jandbstripingaz@gmail.com +1 928-848-3449 -- Invited

Prescott Fence Company --

Dave Haggart dhaggart@prescottfence.com +1 928-445-4211 -- Viewed

Prescott Fence officemanager@prescottfence.com +1 928-445-4211 -- Viewed

Red Rock Fence Co --

Charles West redrockfencing.az@gmail.com +1 928-499-1817 -- Viewed

Asphalt Paving & Supply --

Ben Dilcher bdilcher@nicnd.com +1 928-772-6363 ext. 230 -- Invited

Chris Graff cgraff@nicnd.com +1 928-237-6564 -- Invited

Delta Diversified Enterprises, Inc. +1 928-708-0066

James McCormick jimm@deltadiv.com +1 928-708-0066 +1 928-830-8864 Invited

Matt Maxwell matt@deltadiv.com +1 928-699-2042 -- Viewed

Fann Contracting, Inc. +1 928-778-0170

Fann Contracting Estimating estimating@fanncontracting.com +1 928-778-0170 -- Viewed

Michael Fann mfann@fanncontracting.com +1 928-778-0170 -- Invited

33 00 00: Site Utilities Lead: Shannon Cordova Bids Due: Aug 31, 2023 at 2:00 PM MST

9/9

LB Contracting LLC --

Larry Bryant lbryant@lbcontractingaz.com +1 928-277-1634 +1 928-713-4002 Invited

Longfellow Excavating LLC --

Josh Longfellow longfellowgroup@gmail.com +1 928-300-3792 +1 928-821-4745 Invited

McDonald Bros Construction Inc. --

Brian McDonald brian@mcdonaldbrosaz.com +1 928-567-3539 -- Invited

Pehl Contracting --

Gavin Pehl pcinc@outlook.com +1 928-710-2211 -- Invited

R & D Stormwater Management +1 408-365-8180

Ed D'Agostino ed@rdstorm.com +1 602-374-7560 +1 480-365-8180 Invited

Sherri Strickland sherri@rdstorm.com +1 602-374-7560 -- Invited

Reay Brothers Excavation --

Jacob Reay reaybros@hotmail.com +1 928-300-8161 -- Invited

Tiger Trenching --

-- n.rodriguez@tigertrenching.com -- -- Viewed

GENERAL CONDITION

PCS-22-132 Dead Horse Ranch State Park 675 Dead Horse Ranch Rd. 0

Cottonwood, AZ 86326 6.00 Months

26.00 Weeks

GENERAL CONDITIONS BREAKDOWN

11/8/2023

TEMPORARY FACILITIES

01-56-00 Job Site Trailer 100% 6 MO $1,478 $8,867 01-20-00 Job Site Trailer Mob/Demob 100% 1 LS $1,500 $1,500

Hand Wash Station 100% 6 MO $350 $2,100 01-54-00 Temporary Toilets 100% 6 MO $1,300 $7,800

PROJECT STAFF

01-10-00 Project Manager 33% 6 MO $19,933 $39,467 01-11-00 Project Superintendent 100% 26 WKS $4,000 $104,000 01-13-00 Project Engineer / Scheduler 100% 6 MO $8,500 $51,000 01-12-00 Project Coordinator 50% 6 MO $9,920 $29,760 01-14-00 General Labor 50% 26 WKS $800 $10,400

UTILITIES

01-52-00 Connect to Existing Power & Hookup 100% 6 MO $1,550 $9,300 01-55-00 Connect to Existing Water & Hookup 100% 6 MO $350 $2,100

JOBSITE OPERATION EQUIPMENT

01-50-50 Small Tools 100% 6 MO $750 $4,500 01-53-00 Cellular Phone 100% 6 MO $150 $900 01-58-00 Technology 100% 6 MO $1,000 $6,000

TRAVEL & VEHICLE

01-51-00 Superintendent Truck 100% 6 MO $1,500 $9,000

CLEAN-UP

01-70-00 Weekly Cleanup 0% 2 WKS $450 $0 01-70-50 Final Clean-up 100% 1 LS $3,500.00 $3,500 01-71-00 Dumpster/Haul Off 100% 6 MO $1,200 $7,200

GENERAL PROJ. EXPENSES

01-61-00 Drinking Water 100% 6 MO $150 $900 01-46-00 Messenger Service 100% 2 MO $200 $400

TOTAL $298,694

$49,782 Per Month

$1,641 Per Day

Price Total Notes

Cost Per Month $49,782 Square Feet

Duration

Phase # Description % Quantity Unit

PORTABLE TOILETS

Derick Aidoo

From: Linden Fish <linden@aawsi.com>

Sent: Wednesday, October 4, 2023 3:33 PM

To: Derick Aidoo

Subject: Portable Sanitation Quote - Dead Horse Ranch State Park, AZ

Hello Derick

Thank you for the request!

Please find service information below for multiple locations at Dead Horse Ranch State Park, AZ. Placement and number of units at each location TBD - Not to exceed a 5-10 mile radius inside the park. Placement map to be provided prior to delivery, rental rates are based on 14 days

22 - Standard Portable Toilets

12 - Double Faucet Wash Stations

11 - Handicap Accessible Portable Toilets

4 - Services of all units - includes pumpouts, cleaning, chemical replacement and supplies

Delivery and Pick Up

Total: $44,500.00 For Budget Only - To be reviewed when placement map and start and finish date are set.

To schedule the reservation, please complete the form in the link below:

ORDER FORM:

https://www.aawsi.com/order-long.php

CALL OFF FORM:

Call Off Form

Includes: Weekday delivery and pickup plus all fees. The 2 X weekly servicing will be determined upon delivery and the prices quoted above will continue on a recurring 14-28-day cycle until the unit is called off by FAX or EMAIL only or pre scheduled date.. 72-hour notice is required. Call or email for same day or short notice delivery. Hand Sanitizer is an additional $40 per unit.

Payment is due up-front by credit card to cover the first 28-day cycle.

EXACT TIME OF DELIVERY/ARRIVAL IS NEVER GUARANTEED ON THE DATE OF

DELIVERY (DELIVERY HOURS: 8 AM - 6PM; M-F) May vary during Summer months.

Please contact 1-800-560-4381 if you have additional questions or special request.

Our Best Regards, All American Waste Services, Inc.

Corporate Office

Phone: 1-800-560-4381 Emergency: 480-695-4399 Fax: 1-480-396-6979 Email: quote@aawsi.com Website: www.aawsi.com Quote Request

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

Visit Our Website

√ Complete √ Complete √ Complete

Division 2

02 0000

$5,000

Recommended Sub - Contractor Southwestern Base Bid Price $33,218 10/30/2023

Concord Logo Surveying 2 Dead Horse Ranch State Park

Sub-Contractor: Southwestern D2 Surveying EPA

Schedule Status: Available Avialable NO BID

October 30, 2023 PQ Status: Approved Approved Approved

Proposal Evaluation

BASE PRICE TOTAL $33,218 $45,000

Site Control

Lift Station

Water Valve Replacement Locations

NO BID

BASE BID

Surveying - Base Bid

Staking

Vault

Additional Survey

Warranty

BREAKOUTS

TOTAL COST $38,218 $45,000

Electric Lines

Restroom

NO BID

ALTERNATES

August 30, 2023

Estimator

VIA Email:

SOUTHWESTERN

ENVIRONMENTAL

CONSULTANTS, INC.

www.sec-landmgt.com info@sec-landmgt.com

SEC, Inc.

825 COVE PARKWAY

COTTONWOOD, ARIZONA 86326

(928) 634-5889

RE: Proposal/Quote for Construction Staking Surveying Services for Dead Horse State Park located at 675 Dead Horse Ranch Rd., Cottonwood, AZ.

Dear Estimator, SEC, Inc. is pleased to provide you with this proposal and an estimate of costs for construction staking surveying services on the above Dead Horse State Park project. This proposal is based on the construction plans approved by William Janiga dated 07/10/2023.

Following are the tasks, which SEC proposes to provide to the Client:

Construction Staking

• Site Control

• Lift Station

• Water Valve Replacement locations

• Vault

• Restroom (1 set of stakes)

• Electric Lines

We propose to complete the above mentioned scope of work for an estimated cost of

$16,970.00. All work will be charged on a current Time & Materials rates. Additional work will be billed on a current Time & Materials basis. Prior approval will be obtained before proceeding.

Sewer

• Day use area Force Main – Construction Staking and As-built point collection.

• Cabin Loop Restroom to Lift Station – Construction Staking and As-built point collection.

• Raven Loop Sewer Line – Construction Staking and As-built point collection.

• Quail Loop Sewer Line – Construction Staking and As-built point collection.

We propose to complete the above mentioned scope of work for an estimated cost of

$16,248.00. All work will be charged on a current Time & Materials rates. Additional work will be billed on a current Time & Materials basis. Prior approval will be obtained before proceeding.

Additional/Alternatives

• Ranger Residence Sewer Line – Construction Staking and As-built point collection.

• Maintenance Shop Sewer Line – Construction Staking and As-built point collection.

We propose to complete the above mentioned scope of work for an estimated cost of

$4,218.00. All work will be charged on a current Time & Materials rates. Additional work will be billed on a current Time & Materials basis. Prior approval will be obtained before proceeding.

It is assumed that this work will be a total of fourteen (14) site visits. This proposal excludes re-staking, staking for landscape or any other work not specifically listed under proposed services.

It is assumed a geo reference CAD file will be available to develop the necessary survey information. No additional time is allocated, developing points for construction staking. SEC will require a complete set of final approved plans before providing construction staking.

We propose to complete all of the above-mentioned survey and Engineering work for an estimated cost of $37,436.00 with a retainer of $8,200.00. All work will be charged on a current

Time & Materials basis. Additional work will be charged on a current Time & Materials rates.

Approval will be obtained before proceeding. We will issue a Work Order when you are ready to proceed with the work. We will proceed with the work once you have returned a signed copy. Schedules A&B are attached for your reference.

Thank you for the opportunity to provide you with this proposal and an estimate of costs for surveying and engineering services on this project. If you have any questions, please do not hesitate to contact me at (928) 634-5889 or kginige@sec-landmgt.com. Thank you and we look forward to assisting you with your surveying, engineering, and planning needs.

Sincerely, Krishan Ginige, P.E.

President SEC Proposal # 2023-08-252

“Growth is inevitable… it’s planning that makes the difference.”

RATE SCHEDULE - SCHEDULE A

Professional Services (effective January 1, 2012)

The cost of services, provided by SEC, Inc., are determined as basic direct wages times a cost multiplier for overhead expenses. Hourly charges for different disciplines are as follows:

Functions Hourly Rate ($) Principal Engineer / Company Officer ................................................................................................175.00 Project Engineer.................................................................................................................................145.00 Senior Civil Engineer / Planner Level VI.............................................................................................135.00 CE Level IV / Registered Land Surveyor II .........................................................................................120.00 CE Level III / Registered Land Survey I or / Technician Level V / Planner Level V ............................105.00 CE Level II / Survey Chief III / Technician Level IV / Planner Level IV .................................................95.00 CE Level I / Survey Chief II / Technician Level III / Planner Level III ....................................................85.00 Survey Chief I / Technician Level II / Planner Level II ..........................................................................75.00 Technician Level I / Planner Level I......................................................................................................60.00 Laborer .................................................................................................................................................50.00 CADD Designer Level II .......................................................................................................................87.00 CADD Designer Level I ........................................................................................................................70.00 GIS � Level II........................................................................................................................................85.00 GIS - Level I .........................................................................................................................................70.00 CADD Drafter .......................................................................................................................................65.00 Secretary / Non-professional Research (min 1 hour) ...........................................................................50.00

See Natural Resource Rate SCHEDULE A, if applicable

Overtime/Expert Witness Overtime for all disciplines will be charged at the rate of 1.5 times the hourly rate and 2.0 times the hourly rate for Sundays and holidays. Expert Witness will be charged at 2.0 times the hourly rate for that professional.

Equipment and Materials Vehicles .................................................................................................................. 0.70/mile Field Materials ............................................................................................................Cost plus 20% Robotic Total Station.....................................................................................................................$22/hr GPS Receiver .........................................................................................................................$26/hr Special Service(s) & Equipment Rental ...........................................................................Cost plus 20% Blackline Prints: ............................................................................................... 0.25/sf (Public 1.00/sf) Color Prints: 11" x 17"..................................................................................................... 3.50 each Mylar: 18� x 24�..................................................................................................... 7.50 each

24� x 36�................................................................................................... 12.50 each Xerox Copies, Letter & Legal: single/double sided ...................................................... 0.15/0.20 each Xerox Copies: 11� x 17� or Color 8½� x 11� .......................................................................... 0.75 each Color Prints/Plots (24� x 36�)................................................................................................. 15.00 each Check Plots ........................................................................................................................ .20¢/sf CD copy ............................................................................................................... $20.00 each Miscellaneous ............................................................................................................Cost plus 20%

Note: Above fee schedule rates are subject to change without notice. Equipment and material costs are subject to change without prior notice, to reflect supplier price changes.

On projects that require a field crew(s) to stay out of town, per diem expenses (meals, lodging) will be billed on basis of �costs� plus 20%. On all survey jobs, a minimum charge of 2 hours at the current rates will be applied to each job for field work.

ABATEMENT

BID/PROPOSAL AND AGREEMENT

Comprehensive Risk Services, LLC (�CRS�) (4609 S. 33rd Place Phoenix, Arizona 85040; (855) 665-3345) submits this proposal for the work described below. If Client accepts the proposal, then the parties� agreement consists of the terms and conditions that follow. Client is defined as:

Date: October 4, 2023

Client: Mr. Derick Aidoo

Concord Inc., 2240 W. Broadway Rd., Suite 105

Mesa, AZ. 85202

Cell: 480-263-1186 daidoo@concordinc.com

Proposed Project Site: Asbestos Abatement � Dead Horse Ranch State Park

Modular Restroom

675 Dead Horse Ranch Road

Cottonwood, Arizona 86326

SCOPE:

• Properly remove and dispose of the identified asbestos containing materials identified below:

- Door Frame Caulking, approximately 51 lf

• Bid pricing includes waste transportation and disposal fees by CRS.

• Compliance of all OSHA and EPA regulations.

• Bid price does not include for 3rd party testing or oversight, if applicable, assumes contracted by Owner / Other.

• Bid pricing assumes power and water by CRS.

BID PRICE: $4,850.00

CRS is a licensed contractor (AZ ROC 275441) that provides environmental contracting services.

A. Client has requested a proposal (or bid) from CRS to provide services for Client�s project (�Project�) described in the scope of work as incorporated into this proposal.

B. Subject to the terms and conditions in this Bid Proposal and Agreement (�Agreement�), CRS proposes to perform the Work for

C. The Bid Pricing includes labor, equipment, and materials.

D. The Bid Price is subject to the following terms and conditions.

1. CRS shall perform the Work in compliance with applicable EPA and OSHA laws and regulations.

2. CRS shall properly dispose of all Project waste at approved sites in accordance with applicable laws and regulations.

3. Client or other contractors shall perform all air clearance, hired by Owner, if applicable or requested.

CXT

Added Cost Options Price per unit

Click to select

Final Connection to Utilities (per section) $ Optional Wall Texture (per section)- choose one Split Face Block ($5,500) Stone ($7,000)

Optional Roof Texture (per section) Ribbed Metal $ Porch/Wing Wall $ Insulation and Heaters (per section) $ Stainless Steel Water Closet (each) Qty: $ Stainless Steel Lavatory (each) Qty: $ Stainless Steel Urinal (each) Qty: $ Electric Hand Dryer (each) Qty: $ Electronic Flush Valve (each) Qty: $ Electronic Lavatory Faucet (each) Qty: $ Electronic Urinal Flush Valve (each) Qty: $ Paper Towel Dispenser (each) Qty: $ Toilet Seat Cover Dispenser (each) Qty: $ Sanitary Napkin Disposal Receptacle (each) Qty: $ Adult Changing Station (each) Qty: $ Skylight in Restroom (each) Qty: $ Marine Grade Skylight in Restroom (each) Qty: $ Marine Package (excluding fiberglass doors and frames) (per section) $ Exterior Mounted ADA Drinking Fountain w/Cane Skirt (each) Qty: $ 2K Anti-Graffiti Coating (per section) $ Optional Door Closure (each) Qty: $ Fiberglass Entry and Chase Doors and Frames (each) Qty: $ Timed Electric Lock System (does not include chase door) (each) Qty: $ Exterior Frostproof Hose Bib with Box (each) Qty: $

Total for Added Cost Options: $ Custom Options: $

Engineering and State Fees: $ Estimated One-Way Transportation Costs to Site (quote): $

Estimated Tax: $

Total Cost per Unit Placed at Job Site: $

SANTIAGO

Custom building where you can match sections to meet your needs.

Sections include restroom, shower, concession, storage, and combination configurations. Standard features include simulated barnwood textured walls, simulated cedar shake textured roof, vitreous china fixtures, interior and exterior lights, off loaded, and set up at site.

Estimated monthly payment on 5 year lease

This price quote is good for 60 days from date below, and is accurate and complete.

I accept this quote. Please process this order.

Company Name

Company Representative DateCXT Sales Representative Date

Disclaimer: Please call to confirm selected sections are compatible.

800.696.5766 cxtinc.com

Sections

Restroom* Qty: = Qty: = Family Assist Restroom* Qty: = Qty: =

Family Assist Shower* Qty: =

Shower* Concession*

*Includes 4-gallon water heater. Total Sections $

DK-4*† Qty: =

†DK-4 has four individual rooms that can be configured as all toilets or combination of toilets and showers.

$87,887.37$87,887.37 $ 0.00 $104,400.00 1 $ 104,400.00

$87,887.37$87,887.37 $ 0.00 $98,905.26 $ 0.00

$104,400.00$104,400.00 $ 0.00 $124,000.00 1 $ 124,000.00

228,400.00

5,000.00 0.00

Reset Wall Texture 11,000.00

4,000.00 0.00

73,575.90 0.00

19,500.00 0.00

1,750.00 0.00

1,500.00 0.00

1,500.00 0.00

700.00 0.00

1,500.00 0.00

1,500.00 0.00

1,500.00 0.00

350.00 0.00

350.00 0.00

100.00 0.00

1 4,000.00 4,000.00

1,600.00 0.00

2,450.00 0.00

2,350.00 0.00

1 5,600.00 0.00

4,000.00 0.00

9 700.00 ✔ 6,300.00

3,300.00 0.00

1,350.00 0.00

1,200.00 0.00

21,300.00

8 hr crane min $5000, 2 bowl exterior washing sink $5000 10,000.00

5,500.00

44,700.00

309,900.00

$6,228.99

OPTIONS

Exterior Color(s) (For single color mark an X. For two-tone combinations use W = Walls and R = Roof.)

Amber Rose Berry Mauve Buckskin Cappuccino Cream

Charcoal Grey Coca Milk Evergreen Georgia Brick

Golden Beige Granite Rock Hunter Green Java Brown

Liberty Tan Malibu Taupe Mocha Caramel Natural Honey

Nuss Brown Oatmeal Buff Pueblo Gold Raven Black

Rich Earth Rosewood Sage Green Salsa Red

Sand Beige Sun Bronze Toasted Almond Western Wheat

Special roof color #

Special wall color #

Special trim color #

Rock Color Basalt Mountain Blend Natural Grey Romana

Roof Texture Cedar Shake Ribbed Metal

Wall Texture(s) (For single color mark an X. For top and bottom textures use T = Top and B = Bottom.)

Barnwood Horizontal Lap Can only be used as bottom texture

Split Face Block Board & Batt Napa Valley Rock River Rock

Stucco/Skip Trowel Brick Flagstone (Textures not included in CXT’s quote are additional cost.)

Door Opener

Non-locking ADA Handle Privacy ADA Latch Pull Handle/Push Plate

Deadbolt

Accessible Signage Men Women Unisex

Toilet Paper Holder 2-Roll Stainless Steel 3-Roll Stainless Steel

Notes:

cxtinc.com 800.696.5766

Drawing Reference number S-412, Exterior hand washing sink/faucet will be shipped separately and installed by general contractor. 4 Family assist style fully accessible restrooms and 4 family use showers for both locations. Little maintenance

√ Complete √ Complete √ Complete √ Complete

Division 26

026 0000

$28,800 $28,800 $28,800

Recommended Sub - Contractor Sam Nichols Electrical Base Bid Price $422,881 10/30/2023

NO BID

ALTERNATES

Warranty

BREAKOUTS

TOTAL COST $422,881 $482,035 $602,900

Day use restrom underground conduit and conductors

Heat Trace (Circuit, outlet, and connector)

Cutting, removal and replacement

Wellsite electrical - (Conduit and conductor, heat trace)

Electrical - Temporary Power / Lighting

Lift Station underground conduit and conductor

Liftstation control panel

Level floats and connection to motors

BASE BID

Electrical - Base Bid

Concrete

Approved

Proposal Evaluation

BASE PRICE TOTAL $422,881 $482,035 $602,900

October 30, 2023 PQ Status: Approved Approved Approved

Schedule Status: Available Avialable Avialable

Concord Logo Electrical 26 Dead Horse Ranch State Park

Sub-Contractor: Sam Nichols Electrical Klostermeier JDJ Electric

Lic # ROC 92009, ROC 92010,ROC 198333

CA 977548

Electrical Bid

Project: Electrical for Dead Horse Ranch State Park, Cottonwood, AZ

Bid Date Bid Number

3-Oct-23 E9321

To: Shannon Cordova Of: Concord General Contracting, Inc.

Address: 2240 West Broadway Road

Mesa, Arizona 85202

E mail Phone Fax scordova@concordinc.com (480)851-0176

From: David McAtlin Bid no tax: $422,881.08

Sam Nichols Electrical, Inc.

66 Capri Ln.

Lake Havasu City, AZ 86403

Phone: (928)855-4121

Fax: (928)855-4123 Email: david@samnicholselectrical.com

Bid Scope

New electrical for four project areas per electrical site drawing E2.

Lift station and day use restroom: Lift station underground conduit and conductors from existing panel to new packaged lift station, install lift station control panel, level floats and connections to motors, control panel stand. Day use restroom underground conduit and conductors from existing underground feed to new prepackaged restroom building per drawings

E3 & E4 including excavating.

Items excluded: Lift station control panel or float controls (supplied with prepackaged lift station), any electrical items on the interior or exterior of the prepackaged restroom building.

Bridge heat trace: Underground conduit and conductors for new heat trace branch circuit, outlet, heat trace, heat trace connectors at valve A per drawings E 5 & E6 including excavating. Includes Cutting, removal and replacement of existing asphalt for underground trench.

Items excluded: Pipe insulation for piping.

with heat trace.

Wellsite electrical: Underground conduit and conductors for new heat trace branch circuit, outlet, heat trace, heat trace connectors at valve B, C & well house per plans E7 & E8 including excavating and ground boxes, connecting new well pump to existing feed and reconnect new flow meter.

Items excluded: New flow meter or well pump,motor

This estimate will be honored until 2-Nov-23

Estimate Exclusions Any removal of hazardous waste.

Any permits or fees required unless other wise noted in the scope of work.

Any cost required by Utility Companies.

ESTIMATE

Prepared For

Dead Horse State Park

Klostermeier Electric

4071 Blackhawk Dr

Lake Havasu City, AZ 86406

Phone: (928) 260-6405

Email: klostermeierconstruction@gmail.com

Estimate # 205

Date 09/15/2023

Business / Tax # AZ ROC# 337878

Description Total

System as per plans. Trenching and backfill for underground electrical conduits. $482,035.00

Trenching cut 32ft

Hook up owner supplied panels and instrumentation as per plans.

Subtotal $482,035.00

Total $482,035.00

Deposit Due $123,610.50

Notes:

Exclusions:

-Any items not mentioned in scope.

-Any repairs to existing underground utilities not covered by "Bluestake" service.

-Utility company fees, charges or permits.

-Removal or disposal of any hazardous waste.

-Light pole bases.

-Equipment pads.

-Any concrete that may be required.

-Fire Alarm Equipment, wire or devices.

-Heat Tracing, unable to locate a company.

-Teaching or training provided by other.

Not responsible for stucco, drywall, roof or concrete damage or repair.

Engineering plans and one lines are extra charges.

Material cost can increase without notice.

Payments made with debit or credit cards will be subject to a 4% processing fee

Normal note payment is due upon services rendered. 3 days past will result in 20% increase.

Dead Horse State Park

1930 South Alma School Road, A115 � Mesa, Arizona 85210 � (480) 345-1921 � Fax (480) 897-1805

AZ License No. ROC 183921

ELECTRICAL PROPOSAL

DATE: 09-16-23

TO: CONCORD GENERAL CONTRACTING

ATTN: ESTIMATING TEAM

PROJECT: DEAD HORSE STATE PARK

TEAM: BASED ON THE PLANS AND SPECIFICATIONS, WE ARE PLEASED TO SUBMIT TO YOU A

PROPOSAL ON THE ABOVE REFERENCED PROJECT:

BASE BID: $602,900

DOCUMENTS: OUR PROPOSAL IS BASED ON THE FOLLOWING DOCUMENTS, AND WE

ACKNOWLEDGE THOROUGH REVIEW:

• DRAWINGS DATED 5/23

• SHEETS � E36 � E47

EXCLUSIONS: SALES TAX, BOND, PERMITS, ENGINEERING FEES, UTILITY CO. FEES, FORMED

CONCRETE, SAW-CUT/DEMO/PATCHBACK, ROOF JACKS & SEALING OF ROOF PENETRATIONS,

HVAC CONTROL CONDUIT/BOXES, SPECIAL SYSTEMS, FIRE ALARM SYSTEM, SLACK WIRE FOR

LIGHT FIXTURES, DUMPSTER/HAUL OFF FEES AND PAINTING/PATCHING OF ARCHITECTUAL

SURFACES.

INCLUSIONS: CONDUIT AND WIRE COMPLETE PER PLANS AND SPECS. CONTROLS COMPLETE

PER PLANS AND SPECS. POWER COMPLETE PER PLANS AND SPECS. POWER DISTRIBUTION

COMPLETE PER PLANS AND SPECS. ROUGH-IN AND CONNECTION OF NEW EQUIPMENT INDICATED

ON PLANS. CONDUIT/BOXES ROUGH IN ONLY. INCLUDE HEAT TRACE

ANY QUESTIONS DURING THE BID PROCESS, PLEASE CALL DAN ROTH AT 480-980-0000.

THANK YOU,

DAN ROTH

JBJ ELECTRIC CO.

SITE UTILITIES - PAT BERN

√ Complete √ Complete √ Complete

Division 33

33 0000

$1,245,915

$47,616

$468,292

$135,943

Included in Sewer

$61,833

Recommended Sub - Contractor Pat Bern Base Bid Price $1,959,599 10/30/2023

Concord Logo Site Utilities 33 Dead Horse Ranch State Park

Sub-Contractor: Pat Bern

Schedule Status: Available Avialable

October 30, 2023 PQ Status: Approved Approved

BASE BID

Site Utilities - Base Bid

Utilities

Approved

Proposal Evaluation

BASE PRICE TOTAL $1,959,599 NO BID

Sewer System

Entrance Dumpstation

Site Utilities - Valves and Vaults

Site Utilities - CXT piping / Water System

Additional Unforeseen Conditions / Patches - $65K -CONCORD

Site Utilities - Water Well Replacement - By Empire

Includes Coordination and bonding ($5000 & $850)

NO BID

ALTERNATES

Warranty

BREAKOUTS

TOTAL COST $1,959,599 NO BID

CLASS QTY PAGE DESCRIPTION UNIT UNIT PRICE AMOUNT PROFIT % Total Cost

SEWER 1 4 DEMO WET WELL LS 47,300.00$ 47,300.00$ 47,300.00$

130 PIPE LAYER / LABOR GENERAL HR 60.00$ 7,800.00$

120 FOREMAN HR 75.00$ 9,000.00$

40 LOADER OPERATED HR 150.00$ 6,000.00$

40 EXCAVATOR OPERATED HR 150.00$ 6,000.00$

40 BACKHOE OPERATED HR…