This is a Question and Answer Addendum document issued by the Texas Health and Human Services Commission (HHSC) Procurement and Contracting Services division in response to bidder inquiries for IFB HHS0017413, Battery and Capacitor Replacement Services. The solicitation covers supply and installation of replacement batteries and capacitors for uninterruptible power supply (UPS) systems located at TMHP, 12365 Raita Trace Parkway, Building 9, 2nd Floor, Austin, Texas. The scope includes 480 HRL 1234W F2FR batteries for an APC Symmetra PX system (60 modules with 8 batteries per module), an 80 kVA Toshiba UPS 4200 Series unit (208V in/out), and removal and replacement of capacitors for end-of-service Eaton 9315 and 9330 UPS models. Work must be performed during normal business hours (8 a.m. to 5 p.m. Monday through Friday), though bidders are advised that afterhours service should be offered as an option. The initial contract term extends from award through August 31, 2026, with an option for one additional year of extension at HHSC's sole discretion.
The addendum clarifies critical warranty and service terms for responding bidders: batteries carry a manufacturer warranty of three years on all models except the 1234W F2FR, which carries a one-year warranty, and full-service coverage is required on UPS units. HHSC rejected the proposal to replace end-of-service Eaton 9315 and 9330 units, preferring to proceed with the originally requested models despite manufacturer recommendations against standard service agreements or warranties on these units. Pricing must be firm and fixed, inclusive of all labor, equipment, materials, supplies, and related expenses submitted on Exhibit C, with adjustments permitted only at HHSC's discretion through Consumer Price Index formulas or Federal Minimum Wage increases. The document does not specify funding amounts or sources, but establishes that contractors must maintain comprehensive insurance coverage including Workers' Compensation, Commercial General Liability, Commercial Automobile Liability, Professional Liability, and Umbrella Liability policies at specified limits.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PCS 134 HHS Responses to Questions
Effective Date 06/26/2015 Version 1.00 Page 1 of 2 Revision Date 09/13/2023
Solicitation Title: Battery and Capacitor Replacement Services
Solicitation Number: HHS0017413
# Reference Question Response
1.
1. Warranty Duration: Please clarify the required warranty length for all parts and services.
The batteries come with a manufacturer warranty – 3-years on all models except 1234W F2FR, which comes with 1 year warranty.
2.
2. Warranty Scope: The SOW references "the UPS," but we need to confirm which units require warranty coverage. Please specify all equipment that should be included.
The batteries come with a manufacturer warranty – 3-years on all models except 1234W F2FR, which comes with 1 year warranty.
3.
3. Coverage Details: What specific coverage is required? We can provide options including:
o UPS unit only vs. batteries vs. both o Parts and labor vs. parts only o Please advise your preference.
UPS with full-service coverage on our UPS units
4.
4. Toshiba UPS Model: Do you have a specific model number for the Toshiba UPS? This will help us provide accurate pricing and compatibility confirmation.
4200 Series 80.0kVA IN:208V, OUT:208V, AL IN:208V, Auto
5.
5. Post-Installation Recertification: Would you like the units to be re-certified by the manufacturer following installation to maintain service agreement and warranty coverage?
The current full-service agreement will maintain
PCS 134 HHS Responses to Questions
Effective Date 06/26/2015 Version 1.00 Page 2 of 2 Revision Date 09/13/2023
# Reference Question Response
6.
6. Service Hours & Redundancy: The SOW specifies Normal Business Hours for service.
Given that maintenance is often required outside NBH, can you confirm what redundancy measures are in place to prevent downtime during service windows?
Afterhours should be included as an option
7.
7. Equipment Verification: We've reviewed the latest data for QD1211140521 and found a discrepancy— the system shows 60 modular batteries rather than classic batteries, and the quantity differs from the SOW. Could you please verify the correct equipment configuration?
* (480) HRL 1234W F2FR batteries associated with UPS 4 APC Symmetra PX SN: QD1211140521 and 60 modules 8 batteries per module
8.
8. End-of-Service Equipment: We've confirmed with Eaton that the 9315 and 9330 UPS models are end-of-service life. Capacitor replacement is not available, and these units cannot be covered under standard service agreements or warranties. Eaton recommends full unit replacement. Given this limitation, would you like us to propose replacement units, or would you prefer to proceed with these models?
Prefer to proceed with the originally requested models.