ERG BPM006379 Attachment 13 Pricing Sheet.docx
DOCX document 63 KB Posted
- Attached to
- Master Agreement AZ|CTR074220
- Contract number
- CTR074220
- Issued by
- Arizona
About this file
This document is a Pricing Sheet (Attachment 13) for a Request for Proposal (Solicitation No. BPM006379) issued by the Arizona Department of Environmental Quality (ADEQ). The solicitation is for Capacity Development/Technical Assistance to Small Public Drinking Water Systems, with ERG as the responding offeror.
The pricing sheet details hourly rates for multiple labor classifications ranging from $58 to $236, including roles such as Principal, Project Managers, Project Engineers, Environmental Specialists/Scientists, Technicians, and Administrative staff. The rates are calculated with an anticipated start date of 12/1/24 and are escalated to cover work through 12/31/27, with potential future rate adjustments based on the Consumer Price Index. ERG applied approved overhead and G&A rates, and included a fee component. The pricing is all-inclusive, covering labor rates, benefits, insurance, taxes, overhead, and administrative costs. No prompt payment discounts were specified, and the rates are designed to cover services outlined in the solicitation's scope of work.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. BPM006379
Capacity Development/Technical Assistance to Small Public Drinking Water Systems Arizona Department of Environmental Quality (ADEQ) 1110 W. Washington Street Phoenix, AZ 85007
Attachment 13 – Pricing Sheet
Offeror to complete ALL ITEMS in Attachment 13 - Pricing Sheet in its entirety. Offeror shall enter an hourly rate amount for all applicable personnel classification listed below. If your firm does not have a personnel classification, enter N/A. Failure to return a completed Attachment 13 - Pricing Sheet may result in the rejection of the offer.
Item #
Classification Title
Enter Hourly Rate
1.
Principal
$236
2.
Project Manager I
$182
| Project Manager II |
| $196 |
| Project Manager III |
| $224 |
3.
Project Engineer I
$97
| Project Engineer II |
| $118 |
| Project Engineer III |
| $173 |
4.
Engineer in Training
$58
5.
Environmental Specialist/Scientist I
$106
Environmental Specialist/Scientist II
$115
Environmental Specialist/Scientist III
$141
6.
Hydrogeologist I
Hydrogeologist II
Hydrogeologist III
7.
Technician (e.g., field, engineering, CAD) I
$72
| Technician (e.g., field, engineering, CAD) II |
| $80 |
| Technician (e.g., field, engineering, CAD) III |
| $85 |
8.
Clerical/Administrative
$78
In addition, Offeror shall complete the Line Item in the Items (F) tab in the Arizona Procurement Portal (APP) system by inputting one-dollar ($1.00) in the “Unit Price” field to ensure offer submission for the Offer to be considered.
Pricing shall be submitted on an all-inclusive basis and shall include all costs associated with performance of the Scope of Work, including without limitation, labor rate, labor benefits, payroll burden, insurance, Workman’s Compensation, fees, all taxes, profit, overhead (including repairs and maintenance if applicable), administrative costs, reporting and all other related cost factors for services offered in response to this solicitation. ADEQ will not reimburse any item other than the all-inclusive rates contained in the Pricing Schedule. The Pricing Schedule is not meant to indicate all costs related to additional services.
Indicate whether organization will offer a prompt payment discount, please complete one or more that will apply:
DISCOUNT WILL BE _0___% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN SEVEN (7) CALENDAR DAYS FROM ADEQ’S RECEIPT OF INVOICE.
DISCOUNT WILL BE _0___% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN TEN (10) CALENDAR DAYS FROM ADEQ’S RECEIPT OF INVOICE.
DISCOUNT WILL BE _0___% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN ____ (__) CALENDAR DAYS FROM ADEQ’S RECEIPT OF INVOICE.
Offeror to include one or two paragraph(s) describing how Offeror derived pricing proposed in Pricing Document.
Offeror Response:
Rate calculations are based on a start date of 12/1/24 and rates are escalated to account for work through 12/31/27. ERG anticipates requesting a rate increase, if needed, for the final two years of the contract based on the consumer price index.
ERG’s approved Overhead rate and the approved G&A were applied to the escalated pay rate. Fee was applied to the final rate.
As no labor category qualifications were listed, our calculated rates were distributed through the provided labor categories. Engineer rates require personnel to have an Engineering degree.
End of Attachment 13 Solicitation Attachment 13 – Pricing Sheet | Revision No. 1 | Revised 04-23 image1.jpg
File details come from the government source that posted it. Updated .