Attachment_C_-_NPSAS-16_Pricing_Schedules_for_Fixed_Price_Deliverables_rev0419.docx

DOCX document 47 KB Posted

Attached to
National Postsecondary Student Aid Study (NPSAS 2016) & Postsecondary Longitudinal Studies
Solicitation number
ED-IES-13-R-0011
Issued by

About this file

ATTACHMENT C - PRICING SCHEDULE -NPSAS 2016

View the file

Other files

File Type Posted
Amendment_3_-_NPSAS_2016.pdf PDF
Attachment_A_-_NPSAS-16_Performance_Work_Statement_(SAS).pdf PDF
Attachment_B_-_NPSAS-16_Quality_Assurance_Surveillance_Plan_(2).docx DOCX document
Attachment_E_-_NPSAS-16_Past_Performance.docx DOCX document
FormSF33_NPSAS-16.pdf PDF
Attachment_A_-_NPSAS-16_Performance_Work_Statement_040113.docx DOCX document
Attachment_F_-_NPSAS-16_Contractor_Employee_Security_Screening.docx DOCX document
Appendix_4_-_NPSAS-16_Contractor_Employee_Security_Screening_Policy.docx DOCX document
Attachment_H_-_NPSAS-16_Evaluation_Criteria.doc DOC document
Appendix_3_-NPSAS-16_IT_Program_Assessment_Guide_copy.pdf PDF
Attachment_D_-_NPSAS-16_Billing_Instructions.docx DOCX document
Attachment_I_-_NPSAS-16_Subcontracting_Plan_Review_Forms.docx DOCX document
Attachment_J_-_NPSAS-16_Contract_Tasks.doc DOC document
Appendix_2-_NPSAS-16_WebVTS_Data_Upload_Specifications.docx DOCX document
Appendix_1_-_NPSAS-16_Data_Elements_.xlsx XLSX spreadsheet
Attachment_G_-_NPSAS-16_Conflict_of_Interest_Certification.docx DOCX document
Attachment_A_-_DRAFT_PWS_NPSAS_04_01_13.docx DOCX document
presolicitation_conf.mp3 MP3 file
Presolicitation_12-14.pdf PDF
Draft_Performance_Work_Statement_NPSAS_2016.docx DOCX document
Draft_Performance_Work_Statement_NPSAS_2016.docx DOCX document
Draft_PWS_NPSAS_2016_-_RFI —
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

Task #
Task
Deliverable
Due Date
Price

PRICING SCHEDULE FOR FIXED PRICE DELIVERABLES

2015-16 National Postsecondary Student Aid Study (NPSAS 2016) & Postsecondary Longitudinal Studies

(ED-IES-13-R-0011)

Unless otherwise specified, deliverables shall not be physically delivered to the NCES COR. Instead, the contractor shall notify (via e-mail) the NCES COR of the deliverable's placement within the Study Monitoring Portal (SMP), indicating its availability to be downloaded, as needed. For scheduling purposes, the contractor shall allow the NCES COR 10 working days to review materials. Reports and tabulations will require longer review periods.

Due to the unique characteristics of each study, all dates on tables 1 will be finalized at the initial meeting with NCES or when the optional task for the study is exercised. The start or initiation date for the timeline will be negotiated with the COR so that data collection window falls during targeted time of the year for the study.

Task #
Task
Deliverable
Due Date
Price

Task 1: Project Management

1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

1.2
Schedules
Schedules

NOTE: A new schedule must be created for each new study exercised.

Monthly on the 20th day of the month

1.3
Monthly reports
Monthly reports, invoice (SF 1034), and documentation of expenses

Monthly on the 20th day of the month

1.4
Study Monitoring Portal

Study Monitoring Portal platform or website

180 days from award date

1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP

ATTACHMENT C

1.6
Mini technical review meetings
Meeting summary and materials
20 business days following meeting

Task 3: Field Test Data Collections

3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection

Task 4: Full-scale data collection

4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

NOTE: Multiple packages may be necessary.

150 days prior to data collection

Task 5: Analysis and Reporting

5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

· Codebooks 2 weeks following acceptance of the derived variables data file

5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 7: Contract closeout and transition

7.1
Contract closeout and transition
Transition memorandum

Data, reports, IT systems, IT code, statistical programming, work product and documentation for each study 180 days prior to the end of the period of performance.

Optional Task 8a: NPSAS administrative data collection, 2013-14 academic year

8a.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

8a.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
8a.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

NOTE. Multiple packages may be necessary.

150 days prior to data collection

8a.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

8a.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 8b: NPSAS administrative data collection, 2017-18 academic year

8b.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

8b.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
8b.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

8b.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

8b.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 8c: NPSAS administrative data collection, 2019-20 academic year

8c.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

8c.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
8c.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

8c.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

8c.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 9a: NPSAS data collection with interview, 2015-16 academic year

9a.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

9a.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
9a.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
9a.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

9a.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

9a.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 9b: NPSAS data collection with interview, 2015-16 academic year

9b.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

9b.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
9b.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
9b.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

9b.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

9b.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 9c: NPSAS data collection with interview, 2017-18 academic year

9c.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

9c.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
9c.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
9c.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

9c.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

9c.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 9d: NPSAS data collection with interview, 2017-18 academic year

9d.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

9d.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
9d.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
9d.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

9d.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

9d.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 10a: B&B One-year follow-up interview from the NPSAS:16 sample.

10a.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

10a.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
10a.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
10a.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

10a.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

10a.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 10b: B&B Four-year follow-up interview from the NPSAS:16 sample.

10b.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

10b.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
10b.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
10b.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

10b.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

10b.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 10c: B&B One-year follow-up interview from the NPSAS:18 sample.

10c.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

10c.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
10c.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
10c.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

10c.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

10c.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 11a: BPS Eight-year follow-up interview from the NPSAS:12 sample.

11a.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

11a.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
11a.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
11a.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

11a.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

11a.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 11b: BPS Three-year follow-up interview from the NPSAS:16 sample.

11b.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

11b.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
11b.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
11b.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

11b.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

11b.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 11c: BPS Six-year follow-up interview from the NPSAS:16 sample

11c.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

11c.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
11c.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
11c.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

11c.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

11c.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 11d: BPS One-year follow-up interview from the NPSAS:18 sample

11d.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

11d.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
11d.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
11d.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

11d.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

11d.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 12: B&B Ten-year follow-up interview from the NPSAS:08 sample

12.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

12.1.5
Technical Review Panels
Meeting minutes and materials
20 days following TRP
12.3.4
Field test methodology memo
Field test post-collection materials
2 months after data collection
12.4.2
OMB forms clearance
OMB forms clearance package with the following supporting materials.

150 days prior to data collection

12.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

12.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 18: Postsecondary Education Transcript Collection for B&B

18.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

18.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

18.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

Optional Task 19: Postsecondary Education Transcript Collection for B&B

19.1.1
Initial Meeting with NCES
Expanded project management plan
7 days from award date

Summary of meeting

14 days following initial meeting

19.5.2
Datalab/WebVTS data tools
Datalab/WebVTS Input Files, which are used to create:

· PowerStats

· QuickStats

· Data files (for Restricted-use licenses)

2 weeks following acceptance of the derived variables data file

19.5.3
Restricted-use data files
Modified Restricted-use data file cleared for release by SSP/DRB.

2 weeks after receiving the output files from WebVTS

File details come from the government source that posted it. Updated .