Attachment_J_-_NPSAS-16_Contract_Tasks.doc
DOC document 448 KB Posted
- Attached to
- National Postsecondary Student Aid Study (NPSAS 2016) & Postsecondary Longitudinal Studies Federal contract opportunity
- Solicitation number
- ED-IES-13-R-0011
About this file
ATTACHMENT J - CONTRACT TASKS - NPSAS 2016
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J
| Fixed-Price Tasks |
| Task/subtask begins in base period |
NPSAS:16 - Base Contract
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.4 Study Monitoring Portal |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
| 1.6 Mini-technical review meetings |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
| 5.2 Datalab/WebVTS Tools |
| * |
| 5.3 Restricted-Use Data Files |
| * |
| Optional Task 7 - Close out and contract transition |
| * |
Optional Task 8a - Administrative NPSAS in 2013-14
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
| 5.2 Datalab/WebVTS Tools |
| * |
| 5.3 Restricted-Use Data Files |
| * |
Optional Task 8b - Administrative NPSAS in 2017-18
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 8c - Administrative NPSAS in 2019-20
Task 1 - Management, IMS, TRP
1.1 Initial meeting with NCES
1.2 Schedules
1.3 Monthly Reports
1.5.1 Preparation of materials for technical review panel
1.5.3 Staffing at technical review panel
1.5.5 Honoraria for technical review panelist
1.5.6 Post-meeting activities for technical review panel
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 9a - Reduce sample size and add a student interview - BPS & B&B using NPSAS:16 base year
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
| 1.6 Mini-technical review meetings |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Optional Task 9b- Reduce sample size and add a student interview - B&B using NPSAS:16 base year
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
| 1.6 Mini-technical review meetings |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Optional Task 9c- Reduce sample size and add a student interview - BPS & B&B using NPSAS:18 base year
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
| 1.6 Mini-technical review meetings |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Optional Task 9d- Reduce sample size and add a student interview - BPS & B&B using NPSAS:18 base year
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
| 1.6 Mini-technical review meetings |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Optional Task 10a: One-year follow-up interview from the NPSAS:16 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
| 5.2 Datalab/WebVTS Tools |
| * |
| 5.3 Restricted-Use Data Files |
| * |
Optional Task 10b: Four-year follow-up interview from the NPSAS:16 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
| 5.2 Datalab/WebVTS Tools |
| * |
| 5.3 Restricted-Use Data Files |
| * |
Optional Task 10c: One-year follow-up interview from the NPSAS:18 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 3 - Field test
3.4 Field test methodology memo
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 11a: Eight-year follow-up of first time beginning students from NPSAS:12
Task 1 - Management, IMS, TRP
1.1 Initial meeting with NCES
1.2 Schedules
1.3 Monthly Reports
1.5.1 Preparation of materials for technical review panel
1.5.3 Staffing at technical review panel
1.5.5 Honoraria for technical review panelist
1.5.6 Post-meeting activities for technical review panel
Task 3 - Field test
3.4 Field test methodology memo
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 11b: Three-year follow-up of first time beginning students from NPSAS:16
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
| 5.2 Datalab/WebVTS Tools |
| * |
| 5.3 Restricted-Use Data Files |
| * |
Optional Task 11c: Six-year follow-up of first time beginning students from NPSAS:16
Task 1 - Management, IMS, TRP
1.1 Initial meeting with NCES
1.2 Schedules
1.3 Monthly Reports
1.5.1 Preparation of materials for technical review panel
1.5.3 Staffing at technical review panel
1.5.5 Honoraria for technical review panelist
1.5.6 Post-meeting activities for technical review panel
Task 3 - Field test
3.4 Field test methodology memo
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 11d: Three-year follow-up of first time beginning students from NPSAS:18
Task 1 - Management, IMS, TRP
1.1 Initial meeting with NCES
1.2 Schedules
1.3 Monthly Reports
1.5.1 Preparation of materials for technical review panel
1.5.3 Staffing at technical review panel
1.5.5 Honoraria for technical review panelist
1.5.6 Post-meeting activities for technical review panel
Task 3 - Field test
3.4 Field test methodology memo
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 12: Ten-year follow-up interview from the NPSAS:08 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
| 1.5.1 Preparation of materials for technical review panel |
| * |
| 1.5.3 Staffing at technical review panel |
| * |
| 1.5.5 Honoraria for technical review panelist |
| * |
| 1.5.6 Post-meeting activities for technical review panel |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
Optional Task 18: Postsecondary education transcript collection for B&B (N=23k)
Task 1 - Management, IMS, TRP
| 1.1 Initial meeting with NCES |
| * |
| 1.2 Schedules |
| * |
| 1.3 Monthly Reports |
| * |
Task 3 - Field test
| 3.4 Field test methodology memo |
| * |
Task 4 - Full-scale
| 4.2 Full-scale OMB forms clearance |
| * |
Task 5 - Publication and Data Products
| 5.2 Datalab/WebVTS Tools |
| * |
| 5.3 Restricted-Use Data Files |
| * |
Optional Task 19: Postsecondary education transcript collection for BPS (N=23k)
Task 1 - Management, IMS, TRP
1.1 Initial meeting with NCES
1.2 Schedules
1.3 Monthly Reports
Task 3 - Field test
3.4 Field test methodology memo
Task 4 - Full-scale
4.2 Full-scale OMB forms clearance
Task 5 - Publication and Data Products
5.2 Datalab/WebVTS Tools
5.3 Restricted-Use Data Files
| Cost Reimbursement Tasks |
| Task/subtask begins in base period |
NPSAS:16: Base Contract
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
| 2.1 Data Element Comparison Report |
| * |
| 2.2 Institution data reporting system |
| * |
| 2.3 Standardized process for enrollment list collection |
| * |
| 2.4 Standardized process postsecondary institution data extraction |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
| Task 6 - Information Requests, IT Reporting, and Data Analysis |
| * |
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 8a: Administrative NPSAS in 2013-14
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
| 2.3 Standardized process for enrollment list collection |
| * |
| 2.4 Standardized process postsecondary institution data extraction |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 8b: Administrative NPSAS in 2017-18
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
| 2.3 Standardized process for enrollment list collection |
| * |
| 2.4 Standardized process postsecondary institution data extraction |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 8c: Administrative NPSAS in 2019-20
Task 1 - Management, IMS, TRP
1.5.2 Meeting logistics for technical review panel
1.5.4 Travel, hotel, meals, and expenses for technical review panel
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
2.3 Standardized process for enrollment list collection
2.4 Standardized process postsecondary institution data extraction
Task 4 - Full-scale
4.1 Full-scale Sampling
4.3 Full-scale data collection
Task 5 - Publication and Data Products
5.1 Analysis and reporting
Task 6 - Information Requests, IT Reporting, and Data Analysis
6.1 Respond to information requests
6.2 Major IT Data Reporting
6.3 Ad hoc information
Optional Task 9a: Reduce sample size and add a student interview - BPS & B&B using NPSAS:16 base year
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Optional Task 9b: Reduce sample size and add a student interview - B&B using NPSAS:16 base year
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
3.3 Field test data collection
| Task 4 - Full-scale |
| * |
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Optional Task 9c: Reduce sample size and add a student interview - BPS & B&B using NPSAS:18 base year
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Optional Task 9d: Reduce sample size and add a student interview - BPS & B&B using NPSAS:18 base year
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Optional Task 10a: One-year follow-up interview from the NPSAS:16 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 10b: Four-year follow-up interview from the NPSAS:16 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 10c: One-year follow-up interview from the NPSAS:18 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
5.1 Analysis and reporting
| Task 6 - Information Requests, IT Reporting, and Data Analysis |
| * |
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
6.3 Ad hoc information
Optional Task 11a: Eight-year follow-up of first time beginning students from NPSAS:12
Task 1 - Management, IMS, TRP
1.5.2 Meeting logistics for technical review panel
1.5.4 Travel, hotel, meals, and expenses for technical review panel
Task 3 - Field test
3.1 Field test sampling (for studies with a field test)
3.2 Field test OMB forms clearance (for studies with a field test)
3.3 Field test data collection
Task 4 - Full-scale
4.1 Full-scale Sampling
4.3 Full-scale data collection
Task 5 - Publication and Data Products
5.1 Analysis and reporting
Task 6 - Information Requests, IT Reporting, and Data Analysis
6.1 Respond to information requests
6.2 Major IT Data Reporting
6.3 Ad hoc information
Optional Task 11b: Three-year follow-up of first time beginning students from NPSAS:16
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 11c: Six-year follow-up of first time beginning students from NPSAS:16
Task 1 - Management, IMS, TRP
1.5.2 Meeting logistics for technical review panel
1.5.4 Travel, hotel, meals, and expenses for technical review panel
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
Task 3 - Field test
3.1 Field test sampling (for studies with a field test)
3.2 Field test OMB forms clearance (for studies with a field test)
3.3 Field test data collection
Task 4 - Full-scale
4.1 Full-scale Sampling
4.3 Full-scale data collection
Task 5 - Publication and Data Products
5.1 Analysis and reporting
Task 6 - Information Requests, IT Reporting, and Data Analysis
6.1 Respond to information requests
6.2 Major IT Data Reporting
6.3 Ad hoc information
Optional Task 11d: Three-year follow-up of first time beginning students from NPSAS:18
Task 1 - Management, IMS, TRP
1.5.2 Meeting logistics for technical review panel
1.5.4 Travel, hotel, meals, and expenses for technical review panel
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
Task 3 - Field test
3.1 Field test sampling (for studies with a field test)
3.2 Field test OMB forms clearance (for studies with a field test)
3.3 Field test data collection
Task 4 - Full-scale
4.1 Full-scale Sampling
4.3 Full-scale data collection
Task 5 - Publication and Data Products
5.1 Analysis and reporting
Task 6 - Information Requests, IT Reporting, and Data Analysis
6.1 Respond to information requests
6.2 Major IT Data Reporting
6.3 Ad hoc information
Optional Task 12: Ten-year follow-up interview from the NPSAS:08 sample of baccalaureate graduates (B&B)
Task 1 - Management, IMS, TRP
| 1.5.2 Meeting logistics for technical review panel |
| * |
| 1.5.4 Travel, hotel, meals, and expenses for technical review panel |
| * |
Task 2 - Developing Standardized Administrative Data Extractions from Postsecondary Institutions
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
5.1 Analysis and reporting
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 13: Add interview items
Optional Task 13a: Add interview items to NPSAS study in Optional Task 9
Optional Task 13b: Add interview items to a B&B study in Optional Task 10
Optional Task 13c: Add interview items to BPS follow-up study in Optional Task 11
Optional Task 13d: Add interview items B&B follow-up in Optional Task 12
Optional Task 14: Add sample to administrative NPSAS studies
Optional Task 14a: Add sample to NPSAS:16 study in base contract
Optional Task 14b: Add sample to administrative NPSAS study in Optional Task 8
Optional Task 15: Add sample to NPSAS studies with an interview
Optional Task 15a: NPSAS study with an interview in Optional Task 9
Optional Task 15b: NPSAS study with an interview in Optional Task 9
Optional Task 16: Incentives to students
Optional Task 16a: NPSAS study w/ an interview in Optional Task 9
Optional Task 16b: NPSAS study w/ an interview in Optional Task 9
Optional Task 16c: B&B one-year follow-up study based on NPSAS:16 in Optional Task 10
Optional Task 16d: B&B four-year follow-up study based on NPSAS:16 in Optional Task 10
Optional Task 16e: B&B one-year follow-up study based on NPSAS:18 in Optional Task 10
Optional Task 16f: BPS eight-year follow-up study based on NPSAS:12 in Optional Task 11
Optional Task 16g: BPS three-year follow-up study based on NPSAS:16 in Optional Task 11
Optional Task 16h: BPS six-year follow-up study based on NPSAS:16 in Optional Task 11
Optional Task 16i: BPS eight-year follow-up study based on NPSAS:12 in Optional Task 11
Optional Task 16j: B&B ten-year follow-up study based on NPSAS:08 in Optional Task 12
Optional Task 17: Standardized administrative student records collections for other studies
Optional Task 17a: Standardized administrative student records data collections for studies (first exercise)
Optional Task 17b: Standardized administrative student records data collections for studies (second exercise)
Optional Task 17c: Standardized administrative student records data collections for studies (third exercise)
Optional Task 18: Postsecondary education transcript collection for B&B (N=23k)
Task 3 - Field test
| 3.1 Field test sampling (for studies with a field test) |
| * |
| 3.2 Field test OMB forms clearance (for studies with a field test) |
| * |
| 3.3 Field test data collection |
| * |
Task 4 - Full-scale
| 4.1 Full-scale Sampling |
| * |
| 4.3 Full-scale data collection |
| * |
Task 5 - Publication and Data Products
| 5.1 Analysis and reporting |
| * |
Task 6 - Information Requests, IT Reporting, and Data Analysis
| 6.1 Respond to information requests |
| * |
| 6.2 Major IT Data Reporting |
| * |
| 6.3 Ad hoc information |
| * |
Optional Task 19: Postsecondary education transcript collection for BPS (N=23k)
Task 3 - Field test
3.1 Field test sampling (for studies with a field test)
3.2 Field test OMB forms clearance (for studies with a field test)
3.3 Field test data collection
Task 4 - Full-scale
4.1 Full-scale Sampling
4.3 Full-scale data collection
Task 5 - Publication and Data Products
5.1 Analysis and reporting
Task 6 - Information Requests, IT Reporting, and Data Analysis
6.1 Respond to information requests
6.2 Major IT Data Reporting
6.3 Ad hoc information
Optional Task 20: Longitudinal study follow-up using only administrative data (excludes student records matching
Optional Task 20a: Longitudinal study follow-up using only administrative data (exclude SR matching) - one year of data
Optional Task 20b: Longitudinal study follow-up using only administrative data (exclude SR matching) - one year of data
Optional Task 20c: Longitudinal study follow-up using only administrative data (exclude SR matching) - up to five years of data
Optional Task 20d: Longitudinal study follow-up using only administrative data (exclude SR matching) - up to five years of data
Optional Task 20e: Longitudinal study follow-up using only administrative data (exclude SR matching) - up to ten years of data
Optional Task 20f: Longitudinal study follow-up using only administrative data (exclude SR matching) - up to ten years of data
File details come from the government source that posted it. Updated .