WI_25140__AC_PLant_Renewals_Rev._2.pdf

PDF 22 KB Posted

Attached to
NOAA Ship RONALD H. BROWN DOCKSIDE REPAIRS Federal contract opportunity
Solicitation number
EA-133M-17-RP-0081
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

WI_25140_ AC PLant Renewals Rev. 2

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Ship RONALD H. BROWN DOCKSIDE REPAIRS, newest first.
File Type Posted
WI_16240__Doors_Rev._2.pdf PDF
665-6932883.pdf PDF
WI_13200__Switchboard_Cleaning_Rev._2.pdf PDF
WI_12330_Engine_Overhaul_Rev._2.pdf PDF
RB-085-001_Booklet_of_General_Plans.pdf PDF
RFP_EA-133M-17-RP-0081,_REV-1.pdf PDF
US_Standard_Bus_Connection_Bolt_Torque_Values.pdf PDF
WI_22520_Woodward_Controls_Upgrade_spec.pdf PDF
Motor_Inventory_Information.pdf PDF
RHB_Firehose_Inventory.pdf PDF
Tech_Manaul_167-00_Part_1.pdf PDF
Tech_Manaul_167-00_Part_2.pdf PDF
551-04.pdf PDF
RB_555-02_REV_C.pdf PDF
514_6932961.pdf PDF
14_in._exhaust_silencer.pdf PDF
Tech_Man_RB-437-00r.pdf PDF
000-1G_General_Requirements_for_Ship_Repair_Contract_Work_on_NOAA_Ships.pdf PDF
J._4_Past_Performance_Information_Form_Rev.1.pdf PDF
Amendment_0001_RFP_EA-133M-17-RP-0081.pdf PDF
10_in._exhaust_silencer.pdf PDF
J.5__Past_Performance_Questionnaire_Rev.1.pdf PDF
514-6932921.pdf PDF
623-6932856.pdf PDF
514-6932962,_Diagram.pdf PDF
512-6932955_HVAC_Mn_Dk_r.pdf PDF
171-6932832.pdf PDF
259-6932917.pdf PDF
573-2_Overhaul_Repair_of_Hydraulic_Cylinders.pdf PDF
J.2__USDL_Poster.pdf PDF
512-6932954_HVAC_02_Lvl_and_up.pdf PDF
J.4_Past_Performance_Information_Form.pdf PDF
J.1__SPECIFICATION_NOAA_SHIP_RONALD_BROWN_DOCKSIDE_REPAIR.pdf PDF
512-6932958_HVAC_ER.pdf PDF
634-1B_DECK_COVERINGS.pdf PDF
506-6932919_REV_C.pdf PDF
Brown_Life_Raft_Certificates_2016.pdf PDF
NOAA_CAT_3500__Standard_Spec.pdf PDF
300-6932739_Bonding_Grounding.pdf PDF
635-6932885.pdf PDF
NOAA_RHB_480VAC_SWBD_29JAN2011_RED.pdf PDF
Righting_Device_Inspection_Form,_Blank.pdf PDF
631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
638-6932868.pdf PDF
555-6932945.pdf PDF
256-6932914.pdf PDF
624-6932863.pdf PDF
541-6932935.pdf PDF
439-6932759.pdf PDF
RH_Brown_Gauge-Thermometer_List.xls XLS spreadsheet
Show all 50

NOAA Ship RONALD H. BROWN DOCKSIDE REPAIRS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA SHIP RONALD H. BROWN

(R-104)

14 July 2017

ITEM NO. 25140 BASIC ITEM MED/JAL

AIR CONDTIONING CHILLER PLANT RENEWALS

25140-1 l.0 ABSTRACT

1.1 This item describes the removal of the existing air conditioning chilled water plants port and starboard and the installation of new plants.

2.0 REFERENCES:

2.1 Drawing 201-6932912 Rev C GENERATOR ROOM ARRANGEMENT

2.2 Drawing 256-6932915, Auxiliary Salt Water Arr and Dets

2.3 Drawing 514-6932921, Chilled Water System Arr and Dets

2.4 Carrier 30HX Installation Instructions

2.5 Drawing 514-001, Air Conditioning Plants Renewals

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Generator Room Upper Level

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Two(2) each skid mounted Air Conditioning Chilled Water Plants, Carrier Model 30HXS136RY-6-MAR, or similar. Value = $300,000

4.2 Two (2) each water regulating valves, Metrex Model EAMDF-3120-BMF-3W Value= $35,000

4.3 Twelve each Carrier vibration isolation mounts. Value =$3,200.

5.0 NOTES

5.1 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to 001 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in references included in work item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7. STATEMENT OF WORK REQUIRED

7.1. Remove the existing port and starboard skid mounted air conditioning chilled water plants.

7.1.1. Removal of the existing plants and installation of the new plants will require a temporary access cut(s) in the ship’s side shell.

Prior to making access cuts in the hull, submit sketch of proposed access cut to the local ABS Surveyor for review and approval. The sketch shall show as a minimum the proposed access cut, adjacent framing members, nearby penetrations in existence, and scantlings of affected structure. It shall also provide a description of the eventual restoration of the structure to its original configuration, including materials and welding details. A

14 July 2017

25140-2 narrative justification for cutting the opening shall also appear on the sketch.

7.1.2.Provide copy of approved access cut sketch to the COTR in form of condition report.

7.1.3.The temporary access in the hull is to be made weather proof with lumber or other suitable means to prevent rain intrusion into the vessel.

7.2. Evacuate and properly dispose of each plant’s R-22 charge. Each plant contains approximately 200 lbs of refrigerant.

7.3. Remove and properly dispose of each plants’ compressor oil.

7.4. Disconnect all piping from each unit utilizing reference 2.5 for guidance.

7.4.1. Retain all removed expansion joints for re-utilization

7.5. Disconnect and pull back electrical and control connections. These cables will be utilized for new unit.

7.5.1. Remove the existing cable kick pipes for each unit (3 per unit). Insert deck in way of removals.

7.6. Crop off existing foundation flush to the deck and grind smooth in way of removals.

7.7. Relocate one each compressed air refrigerated moisture separator currently located aft of the port plant. The existing installation has the unit orientated forward/aft. Temporarily remove the unit and it’s existing foundation until the port plant is installed in place.

Reinstall the unit and it’s foundation with a port/starboard orientation to allow room for the new plant. Modify the 1” IPS steel piping for air inlet and outlet, as well as the copper tubing drain connection to accommodate the reorientation of this unit.

7.8. Install the new Government Provided Equipment (GFE) listed in paragraph 4.1.

7.8.1.Fabricate and install new foundations to accommodate each new plant utilizing Reference 2.5 for guidance.

7.8.2. Mount each new unit by bolting to the foundation with the GFM vibration mounting pads. Provide and install new fasteners. Note that the unit shall be level to within 1/16 inch per foot along the long axis of the unit.

7.8.3. Install new piping from the existing ship’s piping to each new plant utilizing Reference 2.5 for guidance. Note that Reference

2.5 is for guidance only on the general configuration of the new piping. The contractor is not to prefabricate piping based on

14 July 2017

25140-3 this drawing, but instead field install piping after the new plant skids have been secured to the foundations.

7.8.3.1. Install new salt water supply and return piping. Piping is to be 90/10 CUNI piping, welded.

7.8.3.2. Install new chilled water supply and return piping.

Piping is copper tubing, Type L, ASTM B-88.

7.8.3.3. Install copper tubing from the refrigerant relief valves to the existing relief valve vent piping for each unit.

7.8.3.4. Install piping brackets and supports as required. Ensure that there is no weight or stress on the condenser and chiller connections.

7.8.3.5. Install the following pressure gages and thermometers in the piping for each plant. These gages/thermometers are to be 5 to 10 pipe diameters from the plant’s piping connections.

a)Chilled water supply thermometer b)Chilled water discharge thermometer c)Salt Water Cooling inlet thermometer

d) Salt Water Cooling outlet thermometer

e) Salt water cooling inlet pressure

f) Salt water cooling outlet pressure

7.8.3.6. Accomplish pressure testing of new and modified piping to the satisfaction of the attending ABS Surveyor.

7.8.3.7. Lag all new and disturbed salt water and chilled water piping insulation with closed cell insulation to match the existing insulation. Wrap insulation with cloth and paint.

7.8.4. Install new junction boxes in the overhead of the lower level of the engine room for each plant’s existing main power cable and control voltage cables. Install new cables from the junction box up to the new plant’s connection box through new deck kick pipes. Power cable is to be LSTSGU-200. The control cables are to be LSTSGU-4. Connect the existing power and control cables to the new plants. Install one each control cable from each plant’s control panel to the water regulating valve operator.

7.9. Reinstall all structure and plate in way of access cut(s) to the satisfaction of the attending ABS Surveyor. At a minimum, ABS and Port Engineer to witness fit up, back gouge, final weld, and vacuum box testing. Accomplish DPT of final welds.

7.9.1. Restore freeboard paint in way of access cut(s). The coating system to be applied is:

7.9.1.1. Two each coats International 300V, 4 mils DFT.

7.9.1.2. Three each coats Interthane 990 White, 3.0 mils DFT.

14 July 2017

25140-4

7.10. Insulate the condenser and cooler heads with closed cell insulation.

Wrap with cloth.

7.11. Provide the services of a factory authorized Marine Carrier technician to accomplish the following:

7.11.1. Verify the refrigerant charge in each plant. Inspect new plants for leaks.

7.11.2. Make all control cable terminations and verify power

connections prior to energizing the plants.

7.11.3. Accomplish commissioning/set up of each plant’s parameters and verify proper plant operation.

7.11.4. Provide minimum on full day of crew training on the new plant controls, trouble shooting, and operation.

7.12. Provide copies of all material certifications for new piping systems and piping components.

8.0 GENERAL REQUIREMENTS: None Additional.

File details come from the government source that posted it. Updated .