WI_22520_Woodward_Controls_Upgrade_spec.pdf

PDF 11 KB Posted

Attached to
NOAA Ship RONALD H. BROWN DOCKSIDE REPAIRS Federal contract opportunity
Solicitation number
EA-133M-17-RP-0081
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

WI_22520 Woodward Controls Upgrade_spec

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Ship RONALD H. BROWN DOCKSIDE REPAIRS, newest first.
File Type Posted
RFP_EA-133M-17-RP-0081,_REV-2.pdf PDF
J.1_SPECIFICATION_NOAA_SHIP_RONALD_H._BROWN_REV_2.pdf PDF
Pricing_Sheet__MSWord_RFP_EA-133M-17-RP-0081.R1.docx DOCX document
WI_16240__Doors_Rev._2.pdf PDF
665-6932883.pdf PDF
WI_25140__AC_PLant_Renewals_Rev._2.pdf PDF
WI_13200__Switchboard_Cleaning_Rev._2.pdf PDF
WI_12330_Engine_Overhaul_Rev._2.pdf PDF
RFP_EA-133M-17-RP-0081,_REV-1.pdf PDF
RB-085-001.pdf PDF
439-001.pdf PDF
J.1_SPECIFICATION_NOAA_SHIP_RONALD_BROWN_REV_1.pdf PDF
Switchboard_Breakers_Info.pdf PDF
Tech_Man_RB-437-00r.pdf PDF
US_Standard_Bus_Connection_Bolt_Torque_Values.pdf PDF
Motor_Inventory_Information.pdf PDF
RHB_Firehose_Inventory.pdf PDF
Tech_Manaul_167-00_Part_1.pdf PDF
Tech_Manaul_167-00_Part_2.pdf PDF
551-04.pdf PDF
RB_555-02_REV_C.pdf PDF
J.3__Subcontracting_Plan.pdf PDF
201-6932912.pdf PDF
J.5__Past_Performance_Questionnaire.pdf PDF
RB-085-001.pdf PDF
514-6932961.pdf PDF
RB_555-02_REV_C_Model.pdf PDF
528-6932928.pdf PDF
512-6932959.pdf PDF
300-1_Overhaul_of_Electrical_Rotating_Machinery.pdf PDF
506-6932919_REV_C.pdf PDF
Brown_Life_Raft_Certificates_2016.pdf PDF
NOAA_CAT_3500__Standard_Spec.pdf PDF
300-6932739_Bonding_Grounding.pdf PDF
635-6932885.pdf PDF
NOAA_RHB_480VAC_SWBD_29JAN2011_RED.pdf PDF
Righting_Device_Inspection_Form,_Blank.pdf PDF
631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
514-6932921.pdf PDF
623-6932856.pdf PDF
514-6932962,_Diagram.pdf PDF
512-6932955_HVAC_Mn_Dk_r.pdf PDF
171-6932832.pdf PDF
259-6932917.pdf PDF
573-2_Overhaul_Repair_of_Hydraulic_Cylinders.pdf PDF
J.2__USDL_Poster.pdf PDF
512-6932954_HVAC_02_Lvl_and_up.pdf PDF
J.4_Past_Performance_Information_Form.pdf PDF
J.1__SPECIFICATION_NOAA_SHIP_RONALD_BROWN_DOCKSIDE_REPAIR.pdf PDF
512-6932958_HVAC_ER.pdf PDF
Show all 50

NOAA Ship RONALD H. BROWN DOCKSIDE REPAIRS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA SHIP RONALD H. BROWN

(R-104)

24 June 2017

ITEM NO. 22520 BASIC ITEM MED/JAL

WOODWARD CONTROLS UPGRADE

22520-1 l.0 ABSTRACT

1.1 This item describes the requirement to upgrade the existing Woodward 2301A Electronic Load Sharing and Speed Control units to new Woodward 2301E Electronic Load Sharing and Speed Control units on board the NOAA Ship RONALD

H. BROWN.

2.0 REFERENCES:

2.1 Drawing NOAA Ship BROWN 600V Switchboard Drawing

2.2 NOAA Ship BROWN 480V Switchboard Drawing

3.0 ITEM LOCATION: Switchboard Room

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.

5.0 NOTES:

5.1 The Government will provide ship’s personnel to assist testing of engines.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Ship force shall secure and tag out equipment and associated systems specified in 3.0.

7.2 Provide the services of a factory authorized Woodward Controls engineer to accomplish the following to upgrade the ship’s existing Woodward 2301A Electronic Load Sharing and Speed Control units to new Woodward 2301E Electronic Load Sharing and Speed Control units.

Utilize Reference 2.1 for guidance.

7.3 Disconnect and remove the existing 2301A units.

7.4 Provide and install six each new 2301E units. The new units are to utilize the existing 24VDC power source.

7.4 The new units are to work with the existing governor actuators mounted on each engine. The existing actuators are Woodward EGB-10P Part Number: 8241-513. These units are reverse acting.

7.5 Configure/program the new 2301E units to provide the same functionality as the existing 2301A units.

7.6 Accomplish alongside testing of each generator in every possible configuration of on line operation with each of the other generators. Demonstrate the operation of the new units to the satisfaction of the ABS Surveyor.

NOAA SHIP RONALD H. BROWN

(R-104)

24 June 2017

ITEM NO. 22520 BASIC ITEM MED/JAL

WOODWARD CONTROLS UPGRADE

22520-2

7.7 Provide and turn over to the ship’s crew one each spare 2301E unit and two each connection cables that connect to an external computer for trouble shooting/programming.

7.8 Install the necessary software on the ship’s engineering laptop to allow the ship’s engineers to trouble shoot the 2301E units.

7.9 Provide an eight hour crew training session on the proper operation, troubleshooting, and replacement techniques of the units.

7.10 The Woodward technician shall be on board for a one day 10 hour sea trial near the end of the contract performance period.

7.11 Provide the services of a factory trained and authorized Basler controls technician to inspect/adjust the ship’s six each Basler DECS2001L Voltage Regulators and to provide crew training on same.

The controls technician shall be on site for two days for alongside testing as well as one ten hour day underway for sea trials.

7.12 Provide a red line mark up of Reference 2.1 in pdf format showing all changes.

8.0 GENERAL REQUIREMENTS: None.

File details come from the government source that posted it. Updated .