Report_Bridge_Inspection_5460-084P.pdf

PDF 2 MB Posted

Attached to
Great Smoky Mountains National Park Projects Federal contract opportunity
Solicitation number
DTFH71-17-B-00007
Issued by
Department of Transportation Federal Highway Administration

About this file

Report_Bridge Inspection_5460-084P

View the file

Other files for this federal contract opportunity

Other files attached to Great Smoky Mountains National Park Projects, newest first.
File Type Posted
Results_of_Bid_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf PDF
Amendment_0001_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf PDF
Report_Pavement_Newfound_Gap_Road.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Report_NEPA_GRSM_11(2)_CE.pdf PDF
Report_Bridge_Inspection_5460-089P.pdf PDF
Report_Uniguide_GRSM_11(2).pdf PDF
IFB_Solicitation_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf PDF
Report_Bridge_Inspection_5460-040P.pdf PDF
VETS-4212_-_Form.pdf PDF
Report_NEPA_GRSM_1A29_FONSI.pdf PDF
Report_Bridge_Inspection_5460-087P.pdf PDF
Report_Bridge_Inspection_5460-044P.pdf PDF
Report_Uniguide_GRSM_1A29.pdf PDF
Report_Bridge_Inspection_5460-086P.pdf PDF
Plans_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf PDF
FP14_Eng.pdf PDF
Report_SWPPP_GRSM_1A29_(draft).pdf PDF
Synopsis_NP-GRSM_11(2)_and_NP-GRSM_1A29.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

GUM STAND ROAD CROSSOVER BRIDGE

SPUR CROSSOVER ROAD OVER WEST PRONG LPR

GREAT SMOKY MOUNTAINS NATIONAL PARK

LE

STRUCTURE NO. 5460-084P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/27/12

Report prepared by: ND

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP

STRUCTURE SUMMARY STRUCTURE NO. 5460-084P

GUM STAND ROAD CROSSOVER BRIDGE INSPECTION DATE: 6/27/12

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 187.6 FT (57.2 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 63.1 FT (19.2 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 33.0 FT (10.1 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 26.0 FT (7.9 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 15A6 / 3003A SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 2008-WEARING SURFACE INSTALLED. APPROACHES REPAVED. 2012-EXPANSION JOINTS

OVER PIERS RESEALED.

LOCATION

GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 1.21 (KM PT 1.95)

STATE: ................................. TENNESSEE LOCATION: 3.3 MILES NORTH FROM NPS ROUTE 12

(GATLINBURG BYPASS). FACILITY CARRIED: ............ SPUR CROSSOVER ROAD

FEATURE INTERSECTED: .. WEST PRONG LPR

STRUCTURE EVALUATION SUMMARY

This prestressed concrete multi-beam bridge is in fair to good condition overall. The main problem is scour occuring at the west pier with portions of exposed footing. Other problems include exposed rebar on the abutment breastwalls and pier walls, drift accumulation in the downstream channel, exposed rebar on the underside of Beam #5 in the west span, and soil and debris accumulation on the caps.

Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: C.C. THRIFT, L.M. MUELLER (CLARK NEXSEN)

CONDITION ASSESSMENT:

C. CHRISTOPHER THRIFT, NICET LEVEL IV, FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 10/30/12

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-084P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.1,13,15 CLEAN AND SEAL EXPOSED REBAR ON ABUTMENT BREASTWALLS, EAST FACE

OF EAST PIER WALL, AND TWO AREAS ON EAST PIER CAP WITH APPROVED

PROTECTIVE COATING.

70 SF

60.17 PLACE ENGINEERED RIPRAP ALONG EXPOSED AREAS OF WEST PIER FOOTING. 10 CY

61.4 REMOVE DRIFT ACCUMULATION IN DOWNSTREAM CHANNEL. 1 LS

59.2, 60.1 CLEAN AND SEAL EXPOSED REBAR ON UNDERSIDE OF BEAM #5, WEST SPAN. 1 LS

60.15 PERIODICALLY REMOVE SOIL AND DEBRIS FROM CAPS. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ..

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5460-084P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK

ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F G N N N G N N G

N G

F N G G N G G N G G N N

G N F G F G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR CRACKING OF DECK UNDERSIDE IN BAYS #1 AND #4 AT

PIERS.

58.2 DECK EXPANSION JOINTS RESEALED AND POLYMER-MODIFIED

ASPHALT EXPANSION JOINT SYSTEM OVER PIERS. MINOR FULL

WIDTH TRANSVERSE CRACK IN WEARING SURFACE OVER EAST

ABUTMENT; FULL WIDTH OF WESTBOUND LANE OVER WEST

ABUTMENT.

MINOR DETERIORATION OF SIDEWALK AND PARAPET EXPANSION

JOINT FILLER.

58.3 MINOR POTHOLE DEVELOPMENT IN EASTBOUND LANE OVER WEST

PIER.

58.5,6 MINOR CRACKING AND SPALLING OF CURBS, PARAPETS, AND

SIDEWALKS WITH EFFLORESCENCE. WIDESPREAD MINOR

CRACKING OF APPROACH SIDEWALKS. MINOR DETERIORATION OF

SOME PARAPET MORTAR JOINTS AT APPROACHES. MODERATE

SCALING OF NORTH SIDEWALK, CENTER SPAN OVER EAST PIER.

MINOR COLLISION DAMAGE TO RAILINGS. NORTH RAIL DEFLECTED

SLIGHTLY TOWARD ROADWAY IN WEST SPAN. SEVERAL ANCHOR

BOLTS AND NUTS FOR RAILING SYSTEM UNDERSIZED AND NOT

GALVANIZED.

58.7 MINOR PONDING AT CURBLINES (UNABLE TO VERIFY DURING THIS

INSPECTION).

59.1 MODERATE RUSTING AND RUST SCALE ON ANCHOR BOLTS AND

NUTS. MODERATE RUSTING OF NORTH BEARINGS, BOTH PIERS; UP

TO 1/16" SECTION LOSS TO BEARINGS AT WEST PIER, CENTER

SPAN. BEARINGS AT PIERS CONTRACTED 3/4" AT TIME OF

INSPECTION.

59.2 MINOR STAINING OF GIRDERS UNDER DECK DRAINS DUE TO

INSUFFICIENT LENGTH OF SCUPPERS. APPROXIMATELY 3" LENGTH

OF EXPOSED REBAR ON BEAM #5, WEST SPAN.

G G G G G N

N

G

G

G

FIELD INSPECTION REPORT STRUCTURE NO. 5460-084P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL 6

G F G F N

MED

SUFF

15 FT.

ROCK

222. APPROACHES 8

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT 6.

EROSION5.

SURFACING4.

APPROACH GUARDRAIL 3.

2. RELIEF JOINTS

APPROACH SLABS1. N

N N G G G N G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.6 MINOR CRACKING OF DIAPHRAGMS WITH EFFLORESCENCE AT

ISOLATED LOCATIONS.

60.1 MINOR WIDESPREAD DELAMINATION AND SHALLOW SPALLING OF

ABUTMENT BREASTWALLS, SOUTH SIDE, WITH EXPOSED REBAR

DUE TO INADEQUATE CONCRETE COVER. MINOR DELAMINATION

OF EAST ABUTMENT BREASTWALL IN OTHER LOCATIONS.

FORMWORK TIES EXPOSED AT BOTH ABUTMENTS. MINOR

VERTICAL CRACKING OF EAST ABUTMENT BREASTWALL. HEAVY

VEGETATION GROWTH ON EAST ABUTMENT BREASTWALL AND

BELOW EAST SPAN.

60.6 MINOR EFFLORESCENCE ON WINGWALLS; MINOR TO MODERATE

DETERIORATION OF MORTAR JOINTS. HEAVY VEGETATION

GROWTH ON EAST ABUTMENT WINGWALLS; VEGETATION EXTENDS

ONTO APPROACH PARAPETS.

60.9 CONCRETE FOOTING EXPOSED AT END OF NORTHEAST

WINGWALL.

60.13 MINOR VERTICAL CRACKING AND MODERATE SCALING OF PIER

WALLS. MINOR SPALL WITH EXPOSED REBAR ON EAST SIDE OF

EAST PIER WALL. MINOR VEGETATION GROWTH ALONG WEST

FACE OF EAST PIER.

60.15 TWO MINOR SPALLS WITH EXPOSED REBAR DUE TO INSUFFICIENT

COVER ON EAST PIER CAP, WEST FACE. MODERATE

ACCUMULATION OF DEBRIS ON CAPS.

60.16,17 PREVIOUSLY REPORTED EXPOSED FOOTING OF EAST PIER ON

NORTH SIDE HAS BEEN FILLED IN.

EXPOSED FOOTING ON UPSTREAM SIDE OF WEST PIER FOOTING

UP TO 1.7' DEEP. EAST FACE OF WEST PIER FOOTING EXPOSED UP

TO 1.7' DEEP FOR 12' STARTING FROM UPSTREAM SIDE. 17'L X 2.1'D

EXPOSED FOOTING ALONG WEST FACE STARTING FROM

DOWNSTREAM SIDE (UNABLE TO VERIFY DURING THIS INSPECTION

DUE TO WATER DEPTH). CONSTRUCTION DRAWINGS INDICATE

FOOTINGS ARE FOUNDED ON BEDROCK.

61.2 LARGE SCOUR HOLE ON UPSTREAM SIDE OF WEST PIER (UNABLE

TO VERIFY DURING THIS INSPECTION). MINOR TO MODERATE

SLOUGHING OF CHANNEL BANKS. MINOR SCOUR ON NORTH SIDE

OF EAST PIER.

61.4 MINOR TO MODERATE DRIFT IN DOWNSTREAM CHANNEL.

STRUCTURE LOAD RATING STRUCTURE NO. 5460-084P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 20 18 33 30

HS 25 23 42 38

TYPE 3 24 22 40 36

TYPE 3S2 32 29 54 49

TYPE 3-3 39 35 65 59

DESIGN LOADING: H20 (M18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-084P

STRUCTURE IDENTIFICATION

(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK

(202) STRUCTURE NAME: .......... GUM STAND ROAD CROSSOVER BRIDG

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 5460-084P

(205) NPS REGION: .................... 4 - SOUTHEAST

(206) ROUTE CODE NUMBER: ... 11

(207) ROAD SECTION NO: .......... 084P

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. S. DIST.

(211) PROJECT NO(S): ................ 15A6

(212) DRAWING NUMBERS: ....... 3003A

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

474 - TENNESSEE (TN)

155 - SEVIER

161000110

WEST PRONG LPR

SPUR CROSSOVER ROAD

5460084P0000000

3.3 MILES NORTH FROM NPS

99.99 FT (99.99 M)

1.21 (KM PT 1.95)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

5 - PRESTRESSED CONCRETE

02 - STRINGER/MULTI-BEAM or GIRDER

63.1 FT (19.2 M)

187.6 FT (57.2 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 25.0 TONS (23.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 42.0 TONS (38.1 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/12 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

o

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-084P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 35°45'44.80"

(17) LONGITUDE: ......................... 83°31'24.40"

(19) DETOUR LENGTH: ............... 10 MI (16 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH: ........... 26.0 FT (7.9 M)

(52) DECK WIDTH: ............................ 33.0 FT (10.1 M)

(32) APPR. ROADWAY WIDTH: ........ 36.0 FT (11.0 M)

(213) APPR. PAVEMENT WIDTH: ..... 26.0 FT (7.9 M)

LEFT SHOULDER: .................. 5.0 FT (1.5 M)

RIGHT SHOULDER: ................ 5.0 FT (1.5 M)

(33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(34) SKEW ANGLE: ............................ 0 °

(35) DECK FLARE?: ........................... NO

(47) TOTAL HORIZ. CLEARANCE: .... 26.0 FT (7.9 M)

(50) SIDEWALKS:

LEFT : ...................................... 2.5 FT (0.8 M)

RIGHT : ................................... 2.5 FT (0.8 M)

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION: ......... 2 - MOUNTED ON PARAPET

MATERIAL: .............................. 6 - ALUMINUM

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

(215) BRIDGE RAIL HEIGHT: ............ 3.00 FT (0.91 M)

(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

8 - Stable; scour above top of fo

1 - MAINTENANCE

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2008-WEARING SURFACE INSTALLED. APPROACHES REPAVED. 2012-EXPANSION JOINTS OVER PIERS RESEALED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:83�31'24.40 http:35�45'44.80

APPENDIX STRUCTURE NO. 5460-084P

PHOTOGRAPHS STRUCTURE NO. 5460-084P

PHOTO #1 - LOOKING WEST TOWARD SOUTHBOUND U.S. ROUTE 441

FLOW

PHOTO #2 - SOUTH (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING EAST

PHOTO #4 - POTHOLE DEVELOPMENT IN

WEARING SURFACE, EASTBOUND LANE OVER

WEST PIER

PHOTO #5 - TRANSVERSE CRACK IN WEARING

SURFACE OVER EAST ABUTMENT

PHOTO #6 - TYPICAL DETERIORATION OF

PARAPET AND SIDEWALK EXPANSION JOINT

FILLER MATERIAL; SOUTH PARAPET AND

SIDEWALK OVER WEST PIER SHOWN

PHOTO #7 - SCALING OF NORTH SIDEWALK,

CENTER SPAN OVER EAST PIER

PHOTO #8 - NORTH RAIL DEFLECTED

SLIGHTLY TOWARD ROADWAY IN WEST SPAN

PHOTO #9 - GENERAL UNDERSIDE VIEW LOOKING EAST, WEST SPAN

PHOTO #10 - TYPICAL CRACKING OF DECK UNDERSIDE IN BAYS #1

AND #4 AT PIERS; BAY #4 IN WEST SPAN AT WEST PIER SHOWN

PHOTO #11 - TYPICAL CONTRACTION OF BEARINGS AT PIERS; BEAM

#1 BEARING IN EAST SPAN AT EAST PIER SHOWN; ALSO NOT

ACCUMULATION OF DEBRIS ON CAP

PHOTO #12 - TYPICAL RUSTING AND RUST SCALE ON ANCHOR BOLTS

AND NUTS; BEAM #1 BEARING AT WEST ABUTMENT SHOWN

PHOTO #13 - GENERAL VIEW OF WEST

ABUTMENT

PHOTO #14 - TYPICAL DELAMINATION AND

SHALLOW SPALLING OF ABUTMENT

BREASTWALLS, SOUTH SIDE; WEST

ABUTMENT BREASTWALL SHOWN

PHOTO #15 - TYPICAL DELAMINATION AND

SHALLOW SPALLING OF ABUTMENT

BREASTWALLS, SOUTH SIDE; EAST

ABUTMENT BREASTWALL SHOWN

PHOTO #16 - VEGETATION GROWTH ON

NORTHEAST WINGWALL; VEGETATION

EXTENDS ONTO APPROACH PARAPETS.

PHOTO #17 - GENERAL VIEW OF EAST PIER, WEST FACE; NOTE

VEGETATION GROWTH ON PIER WALL

PHOTO #18 - SPALL WITH EXPOSED REBAR ON EAST SIDE OF EAST

PIER WALL

PHOTO #19 - TYPICAL SCALING OF PIER WALLS; EAST SIDE OF WEST

PIER AT NORTH END SHOWN

PHOTO #20 - UPSTREAM CHANNEL

PHOTO #21 - DOWNSTREAM CHANNEL; NOTE DRIFT

File details come from the government source that posted it. Updated .