IFB_Solicitation_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf
PDF 43 MB Posted
- Attached to
- Great Smoky Mountains National Park Projects Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00007
About this file
Bid Opening date is scheduled for December 01 2016 at 2 00 pm EST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf | ||
| Amendment_0001_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf | ||
| Report_Pavement_Newfound_Gap_Road.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Report_NEPA_GRSM_11(2)_CE.pdf | ||
| Report_Bridge_Inspection_5460-086P.pdf | ||
| Plans_-_NP-GRSM_11(2) _NP-GRSM_1A29.pdf | ||
| FP14_Eng.pdf | ||
| Report_SWPPP_GRSM_1A29_(draft).pdf | ||
| Report_NEPA_GRSM_1A29_FONSI.pdf | ||
| Report_Bridge_Inspection_5460-084P.pdf | ||
| Report_Bridge_Inspection_5460-087P.pdf | ||
| Report_Bridge_Inspection_5460-044P.pdf | ||
| Report_Uniguide_GRSM_1A29.pdf | ||
| Report_Bridge_Inspection_5460-089P.pdf | ||
| Report_Uniguide_GRSM_11(2).pdf | ||
| Report_Bridge_Inspection_5460-040P.pdf | ||
| VETS-4212_-_Form.pdf | ||
| Synopsis_NP-GRSM_11(2)_and_NP-GRSM_1A29.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
IFB No. DTFH71- 17-B-00007
This Contract Cites
STANDARD SPECIFICATIONS (FP-14)
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NP-GRSM 11(2) and NP-GRSM 1A29
GREAT SMOKY MOUNTAINS NATIONAL PARK
GATLINBURG SPUR ROAD AND SIDE ROADS
AND
NEWFOUND GAP ROAD
(TN MP 0.0 to MP 1.8)
Contract No.
PMIS# 188870, 188870C
ADDRESS:
CONTRACTOR:
STATE Tennessee
COUNTY Sevier
PARK Great Smoky Mountains National Park
Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear
Feet Route Miles
Lane Miles
A
Gatlinburg Spur Road, Gatlinburg Spur Road Northbound, Wiley Oakley Drive (Crossover Section), Gum Stand Road Crossover, and Gatlinburg Spur Road Parking #3
21+48 To 235+73
21,648 4.10 8.53
B
Gatlinburg Spur Road Southbound, Flat Branch Road (including Crossover), Gatlinburg Spur Road Parking #1, Gatlinburg Spur Road Parking #2
33+10 To 247+04
23,674 4.48 8.65
C Banner Road/Wiley Oakley Drive, Gum Stand Road, Gnatty Branch Road, Gatlinburg Visitor Parking Area
To 5,440 1.03 1.86
D Newfound Gap Road North, Gatlinburg Bypass Road, River Road
26+90 To 125+50 15,909 3.01 5.18
E
Caney Creek Road, Norton Creek/Cove Mountain Road, King Branch Road, Huskey Grove Road, Beech Branch, Little Smoky Road
To
5,160 0.98 1.92
Project Length Totals 13.60 26.14
For Parking Areas, Lane Miles is calculated as SQFT / 11ft (nominal) lane
TYPE OF IMPROVEMENT
SCHEDULE A & B: Work includes mill and overlay of the northbound (Schedule A) and southbound (Schedule B) lanes of Gatlinburg Spur Road, crossover roads and pull-offs; permanent signing and pavement markings, and temporary traffic control. Other work includes repair of select guardrail and minor shoulder deficiencies; and installation of asphaltic plug joints at various bridges.
SCHEDULE C & E: Asphalt overlay, pavement patching, and permanent pavement markings of side roads that intersect the Spur Road.
SCHEDULE D: Rehabilitate Newfound Gap Road from MP 0.0 to MP 1.8, the interchange with Gatlinburg Bypass Road, and the intersection at River Road.
TABLE OF CONTENTS
Page
Notice to Bidders 1 through 2
Checklist for Bid Submission 1 through 2
*SF-1442 Solicitation, Offer, and Award 1 through 5
Bid Schedule Instructions 1 through 3
*Bid Schedule B-1 through B-17
*SF-24 Bid Bond C-1 through C-2
FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION
REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES
Index to Federal and Transportation Acquisition Regulations 1 through 7
Representations and Certifications (OCRA online) D-1 through D-2
Instructions to Bidders E-1
*Socioeconomic Program Requirements F-1 through F-7
Minimum Wage Schedule F-8 through F-12
*General Contract Requirements G-1 through G-4
Construction Contract Requirements H-1 through H-5
Special Contract Requirements J-1 through J-73
Section K K-1 through K-3
Permits Obtained for this Project 1 through 86
SPECIFICATIONS On CD
Plans 1 through 198 BIP Report 5460-040P 1 through 19
BIP Report 5460-044P 1 through 21
BIP Report 5460-084P 1 through 20
BIP Report 5460-086P 1 through 21
BIP Report 5460-087P 1 through 23
BIP Report 5460-089P 1 through 21
NEPA GRSM 1A29 FONSI 1 through 41
NEPA GRSM 11(2) CE 1 through 8
TABLE OF CONTENTS
Pavements Rpt 1 through 164
SWPPP Report 1 through 104
Rpt Uniguide GRSM 1A29 1 through 37
Rpt Uniguide GRSM 11(2) 1 through 56
* Bidder’s Qualifications Form 1 through 7
* Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5
*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE
NOTICE TO BIDDERS
CONTRACT FORMAT:
Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.
FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Bidders are encouraged to review the documents thoroughly before bidding.
PROPOSAL BOOKLET AND OFFER SUBMITTAL:
It is the responsibility of the Bidder to verify that this proposal is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the offer.
Offerors should use the Checklist for Bid Submission included in this booklet to check that their bids are complete.
CONSTRUCTION CONTRACTS:
Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.
HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDS's within two weeks after bid opening.
FINANCING ASSISTANCE: Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169 or 202-366-1930. Internet address: http://osdbuweb.dot.gov
INTERNET BASED DATA BASES - REQUIRED INPUT:
According to the FAR Subpart 4.1102 contractors MUST be registered in System for Award Management (SAM) prior to contract award. Access the following web site to register:
www.sam.gov
According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application prior to contract award online at http://sam.gov/.
According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. 2015 VETS-4212 Filing Cycle Effective August 1, 2015 and ends on September 30, 2015, Customers will no longer be able to electronically file a VETS-4212 Report. Customers may still file, but must first download the form from the VETS website http://www.dol.gov/vets/vets4212.htm, fill out the form and mail or email it to: VETS-4212 Service Center C/O Department of Labor National Contact Center (DOL-NCC)15000 Conference Center Drive, Suite B0132 Chantilly, VA 20151(866) 237-0275 Or email to: vets100-customersupport@dolncc.dol.gov
PAYMENT:
Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.
NOTICE TO BIDDERS
PROGRESS PAYMENTS:
ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.
WELFARE-TO-WORK INITIATIVE:
The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.
INCREASING SEAT BELT USE IN THE UNITED STATES:
The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.
OBTAINING BID DOCUMENTS:
Bid documents will not be mailed. All bid documents are available for direct download from the Federal Business Opportunities (FBO) website: http://www.fbo.gov/. Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:
eflhd.contracts@dot.gov.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES
NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID
CHANGES.
PLEASE NOTE: for security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to schedule bid opening. All visitors must register with the receptionist in Room 100. A Government employee will collect all bids. Prior to bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.
CHECKLIST FOR BID SUBMISSION
The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.
1. Bid Envelope:
a. Addressed as shown in Block 7 of SF-1442
b. In lower left corner, indicate the following: Solicitation No., Project Name & Number, mail to room
105, if proposals are hand delivered bring them to Reception Area Room 100 and a Contract Specialist will be notified.
2. Standard Form 1442: Solicitation, Offer and Award
a. Block 14: Name and Address of Bidder.
b. Block 15: Telephone Number of Bidder.
c. Block 16: Remittance Address if different from Block 14.
d. Block 19: All Amendments Acknowledged, with dates of Amendments.
e. Block 20: Bid is signed and dated.
3. Bid Schedule - (Pages B-1 through B-17)
a. Unit bid price and bid amount provided for each pay item in numbers.
b. Corrections initialed.
4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)
a. Date executed
b. Legal name and address of bidder.
c. Type of organization.
d. State of incorporation (if applicable).
e. Name and business address of Treasury approved surety.
f. Penal sum of bond (not less than 20% of bid total).
g. Bid identification.
h. Signature of Bidder
i. Seal, if corporation
j. Signature of Surety
k. Seal, if corporation
BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.
5. Power of Attorney.
a. Dated on or before execution date of bond
b. Power has original signature of surety, or is embossed with surety's seal in the certification section
BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.
CHECKLIST FOR BID SUBMISSION
6. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).
Form completed, signed and submitted with bid
THE FOLLOWING THREE ITEMS IF NOT SUBMITTED WITH THE BID; MUST
BE COMPLETED ELECTRONICALLY PRIOR TO CONTRACT AWARD.
7. System for Award Management (SAM): The Contractor is currently registered in the Internet-Based SAM database at http://www.sam.gov. If contractor elects to not have SAM viewed by public they must submit a copy with Bidder’s Qualification Package.
8. Online Representations and Certifications Application: The Contractor's Representations and Certifications have been input online via the Internet-Based electronic database at http://sam.gov.
9. VETS – 4212 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at http://www.dol.gov/vets/vets4212.htm.
VETS 4212 Filing Cycle Effective August 1, 2015 and ends on September 30, 2015, Customers will no longer be able to electronically file a VETS 4212 Report. Customers may still file, but must first download the form from the VETS website http://www.dol.gov/vets/programs/fcp/vets-4212.pdf, fill out the form and mail or email it to: vets-4212 Service Center, In Care of: Department of Labor National Contact Center (DOL-NCC), 15000 Conference Center Drive, Suite B0132 Chantilly, VA 20151 (866) 237-0275 Or email to: VETS4212-customersupport@dol.gov.
NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL
DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A BID PACKAGE IS
SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR UPDATE YOUR DATA
PRIOR TO CONTRACT AWARD MAY CAUSE THE BID TO BE REJECTED.
http://www.sam.gov/ http://sam.gov/ http://www.dol.gov/vets/vets4212.htm http://www.dol.gov/vets/programs/fcp/main.htm mailto:VETS4212-customersupport@dol.gov
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
EFL16PP112
Federal Highway Administration
Eastern Federal Lands Highway Div.
Acquisitions Office 21400 Ridgetop Circle
EFLHD-AC
Sterling VA 20166-6511
SEE BLOCK 7
Shirley Anderson eflhd.contracts@dot.gov x
10/27/2016
DTFH7117B00007
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This Invitation for Bids is for the Great Smoky Mountains National Park Projects
NP-GRSM 11(2) and NP-GRSM 1A29, located in Sevier County, Tennessee in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.
FP - Standard Specification for Construction of Roads & Bridges on Federal Highway
Projects.
Bid Schedule, Section B - pages B-1 through B-17
Special Contract Requirements, Section J - pages J-1 through J-73
Plans, Sheets 1 through 198
Permits, pages 1 through 86
BIP Report 5460-040P, Sheets 1 through 19
BIP Report 5460-044P, Sheets 1 through 21
BIP Report 5460-084P, Sheets 1 through 20
BIP Report 5460-086P, Sheets 1 through 21
BIP Report 5460-087P, Sheets 1 through 23
BIP Report 5460-089P, Sheets 1 through 21
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ ________________ calendar days after receiving
CONTINUATION SHEET, BLOCK 11
12/01/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Federal Highway Administration Eastern Federal Lands Highway Div.
Construction Office 21400 Ridgetop Circle
EFLHD-CO
Sterling VA 20166-6511
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL
9-AMC-AMZ-EFLINVOICES@FAA.GOV
Oklahoma City, OK 73125
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
DTFH7117B00007
NEPA GRSM 1A29 FONSI, Sheets 1 through 41
NEPA GRSM 11(2) CE, Sheets 1 through 8
Pavements, Sheets 1 through 164
SWPPP Report, Sheets 1 through 104
Rpt Uniguide GRSM 1A29, Sheets 1 through 37
Rpt Uniguide GRSM 11(2), Sheets 1 through 56
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
CONTINUATION OF SF 1442
Block 2:
This project is RESTRICTED - Bids will be accepted from only eligible HUBZone Certified Business concerns.
This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)
Facsimile and electronic bids will not be accepted.
PHYSICAL DATA AVAILABLE FOR REVIEW
1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2009 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.
2. National Park Service Sign Manual, revised - January 1988, United States Department of the Interior. http://flh.fhwa.dot.gov/resources/design/library.
3. Bridge Inspection (BIP) Reports
4. Permits
5. Report_Pavement_Newfound Gap Road
6. Report_NEPA_GRSM 1A29_FONSI
7. Report_NEPA_GRSM 11(2)_CE
8. Report_SWPPP_GRSM 1A29 (draft)
9. Report_Uniguide_GRSM 1A29
10. Report_Uniguide_GRSM 11(2)
Block 9:
In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.
∗Block 11:
All work for Schedules A, B, C, and E must be completed by no later than June 15, 2017.
All work for Schedule D must be completed by no later than September 16, 2017.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
• If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 140 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
• If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 130 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
• If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 25 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
http://flh.fhwa.dot.gov/resources/design/library mailto:eflhd.contracts@dot.gov
CONTINUATION OF SF 1442
• If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 95 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
• If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 35 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.
See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. Work restrictions can be found in SCR Sections 108 and 156.
Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)
Block 12A:
Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.
Block 13:
A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.
Block 17:
Amounts should be completed as follows:
Schedule A - $ Schedule B (Option 1) - $ Schedule C (Option 2) - $ Schedule D (Option 3) - $ Schedule E (Option 4) - $
Other:
The estimated price is expected to fall within the price range of greater than 10,000,000.
Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-14 versions can be downloaded at the FHWA web site. FHWA web site is http://flh.fhwa.dot.gov/resources/specs/ then click on “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”.
http://flh.fhwa.dot.gov/resources/specs/
BID SCHEDULE INSTRUCTIONS
PROJECT: NP-GRSM 11(2) and NP-GRSM 1A29 BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to
Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-3 for Schedule A, Page B-6 for Schedule B, Page B-8 for Schedule C, Page B-14 for Schedule D, and Page B-16 for Schedule E. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total(s) as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The amount in Block 17 of the SF-1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
Schedule C - $ .
Schedule D - $ .
Schedule E - $ .
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A - (Base Contract) - Pages B-1 thru B-3 - GRSM 11(2) Schedule B - (Government Option 1) - Pages B-4 thru B-6 - GRSM 11(2) Schedule C - (Government Option 2) - Pages B-7 thru B-8 - GRSM 11(2) Schedule D - (Government Option 3) - Pages B-9 thru B-14 - GRSM 1A29 Schedule E - (Government Option 4) - Pages B-15 thru B-16 - GRSM 11(2)
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, D, and E (Government Options 1, 2, 3, and 4); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of available funds and upon receipt of all required funding. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) at that time. If funding for Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) is received after award of Schedule A (Base Contract), the Government has the right to exercise Schedules B, C, D, and E (Government Options 1, 2, 3, and 4) at the unit prices bid according to the following schedule:
Schedule B (Government Option 1): No later than the contract completion date for Schedule A (Base Contract).
Schedule C (Government Option 2): No later than the contract completion date for Schedule B (Government Option 1).
Schedule D (Government Option 3): No later than June 15, 2017.
Schedule E (Government Option 4): No later than the contract completion date for Schedule B (Government Option 1).
COMPLETION OF WORK
The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice To Proceed to contract completion for the various contract award scenarios. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.
If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be as stated in Subsection 108.01 of the Special Contract Requirements (J Pages), which specifies the following:
All work for Schedules A, B, C, and E must be completed by no later than June 15, 2017.
All work for Schedule D must be completed by no later than September 16, 2017.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 140 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 130 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 25 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 95 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 35 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be no earlier than the end of January 2017. See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total + Schedule D (Government Option 3) Bid Total + Schedule E (Government Option 4) Bid Total.
B I D S C H E D U L E Schedule A B-1
Project No: NP-GRSM 11(2)
Name: Mill and Overlay of Gatlinburg Spur Road (Northbound)
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15201-0000
Line A0040 ALL LPSM $
15401-0000
Line A0060 ALL LPSM $
15705-1400
Line A0080 9,100 LNFT $ $
20301-2400
Line A0100 158 EACH $ $
20302-1400
Line A0120 1,280 LNFT $ $
25102-2200
Line A0140 65 TON $ $
30202-2000
Line A0160 800 TON $ $
30302-1000
Line A0180 450 LNFT $ $
30302-2000
Line A0200 4,200 LNFT $ $
40201-0100
Line A0220 6,700 TON $ $
40301-0200
Line A0240 550 TON $ $
41301-0200
Line A0260 67,500 SQYD $ $
41301-0400
Line A0280 780 SQYD $ $
41501-0000
Line A0300 1,500 SQYD $ $
55235-0000
Line A0320 210 LNFT $ $
60802-0400
Line A0340 150 LNFT $ $
60811-0000
Line A0360 11 EACH $ $
60902-0800
Line A0380 2,200 LNFT $ $
EXPANSION JOINTS (ASPHALTIC PLUG)
PAVED WATERWAY, TYPE 4
DRAINAGE CHUTE
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
SOIL EROSION CONTROL, FIBER ROLL
REMOVAL OF SIGN
REMOVAL OF GUARDRAIL, TIMBER
CURB AND GUTTER, CONCRETE, 10-INCH DEPTH
ASPHALT PAVEMENT MILLING, 1-INCH DEPTH
ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
PAVING GEOTEXTILE
PLACED RIPRAP, METHOD B, CLASS 2
ROADWAY AGGREGATE, METHOD 2
DITCH RECONDITIONING
SHOULDER RECONDITIONING
ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH NOMINAL MAXIMUM
SIZE AGGREGATE, TYPE II OR IV ROUGHNESS)
ASPHALT CONCRETE PAVEMENT, TYPE 2
Base Contract
Schedule A B-2
Project No: NP-GRSM 11(2)
Name: Mill and Overlay of Gatlinburg Spur Road (Northbound)
Item No. Quantity Unit Unit Price Amount
61701-4000
Line A0400 1,130 LNFT $ $
61702-0100
Line A0420 2 EACH $ $
61702-0510
Line A0440 4 EACH $ $
61901-0000
Line A0460 100 LNFT $ $
62031-0000
Line A0480 100 SQFT $ $
62501-0000
Line A0500 1.3 ACRE $ $
63304-0900
Line A0520 1,060 SQFT $ $
63309-0000
Line A0540 400 EACH $ $
63313-1000
Line A0560 3,050 LNFT $ $
63405-2900
Line A0580 8 EACH $ $
63405-2950
Line A0600 26 EACH $ $
63405-3000
Line A0620 2 EACH $ $
63411-1500
Line A0640 47,500 LNFT $ $
63411-1600
Line A0660 23,000 LNFT $ $
63411-1650
Line A0680 2,700 LNFT $ $
63502-0200
Line A0700 1 EACH $ $
63502-1300
Line A0720 252 EACH $ $
63502-1600
Line A0740 13 EACH $ $
63502-1900
Line A0760 1 EACH $ $
63502-2000
Line A0780 4 EACH $ $
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
RECESSED PAVEMENT MARKINGS, TYPE H, DOTTED
TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE B
TEMPORARY TRAFFIC CONTROL, DRUM
RUMBLE STRIP, SHOULDER
PAVEMENT MARKINGS, TYPE H, TURN ARROW
PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
TERMINAL SECTION, TYPE SBT-FAT
FENCE (TREE PROTECTION)
REPOINT STONE MASONRY
PAVEMENT MARKINGS, TYPE H, STRAIGHT/TURN ARROW COMBINATION
RECESSED PAVEMENT MARKINGS, TYPE H, SOLID
RECESSED PAVEMENT MARKINGS, TYPE H, BROKEN
GUARDRAIL SYSTEM SBTB
TERMINAL SECTION, TYPE SBT-BAT
TURF ESTABLISHMENT
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
DELINEATOR (TUNNEL)
Schedule A B-3
Project No: NP-GRSM 11(2)
Name: Mill and Overlay of Gatlinburg Spur Road (Northbound)
Item No. Quantity Unit Unit Price Amount
63503-0300
Line A0800 48 LNFT $ $
63503-0700
Line A0820 146,400 LNFT $ $
63504-1000
Line A0840 330 SQFT $ $
63506-0500
Line A0860 1,280 HOUR $ $
63708-0000
Line A0880 3 MO $ $
TEMPORARY TRAFFIC CONTROL, FLAGGER
CELLULAR PHONE SERVICE
Schedule A Bid Total:
Submitted by:
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
26.40 33,792.00
B-4Schedule B Government Option 1
Project No: NP-GRSM 11(2)
Name: Mill and Overlay of Gatlinburg Spur Road (Southbound)
Item No. Quantity Unit Unit Price Amount
15101-0000
Line B0020 ALL LPSM $
15201-0000
Line B0040 ALL LPSM $
15401-0000
Line B0060 ALL LPSM $
15705-1400
Line B0080 1,250 LNFT $ $
15706-1000
Line B0100 1 EACH $ $
20301-2400
Line B0120 131 EACH $ $
20302-1400
Line B0140 630 LNFT $ $
25102-2200
Line B0160 20 TON $ $
30202-2000
Line B0180 90 TON $ $
30302-1000
Line B0200 550 LNFT $ $
30302-2000
Line B0220 4,400 LNFT $ $
40201-0100
Line B0240 6,400 TON $ $
40301-0200
Line B0260 80 TON $ $
41301-0200
Line B0280 66,900 SQYD $ $
41301-0400
Line B0300 2,100 SQYD $ $
41501-0000
Line B0320 140 SQYD $ $
55235-0000
Line B0340 380 LNFT $ $
60802-0400
Line B0360 20 LNFT $ $
60811-0000
Line B0380 3 EACH $ $
PAVING GEOTEXTILE
EXPANSION JOINTS (ASPHALTIC PLUG)
PAVED WATERWAY, TYPE 4
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, INLET PROTECTION
REMOVAL OF SIGN
DRAINAGE CHUTE
ASPHALT CONCRETE PAVEMENT, TYPE 2
ASPHALT PAVEMENT MILLING, 1-INCH DEPTH
ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
REMOVAL OF GUARDRAIL, TIMBER
PLACED RIPRAP, METHOD B, CLASS 2
ROADWAY AGGREGATE, METHOD 2
DITCH RECONDITIONING
SHOULDER RECONDITIONING
ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH NOMINAL MAXIMUM
SIZE AGGREGATE, TYPE II OR IV ROUGHNESS)
B-5Schedule B Government Option 1
Project No: NP-GRSM 11(2)
Name: Mill and Overlay of Gatlinburg Spur Road (Southbound)
Item No. Quantity Unit Unit Price Amount
60902-0800
Line B0400 550 LNFT $ $
61701-4000
Line B0420 700 LNFT $ $
61702-0100
Line B0440 1 EACH $ $
61702-0510
Line B0460 4 EACH $ $
61901-0000
Line B0480 100 LNFT $ $
61902-0900
Line B0500 1 EACH $ $
62501-0000
Line B0520 0.7 ACRE $ $
63301-0000
Line B0540 4 EACH $ $
63304-0900
Line B0560 980 SQFT $ $
63313-1000
Line B0580 5,950 LNFT $ $
63405-2900
Line B0600 6 EACH $ $
63405-2950
Line B0620 14 EACH $ $
63405-3000
Line B0640 2 EACH $ $
63411-1500
Line B0660 45,000 LNFT $ $
63411-1600
Line B0680 22,500 LNFT $ $
63411-1650
Line B0700 2,200 LNFT $ $
63502-0200
Line B0720 1 EACH $ $
63502-1300
Line B0740 286 EACH $ $
63502-1600
Line B0760 14 EACH $ $
63502-1900
Line B0780 1 EACH $ $
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE
RECESSED PAVEMENT MARKINGS, TYPE H, BROKEN
RECESSED PAVEMENT MARKINGS, TYPE H, DOTTED
TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE B
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
RUMBLE STRIP, SHOULDER
PAVEMENT MARKINGS, TYPE H, TURN ARROW
TERMINAL SECTION, TYPE SBT-BAT
TERMINAL SECTION, TYPE SBT-FAT
FENCE (TREE PROTECTION)
PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE H, STRAIGHT/TURN ARROW COMBINATION
RECESSED PAVEMENT MARKINGS, TYPE H, SOLID
CURB AND GUTTER, CONCRETE, 10-INCH DEPTH
GUARDRAIL SYSTEM SBTB
GATE, METAL (SINGLE)
TURF ESTABLISHMENT
SIGN SYSTEM (TURNABLE TRAFFIC SIGN POST)
B-6Schedule B Government Option 1
Project No: NP-GRSM 11(2)
Name: Mill and Overlay of Gatlinburg Spur Road (Southbound)
Item No. Quantity Unit Unit Price Amount
63502-2000
Line B0800 3 EACH $ $
63503-0300
Line B0820 48 LNFT $ $
63503-0700
Line B0840 139,400 LNFT $ $
63504-1000
Line B0860 340 SQFT $ $
63506-0500
Line B0880 1,280 HOUR $ $
63708-0000
Line B0900 3 MO $ $
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
CELLULAR PHONE SERVICE
Schedule B Bid Total:
Submitted by:
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
26.40 33,792.00
B-7Schedule C Government Option 2
Project No: NP-GRSM 11(2)
Name: Overlay of Side Roads Intersecting Gatlinburg Spur Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line C0020 ALL LPSM $
15201-0000
Line C0040 ALL LPSM $
15401-0000
Line C0060 ALL LPSM $
20301-2400
Line C0080 18 EACH $ $
20302-2600
Line C0100 1,800 LNFT $ $
40201-0100
Line C0120 1,250 TON $ $
41301-0200
Line C0140 3,500 SQYD $ $
41401-2000
Line C0160 500 LNFT $ $
41801-1000
Line C0180 100 SQYD $ $
60901-2100
Line C0200 120 LNFT $ $
61901-0000
Line C0220 50 LNFT $ $
62501-0000
Line C0240 0.5 ACRE $ $
63304-0900
Line C0260 130 SQFT $ $
63401-1500
Line C0280 1,800 LNFT $ $
63502-1300
Line C0300 100 EACH $ $
63504-1000
Line C0320 100 SQFT $ $
63506-0500
Line C0340 240 HOUR $ $
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
REMOVAL OF SIGN
REMOVAL OF PAVEMENT MARKINGS
ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH NOMINAL MAXIMUM
SIZE AGGREGATE, TYPE II ROUGHNESS)
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
PAVEMENT MARKINGS, TYPE H, SOLID
TEMPORARY TRAFFIC CONTROL, DRUM
ASPHALT PAVEMENT MILLING, 1-INCH DEPTH
CRACKS, CLEANING AND SEALING
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
CURB, ASPHALT, 4-INCH DEPTH
FENCE (TREE PROTECTION)
26.40 6,336.00
B-8Schedule C Government Option 2
Project No: NP-GRSM 11(2)
Name: Overlay of Side Roads Intersecting Gatlinburg Spur Road
Item No. Quantity Unit Unit Price Amount
63708-0000
Line C0360 1 MO $ $
CELLULAR PHONE SERVICE
Schedule C Bid Total:
Submitted by:
B-9Schedule D Government Option 3
Project No: NP-GRSM 1A29
Name: Rehabilitate Newfound Gap Road from approximate TN Milepost 0.0 to TN Milepost 1.8
Item No. Quantity Unit Unit Price Amount
15101-0000
Line D0020 ALL LPSM $
15201-0000
Line D0040 ALL LPSM $
15401-0000
Line D0060 ALL LPSM $
15701-0000
Line D0080 ALL LPSM $
15702-1000
Line D0100 ALL LPSM $
15705-0100
Line D0120 2,500 LNFT $ $
15706-0200
Line D0140 6 EACH $ $
15706-1300
Line D0160 1 EACH $ $
20301-1100
Line D0180 2 EACH $ $
20301-1200
Line D0200 2 EACH $ $
20301-1400
Line D0220 1 EACH $ $
20301-2400
Line D0240 80 EACH $ $
20301-3400
Line D0260 32 EACH $ $
20302-0400
Line D0280 70 LNFT $ $
20302-0600
Line D0300 50 LNFT $ $
20302-1400
Line D0320 1,250 LNFT $ $
20302-2100
Line D0340 175 LNFT $ $
20302-2300
Line D0360 225 LNFT $ $
20303-1600
Line D0380 3,850 SQYD $ $
20303-3000
Line D0400 350 SQYD $ $
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
SOIL EROSION CONTROL (SWPPP)
SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL (IN-STREAM)
SOIL EROSION CONTROL, SILT FENCE (WIRE BACKED)
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF SIDEWALK, ASPHALT
REMOVAL OF WHEELSTOP
REMOVAL OF CURB, ASPHALT
REMOVAL OF CURB, STONE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION TYPE C
REMOVAL OF GATE
REMOVAL OF HEADWALL
REMOVAL OF INLET
REMOVAL OF SIGN
REMOVAL OF GUARDRAIL, TIMBER
REMOVAL OF PIPE CULVERT
REMOVAL OF WATERLINE
B-10Schedule D Government Option 3
Project No: NP-GRSM 1A29
Name: Rehabilitate Newfound Gap Road from approximate TN Milepost 0.0 to TN Milepost 1.8
Item No. Quantity Unit Unit Price Amount
20304-9000
Line D0420 ALL LPSM $
20315-0000
Line D0440 5,400 LNFT $ $
20401-0000
Line D0460 450 CUYD $ $
20410-0000
Line D0480 800 CUYD $ $
20425-1000
Line D0500 700 LNFT $ $
25111-2100
Line D0520 30 TON $ $
27001-0000
Line D0540 5 CUYD $ $
30101-1000
Line D0560 75 TON $ $
30302-1000
Line D0580 9,800 LNFT $ $
30302-2000
Line D0600 18,700 LNFT $ $
30303-2000
Line D0620 4,600 SQYD $ $
31301-0000
Line D0640 430 TON $ $
40201-0100
Line D0660 8,900 TON $ $
40201-0100
Line D0680 2,200 TON $ $
41301-0000
Line D0700 450 SQYD $ $
41301-0400
Line D0720 800 SQYD $ $
41301-0600
Line D0740 35,400 SQYD $ $
41301-0800
Line D0760 800 SQYD $ $
41501-0000
Line D0780 150 SQYD $ $
41801-1000
Line D0800 100 SQYD $ $
AGGREGATE SURFACE RECONDITIONING
AGGREGATE-TOPSOIL COURSE
ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, TYPE I OR IV ROUGHNESS)
REMOVAL OF STREAM DEBRIS
DITCH, EXCAVATION
GROUTED RIPRAP, METHOD B, CLASS 1
GROUT
AGGREGATE BASE GRADING C
DITCH RECONDITIONING
SHOULDER RECONDITIONING
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SELECT BORROW
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
ASPHALT PAVEMENT MILLING, 3-INCH DEPTH (MICRO MILLING)
PAVING GEOTEXTILE
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1-INCH NOMINAL MAXIMUM SIZE
AGGREGATE)
ASPHALT PAVEMENT MILLING (0 TO 2-INCH DEPTH)
ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
B-11Schedule D Government Option 3
Project No: NP-GRSM 1A29
Name: Rehabilitate Newfound Gap Road from approximate TN Milepost 0.0 to TN Milepost 1.8
Item No. Quantity Unit Unit Price Amount
55220-0000
Line D0820 100 SQYD $ $
55220-0000
Line D0840 188 SQYD $ $
55235-0000
Line D0860 75 LNFT $ $
56901-0000
Line D0880 750 SQYD $ $
60201-0500
Line D0900 64 LNFT $ $
60201-0800
Line D0920 48 LNFT $ $
60210-0600
Line D0940 1 EACH $ $
60403-0900
Line D0960 1 EACH $ $
60412-1000
Line D0980 1 EACH $ $
60503-0000
Line D1000 14,500 LNFT $ $
60704-0000
Line D1020 16 EACH $ $
60706-0000
Line D1040 30 EACH $ $
60707-0600
Line D1060 140 LNFT $ $
60802-0500
Line D1080 525 LNFT $ $
60811-0000
Line D1100 1 EACH $ $
60901-4000
Line D1120 900 LNFT $ $
60901-4000
Line D1140 600 LNFT $ $
60910-0000
Line D1160 5,980 LNFT $ $
61102-1545
Line D1180 225 LNFT $ $
61501-0100
Line D1200 450 SQYD $ $
REPAIR CONCRETE (BRIDGE DECK REPAIRS GREATER THAN 1-INCH DEPTH)
REPAIR CONCRETE (BRIDGE DECK REPAIRS LESS THAN 1-INCH DEPTH USING POLYESTER
POLYMER CONCRETE)
REMOVE AND RESET METAL FRAME AND GRATE
GEOCOMPOSITE PAVEMENT EDGE DRAIN SYSTEM
CLEANING CULVERT IN PLACE
CLEANING DRAINAGE STRUCTURE (WEEP HOLES)
LINING 30-INCH PIPE CULVERT
PAVED WATERWAY, TYPE 5
EXPANSION JOINTS
CONCRETE OVERLAY (POLYESTER POLYMER CONCRETE, 1-INCH DEPTH)
15-INCH PIPE CULVERT
24-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
INLET, FLH TYPE 4B
DRAINAGE CHUTE (18"X6" FLUME)
CURB, STONE, TYPE 1, 16-INCH DEPTH
CURB, STONE, TYPE 1, 16-INCH DEPTH (GOVERNMENT PROVIDED)
RESET CURB
2-INCH WATERLINE
SIDEWALK, CONCRETE
B-12Schedule D Government Option 3
Project No: NP-GRSM 1A29
Name: Rehabilitate Newfound Gap Road from approximate TN Milepost 0.0 to TN Milepost 1.8
Item No. Quantity Unit Unit Price Amount
61501-1100
Line D1220 15 SQYD $ $
61701-4000
Line D1240 1,000 LNFT $ $
61702-0510
Line D1260 6 EACH $ $
61703-0000
Line D1280 1 EACH $ $
61708-1000
Line D1300 60 LNFT $ $
61901-0000
Line D1320 500 LNFT $ $
61902-0900
Line D1340 2 EACH $ $
61904-0000
Line D1360 1 EACH $ $
61921-1000
Line D1380 150 LNFT $ $
62001-0000
Line D1400 1 CUYD $ $
62002-0000
Line D1420 30 SQYD $ $
62011-0500
Line D1440 1 EACH $ $
62013-1000
Line D1460 65 SQYD $ $
62025-1000
Line D1480 1.5 CUYD $ $
62028-1000
Line D1500 1 EACH $ $
62030-0000
Line D1520 3,525 LNFT $ $
62101-0000
Line D1540 1 EACH $ $
62401-0300
Line D1560 350 SQYD $ $
62501-0000
Line D1580 0.2 ACRE $ $
62901-0500
Line D1600 525 SQYD $ $
SIDEWALK, ASPHALT
GUARDRAIL SYSTEM SBTB
TERMINAL SECTION, TYPE SBT-FAT
TERMINAL END (TRANSITION)
REMOVE AND RESET, GUARDRAIL
FENCE (TREE PROTECTION)
STONE MASONRY APRON
REMOVE AND RESET STONE MASONRY
REMOVE AND RESET STONE MASONRY HEADWALL
REPOINT STONE MASONRY
MONUMENT (MILE MARKER)
FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
GATE, METAL (DOUBLE)
BOLLARD POST (CAMERA POST)
REMOVE AND RESET FENCE
STONE MASONRY (CAPSTONE)
STONE MASONRY (DRAINAGE CURB BREAK)
STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
ROLLED EROSION CONTROL PRODUCT, TYPE 2.A
B-13
Schedule D Government Option 3
Project No: NP-GRSM 1A29
Name: Rehabilitate Newfound Gap Road from approximate TN Milepost 0.0 to TN Milepost 1.8
Item No. Quantity Unit Unit Price Amount
63301-0000
Line D1620 1 EACH $ $
63301-0000
Line D1640 1 EACH $ $
63302-0000
Line D1660 510 SQFT $ $
63304-0900
Line D1680 360 SQFT $ $
63309-0900
Line D1700 5 EACH $ $
63405-4500
Line D1720 7 EACH $ $
63405-4550
Line D1740 3 EACH $ $
63405-4600
Line D1760 1 EACH $ $
63405-4850
Line D1780 1 EACH $ $
63411-1500
Line D1800 50,700 LNFT $ $
63411-1600
Line D1820 900 LNFT $ $
63502-0900
Line D1840 100 EACH $ $
63502-1300
Line D1860 300 EACH $ $
63502-1600
Line D1880 18 EACH $ $
63502-2000
Line D1900 4 EACH $ $
63503-0300
Line D1920 330 LNFT $ $
63503-0700
Line D1940 130,000 LNFT $ $
63503-0800
Line D1960 2,000 LNFT $ $
63504-1000
Line D1980 770 SQFT $ $
63506-0500
Line D2000 2,000 HOUR $ $
DELINEATOR, TYPE FLEXIBLE
PAVEMENT MARKINGS, TYPE L, TURN ARROW
PAVEMENT MARKINGS, TYPE L, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE L, STRAIGHT/TURN ARROW COMBINATION
PAVEMENT MARKINGS, TYPE L, ACCESSIBILITY SYMBOL
RECESSED PAVEMENT MARKINGS, TYPE H, SOLID
SIGN SYSTEM (TURNABLE TRAFFIC SIGN POST)
SIGN SYSTEM (REFURBISH INTERCHANGEABLE SIGN SYSTEM)
SIGN SYSTEM (UNIGUIDE)
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
RECESSED PAVEMENT MARKINGS, TYPE H, BROKEN
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 28-INCH
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
26.40 52,800.00
B-14Schedule D Government Option 3
Project No: NP-GRSM 1A29
Name: Rehabilitate Newfound Gap Road from approximate TN Milepost 0.0 to TN Milepost 1.8
Item No. Quantity Unit Unit Price Amount
63507-0600
Line D2020 50 DAY $ $
63601-6000
Line D2040 ALL LPSM $
63602-6020
Line D2060 4 EACH $ $
63621-1000
Line D2080 2 EACH $ $
63708-0000
Line D2100 4 MO $ $
64501-0000
Line D2120 ALL LPSM $
64705-1000
Line D2140 35 TON $ $
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
UTILITY BOX, PULLBOX
CELLULAR PHONE SERVICE
LOCATE UTILITIES
MITIGATION, AGRICULTURAL LIMESTONE
Schedule D Bid Total:
Submitted by:
Schedule E B-15
Project No: NP-GRSM 11(2)
Name: Overlay of Side Roads Intersecting Gatlinburg Spur Road
Item No. Quantity Unit Unit Price Amount
15101-0000
Line E0020 ALL LPSM $
15201-0000
Line E0040 ALL LPSM $
15401-0000
Line E0060 ALL LPSM $
15705-1400
Line E0080 900 LNFT $ $
20301-2400
Line E0100 27 EACH $ $
20302-2600
Line E0120 12,900 LNFT $ $
30202-2000
Line E0140 200 TON $ $
40201-0100
Line E0160 1,050 TON $ $
40301-0200
Line E0180 80 TON $ $
41501-0000
Line E0200 110 SQYD $ $
41801-1000
Line E0220 100 SQYD $ $
61901-0000
Line E0240 50 LNFT $ $
62501-0000
Line E0260 0.5 ACRE $ $
63304-0900
Line E0280 200 SQFT $ $
63401-1500
Line E0300 12,900 LNFT $ $
63405-2900
Line E0320 1 EACH $ $
PAVEMENT MARKINGS, TYPE H, TURN ARROW
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
SOIL EROSION CONTROL, FIBER ROLL
REMOVAL OF SIGN
REMOVAL OF PAVEMENT MARKINGS
TURF ESTABLISHMENT
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
PAVEMENT MARKINGS, TYPE H, SOLID
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH NOMINAL MAXIMUM
SIZE AGGREGATE, TYPE II OR IV ROUGHNESS)
ASPHALT CONCRETE PAVEMENT, TYPE 2
PAVING GEOTEXTILE
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
FENCE (TREE PROTECTION)
Government Option 4
Schedule E B-16
Project No: NP-GRSM 11(2)
Name: Overlay of Side Roads Intersecting Gatlinburg Spur Road
Item No. Quantity Unit Unit Price Amount
63502-1300
Line E0340 100 EACH $ $
63504-1000
Line E0360 100 SQFT $ $
63506-0500
Line E0380 320 HOUR $ $
63708-0000
Line E0400 1 MO $ $
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Schedule E Bid Total:
Submitted by:
TEMPORARY TRAFFIC CONTROL, FLAGGER
CELLULAR PHONE SERVICE
26.40 8,448.00
Government Option 4
Bonnie.Dubose Typewritten Text
B -17
BID SUMMARY
Project NP-GRSM 11(2) and NP-GRSM 1A29
(1) Schedule A (Base Contract) Bid Total…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .