Report_5_Soils_and_Foundation.pdf
PDF 3 MB Posted
- Attached to
- Natchez Trace Parkway 1E10 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00005
About this file
Report 5_Soils and Foundation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006_-_PRA-NATR_1E10.pdf | ||
| Amendment_0005-_PRA-NATR_1E10.pdf | ||
| Amendment_0004_-_PRA-NATR_1E10.pdf | ||
| Amendment_0003_-_PRA-NATR_1E10.pdf | ||
| Amendment_0002-_PRA-NATR_1E10.pdf | ||
| Amendment_0001_-_PRA-NATR_1E10.pdf | ||
| Report_4_Bridge_Inspection_Big_Swan.pdf | ||
| Report_2_NEPA_Big_Swan.pdf | ||
| FP03_Eng_.pdf | ||
| Plans_PRA-NATR_1E10.pdf | ||
| IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf | ||
| Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| Report_1_NEPA_Little_Swan.pdf | ||
| Report_3_Bridge_Inspection_Little_Swan.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| FP03_Errata.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-100A-Form.pdf | ||
| Synopsis_PRA-NATR_1E10.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOILS AND FOUNDATIONS REPORT
NO. 15-13
PROJECT TN PRA-NATR 1E10
LITTLE SWAN CREEK BRIDGE REPLACEMENT (MP 386.89)
(Structure Number 5570-004P)
NATCHEZ TRACE PARKWAY
LEWIS COUNTY, TENNESSEE
U.S. Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Division
21400 Ridgetop Circle Sterling, VA 20166
March 2014
Page 1 of 2 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MEMORANDUM: NATR 1E10 cc: TS Reading, Bridge, w/ attachments
M:\PROJECTS\natr\1e10\Techserv\Geotech\Reports\Addendum\NATR 1E10 Report Addendum - Final.docx
SUBJECT: PRA-NATR 1E10 – Revised Foundation Recommendations for the South Abutment of Little Swan Creek Bridge
TO MESSAGE/COMMENT FROM/DATE
R. Satasiya Project Manager
Through:
A. Teikari Supervisor Highway Engineer
This memorandum is an addendum to the recommendations listed in our Geotechnical Report No. 15-13, dated March 2014. Revisions to the previously transmitted foundation recommendations were made in conjunction with EFLHD’s Bridge Division’s determination that the south abutment (Abutment
1) will be supported on a deep foundation system, consisting precast/prestressed concrete (PPC) piles, instead of spread footings.
DESIGN ANALYSIS AND CONCLUSIONS
Estimated bedrock elevations at the south abutment are based on the results of our subsurface exploration. Proposed pier elevations and pile lengths have been provided by the EFLHD Bridge Division, and are listed in Table 1.
Table 1 – Anticipated Elevations of Bedrock and Piles
Feet
Estimated Bedrock Elevation (from Boring B-1) EL 709.7
Bottom of Pier Cap Elevation EL 723.8
Embedment Depth of Pile into Pile Cap 1.0
Exposed Pile Length 14.1
Total Pile length 15.1
Anticipated loads are listed in Table 2.
Table 2 – Anticipated Unfactored Loads for South Abutment
South Abutment
Axial Compressive Load (kips) 2000
Lateral Load (kips) 400
Moment (kip-ft) 2800
Axial and lateral capacities of the piles were analyzed using AllPile version 7.12s software.
Bearing Resistance and Settlement Foundation bearing resistance was evaluated in accordance with Section 10 of AASHTO (2012) LRFD Bridge Design Specifications. A bearing resistance factor for driven piles (φstat) of 0.65 was utilized, as listed in AASHTO Table
C. Lynch Geotechnical
M.
Abouzakhm Division Geotechnical
S. Whittemore Supervisor Technical Services
08/12/2014
Page 2 of 2 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MEMORANDUM: NATR 1E10
10.5.5.2.3-1, which requires dynamic testing of at least two piles during construction.
Lateral Resistance Analysis and Deflection Foundation lateral resistance was also evaluated. A lateral resistance factor for driven piles (φ) of 1.0 was utilized, as listed in AASHTO Table 10.5.5.2.3-1.
RECOMMENDATIONS
A system of 14 inch by 14 inch precast concrete piles bearing on bedrock is recommended to support Abutment 1 and wingwalls. Our analysis indicated that piles supported on the bedrock can withstand factored axial compressive load of 120 kips. Our lateral analysis results indicate that the lateral resistance provided by the subsurface soils is adequate to limit pile head deflections to less than 1 inch. Computer outputs are included in Attachment 2.
Since PPC piles will be installed in more than 5 feet of compacted embankment (fill), pre-boring may be required as listed in Subsection 551.07 of FP-03. We recommend that the tips of concrete piles be protected by steel pile shoes to prevent damage during installation and dynamic load testing. A minimum of two (2) dynamic load tests shall be performed following pre-boring, pile placement, and backfilling. Re-strike may not be required if the design capacity is achieved at the end of the initial driving.
The Contractor shall submit shop drawings for the PPC piles in accordance with FP-03 Specifications, to include tip protection geometry, material properties, and method of attachment to the piles.
Attachments:
1. Foundation Layout
2. Pile Resistance Analysis Output
Attachment 1
Foundation Layout
Attachment 2
Pile Resistance Analysis Output
Depth from Ground-ft
Depth from Ground-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
(Pile diameter not to scale) Surface Angle=0Batter Angle=0
Depth -lb/f3 C-kp/f2 k-lb/i3 e50 % Nspt
0.0 115.7 33.3 0.00 151.0 11
Sand/Gravel-py
14.1 147.2 10.0 22.00 758.4 0.06 18 Porous limestones
Depth Width-in A'-in2 Per.-in I'-in4 E -kp/i2 W -kp/f
0.0 14 153.9 44.0 1885.7 3000 0.160
Concrete (smooth)
14.1
Displacement pile: Higher friction.
FOUNDATION PROFILE & SOIL CONDITIONS
FOUNDATION PROPERTIES SOIL PROPERTIES
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 1
NATR 1E10 - Little Swan Creek Bridge 14-in PPC Pile Group
Loads:
Load Factor for Vertical Loads= 1.0 Load Factor for Lateral Loads= 1.0 Loads Supported by Pile Cap= 0 % Shear Condition: Static
Vertical Load, Q= 2000.0 -kp Shear Load, P= 400.0 -kp Slope Restain St= 0.00 -in/-in
Profile:
Pile Length, L= 14.1 -ft Top Height, H= 0 -ft Slope Angle, As= 0 Batter Angle, Ab= 0 Group and Boundary Condition:
Fixed Head Sx= 58 -in Sy= 60 -in Nx= 9 Ny= 2
Soil Data:
Depth Gamma Phi C K e50 or Dr Nspt -ft -lb/f3 -kp/f2 -lb/i3 % 0 115.7 33.3 0.00 151.0 36.52 11
14.1 147.2 10.0 22.00 758.4 0.06 18
Pile Data:
Depth Width Area Per. I E Weight -ft -in -in2 -in -in4 -kp/i2 -kp/f
0.0 14 153.9 44.0 1885.7 3000 0.160 14.1
Group Vertical capacity:
Total Ultimate Capacity (Down)= 4347.306-kp Total Ultimate Capacity (Up)= 302.262-kp Total Allowable Capacity (Down)= 2244.517-kp Total Allowable Capacity (Up)= 171.435-kp OK! Qallow > Q
Group Settlement Calculation:
At Xallow= 1.00-in Qallow= 99999.00-kp At Q= 2000.00-kp Settlement= 0.10299-in
Note: If the program cannot find a result or the result exceeds the upper limit. The result will be displayed as 99999.
VERTICAL ANALYSIS Figure 1
Driving Concrete Pile
CivilTech Software
0.00 0.03 0.05 0.08 0.10 0.13 0.15 0.18 0.20 0.23 0.25 0.28 0.30 0.33 0.35 0.38 0.40 0.43 0.45 0.48 0.50
Total Side Tip
Total Settlement, X -in
C o m p re ss io n
L o ad
Q d w kp Vertical Load vs. Total Settlement
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 1
0 0
2000 2000
4000 4000
6000 6000
8000 8000
10000 10000
12000 12000
14000 14000
16000 16000
18000 18000
20000 20000
0 02 24 46 68 810 1012 1214 1416 1618 1820 20
Foundation Depth, L -ft Foundation Depth, L -ft
C o m p re ss io n
C ap ac it y, Q d w kp
U p lif t
C ap ac it y, Q u p kp
ULTIMATE CAPACITY vs FOUNDATION DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 1
0 0
70 70
140 140
210 210
280 280
350 350
420 420
490 490
560 560
630 630
700 700
0.0 00.2 400.4 800.6 1200.8 1601.0 2001.2 2401.4 2801.6 3201.8 3602.0 400
Top Deflection, yt -in Max. Moment in Single Pile, Mmax -kp-f
L at er al
L o ad
P kp
L at er al
L o ad
P kp
X-Direction, Group Piles
LATERAL LOAD vs DEFLECTION & MAX. MOMENT
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Depth (Zp)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
Tip yt=-1.52E-1 Top yt=8.05E-1 Max. yt=8.05E-1 Top St=0E+0
0-1.00 +1.00 yt=0 at 11.8-ft St=0 at 0.1-ft
Top Moment=-100.8 Max. Moment=100.8
0-200 +200
Top Shear=18.9 Max. Shear=19.2
0-20 +20
Max. Pressure=0.91
0-1 +1
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp Pressure -kp/f2
X-Back, Single Pile, Kbc =2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
0-1.00 +1.00
Lateral Slope Vertical yt Slope Max.
No. Load Restraint Load at Top at Top Moment (kip) (in/in) (kip) (in) (in/in) (kip-ft)
1 1.9 0.0 111.0 0.0 0.00 -5.7 2 5.7 0.0 111.0 0.1 0.00 -22.8 3 9.5 0.0 111.0 0.3 0.00 -42.9 4 13.2 0.0 111.0 0.5 0.00 -64.6 5 15.1 0.0 111.0 0.6 0.00 -75.7 6 17.0 0.0 111.0 0.7 0.00 -87.5 7 18.9 0.0 111.0 0.8 0.00 -100.8
DEFLECTION, yt -in
X-Back, Single Pile, Kbc =2 PILE DEFLECTION vs LOADING
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
Tip yt=-4.98E-2 Top yt=9.4E-1 Max. yt=9.4E-1 Top St=3.25E-17
0-1.00 +1.00 yt=0 at 11.3-ft
Top Moment=-197.5 Max. Moment=197.5
0-200 +200
Top Shear=48.7 Max. Shear=48.8
0-50 +50
Max. Pressure=2.36
0-5 +5
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp Pressure -kp/f2
X-Front, Single Pile, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
0-1.00 +1.00
Lateral Slope Vertical yt Slope Max.
No. Load Restraint Load at Top at Top Moment (kip) (in/in) (kip) (in) (in/in) (kip-ft)
1 4.9 0.0 111.0 0.0 0.00 -12.4 2 14.6 0.0 111.0 0.2 0.00 -46.8 3 24.3 0.0 111.0 0.3 0.00 -86.7 4 34.1 0.0 111.0 0.5 0.00 -127.5 5 39.0 0.0 111.0 0.7 0.00 -149.2 6 43.8 0.0 111.0 0.8 0.00 -172.5 7 48.7 0.0 111.0 0.9 0.00 -197.5
DEFLECTION, yt -in
X-Front, Single Pile, Kbc=2 PILE DEFLECTION vs LOADING
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
Tip yt=-7.72E-2 Top yt=4.6E-1 Max. yt=4.6E-1 Top St=-1.62E-17
0-0.50 +0.50 yt=0 at 11.7-ft St=0 at 0.1-ft
Top Moment=-65.7 Max. Moment=65.7
0-100 +100
Top Shear=13.7 Max. Shear=13.7
0-20 +20
Max. Pressure=0.65
0-1 +1
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp Pressure -kp/f2
Y-Back, Single Pile, Kbc =2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
0-0.50 +0.50
Lateral Slope Vertical yt Slope Max.
No. Load Restraint Load at Top at Top Moment (kip) (in/in) (kip) (in) (in/in) (kip-ft)
1 1.4 0.0 111.0 0.0 0.00 -3.7 2 4.1 0.0 111.0 0.1 0.00 -14.9 3 6.8 0.0 111.0 0.2 0.00 -28.1 4 9.6 0.0 111.0 0.3 0.00 -42.6 5 11.0 0.0 111.0 0.3 0.00 -50.2 6 12.3 0.0 111.0 0.4 0.00 -57.8 7 13.7 0.0 111.0 0.5 0.00 -65.7
DEFLECTION, yt -in
Y-Back, Single Pile, Kbc =2 PILE DEFLECTION vs LOADING
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
Tip yt=-1.84E-2 Top yt=4.75E-1 Max. yt=4.75E-1 Top St=-3.25E-17
0-0.50 +0.50 yt=0 at 10.8-ft
Top Moment=-113.3 Max. Moment=113.3
0-200 +200
Top Shear=30.7 Max. Shear=30.9
0-50 +50
Max. Pressure=1.18
0-2 +2
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp Pressure -kp/f2
Y-Front,Single Pile, Kbc =2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
5 5
10 10
15 15
20 20
25 25
30 30
0-0.50 +0.50
Lateral Slope Vertical yt Slope Max.
No. Load Restraint Load at Top at Top Moment (kip) (in/in) (kip) (in) (in/in) (kip-ft)
1 3.1 0.0 111.0 0.0 0.00 -7.8 2 9.2 0.0 111.0 0.1 0.00 -26.6 3 15.4 0.0 111.0 0.2 0.00 -49.8 4 21.5 0.0 111.0 0.3 0.00 -74.8 5 24.6 0.0 111.0 0.3 0.00 -87.5 6 27.7 0.0 111.0 0.4 0.00 -100.8 7 30.7 0.0 111.0 0.5 0.00 -113.3
DEFLECTION, yt -in
Y-Front,Single Pile, Kbc =2 PILE DEFLECTION vs LOADING
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software Figure 2
TABLE OF CONTENTS
1 INTRODUCTION
1.1 General
1.2 Project Description
2 GEOLOGIC SETTING
2.1 Regional Geology
2.2 Soil Survey
3 PROCEDURES AND RESULTS
3.1 General
3.2 Sampling
3.3 Field Tests and Measurements
3.4 Data Summary
3.5 Laboratory Testing
3.6 Findings
4 DESIGN ANALYSIS AND CONCLUSIONS
4.1 Bearing Resistance and Settlement
4.2 Sliding Resistance
5 RECOMMENDATIONS
5.1 Bridge Foundations
5.2 Abutment Walls
6 CONSTRUCTION CONSIDERATIONS
7 DISCLAIMER/LIMITATIONS CLAUSE
8 REFERENCES
APPENDICES
APPENDIX A – Figures APPENDIX B – Boring Location Plan and Subsurface Profile APPENDIX C – Boring Logs APPENDIX D – Laboratory Testing Results APPENDIX E – Design Analysis APPENDIX F – Representative Photographs
Note: Design changes made subsequent to distribution of this report and prior to project advertisement will be documented in a memo inserted after the title page.
SOILS AND FOUNDATIONS REPORT
NO. 15-13
PROJECT TN PRA-NATR 1E10
LITTLE SWAN CREEK BRIDGE REPLACEMENT (MP 386.89)
(Structure Number 5570-004P)
NATCHEZ TRACE PARKWAY
LEWIS COUNTY, TENNESSEE
1 INTRODUCTION
1.1 General
This report summarizes the results of our subsurface exploration, laboratory testing, and design analyses and presents our evaluations and recommendations for Little Swan Creek Bridge replacement. The site is located along the Natchez Trace Parkway in Lewis County, Tennessee. A project location map is provided as Figure 1 of Appendix A.
1.2 Project Description
The existing 3-span Little Swan Creek Bridge (Structure Number 5570-004P) was built in 1962 and is supported on spread footings bearing on bedrock. The abutments and wing walls are also supported on spread footings. The bridge inspection report of August 1, 2013 indicated that the bridge was in poor condition and listed widespread cracking and delamination of the pier caps.
The new bridge will consist of two 120-foot long spans with two 11-foot wide lanes and 6-foot wide shoulders.
2 GEOLOGIC SETTING
2.1 Regional Geology
USGS Open File Report No. 2005-13241 indicated that the Little Swan Creek Bridge is predominantly underlain by the Fort Payne Formation, which is described as Mississippian in age, “bedded chert, calcareous and dolomitic, somewhat crinoidal, and minor shale; thin green shale (Maury) at base; average thickness about 200 feet.” The bridge is also bounded by the St. Louis and Warsaw Limestones, which are described also as Mississippian in age, “nodules and blocks of chert in sandy clay (originally grayish-brown, medium-bedded limestone),” with thicknesses from 50 ft to 60 ft. A Site Geologic Map is included as Figure 2 of Appendix A.
2.2 Soil Survey
According to the United States Department of Agriculture Web Soil Survey2 for Lewis County, Tennessee (2013), the Little Swan Creek Bridge is predominantly underlain by the Tarkin-Humphreys Complex (TmC2) and the Riverby gravelly sandy loam (Rb), and is surrounded by the Biffle-Sulphura-Rock outcrop association (BOF). These three map units can be described collectively as loamy alluvium and/or colluvium and residuum, Project: TN PRA-NATR 1E10 Soils and Foundations Report Little Swan Creek Bridge (MP 386.89) No. 15-13 Natchez Trace Parkway, Lewis County, Tennessee
2 U.S. DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VA
derived from interbedded limestone or sedimentary rock, with profiles including gravelly silt loam and sandy loam. A Soil Survey Map is included as Figure 3 of Appendix A.
3 PROCEDURES AND RESULTS
3.1 General
The Eastern Federal Lands Highway Division’s (EFLHD) Subsurface Exploration Team performed the drilling operations for this site between June 10th and 12th, 2013. Three
(3) borings were drilled along the proposed alignment – one boring at each proposed abutment and one boring at the proposed pier location. The borings, designated B-1, B-2, and B-3, were extended to depths of 47.4 ft, 17.5 ft, and 27.5 ft below existing site grades, respectively. The borings were drilled using a CME 850, rotary, track-mounted drill rig. Appendix B contains the Boring Location Plan and Subsurface Profile. Borings were laid out in the field by EFLHD field personnel by referencing ground surface topography, measuring distances from existing surface features, and estimating right angles. Due to the methods used to locate the borings in the field, borings location shown in Appendix B should be considered approximate. Ground surface elevations at the boring locations were determined from the topography plans provided by the Survey Division.
3.2 Sampling
Borings were advanced using 3-¾ inch (ID) hollow-stem augers. Standard Penetration Tests (SPT) were performed using a 2.0-inch (OD) split-spoon sampler in accordance with AASHTO T206. SPT samples were recovered by driving the split-spoon sampler a distance of 24 inches, or until refusal, into the soil under the action of a 140-pound automatic hammer free-falling 30 inches. The number of hammer blows required to advance the split-spoon sampler the middle foot of the 24-inch sample is designated as the “Standard Penetration Resistance” or N-Value. The number of blows required to advance the sampler through each 6-in. interval was recorded on field boring logs.
Representative portions of split-spoon samples were preserved in glass jars and transported to EFLHD’s Materials Testing Laboratory in Sevierville, Tennessee for testing and storage. Split-spoon refusal is defined by 50 blows per 1 inch of penetration of the split-spoon sampler. The sampling sequence and associated jar samples for each boring may be referenced on the boring logs in Appendix C.
Rock coring also was performed at each boring location upon reaching auger refusal.
Coring was performed using the double-tube wireline method with an NQ-size core barrel.
3 U.S. DEPARTMENT OF TRANSPORTATION
3.3 Field Tests and Measurements
A field description by color and texture was made for each recovered soil sample and rock core. Field descriptions of the recovered rock cores are included in the boring logs.
3.4 Data Summary
The results of field tests and measurements were recorded on the driller’s logs and appropriate data sheets in the field. These data sheets and logs contain information concerning the boring methods, samples attempted and recovered, indications of the presence of various material such as gravel, pebbles, organic matter, etc. and observations of groundwater. They also contain interpretations by the exploration foreman of the subsurface conditions based on the performance of the equipment and cuttings brought to the surface by the drilling tools; therefore, the field data represents both factual and interpretative information.
The boring logs represent an interpretation of field data and description of the soil samples by a geotechnical engineer. These records occasionally do not include all data recorded on driller’s logs and field data sheets, but do include all information considered relevant to the design and preparation of this memorandum.
No groundwater level readings were made at the time of drilling as drilling fluid was introduced during the rock coring; however, groundwater may be present within the depths drilled. Fluctuations in groundwater level due to seasonal variations, rainfall, temperature, and other factors not evident at the time measurements were made should be expected.
3.5 Laboratory Testing
At the conclusion of the fieldwork laboratory testing was conducted on representative rock samples. The primary purpose of the testing was to evaluate the unconfined compressive strengths of the rock cores recovered. All tests were conducted in accordance with ASTM 2938. Laboratory test results are summarized in Table 1 and are included in Appendix D.
Table 1 – Laboratory Test Results
Boring No.
Core Depth (ft)
Unconfined Compressive
Strength (psi)
B-1 37.4 – 42.4 11,680
B-2 4.0 – 7.55 18,480
B-3 17.5 – 22.5 22,040
4 U.S. DEPARTMENT OF TRANSPORTATION
3.6 Findings
A brief description of the soil and rock conditions encountered during our drilling operation is presented below. The stratification lines designating the interfaces between soil types on the boring logs in Appendix C represent approximate boundaries. The transition between materials may be gradual. It should be noted that one or more of the units may be absent at specific locations.
Pavement – Pavement thicknesses encountered in the soil borings ranged between 6 inches and 9.5 inches in borings B-1 and B-3, respectively.
Fill – Fill, probably associated with the existing embankments, was encountered underneath the pavement and extended to approximate depths of 37.4 ft and 16.2 ft below existing site grades in Borings B-1 and B-3, respectively. The fill consisted primarily of soft to stiff chert, clay, and shale, with various amounts of sand, gravel, cobbles and boulders. SPT N-values in this layer range from 4 to 11 bpf.
It should be noted that Boring B-2 yielded 4 ft of natural deposits before auger refusal was encountered.
Bedrock – Underneath the fill materials (Borings B-1 and B-3) and natural deposits (Boring B-2), limestone was encountered in all of the borings. Table 2 includes a summary of our field measurements. Rock core recovery values ranged from 16 to 100% and RQD values ranged from 8 to 100%. The unconfined compressive strength of the rock samples ranged from 11,680 to 22,040 psi.
Table 2 – Estimated Bedrock Elevations
Boring No.
Ground Surface
Elevation (ft)
Depth to Bedrock
(ft)
Estimated Bedrock Elevation
(ft)
B-1 747.1 37.4 709.7
B-2 714.4 4.0 710.4
B-3 747.4 16.2 731.2
It should be noted that the estimated bedrock elevations listed in Table 2 are based on the soil profile encountered in the soil borings. Bed rock depths, strengths, degree of weathering, and competency are expected to vary across the site.
5 U.S. DEPARTMENT OF TRANSPORTATION
4 DESIGN ANALYSIS AND CONCLUSIONS
Based on the subsurface profile encountered during this geotechnical study, structural loads, and scour analyses, it is our opinion that the proposed bridge can be supported on spread footings bearing on bedrock.
4.1 Bearing Resistance and Settlement
Foundation bearing resistance was evaluated in accordance with AASHTO LRFD Bridge Design Specifications3. A bearing resistance factor for strength limit state of (b) of 0.45 was utilized, as listed in AASHTO Table 10.5.5.2.2-1. The service limit state bearing resistance was calculated assuming a maximum tolerable settlement of 0.50 inch.
Bearing resistance was evaluated in accordance with AASHTO Section 10.6.3. Potential settlement was evaluated in accordance with AASHTO Section 10.6.2.4.4. Computer output is included in Appendix E.
4.2 Sliding Resistance
Resistance to sliding was evaluated in accordance with AASHTO Section 10.6.3.4. An interface friction angle (δ) of 35 degrees was used for footings that are cast directly on rock, as listed in AASHTO Table 3.11.5.3-1. A resistance factor for shear resistance between soil and foundation (φτ) of 0.8 for cast-in-place concrete was chosen. The resistance factor for passive resistance (φep) is 0.5, as listed in AASHTO Table 10.5.5.2.2-1.
5 RECOMMENDATIONS
5.1 Bridge Foundations
A system of spread footings bearing on bedrock is recommended to support the foundations of the new bridge. Footings should be sized to limit the factored bearing pressure to 8 ksf and to withstand a total vertical settlement on the order of 0.50 inch.
An experienced geotechnical engineer or engineering geologist should evaluate and approve the bedrock immediately prior to casting the foundation.
5.2 Abutment Walls
The soil properties presented in Table 3 are recommended for design of abutment walls.
6 U.S. DEPARTMENT OF TRANSPORTATION
Table 3 – Soil Design Parameters for Abutment Walls
Parameter Value
Moist Soil Unit Weight, γ (kcf) 0.125
Friction Angle, φ (deg.) 32
Active Earth Pressure Coeff., Ka 0.31
Passive Earth Pressure Coeff., Kp 3.25
At-rest Earth Pressure Coeff., Ko 0.47
6 CONSTRUCTION CONSIDERATIONS
Excavations: All excavations should be performed in accordance with applicable Federal, state, local, and OSHA standards and in accordance with Section 204 of the FP- 03 Specifications. Any unsuitable materials encountered below proposed footing elevations should be removed.
Structural Backfill and Backfill Drainage: Weepholes with 6-inch diameter through abutment walls and wingwalls should be installed at a maximum spacing of 10 feet.
Weepholes should be installed above the top of backfill at front face. All weepholes should be approved non-perforated PVC pipes per Subsection 706.08(e) of the FP-03 Specifications. Approved geocomposite drains as per Subsection 714.02(b) of the FP-03 Specifications should be placed against the back face of the walls. The geocomposite drains should extend from the top of the weepholes to the bottom of the proposed aggregate base course at approaches. Type IV-A geotextile fabric per FP-03 Specifications should be attached to the core of the geocomposite drains. Type II-B geotextile fabric should be placed between the on-site soil backfill material and the granular select borrow for separation/filtration. Backfilling behind and in front of all walls and pier footings should be done in accordance with Subsection 208.10 and compacting per Subsection 208.11 of the FP-03 Specifications.
7 U.S. DEPARTMENT OF TRANSPORTATION
7 DISCLAIMER/LIMITATIONS CLAUSE
The subsurface explorations and tests described in the section on Procedures and Results have been conducted in accordance with standard practices and procedures (except as specifically noted). The results of these explorations and tests represent conditions at the specific locations indicated. Subsurface conditions between these locations may vary.
The Design Analysis and Conclusions section and the Recommendations section in this report include interpretations and recommendations developed by the Government in the process of preparing the design. These interpretations are not intended as a substitute for the personal investigation, independent interpretation, and judgment of the Contractor.
Prepared by:
Christopher Lynch, EIT Geotechnical Engineer
Reviewed by:
Mounir Abouzakhm, P.E.
Division Geotechnical Engineer
8 U.S. DEPARTMENT OF TRANSPORTATION
8 REFERENCES
1 Nicholson, S.W., Dicken, C. L., Horton, J. D., Labay, K. A., Foose, M. P., and Mueller, J. A. L. (2005). Preliminary Integrated Geologic Map Databases for the United States: Kentucky, Ohio, Tennessee, and West Virginia: U.S. Geological Survey Open-File Report 2005-1324, U.S. Geological Survey, Reston, VA.
http://mrdata.usgs.gov/sgmc/tn.html
2 Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov/. Accessed October 28, 2013.
3 AASHTO (2012). LRFD Bridge Design Specifications, Customary U.S. Units, 6th Edition, American Association of State Highway and Transportation Officials, Washington, D.C.
APPENDIX A
Figures
STATEREG
NATR 1E10
TOTAL
SHEETS
SHEET
NO.
PROJECT
1SE 1TN
FIGURE 1
PROJECT LOCATION MAP
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NATR 1E10
LITTLE SWAN CREEK BRIDGE
MP 386.89
Source: United States Geological Survey (USGS), "Tennessee Geologic Map Data" http://mrdata.usgs.gov/sgmc/tn.html
1TN
FIGURE 2
GEOLOGIC MAP
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA SE
SHEET
NO.
PROJECT
STATEREG
NATR 1E10
TOTAL
SHEETS
Fort Payne Formation (Mfp): Bedded chert, calcareous and dolomitic, somewhat crinoidal; and minor shale. Thin green shale (Maury) at base. Average thickness about 200 feet.
Geologic Age: Mississippian Primary Rock Type: Chert Secondary Rock Type: Shale
St. Louis Limestone and Warsaw Limestone (Msw): Residuum of nodules and blocks of chert in sandy clay. (Originally grayish‐brown, medium‐bedded limestone.) Maximum preserved thickness about 50 feet. Warsaw Limestone ‐ Residuum of porous chert blocks in sandy clay. (Originally gray, medium‐ to coarse‐grained, thick‐ bedded limestone.) Thickness about 60 feet.
Geologic Age: Mississippian Primary Rock Type: clay or mud Secondary Rock Type: chert
Silurian Formations, including Decatur Limestone, Brownsport Group (Lobelville Formation, Bob Limestone, Beech River Formation), Wayne Group (Dixon Formation, Lego Formation, Waldron Shale, Laurel Limestone, Osgood Formation) and Brassfield Limestone (S): Silurian Formations ‐ A complete section of Silurian formations is not common because of pre‐Chattanooga and/or pre‐ Cretaceous erosion. Where preserved, Silurian formations are remarkably uniform in thickness and are characteristically light olive‐gray to greenish‐gray with variable reddish‐brown color in some area;. Decatur Limestone ‐ Thick‐bedded, medium‐ to coarse‐grained limestone, gray with reddish‐brown grains. Thickness 0 to 70 feet; Brownsport Group which includes 1) Lobelville Formation ‐ Shale with thin beds of limestone. Thickness 0 to 40 feet; 2) Bob Limestone ‐ Thick‐bedded, medium‐grained limestone, locally oolitic. Thickness 0 to 25 feet; and 3) Beech River Formation ‐ Shale with thin beds of limestone. Thickness 0 to 60 feet; Wayne Group which includes: 1) Dixon Formation ‐ Green and reddish‐brown argillaceous limestone, shale, and mudstone. Thickness 0 to 40 feet; 2) Lego Limestone ‐ Even‐bedded, olive‐gray limestone with scattered reddish‐brown grains. Thickness 0 to 30 feet; 3) Waldron Shale ‐ Greenish‐gray fossiliferous shale. Thickness 0 to 5 feet; 4) Laurel Limestone ‐ Even‐bedded, gray limestone with scattered reddish‐brown grains. Thickness 0 to 30 feet; 5) Osgood Formation ‐ Greenish‐ and reddish‐gray shale and argillaceous limestone. Thickness 0 to 15 feet.; and Brassfield Limestone ‐ Thin‐bedded cherty limestone, locally glauconitic. Thickness 0 to 20 feet.
Geologic Age: Silurian Primary Rock Type: limestone Secondary Rock Type: shale, mudstone
Ordovician [units] including Richmond Group (which includes Mannie Shale, Fernvale Limestone, Sequatchie Formation, and Arnheim Formation), the Maysville Group (which includes Leipers Formation), the Eden Group (which includes Inman Formation), and the Nashville Group (which includes Catheys Formation) (Ou): Ordovician [units] including Richmond Group (which includes Mannie Shale ‐ Olive‐gray shale. Thickness 0 to 20 feet; Fernvale Limestone ‐ Massive, coarsely crystalline, gray limestone with varicolored grains. Thickness 0 to 50 feet; Sequatchie Formation ‐ Olive‐gray and greenish‐gray shale, mudstone, and argillaceous limestone; dolomitic, laminated, and sandy. Thickness 0 to 100 feet; and Arnheim Formation Nodular, shaly, gray limestone. Thickness 0 to 20 feet; the Maysville Group (which includes Leipers Formation ‐ Nodular, shaly limestone; fine‐ to coarse‐grained limestone; and phosphatic calcarenite locally. Thickness 0 to 150 feet); the Eden Group (which includes the Inman Formation ‐ Thin‐bedded to laminated, fine‐grained, gray limestone with shale partings. Thickness 0 to 50 feet); and the Nashville Group (which includes Catheys Formation ‐ Nodular, shaly limestone; fine‐ to coarse‐grained limestone; phosphatic calcarenite; and light‐gray cryptograined limestone. Thickness 50 to 175 feet.)
Geologic Age: Ordovician Primary Rock Type: shale Secondary Rock Type: limestone
Mfp
Mfp
S
S
Ou
Ou
Msw
Msw
Little Swan Creek Bridge
Mfp
US 412
TN 99
Lewis County,Tennessee (2012) Source: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx
TmC2 - Tarklin-Humphreys complex, eroded BOF - Biffle-Sulphura-Rock outcrop association, very steep Parent material: Loamy alluvium and/or Parent material: Loamy residuum weathered colluvium derived from limestone Typical profile Typical profile 0 to 5 inches: Gravelly silt loam 0 to 12 inches: Gravelly silt loam 5 to 22 inches: Gravelly silt loam 12 to 32 inches: Gravelly silt loam 22 to 60 inches: Very gravelly silt loam 32 to 42 inches: Bedrock from cherty limestone Rb - Riverby gravelly sandy loam, frequently flooded
Parent material: Gravelly alluvium derived from interbedded sedimentary rock Typical profile 0 to 10 inches: Gravelly sandy loam 10 to 60 inches: Extremely gravelly coarse sandy loam
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
1TN
FIGURE 3
SOIL SURVEY MAP EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
TOTAL
SHEETS
SE
SHEET
NO.
PROJECT
STATEREG
NATR 1E10
Little Swan Creek Bridge
APPENDIX B
Boring Location Plan and Subsurface Profile
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
-M a r -2
:4
P
M :4
1:
P
M M
P R
O J E
C T
S n a tr 1e
T e c h s e r v G e o te c h C
A D
D B o r in g
P la n a n d
P r o f il e .d g n
STERLING, VIRGINIA
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOL SYMBOLTYPE OF MATERIAL TYPE OF MATERIAL TEST BORING MISCELLANEOUS
S R
SE 1
AND SUBSURFACE PROFILE
BORING LOCATION PLAN
(MILEPOST 386.89)
OVER LITTLE SWAN CREEK
ON NATCHEZ TRACE PARKWAY
BRIDGE 5570-004P
ELEVATION
TN 1NATR 1E10
FILL
PLAN
Parkway
L Natchez TraceC
120'-8" 120'-8"
T y p
Little Swan Creek
Bridge length = 241'-4"
N
241'-4"
Cat 18'-0" left of L
Existing groundline
0.11%
1:2 1:
106+00 107+00 108+00
Existing Pier Locations bridge
Begin Existing
Bridge End Existing
B-1
B-2
B-3
Sta. 105+65
Begin bridge
CONDITIONS MAY VARY BETWEEN THESE LOCATIONS.
AT THE BORING LOCATIONS SHOWN. SUBSURFACE
THE SUBSURFACE CONDITIONS ENCOUNTERED
THE BORING LOGS ON THIS SHEET REPRESENT
12" (SPT)
N BLOWS/
(24 HOURS)
WATER LEVEL (WL)
(TIME OF DRILLING)
WATER LEVEL (WL)
DEPTH MARKS
BHT OR BHR
(B-N)
BORING NUMBER
SCALE IN FEET
0 25 50
Sta. 108+06
End bridge at 18'-0" left of L
Existing groundline C
GEOTECHNICAL REPORT NO. 15-13
PROJECT TN PRA-NATR 1E10
LIMESTONE
SAND AND GRAVEL
7. GEOPHYSICAL TEST SITE: SEISMIC RESISTIVITY
6. BHR - BORE HOLE REFUSAL
5. BHT - BORE HOLE TERMINATED
4. RQD - ROCK QUALITY DESIGNATION
3. REC. - PERCENT OF RECOVERY
2. R - REFUSAL, SPT 100 BLOWS/12"
1. SPT - STANDARD PENETRATION TEST - AASHTO T206
RQD(%)
REC.(%) /
Anticipated top of rock
B-1
B-2
B-3
BHT
BHT
BHT
100 / 78
100 / 81
47.4
100 / 95
100 / 100
17.5
100 / 100
100 / 100
1.3
16.2
27.5
Depth (ft) N Rec. / RQD
Depth (ft) N Rec. / RQD
Depth (ft) N Rec. / RQD
37.4
100 / 88
APPENDIX C
Borings Logs
Asphalt pavement and base course
Soft to stiff, brown CHERT AND CLAY, trace sand (Moist)
Possible boulders between 3' to 5' depth. (Moist)
- FILL -
Auger Refusal at 8 ft
Brown and gray CHERT, CLAY, AND SHALE (Moist)
Possible cobbles and boulders at different depths
- FILL -
1.0
8.0
1.1 6-6-5-3
1-2-2-2
J-1
J-2
2 in.
6/11/13 K.Thornton
R.Kingsley/D.HutchinsOperator:
Sta. 105+67, 8' LT
Weather:
SAMPLE
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Project Location:
P P
/R Q
D
Boring Location:
La ye r
D ep th ft)
Penetrometer (PP in tsf) Rock Core (RQD in %)
US State Plane 1983, NAD 1983, Tennessee 4100; NAVD 1988 Surface Elevation:
Sample Types:
BORING LOG
Standard Penetration Test Data
Boring Began: 6/11/13
10 60
T yp e
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Plastic Limit
S P
T B lo w s pe r in
Hammer Wt. & Type:
Hot
Encountered at:
After
Northing: 434127 Easting: 1538136
Boring was backfilled with auger cuttings and sand upon completion.
No groundwater was encountered during our drilling operation.
PRA-NATR 1E10 - Bridge (5570-004P) Over Little Swan Creek
D ep th S ca le ft)
E le va tio n (f ee t)
HSA/WL
B-1
Caved at:
Hammer Drop:
Project Name:
N o.
Natchez Trace Parkway-Milepost 386.89, Lewis County, Tennessee Project Datum:
15.8 ft
(Blows / ft)
747.1 ft
Undisturbed (UD)
R ec ft)
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
At Completion:
Completed:
Hole Diameter:
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic 3.75 in.
Water Content % Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
B
O R
IN
G
L O
G
/6 /1
:5
M
:\P R
O
JE
C T
S \N
A T
R \1
E
0\ T
E C
H S
E R
V \G
E O
T E
C H
\S U
B S
U R
F A
C E
I N
V E
S T
IG
A
T
IO
N \B
O R
IN
G
L O
G S
\N A
T R
E
M A
-C M
L.
G
P J
746.1
739.1
Brown and gray CHERT, CLAY, AND SHALE (Moist)
Possible cobbles and boulders at different depths
- FILL - (Continued)
Moderately hard, gray, slightly weathered LIMESTONE, fine texture
Recovery: 100% RQD: 78% Unconfined Compressive Strength = 11,680 psi
Recovery: 100% RQD: 81%
Boring was terminated at a depth of 47.4 ft
37.4
42.4
47.4
2 in.
6/11/13 K.Thornton
R.Kingsley/D.HutchinsOperator:
Sta. 105+67, 8' LT
Weather:
SAMPLE
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Project Location:
P P
/R Q
D
Boring Location:
La ye r
D ep th ft)
Penetrometer (PP in tsf) Rock Core (RQD in %)
US State Plane 1983, NAD 1983, Tennessee 4100; NAVD 1988 Surface Elevation:
Sample Types:
BORING LOG
Standard Penetration Test Data
Boring Began: 6/11/13
10 60
T yp e
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Plastic Limit
S P
T B lo w s pe r in
Hammer Wt. & Type:
Hot
Encountered at:
After
Northing: 434127 Easting: 1538136
Boring was backfilled with auger cuttings and sand upon completion.
No groundwater was encountered during our drilling operation.
PRA-NATR 1E10 - Bridge (5570-004P) Over Little Swan Creek
D ep th S ca le ft)
E le va tio n (f ee t)
HSA/WL
B-1
Caved at:
Hammer Drop:
Project Name:
N o.
Natchez Trace Parkway-Milepost 386.89, Lewis County, Tennessee Project Datum:
15.8 ft
(Blows / ft)
747.1 ft
Undisturbed (UD)
R ec ft)
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
At Completion:
Completed:
Hole Diameter:
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic 3.75 in.
Water Content % Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
B
O R
IN
G
L O
G
/6 /1
:5
M
:\P R
O
JE
C T
S \N
A T
R \1
E
0\ T
E C
H S
E R
V \G
E O
T E
C H
\S U
B S
U R
F A
C E
I N
V E
S T
IG
A
T
IO
N \B
O R
IN
G
L O
G S
\N A
T R
E
M A
-C M
L.
G
P J 709.7
704.7
699.7
Medium dense, brown and black SAND AND GRAVEL (Moist)
- ALLUVIAL DEPOSITS -
Auger Refusal at 4 ft
Gray, slightly weathered LIMESTONE, very fine texture.
Reovery: 100% RQD: 95% Unconfined Compressive Strength = 18,480 psi
Recovery: 100% RQD: 88%
Recovery: 100% RQD: 100%
Boring was terminated at a depth of 17.5 ft
4.0
7.5
12.5
17.5
1.3 8-7-6-9J-1
2 in.
6/10/13 K.Thornton/E.Del Valle R.Kingsley/D.HutchinsOperator:
Sta. 106+89, 17' LT
Weather:
SAMPLE
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Project Location:
P P
/R Q
D
Boring Location:
La ye r
D ep th ft)
Penetrometer (PP in tsf) Rock Core (RQD in %)
US State Plane 1983, NAD 1983, Tennessee 4100; NAVD 1988 Surface Elevation:
Sample Types:
BORING LOG
Standard Penetration Test Data
Boring Began: 6/10/13
10 60
T yp e
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Plastic Limit
S P
T B lo w s pe r in
Hammer Wt. & Type:
Hot/Clear
Encountered at:
After
Northing: 434224 Easting: 1538209
Boring was backfilled with auger cuttings upon completion.
No groundwater was encountered during our drilling operation.
PRA-NATR 1E10 - Bridge (5570-004P) Over Little Swan Creek
D ep th S ca le ft)
E le va tio n (f ee t)
HSA/WL
B-2
Caved at:
Hammer Drop:
Project Name:
N o.
Natchez Trace Parkway-Milepost 386.89, Lewis County, Tennessee Project Datum:
14.2 ft
(Blows / ft)
714.4 ft
Undisturbed (UD)
R ec ft)
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
At Completion:
Completed:
Hole Diameter:
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic 3.75 in.
Water Content % Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
B
O R
IN
G
L O
G
/6 /1
:5
M
:\P R
O
JE
C T
S \N
A T
R \1
E
0\ T
E C
H S
E R
V \G
E O
T E
C H
\S U
B S
U R
F A
C E
I N
V E
S T
IG
A
T
IO
N \B
O R
IN
G
L O
G S
\N A
T R
E
M A
-C M
L.
G
P J
710.4
706.9
701.9
696.9
Asphalt pavement and base course
Gravel and boulders COBBLES & BOULDERS (Moist)
- FILL -
Gray, slightly weathered LIMESTONE, fine texture
Unconfined Compressive Strength = 22,040 psi
Recovery: 100% RQD: 100%
Recovery: 100% RQD: 100%
Boring was terminated at a depth of 27.5 ft
1.3
16.2
22.5
27.5
2 in.
6/12/13 K.Thornton/E.Del Valle R.Kingsley/D.HutchinsOperator:
Sta. 108+08, 6' LT
Weather:
SAMPLE
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Project Location:
P P
/R Q
D
Boring Location:
La ye r
D ep th ft)
Penetrometer (PP in tsf) Rock Core (RQD in %)
US State Plane 1983, NAD 1983, Tennessee 4100; NAVD 1988 Surface Elevation:
Sample Types:
BORING LOG
Standard Penetration Test Data
Boring Began: 6/12/13
10 60
T yp e
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Plastic Limit
S P
T B lo w s pe r in
Hammer Wt. & Type:
Hot
Encountered at:
After
Northing: 434307 Easting: 1538296
Boring was backfilled with auger cuttings and sand upon completion.
No groundwater was encountered during our drilling operation.
PRA-NATR 1E10 - Bridge (5570-004P) Over Little Swan Creek
D ep th S ca le ft)
E le va tio n (f ee t)
WL
B-3
Caved at:
Hammer Drop:
Project Name:
N o.
Natchez Trace Parkway-Milepost 386.89, Lewis County, Tennessee Project Datum:
13.1 ft
(Blows / ft)
747.4 ft
Undisturbed (UD)
R ec ft)
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
At Completion:
Completed:
Hole Diameter:
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic 2 in.
Water Content % Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
B
O R
IN
G
L O
G
/6 /1
:5
M
:\P R
O
JE
C T
S \N
A T
R \1
E
0\ T
E C
H S
E R
V \G
E O
T E
C H
\S U
B S
U R
F A
C E
I N
V E
S T
IG
A
T
IO
N \B
O R
IN
G
L O
G S
\N A
T R
E
M A
-C M
L.
G
P J
746.1
731.2
724.9
719.9
APPENDIX D
Laboratory Testing Results
Federal Lands Highway Office
Eastern Federal Lands Highway Division Materials Testing Laboratory
1827 Jack Delozier Drive, Sevierville, TN 37876
Replacement of Little Swan Creek Bridge
NATR 1E10 Lewis
TN
Eva N. Valle-Valentin
B-1
Verification
Lewis County, Tn
Rock Core
Project Name: State:
County:
Submitted By:
Field Sample No:
Sample Type:
Source Location:
Boring No:
Material
Project Number:
Depth: 37.4 to 42.4 ft.B-1
Report of Unconfined Compressive Strength of Intact Rock Cores
Unconfined Compressive Strength of Intact Rock Core (ASTM 2938)
Unconfined Compressive Strength, psi 11680
Page 1 of 1 8/6/2013 10:52 AM
Charles W. McCown, Jr. - Laboratory Team Leader Date
Lab Control No: E-13-0663
Uncontrolled Copy
Federal Lands Highway Office
Eastern Federal Lands Highway Division Materials Testing Laboratory
1827 Jack Delozier Drive, Sevierville, TN 37876
Replacement of Little Swan Creek Bridge
NATR 1E10 Lewis
TN
Eva N. Valle-Valentin
B-2
Verification
Lewis County, Tn
Rock Core
Project Name: State:
County:
Submitted By:
Field Sample No:
Sample Type:
Source Location:
Boring No:
Material
Project Number:
Depth: 4.0 to 7.55 ft.B-2
Report of Unconfined Compressive Strength of Intact Rock Cores
Unconfined Compressive Strength of Intact Rock Core (ASTM 2938)
Unconfined Compressive Strength, psi 18480
Page 1 of 1 8/6/2013 10:53 AM
Charles W. McCown, Jr. - Laboratory Team Leader Date
Lab Control No: E-13-0664
Federal Lands Highway Office
Eastern Federal Lands Highway Division Materials Testing Laboratory
1827 Jack Delozier Drive, Sevierville, TN 37876
Replacement of Little Swan Creek Bridge
NATR 1E10 Lewis
TN
Eva N. Valle-Valentin
B-3
Verification
Lewis County, Tn
Rock Core
Project Name: State:
County:
Submitted By:
Field Sample No:
Sample Type:
Source Location:
Boring No:
Material
Project Number:
Depth: 17.5 to 22.5 ft.B-3
Report of Unconfined Compressive Strength of Intact Rock Cores
Unconfined Compressive Strength of Intact Rock Core (ASTM 2938)
Unconfined Compressive Strength, psi 22040
Page 1 of 1 8/6/2013 10:54 AM
Charles W. McCown, Jr. - Laboratory Team Leader Date
Lab Control No: E-13-0665
APPENDIX E
Design Analysis
7 9 11 13
N om in al
B ea ri n g R es is ta n ce k sf
Effective Footing Width, Bf or Radius, R (ft)
Little Swan Creek Bridge Nominal Bearing Resistance
Service Limit State shown for 0.25-inch Settlement
Service Limit State - South Abut.
Strength Limit State - South Abut.
APPENDIX F
Representative Photographs
F-1
Photo 1 – Apparent limestone outcrop, approx. station 108+25.00 to 109+10.00, RT.
Photo 2 – Existing Eastern pier in vicinity of boring B-2, looking south.
F-2
Photo 3 – Sample recovery for boring B-2.
Photo 4 – Sample recovery for boring B-3.
F-3
Photo 5 – Existing south abutment, looking west.
Photo 6 – Apparent limestone rock outcrops in vicinity of Little Swan Creek Bridge.
| Pages from Report No. 15-13 - NATR 1E10 p1 |
| Pages from NATR 1E10 Report Addendum-p1-18 |
| Pages from Report No. 15-13 - NATR 1E10 p2-31 |
| 2014-08-18T17:50:02-0400 | |
| CHRISTOPHER M LYNCH |
| 2014-08-18T17:51:09-0400 | |
| CHRISTOPHER M LYNCH |
| 2014-08-19T06:19:06-0400 | |
| MOUNIR A ABOUZAKHM |
| 2014-08-19T06:20:22-0400 | |
| MOUNIR A ABOUZAKHM |
File details come from the government source that posted it. Updated .