Report_3_Bridge_Inspection_Little_Swan.pdf
PDF 4 MB Posted
- Attached to
- Natchez Trace Parkway 1E10 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00005
About this file
Report 3_Bridge Inspection_Little Swan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006_-_PRA-NATR_1E10.pdf | ||
| Amendment_0005-_PRA-NATR_1E10.pdf | ||
| Amendment_0004_-_PRA-NATR_1E10.pdf | ||
| Amendment_0003_-_PRA-NATR_1E10.pdf | ||
| Amendment_0002-_PRA-NATR_1E10.pdf | ||
| Amendment_0001_-_PRA-NATR_1E10.pdf | ||
| Report_5_Soils_and_Foundation.pdf | ||
| Report_4_Bridge_Inspection_Big_Swan.pdf | ||
| Report_2_NEPA_Big_Swan.pdf | ||
| FP03_Eng_.pdf | ||
| Plans_PRA-NATR_1E10.pdf | ||
| IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf | ||
| Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| Report_1_NEPA_Little_Swan.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| FP03_Errata.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-100A-Form.pdf | ||
| Synopsis_PRA-NATR_1E10.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
LITTLE SWAN CREEK BRIDGE
NATCHEZ TRACE PARKWAY OVER LITTLE SWAN CREEK
NATCHEZ TRACE PARKWAY
LN
STRUCTURE NO. 5570-004P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 3/14/13
Report prepared by: WD
MILE POINT: 386.89
Federal Highway Administration KILOMETER POINT: 622.62 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5570-004P
LITTLE SWAN CREEK BRIDGE INSPECTION DATE: 3/14/13
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 200.0 FT (61.0 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 67.0 FT (20.4 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.3 FT (9.8 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 28.2 FT (8.6 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1E4 / 3214A SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1983-JOINT REPAIR; 1996-DECK STUDY; 2010-BRIDGE AND APPROACHES REPAVED.
LOCATION
NATCHEZ TRACE PARKWAY MILE POINT: ..................... 386.89 (KM PT 622.62)
STATE: ................................. TENNESSEE LOCATION: 1.1 MILES FROM TN ROUTE 20
FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY
FEATURE INTERSECTED: .. LITTLE SW AN CREEK
STRUCTURE EVALUATION SUMMARY
This prestressed concrete multi-girder bridge is in poor condition overall. The main problem is widespread cracking and delamination of both pier caps, with heavy efflorescence present; this is a serious condition which could affect the bearing seats and lead to a loss of load capacity if not repaired in the near future. Other problems include cracking with moderate to heavy efflorescence and numerous popouts on the deck underside, likely due to alkali-silica contamination; a lack of sealant in the expansion joints; widespread cracking and spalling of the curbs and railings;
moderate to severe cracking of the asphalt wearing surface over the abutments and piers and at the approach slab ends; debris and vegetation growth along the curblines; and a tree growing out of a weep hole at the north abutment.
Repairs are not required at this time, as the structure is programmed for replacement under Project NATR 1E10 with an anticipated completion date in 2015.
INSPECTION TEAM: D.K. JOHNSON, J.S. SMITHDEAL (CLARK NEXSEN)
CONDITION ASSESSMENT:
D. KEITH JOHNSON, P.E., FIELD TEAM LEADER
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 8/1/13
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-004P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
$0 $0 $0
$0
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$0
REMARKS: Structure is programmed for replacement under Project NATR 1E10 with scheduled completion in 2015.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-004P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 5
1. DECK SLAB F
2. EXPANSION JOINTS F
3. WEARING SURFACE F
4. RIDEABILITY G
5. CURBS, SIDEWALKS, AND MEDIAN F
6. PARAPETS AND/OR RAILINGS F
7. DRAINS AND DRAINAGE F
8. UTILITIES N
9. DEFLECTION AND/OR VIBRATION G
10. OTHER N
59. SUPERSTRUCTURE 7
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS (SPREAD FTG)
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER (VEGETATION)
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER (VEGETATION)
G G N N N G N N G G N
G N G G G G F N G G N G
G N P N G G G
58.1
58.2,3
58.5,6
58.7
59.2
60.1
60.5,9
60.6
60.7
ITEM REFERENCE AND REMARKS
WIDESPREAD MINOR TRANSVERSE AND RANDOM CRACKING WITH
MODERATE TO HEAVY EFFLORESCENCE AND NUMEROUS
POPOUTS ON DECK UNDERSIDE; DECK CONCRETE APPEARS TO BE
CONTAMINATED WITH CHLORIDES IN PLACES. SEE ALSO 59.2.
EXPANSION JOINTS PAVED OVER; MODERATE TO SEVERE
TRANSVERSE CRACKING OF ASPHALT WEARING SURFACE OVER
BOTH PIERS; MINOR TO MODERATE OVER ABUTMENTS.
MODERATE WATER LEAKAGE THROUGH JOINTS ONTO PIERS AND
ABUTMENTS. MINOR LONGITUDINAL CRACK IN SOUTH SPAN,
NORTHBOUND LANE.
POPOUTS PRESENT THROUGHOUT CURBS AND RAILINGS.
WIDESPREAD MINOR TO MODERATE RANDOM CRACKING WITH
EFFLORESCENCE ON CURBS WITH MINOR SPALLING. MINOR TO
MODERATE VERTICAL CRACKING ON RAILINGS AT EXPANSION
JOINTS. SOUTH SPAN HAS CONCENTRATED AREA OF MINOR
RANDOM CRACKING WITH EFFLORESCENCE ON BOTH SIDES.
MINOR ACCUMULATION OF DEBRIS AND VEGETATION GROWTH
ALONG EAST CURBLINE. DECK DRAINS ARE PARTIALLY CLOGGED.
MODERATE TO HEAVY EFFLORESCENCE ALONG GIRDER/DECK
INTERFACE. RUSTING OF EXPOSED REBAR CHAIRS ON BOTTOM
FACE OF GIRDERS IN ALL SPANS. MINOR DIAGONAL CRACKING OF
GIRDER WEBS EXTENDING FROM CORNERS OF END DIAPHRAGMS.
WATER LEAKAGE HAS STAINED BOTH ABUTMENTS (SEE 58.2,3).
TOP OF NORTH ABUTMENT FOOTING HAS BEEN EXPOSED BY
EROSION, BUT FOOTING WAS CAST IN BEDROCK. MINOR EROSION
ALONG SOUTH ABUTMENT AT WEST SIDE AND UNDER GIRDER #2.
MINOR VERTICAL AND DIAGONAL CRACKING AND POPOUTS ON
WINGWALLS.
TREE AND VINES GROWING OUT OF WEEP HOLES AT NORTH
ABUTMENT.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-004P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 8
G G N G N
MED
SUFF
27 FT.
ROCK
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1.
(CONCRETE APRON)
N N N F F F G G F
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 0
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.12,19 MINOR VINE GROWTH ON ABUTMENTS AND PIER COLUMNS.
60.13 MINOR POPOUTS AND WATER STAINING ON BOTH PIER COLUMNS.
60.15 MODERATE DELAMINATION ON BOTH PIER CAPS AROUND BEARING
AREAS FOR GIRDER #4. WIDESPREAD MODERATE CRACKING WITH
HEAVY EFFLORESCENCE THROUGHOUT BOTH PIER CAPS.
MODERATE TO SEVERE DELAMINATION ON SOUTH PIER, EAST
UNDERSIDE.
60.17 MINOR EROSION AT BASE OF SOUTH PIER COLUMN, SOUTH SIDE.
222.4 MINOR TO MODERATE TRANSVERSE CRACKING OF APPROACH
PAVEMENT OVER APPROACH SLAB ENDS.
222.5 MINOR UNDERMINING (2 1/2' UNDER) OF CONCRETE APRON AT
SOUTHEAST PARAPET END.
222.6 MINOR TO MODERATE SETTLEMENT OF NORTH APPROACH
PAVEMENT AT NORTH ABUTMENT.
222.7 TYPE 3 REFLECTIVE OBJECT MARKERS AT CORNERS OF
STRUCTURE. "LITTLE SWAN CREEK" SIGNS AT SOUTHEAST AND
NORTHWEST CORNERS OF STRUCTURE. TEMPORARY FLASHER
ON WEST RAILING AT SOUTH APPROACH.
222.9 MODERATE TO SEVERE RANDOM CRACKING OF CONCRETE APRON
AT SOUTHEAST PARAPET END.
36.A RAILING HEIGHT OF 1'-11" ON EAST SIDE DOES NOT MEET AASHTO
MINIMUM HEIGHT SPEC OF 2'-3" FOR TRAFFIC BARRIERS.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-004P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 19 17 32 29
TYPE 3 18 16 30 27
TYPE 3S2 24 22 40 36
TYPE 3-3 28 25 48 44
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-004P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... LITTLE SWAN CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 101 - LEWIS
(204) STRUCTURE NUMBER: ..... 5570-004P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... LITTLE SWAN CREEK
(207) ROAD SECTION NO: .......... 004P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570004P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.1 MILES FROM TN ROUTE 2
(210) OPERATING UNIT: ............. M. LEWIS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1E4 (11) MILE POINT: ............................. 386.89 (KM PT 622.62)
(212) DRAWING NUMBERS: ....... 3214A (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
02 - STRINGER/MULTI-BEAM or GIRDER
67.0 FT (20.4 M)
200.0 FT (61.0 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 19.0 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 3 - POSTING REQUIRED
(64) OPERATING RATING: ...... 32.0 TONS (29.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 3/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 1 - DECK SURVEY (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
o
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-004P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°31'01.90" (51) CURB TO CURB WIDTH: ........... 28.2 FT (8.6 M)
(17) LONGITUDE: ......................... 87°26'46.30" (52) DECK WIDTH: ............................ 32.3 FT (9.8 M)
(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 480 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2007 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 488 (47) TOTAL HORIZ. CLEARANCE: .... 28.2 FT (8.6 M)
(115) YEAR OF FUTURE ADT: ..... 2027 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 1.92 FT (0.59 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable; scour above top of fo
1 - MAINTENANCE
B - MAJOR
$0
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1983-JOINT REPAIR; 1996-DECK STUDY; 2010-BRIDGE AND APPROACHES REPAVED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:87�26'46.30 http:35�31'01.90
APPENDIX STRUCTURE NO. 5570-004P
PHOTOGRAPHS STRUCTURE NO. 5570-004P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD TUPELO
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING SOUTH
PHOTO #4 - TYPICAL TRANSVERSE CRACKING
OF ASPHALT WEARING SURFACE OVER BOTH
PIERS; WEARING SURFACE OVER NORTH
PIER SHOWN
PHOTO #5 - LONGITUDINAL CRACK IN SOUTH
SPAN, NORTHBOUND LANE
PHOTO #6 - TYPICAL TRANSVERSE CRACKING
OF APPROACH PAVEMENT OVER APPROACH
SLAB ENDS; NORTH APPROACH SHOWN
PHOTO #7 - SETTLEMENT OF NORTH APPROACH PAVEMENT AT
NORTH ABUTMENT
PHOTO #8 - TYPICAL RANDOM CRACKING WITH EFFLORESCENCE ON
CURBS; WEST CURB OVER NORTH ABUTMENT SHOWN
PHOTO #9 - TYPICAL SPALLING OF CURBS;
EAST CURB OVER SOUTH PIER SHOWN
PHOTO #10 - TYPICAL ACCUMULATION OF
DEBRIS AND VEGETATION GROWTH ALONG
EAST CURBLINE; NORTH SPAN SHOWN
PHOTO #11 - TYPICAL PARTIALLY CLOGGED DECK DRAINS; EAST
SHOULDER, NORTH SPAN SHOWN
PHOTO #12 - UNDERMINING OF CONCRETE APRON AT SOUTHEAST
PARAPET END
PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING NORTH, SOUTH
SPAN
PHOTO #14 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE ON DECK UNDERSIDE; CENTER BAY, CENTER SPAN
SHOWN
PHOTO #15 - TYPICAL EFFLORESCENCE ALONG GIRDER/DECK
INTERFACE; GIRDER #4, SOUTH SPAN SHOWN; ALSO NOTE TYPICAL
RANDOM CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE
PHOTO #16 - TYPICAL DIAGONAL CRACKING OF GIRDER WEBS
EXTENDING FROM CORNERS OF END DIAPHRAGMS; EAST SIDE OF
BEAM #2 AT NORTH ABUTMENT SHOWN
PHOTO #17 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #18 - TOP OF NORTH ABUTMENT FOOTING EXPOSED BY
EROSION
PHOTO #19 - EROSION ALONG SOUTH ABUTMENT UNDER GIRDER #2
PHOTO #20 - TYPICAL VERTICAL AND DIAGONAL CRACKING OF
WINGWALLS; SOUTHEAST WINGWALL SHOWN
PHOTO #21 - TREE AND VINES GROWING OUT
OF WEEP HOLE AT NORTH ABUTMENT
PHOTO #22 - GENERAL VIEW OF SOUTH PIER,
SOUTH FACE
PHOTO #23 - TYPICAL POPOUTS, WATER STAINING AND VINE
GROWTH ON BOTH PIER COLUMNS; SOUTH PIER, SOUTH FACE
SHOWN
PHOTO #24 - TYPICAL CRACKING WITH EFFLORESCENCE
THROUGHOUT BOTH PIER CAPS; SOUTH PIER, EAST END SHOWN;
ALSO NOTE EFFLORESCENCE ALONG GIRDER/DECK INTERFACE
PHOTO #25 - TYPICAL CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF BOTH PIER CAPS; NORTH PIER, WEST SIDE SHOWN
PHOTO #26 - UPSTREAM CHANNEL
PHOTO #27 - DOWNSTREAM CHANNEL