Amendment_0001_-_PRA-NATR_1E10.pdf

PDF 120 KB Posted

Attached to
Natchez Trace Parkway 1E10 Federal contract opportunity
Solicitation number
DTFH71-15-B-00005
Issued by
Department of Transportation Federal Highway Administration

About this file

Bid Opening date remains March 10 2015 at 2 00 pm EST.

View the file

Other files for this federal contract opportunity

Other files attached to Natchez Trace Parkway 1E10, newest first.
File Type Posted
Amendment_0006_-_PRA-NATR_1E10.pdf PDF
Amendment_0005-_PRA-NATR_1E10.pdf PDF
Amendment_0004_-_PRA-NATR_1E10.pdf PDF
Amendment_0003_-_PRA-NATR_1E10.pdf PDF
Amendment_0002-_PRA-NATR_1E10.pdf PDF
Report_5_Soils_and_Foundation.pdf PDF
Report_4_Bridge_Inspection_Big_Swan.pdf PDF
Report_2_NEPA_Big_Swan.pdf PDF
FP03_Eng_.pdf PDF
Plans_PRA-NATR_1E10.pdf PDF
IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf PDF
Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf PDF
Report_1_NEPA_Little_Swan.pdf PDF
Report_3_Bridge_Inspection_Little_Swan.pdf PDF
ADV_Subcontracting_Plan.doc DOC document
FP03_Errata.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-100A-Form.pdf PDF
Synopsis_PRA-NATR_1E10.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7115B00005

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

PRA-NATR 1E1003/04/20150001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/06/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Revise Section 104 to clarify the load restriction requirements.

b) Revise Section 401 to allow Section 402 asphalt.

c) Add Section 402 to include asphalt concrete pavement by Hveem or Marshall Mix Design

Method requirements.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of March 10, 2015 at 2:00 p.m. will remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project PRA-NATR 1E10 Natchez Trace Parkway

Little Swan Creek Bridge Replacement Big Swan Creek Bridge Repair

Solicitation: DTFH71-15-B-00005

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Revise Section 104 to clarify the load restriction requirements.

b) Revise Section 401 to allow Section 402 asphalt.

c) Add Section 402 to include asphalt concrete pavement by Hveem or Marshall Mix

Design Method requirements.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of March 10, 2015 at 2:00 p.m. will remain the same.

Special Contract Requirements (J Pages) changes

1. Add the following to Subsection 104.05 of the Special Contract Requirements, page J-5:

Load restrictions on the Natchez Trace Parkway do not apply for the hauling of Little Swan Creek Bridge precast concrete units only. Load restrictions on the Natchez Trace Parkway do apply for the hauling of all other materials.

2. Add the following to Subsection 401.03 of the Special Contract Requirements, page J-19:

At the option of the Contractor, a State Department of Transportation asphalt concrete pavement mixture that has the same properties as a mixture described in Section 402 may be submitted for approval.

3. Add the following to the Special Contract Requirements, page J-23:

Section 402. — HOT ASPHALT CONCRETE PAVEMENT BY HVEEM OR

MARSHALL MIX DESIGN METHOD

402.01. Delete the first paragraph and substitute the following:

This work consists of constructing one or more courses of Hveem or Marshall hot asphalt concrete pavement using hot or warm mix asphalt.

402.01. Add the following:

Asphalt binder is designated as performance grade PG 67-22.

402.03. Add the following:

At the option of the Contractor, a State Department of Transportation mixture gradation may be submitted that has the same maximum size aggregate as the specified grading and conforms to the aggregate quality requirements in Subsection 703.07, and design parameters (b); (c)(2) or (d);

and (e) in Table 402-1 for the specified mix Class and the requirements of Table 402-2 may be submitted for approval.

The allowable deviations for an optional State Department of Transportation gradation will be the allowable deviations as shown in Table 703-4 for the gradation specified.

402.03(b). Add the following after the first sentence:

Submit all job-mix formula materials and information to the EFLHD Central Laboratory in Sevierville, Tennessee, with a copy to the CO as directed.

402.03(b). Add the following:

(5) Warm mix technology and additive information. See Subsection 401.03(b)(5).

See Subsection 401.03(b) for additional requirements concerning State Department of Transportation documentation and recycled asphalt pavement quality control plan.

402.03(c). Add the following:

Allow a minimum of 21 calendar days for verification of each job-mix formula after receipt of all materials and information at the EFLHD Central Laboratory.

Add the following after Subsection 402.05:

402.05A Material Transfer Vehicle. See Subsection 401.05A.

Questions/Clarifications

Questions / Clarifications

The following questions and issues were submitted to EFLHD at eflhd.conracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. Under what item will the ultra-high performance concrete be paid?

Response: As specified in Subsection 552.03(v) of the Special Contract Requirements (SCRs) and on Plan Sheet R01, the ultra-high performance concrete is required for all closure pours and haunches for the Little Swan Bridge. Closure pours are only required for the Class D(AE) concrete and will therefore only be measured under the Section 552 Class D(AE) concrete pay item as specified in Subsection 575.21.

2. Section 104.05 defines load restrictions on National Park Service Roads. Precast substructure units and precast girders will exceed these weights. Will these restrictions on the Natchez Trace Parkway be waived for delivery of material to the project site from U.S. 412? If not, how does the Department propose these materials be delivered?

Response: The Subsection 104.05 load restrictions will not apply to the Little Swan Creek Bridge precast concrete units. The SCRs will be updated to clarify.

3. The bid items and specs call for Superpave Asphalt Mix. Superpave is not available or used in the state of Tennessee. Can the Asphalt be changed to TDOT STD (Marshall Mix Design) Asphalt?

Response: The SCRs for Section 401 Superpave Asphalt will be revised to allow a State DOT approved asphalt mix to be submitted for approval.

Amendment 1 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project PRA-NATR 1E10
Natchez Trace Parkway
Little Swan Creek Bridge Replacement
Big Swan Creek Bridge Repair
Solicitation: DTFH71-15-B-00005
J Pages_Amended.pdf
Section 402. — HOT ASPHALT CONCRETE PAVEMENT BY HVEEM OR MARSHALL MIX DESIGN METHOD