Bid opening date is reschedule to April 21 2015 at 2 00 p.m.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006_-_PRA-NATR_1E10.pdf | ||
| Amendment_0005-_PRA-NATR_1E10.pdf | ||
| Amendment_0003_-_PRA-NATR_1E10.pdf | ||
| Amendment_0002-_PRA-NATR_1E10.pdf | ||
| Amendment_0001_-_PRA-NATR_1E10.pdf | ||
| Report_5_Soils_and_Foundation.pdf | ||
| Report_4_Bridge_Inspection_Big_Swan.pdf | ||
| Report_2_NEPA_Big_Swan.pdf | ||
| FP03_Eng_.pdf | ||
| Plans_PRA-NATR_1E10.pdf | ||
| IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf | ||
| Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| Report_1_NEPA_Little_Swan.pdf | ||
| Report_3_Bridge_Inspection_Little_Swan.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| FP03_Errata.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-100A-Form.pdf | ||
| Synopsis_PRA-NATR_1E10.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7115B00005
x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
PRA-NATR 1E1004/13/20150004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/06/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PRA-NATR 1E10
The purpose of this Amendment is to:
1) Revise the Plans to replace Sheets R17 and R28.
2) Provide two precast manufacturing plants for informational purposes only.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) Reschedule the Bid Opening date to April 21, 2015, at 2:00 p.m.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0004
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PRA-NATR 1E10 Natchez Trace Parkway
Little Swan Creek Bridge Replacement Big Swan Creek Bridge Repair
Solicitation: DTFH71-15-B-00005
The purpose of this Amendment is to:
1) Revise the Plans to replace Sheets R17 and R28.
2) Provide two precast manufacturing plants for informational purposes only.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) Reschedule the Bid Opening date to April 21, 2015, at 2:00 p.m.
Plans changes
Delete Plan Sheets R17 and R28, and substitute the amended Plan Sheets R17 and R28.
1) Sheet R17 updated to provide additional detail and bars required for the overhang.
2) Sheet R28 updated to provide additional bar for the bar list.
Questions / Clarifications
The following questions and issues were submitted to EFLHD at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. The project was originally advertised on 2/06/2015, readvertised on 4/6/2015, and then rescheduled the bid opening date to 4/16/201. This leaves only a period of 10 days from readvertisement to bid opening for review and response. Can this period be extended to allow a minimum of 14 days for review and response?
Response: The bid opening date will be extended to April 21, 2015.
mailto:eflhd.contracts@dot.gov
Info Page 2 of 2
2. Since the bid opening was temporarily suspended, will the original bid proposal be acceptable or will a new bid proposal be required?
Response: The original bid proposal is acceptable if prices do not change from any amendment information.
3. The Little Swan Creek Bridge, Schedule A, does not provide enough reinforcement detail for the cast-in-place overhang on Section B-B, pages R17. For clarity, can you provide a detail for the cast-in-place overhang?
Response: Plan Sheets R17 (Deck Panels) and R28 (Bar List - 4) will be revised by amendment to clarify the requirements.
4. Amendment No. 3 has answered to load restriction regarding the hauling of the little Swan Creek Bridge precast units but does not address construction equipment. Cranes, and other equipment, needed to off load and erect the precast units, construct access roads and temporary structures will exceed the load rating by themselves, not including the trucks and trailers needed to mobilize the equipment. Will the load restrictions on the Natchez Trace Parkway be waived in order for construction equipment to mobilize the site(s)?
Response: Load restrictions on the Natchez Trace Parkway do not apply for the hauling of Little Swan Creek Bridge precast concrete units only. Load restrictions on the Natchez Trace Parkway do apply for the hauling of all other materials.
5. Addendum #3 has answered that two precast plants in TN exist that have the ability to perform the work. Can the contact information for the two TN precast manufacturing plants that will be quoting the precast components be provided?
Response: Two precast manufacturing plants are provided with this amendment for informational purposes only.
-A p r -2
1:
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e P
S
E
A d v e r ti s e m e n t\
M ic r o s ta ti o n L it tl e
S w a n A
M E
N D
A
M E
N D
R
N
A T
R -1
E
(L
S
P r e -D e c k .D
G N
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
QUANTITY
Concrete
(cuyd.)
A C
T U
A L F I L E R
N A
T R
E
L S P r e D e c k .D
G N
N
"2
DETAIL A
Scale: 1" = 1’-0"
JJO As shown
PLAN
" = 1’-0"8 1Scale:
Detail B
3.2
2.0 710
3.0
1.9 633
R17
Bridge
Begin/End L Parkway
C Natchez Trace
C A A A A A A A A A A A A A
D B B B B B B B B B B B B B
D B B B B B B B B B B B BB
A
8" Diaphragm
L Intermediate C Diaphragm
L Intermediate C
Diaphragm
L Intermediate C
Diaphragm
L Intermediate C CL Pier
B
B
" = 1’-0"2 1Scale:
SECTION B-B
A
6"
(Typ.)
Detail A
"8
(Typ.)
DETAIL B
Scale: 1" = 1’-0"
7"
Ultra-high performance concrete
Precast panels
(Typ.)
#5SE1
S p a
" = 1’-0"4 1Scale:
(Typ.)
T y p
" = 1’-0"4 1Scale:
4"
14 Spa. @ 6"
S p a
PANEL A PANEL B
S p a
S p a
T y p
13 Spa. @ 6" 13 Spa. @ 6"
T y p
T y p
" = 1’-0"4 1Scale:
PANEL C
" = 1’-0"4 1Scale:
PANEL D
" = 1’-0"2 1Scale:
SECTION A-A
Precast panels
(Typ.)
Ultra-high performance concrete
Precast panel
(Typ.)
8"
=6’-6"
(Typ.)
4"
S
E
B o tt
S
E
T o p
S
E
B o tt
S
E
T o p
6"x6" Port
1’-3" 2’-0"
(Typ.) (Typ.)
8’-0"
(Typ.)
4" 14 Spa. @ 6"
1’-3" 2’-0"
(Typ.) (Typ.)
8’-0"
=7’-0"
#5SE3 (Top)
#5SE4 (Bott.)
#5SE2
#5SE1
(Top & Bott.)=7’-0"
S
E
T o p B o tt
S
E
T o p B o tt
(Typ.)
4"
=6’-6" #5SE4 (Bott.)
#5SE3 (Top)
C GirderL
C GirderL
C GirderL
C GirderL
C GirderL
#5SE5
#5SE2
#5SE3
#5SE4
#5SE2
#5SE2
#5SE1
PANEL
A
B
C
D
DECK PANELS ESTIMATE
Reinf. steel
1,148
1,024
16’-2"
11’-6"
BAR MARK
(Lbs.)
Bar Length (ft)
#5SE1
#5SE2
#5SE3
#5SE4
#5SE5
8’-10"
10’-6"
7’-11"
#5SE5
T y p
T o p
B o tt
#5SE1
(Top & Bott.)
5"
(Typ.)
DECK PANELS
Cast-in-place overhang
6"
(Typ.)
"2 11’-10 overhang
Cast in-place
#5SE6 (Top)
6" #5SE6 (Bott.)
cast-in-place overhang.
3. Provide #5SE6 bars the full length of the bridge in the performance concrete.
2. Fill closure pours, haunches and concrete ports with Ultra-high
1. For railing details, see "RAILING DETAIL-1"sheet.
Notes:
AMENDMENT NO. 004 4
4/13/15 ADDED LONGITUDINAL OVERHANG REBAR4 CN
3 Spa. @ 6" = 1’-6"
STATE PROJECT
SHEET
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
114016
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
JJO Phillip BoinskeCN
Structure Number
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-120829 August 2014
REINFORCING STEEL SCHEDULE DIMENSION TABLE
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R V
PIER REINFORCEMENT CONTINUE)
64#6P19k 6 Stirrups
64#6P19l 6 Stirrups
64#6P19m 6 Stirrups
64#6P19n 6 Stirrups
64#6P19o 6 Stirrups
64#6P19p 6 Stirrups
64#6P19q 6 Stirrups
64#6P19r 6 Stirrups
64#6P19s 6 Stirrups
64#6P19t 6 Stirrups
LBSSUBTOTAL
PIER FOOTING REINFORCEMENT
STR#11PF1 11 Horiz. top & bot.
17 0’-12"#11PF2 11 Vert.
LBSSUBTOTAL
B
C
D
OPTIONAL LEG
TYPE 17
A
B
(C)R R
TYPE 64
-A p r -2
1:
P M
M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s A
M E
N D
M E
N T
R
N A
T R -1
E
(L
S
B a r
L is t .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
R28
28No scaleJEG
STATE PROJECT
SHEET
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
114016
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
JJO Phillip BoinskeCN
Structure Number
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-120829
BAR LIST - 4
A C
T U
A L F I L E R
N A
T R
E L S B a r L is t .D
G N
August 2014
STR
DECK OVERHANG REINFORCEMENT
SUBTOTAL LBS
5 Long. top & bot.#5SE6
AMENDMENT NO. 004 4
4/13/15 CN ADDED OVERHANG REBAR
Precast manufacturing plants 1 of 1
Precast manufacturing plants in Tennessee. Please note that neither of these plants stated that they will be providing quotes:
1. Prestress Services Industries, LLC
Memphis, Tennessee (901)775-9880 http://www.prestressservices.com Certification Category: B4,C3
Products Produced: Box Beams/Slabs, Poles, Sound Walls, Beams, Columns, Joists, Bleacher, Cell Modules, Double Tees, Hollow Core Slabs, I-Beams, Girders, Piles, Single Tees, Structural Wall Panels
2. Ross Prestressed Concrete, Inc.
Knoxville, Tennessee (865)524-1485 http://www.rossprestress.com
Certification Category: B4,C4
Products Produced: Hollow Core Slabs, Beams, Columns, Joists, Bleacher, Box Beams/Slabs, Double Tees, I-Beams, Girders, Other Sections, Segmental Bridge Units, Sound Walls, Structural Wall Panels
INFORMATIONAL PURPOSES ONLY
http://www.prestressservices.com/ http://www.rossprestress.com/
| Amendment 4 info_revised.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0004 |
| Project PRA-NATR 1E10 |
| Natchez Trace Parkway |
| Little Swan Creek Bridge Replacement |
| Big Swan Creek Bridge Repair |
| Solicitation: DTFH71-15-B-00005 |
| Plans_Amendment 4.pdf |
| AMEND_R17_NATR-1E10 (LS)_Pre-Deck |
| AMEND_R28_NATR-1E10 (LS)_Bar List - 4 |
File details come from the government source that posted it. Updated .