Report_4_Bridge_Inspection_Big_Swan.pdf

PDF 4 MB Posted

Attached to
Natchez Trace Parkway 1E10 Federal contract opportunity
Solicitation number
DTFH71-15-B-00005
Issued by
Department of Transportation Federal Highway Administration

About this file

Report 4_Bridge Inspection_Big Swan

View the file

Other files for this federal contract opportunity

Other files attached to Natchez Trace Parkway 1E10, newest first.
File Type Posted
Amendment_0006_-_PRA-NATR_1E10.pdf PDF
Amendment_0005-_PRA-NATR_1E10.pdf PDF
Amendment_0004_-_PRA-NATR_1E10.pdf PDF
Amendment_0003_-_PRA-NATR_1E10.pdf PDF
Amendment_0002-_PRA-NATR_1E10.pdf PDF
Amendment_0001_-_PRA-NATR_1E10.pdf PDF
Report_5_Soils_and_Foundation.pdf PDF
Report_2_NEPA_Big_Swan.pdf PDF
FP03_Eng_.pdf PDF
Plans_PRA-NATR_1E10.pdf PDF
Report_3_Bridge_Inspection_Little_Swan.pdf PDF
ADV_Subcontracting_Plan.doc DOC document
FP03_Errata.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-100A-Form.pdf PDF
IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf PDF
Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf PDF
Report_1_NEPA_Little_Swan.pdf PDF
Synopsis_PRA-NATR_1E10.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

BIG SWAN CREEK BRIDGE

NATCHEZ TRACE PARKWAY OVER BIG SWAN CREEK

NATCHEZ TRACE PARKWAY

LN

STRUCTURE NO. 5570-002P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/15/13

Report prepared by: WD

MILE POINT: 391.50

Federal Highway Administration KILOMETER POINT: 630.04 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP

STRUCTURE SUMMARY STRUCTURE NO. 5570-002P

BIG SWAN CREEK BRIDGE INSPECTION DATE: 3/15/13

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 300.5 FT (91.6 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 50.1 FT (15.3 M)

WEARING SURFACE: .......... EPOXY OVERLAY DECK WIDTH: ...................... 32.4 FT (9.9 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.0 FT (8.5 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1984

PROJ./PLAN REF. NO: ......... 1E3 / 41908 SKEW ANGLE: ..................... 26 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1984-MAJOR RECONSTRUCTION/SUPERSTRUCTURE; 1997-EXPANSION JOINT

REPLACEMENT.

LOCATION

NATCHEZ TRACE PARKWAY MILE POINT: ..................... 391.50 (KM PT 630.04)

STATE: ................................. TENNESSEE LOCATION: 0.1 MILES FROM TN ROUTE 99

FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY

FEATURE INTERSECTED: .. BIG SWAN CREEK

STRUCTURE EVALUATION SUMMARY

This prestressed concrete continuous multi-girder bridge is in fair condition overall. Problems noted include widespread moderate to severe cracking with heavy efflorescence on the east side of Pier Caps #1 and #5, and moderate to severe cracking with efflorescence and spalling of the east deck overhang over the piers. Additional problems include cracking and spalling of the curbs and railings at the expansion joints, cracking, delamination and spalling of the closure diaphragms at Piers #2 and #4, cracking of the wearing surface, and moderate debris accumulation at the upstream side of Piers #2 and #3. Moderate to heavy vegetation growth is also present beneath the bridge.

Repairs are not required at this time, as the structure is programmed for rehabilitation under Project NATR 1E10 with an anticipated completion date in 2015.

INSPECTION TEAM: D.K. JOHNSON, J.S. SMITHDEAL (CLARK NEXSEN)

CONDITION ASSESSMENT:

D. KEITH JOHNSON, P.E., FIELD TEAM LEADER

REPORT REVIEW :

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 8/1/13

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-002P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL:

TOTAL ITEMIZED COSTS:

$0 $0 $0

$0

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

$0

REMARKS: Structure is programmed for rehabilitation under Project NATR 1E10 with scheduled completion in 2015.

FIELD INSPECTION REPORT STRUCTURE NO. 5570-002P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK

ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(VEGETATION)

G G N N N G N N G

F G

(VEGETATION)

F N F F N G G N G G N

F(VEGETATION)

G N F N G G

F(VEGETATION)

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR RANDOM CRACKING OF CONCRETE DECK HEADERS

THROUGHOUT.

MINOR RANDOM CRACKING WITH EFFLORESCENCE AND MINOR

HONEYCOMBING ON DECK UNDERSIDE IN SEVERAL LOCATIONS.

MODERATE RANDOM CRACKING WITH EFFLORESCENCE AND

SPALLING ON UNDERSIDE OF EAST OVERHANG AT PIERS; SEVERE

SPALLING AT PIER #5. REPAIR FORMS LEFT IN PLACE ON DECK

UNDERSIDE. SEVERAL DECK CORES HAVE BEEN TAKEN IN THE

PAST.

58.2 MINOR DEBRIS ACCUMULATION THROUGHOUT JOINTS.

58.3 MINOR TRANSVERSE CRACKING OF THIN EPOXY WEARING

SURFACE BEHIND DECK HEADERS AND OVER PIERS #2 - #4. MINOR

RANDOM CRACKING IN EAST SHOULDER, SPAN #1. MINOR LOSS OF

WEARING SURFACE IN NORTHBOUND LANE, SPAN #6, NEAR PIER

#5.

LANE STRIPING IS CRACKED AND BEGINNING TO FADE.

58.5,6 MINOR RANDOM CRACKING OF CURBS AND RAILINGS WITH MORE

EXTENSIVE MODERATE RANDOM CRACKING, DELAMINATION, AND

SPALLING OF CURBS AND RAILINGS NEAR EXPANSION JOINTS.

58.7 DRAINS PARTIALLY COGGED WITH DIRT AND VEGETATION.

58.10, 59.11, 60.12,19

MINOR VINE GROWTH ON DECK UNDERSIDE, CLOSURE

DIAPHRAGMS, PIER STEMS AND CAPS, PIERS #1, #4, AND #5.

MODERATE TO HEAVY VEGETATION GROWTH UNDER BRIDGE.

59.2 EXPOSED AND RUSTED REBAR CHAIRS ON UNDERSIDE OF

GIRDERS THROUGHOUT.

59.6 MINOR CRACKING AND DELAMINATION DEVELOPING INTO SPALLS

ON CLOSURE DIAPHRAGMS OVER PIERS #2 AND #4 ALONG GIRDER

EDGES.

F G F F F N

F

G

G

F

INSPECTION DATE: 3/15/13

STRUCTURE NO. 5570-002P FIELD INSPECTION REPORT

BIG SWAN CREEK BRIDGE

ITEM REFERENCE AND REMARKS

AVERAGE CLEAR OPENING 8.

7. NORMAL VELOCITY

ADEQUACY OF OPENING 6.

5. OTHER

4. WATERWAY OBSTRUCTIONS

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL 6

G G N F N

MED

SUFF

19 FT.

9. STREAM BED COMPOSITION :

ROCK, GRAVEL

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT 6.

EROSION5.

SURFACING4.

APPROACH GUARDRAIL 3.

2. RELIEF JOINTS

APPROACH SLABS1. N

N N F G G G G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

60.1,3,4 MODERATE LEAKAGE ONTO BREASTWALLS AT EAST CORNER OF

BOTH ABUTMENTS. MODERATE CRACKING WITH EFFLORESCENCE

ON EAST CORNER OF BOTH ABUTMENT BACKWALLS AND

BREASTWALLS. MINOR CRACKING ON BACKWALL AT WEST SIDE

OF SOUTH ABUTMENT.

60.6 MINOR MAP CRACKING OF WINGWALLS AND MINOR POPOUTS ON

EAST WINGWALLS AT BOTH ABUTMENTS BELOW BEARING SEATS;

MODERATE EFFLORESCENCE PRESENT.

60.7 MINOR LOSS OF FILL THROUGH WEEP HOLES AT NORTH

ABUTMENT.

60.13 MODERATE HORIZONTAL CRACK ON PIER #5 STEM.

60.15 WIDESPREAD MINOR TO MODERATE CRACKING WITH HEAVY

EFFLORESCENCE ON PIER CAPS; SEVERE AT EAST SIDE OF PIER

CAPS #1 AND #5. MINOR SPALLING ALONG BOTTOM EDGE OF EAST

SIDE OF PIER CAP #1. MINOR SPALL ON WEST SIDE OF PIER CAP

#4.

60.17, 61.2 MINOR SCOUR AT PIER #3; MINOR EROSION AT PIER #4. MINOR

SLOUGHING OF NORTH CHANNEL BANK UPSTREAM AND

DOWNSTREAM OF BRIDGE.

61.4 MODERATE AMOUNT OF FLOOD DEBRIS ON UPSTREAM SIDE OF

PIER #2. TREES AND DEBRIS LODGED AGAINST UPSTREAM AND

SOUTH SIDES OF PIER #3; SMALL ISLAND FORMING IN SPAN #3.

222.4 MINOR TO MODERATE TRANSVERSE AND RANDOM CRACKING OF

APPROACH PAVEMENT.

222.5 MINOR EROSION AT NORTHEAST PARAPET END; EROSION

EXTENDS DOWN EMBANKMENT 15'.

222.7 TYPE 3 REFLECTIVE OBJECT MARKERS AT CORNERS OF

STRUCTURE. "BIG SWAN CREEK" SIGNS AT SOUTHEAST AND

NORTHWEST CORNERS OF STRUCTURE. TEMPORARY FLASHER

ON WEST RAILING AT NORTH APPROACH.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-002P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 19 17 32 29

TYPE 3 18 16 29 26

TYPE 3S2 27 24 45 41

TYPE 3-3 33 30 55 50

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-002P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 474 - TENNESSEE (TN)

(202) STRUCTURE NAME: .......... BIG SWAN CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 101 - LEWIS

(204) STRUCTURE NUMBER: ..... 5570-002P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG SWAN CREEK

(207) ROAD SECTION NO: .......... 002P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570002P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES FROM TN ROUTE 9

(210) OPERATING UNIT: ............. M. LEWIS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 1E3 (11) MILE POINT: ............................. 391.50 (KM PT 630.04)

(212) DRAWING NUMBERS: ....... 41908 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

6 - P/S CONCRETE CONTINUOUS

02 - STRINGER/MULTI-BEAM or GIRDER

50.1 FT (15.3 M)

300.5 FT (91.6 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 5 - EPOXY OVERLAY

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 19.0 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 3 - POSTING REQUIRED

(64) OPERATING RATING: ...... 32.0 TONS (29.0 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 3/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

o

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-002P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 35°34'43.90" (51) CURB TO CURB WIDTH: ........... 28.0 FT (8.5 M)

(17) LONGITUDE: ......................... 87°26'00.60" (52) DECK WIDTH: ............................ 32.4 FT (9.9 M)

(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 210 (34) SKEW ANGLE: ............................ 26 °

(30) YEAR OF ADT: ...................... 2011 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 231 (47) TOTAL HORIZ. CLEARANCE: .... 28.0 FT (8.5 M)

(115) YEAR OF FUTURE ADT: ..... 2031 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.50 FT (0.76 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

8 - Stable; scour above top of fo

1 - MAINTENANCE

C - MODERATE

$0

$0

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1984-MAJOR RECONSTRUCTION/SUPERSTRUCTURE; 1997-EXPANSION JOINT REPLACEMENT.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:87�26'00.60 http:35�34'43.90

APPENDIX STRUCTURE NO. 5570-002P

PHOTOGRAPHS STRUCTURE NO. 5570-002P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD TUPELO

FLOW

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO #4 - TYPICAL DETERIORATION OF LANE STRIPING; SPANS #4

AND #5 SHOWN

PHOTO #5 - RANDOM CRACKING OF WEARING

SURFACE IN EAST SHOULDER, SPAN #1

PHOTO #6 - TYPICAL TRANSVERSE CRACKING

OF WEARING SURFACE OVER PIERS #2 - #4;

WEARING SURFACE OVER PIER #2 SHOWN;

ALSO NOTE DECK CORES TAKEN IN THE PAST

PHOTO #7 - LOSS OF WEARING SURFACE IN NORTHBOUND LANE,

SPAN #6, NEAR PIER #5

PHOTO #8 - TYPICAL TRANSVERSE CRACKING OF APPROACH

PAVEMENT; NORTH APPROACH SHOWN

PHOTO #9 - TYPICAL RANDOM CRACKING OF

CONCRETE DECK HEADERS THROUGHOUT;

DECK HEADERS ALONG EXPANSION JOINT

OVER PIER #1 SHOWN

PHOTO #10 - TYPICAL DEBRIS ACCUMULATION

THROUGHOUT JOINTS; EXPANSION JOINT

OVER SOUTH ABUTMENT SHOWN

PHOTO #11 - TYPICAL DETERIORATION OF CURBS NEAR EXPANSION

JOINTS; EAST CURB, SPAN #2 NEAR PIER #1 SHOWN

PHOTO #12 - TYPICAL DETERIORATION OF RAILINGS NEAR

EXPANSION JOINTS; EAST RAILING, SPAN #3 NEAR PIER #3 SHOWN

PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING NORTH, SPAN #3

PHOTO #14 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE IN SEVERAL LOCATIONS; EAST BAY, SPAN #2 SHOWN

PHOTO #15 - CRACKING WITH EFFLORESCENCE AND SPALLING ON

UNDERSIDE OF EAST OVERHANG AT PIER #5

PHOTO #16 - TYPICAL REPAIR FORMS LEFT IN PLACE ON DECK

UNDERSIDE; CENTER BAY, SPAN #6 SHOWN

PHOTO #17 - TYPICAL CRACKING AND DELAMINATION DEVELOPING

INTO SPALLS ON CLOSURE DIAPHRAGMS OVER PIERS #2 AND #4

ALONG GIRDER EDGES; EAST BAY, SPAN #5 AT PIER #4 SHOWN

PHOTO #18 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #19 - TYPICAL CRACKING WITH

EFFLORESCENCE ON EAST CORNER OF BOTH

ABUTMENT BACKWALLS, BREASTWALLS AND

WINGWALLS; SOUTH ABUTMENT SHOWN

PHOTO #20 - GENERAL VIEW OF PIER #3,

SOUTH FACE

PHOTO #21 - TYPICAL VINE GROWTH ON DECK UNDERSIDE,

DIAPHRAGMS, PIER STEMS AND CAPS; PIER #5, NORTH FACE SHOWN

PHOTO #22 - TYPICAL CRACKING WITH EFFLORESCENCE ON PIER

CAPS; PIER #3, SOUTH FACE SHOWN

PHOTO #23 - CRACKING WITH EFFLORESCENCE AT EAST SIDE OF

PIER CAP #5; NORTH FACE SHOWN

PHOTO #24 - EROSION AT PIER #4

PHOTO #25 - TYPICAL VEGETATION GROWTH UNDER BRIDGE; SPAN #2

SHOWN

PHOTO #26 - UPSTREAM CHANNEL

PHOTO #27 - DOWNSTREAM CHANNEL

PHOTO #28 - TREES AND FLOOD DEBRIS LODGED AGAINST UPSTREAM

AND SOUTH SIDES OF PIER #3

PHOTO #29 - SLOUGHING OF NORTH

UPSTREAM CHANNEL BANK