Report_4_Bridge_Inspection_Big_Swan.pdf
PDF 4 MB Posted
- Attached to
- Natchez Trace Parkway 1E10 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00005
About this file
Report 4_Bridge Inspection_Big Swan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006_-_PRA-NATR_1E10.pdf | ||
| Amendment_0005-_PRA-NATR_1E10.pdf | ||
| Amendment_0004_-_PRA-NATR_1E10.pdf | ||
| Amendment_0003_-_PRA-NATR_1E10.pdf | ||
| Amendment_0002-_PRA-NATR_1E10.pdf | ||
| Amendment_0001_-_PRA-NATR_1E10.pdf | ||
| Report_5_Soils_and_Foundation.pdf | ||
| Report_2_NEPA_Big_Swan.pdf | ||
| FP03_Eng_.pdf | ||
| Plans_PRA-NATR_1E10.pdf | ||
| Report_3_Bridge_Inspection_Little_Swan.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| FP03_Errata.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-100A-Form.pdf | ||
| IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf | ||
| Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| Report_1_NEPA_Little_Swan.pdf | ||
| Synopsis_PRA-NATR_1E10.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG SWAN CREEK BRIDGE
NATCHEZ TRACE PARKWAY OVER BIG SWAN CREEK
NATCHEZ TRACE PARKWAY
LN
STRUCTURE NO. 5570-002P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 3/15/13
Report prepared by: WD
MILE POINT: 391.50
Federal Highway Administration KILOMETER POINT: 630.04 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5570-002P
BIG SWAN CREEK BRIDGE INSPECTION DATE: 3/15/13
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 300.5 FT (91.6 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 50.1 FT (15.3 M)
WEARING SURFACE: .......... EPOXY OVERLAY DECK WIDTH: ...................... 32.4 FT (9.9 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.0 FT (8.5 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1984
PROJ./PLAN REF. NO: ......... 1E3 / 41908 SKEW ANGLE: ..................... 26 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1984-MAJOR RECONSTRUCTION/SUPERSTRUCTURE; 1997-EXPANSION JOINT
REPLACEMENT.
LOCATION
NATCHEZ TRACE PARKWAY MILE POINT: ..................... 391.50 (KM PT 630.04)
STATE: ................................. TENNESSEE LOCATION: 0.1 MILES FROM TN ROUTE 99
FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY
FEATURE INTERSECTED: .. BIG SWAN CREEK
STRUCTURE EVALUATION SUMMARY
This prestressed concrete continuous multi-girder bridge is in fair condition overall. Problems noted include widespread moderate to severe cracking with heavy efflorescence on the east side of Pier Caps #1 and #5, and moderate to severe cracking with efflorescence and spalling of the east deck overhang over the piers. Additional problems include cracking and spalling of the curbs and railings at the expansion joints, cracking, delamination and spalling of the closure diaphragms at Piers #2 and #4, cracking of the wearing surface, and moderate debris accumulation at the upstream side of Piers #2 and #3. Moderate to heavy vegetation growth is also present beneath the bridge.
Repairs are not required at this time, as the structure is programmed for rehabilitation under Project NATR 1E10 with an anticipated completion date in 2015.
INSPECTION TEAM: D.K. JOHNSON, J.S. SMITHDEAL (CLARK NEXSEN)
CONDITION ASSESSMENT:
D. KEITH JOHNSON, P.E., FIELD TEAM LEADER
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 8/1/13
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-002P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
$0 $0 $0
$0
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$0
REMARKS: Structure is programmed for rehabilitation under Project NATR 1E10 with scheduled completion in 2015.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-002P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK
ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(VEGETATION)
G G N N N G N N G
F G
(VEGETATION)
F N F F N G G N G G N
F(VEGETATION)
G N F N G G
F(VEGETATION)
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1 MINOR RANDOM CRACKING OF CONCRETE DECK HEADERS
THROUGHOUT.
MINOR RANDOM CRACKING WITH EFFLORESCENCE AND MINOR
HONEYCOMBING ON DECK UNDERSIDE IN SEVERAL LOCATIONS.
MODERATE RANDOM CRACKING WITH EFFLORESCENCE AND
SPALLING ON UNDERSIDE OF EAST OVERHANG AT PIERS; SEVERE
SPALLING AT PIER #5. REPAIR FORMS LEFT IN PLACE ON DECK
UNDERSIDE. SEVERAL DECK CORES HAVE BEEN TAKEN IN THE
PAST.
58.2 MINOR DEBRIS ACCUMULATION THROUGHOUT JOINTS.
58.3 MINOR TRANSVERSE CRACKING OF THIN EPOXY WEARING
SURFACE BEHIND DECK HEADERS AND OVER PIERS #2 - #4. MINOR
RANDOM CRACKING IN EAST SHOULDER, SPAN #1. MINOR LOSS OF
WEARING SURFACE IN NORTHBOUND LANE, SPAN #6, NEAR PIER
#5.
LANE STRIPING IS CRACKED AND BEGINNING TO FADE.
58.5,6 MINOR RANDOM CRACKING OF CURBS AND RAILINGS WITH MORE
EXTENSIVE MODERATE RANDOM CRACKING, DELAMINATION, AND
SPALLING OF CURBS AND RAILINGS NEAR EXPANSION JOINTS.
58.7 DRAINS PARTIALLY COGGED WITH DIRT AND VEGETATION.
58.10, 59.11, 60.12,19
MINOR VINE GROWTH ON DECK UNDERSIDE, CLOSURE
DIAPHRAGMS, PIER STEMS AND CAPS, PIERS #1, #4, AND #5.
MODERATE TO HEAVY VEGETATION GROWTH UNDER BRIDGE.
59.2 EXPOSED AND RUSTED REBAR CHAIRS ON UNDERSIDE OF
GIRDERS THROUGHOUT.
59.6 MINOR CRACKING AND DELAMINATION DEVELOPING INTO SPALLS
ON CLOSURE DIAPHRAGMS OVER PIERS #2 AND #4 ALONG GIRDER
EDGES.
F G F F F N
F
G
G
F
INSPECTION DATE: 3/15/13
STRUCTURE NO. 5570-002P FIELD INSPECTION REPORT
BIG SWAN CREEK BRIDGE
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING 8.
7. NORMAL VELOCITY
ADEQUACY OF OPENING 6.
5. OTHER
4. WATERWAY OBSTRUCTIONS
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
G G N F N
MED
SUFF
19 FT.
9. STREAM BED COMPOSITION :
ROCK, GRAVEL
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N N F G G G G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.1,3,4 MODERATE LEAKAGE ONTO BREASTWALLS AT EAST CORNER OF
BOTH ABUTMENTS. MODERATE CRACKING WITH EFFLORESCENCE
ON EAST CORNER OF BOTH ABUTMENT BACKWALLS AND
BREASTWALLS. MINOR CRACKING ON BACKWALL AT WEST SIDE
OF SOUTH ABUTMENT.
60.6 MINOR MAP CRACKING OF WINGWALLS AND MINOR POPOUTS ON
EAST WINGWALLS AT BOTH ABUTMENTS BELOW BEARING SEATS;
MODERATE EFFLORESCENCE PRESENT.
60.7 MINOR LOSS OF FILL THROUGH WEEP HOLES AT NORTH
ABUTMENT.
60.13 MODERATE HORIZONTAL CRACK ON PIER #5 STEM.
60.15 WIDESPREAD MINOR TO MODERATE CRACKING WITH HEAVY
EFFLORESCENCE ON PIER CAPS; SEVERE AT EAST SIDE OF PIER
CAPS #1 AND #5. MINOR SPALLING ALONG BOTTOM EDGE OF EAST
SIDE OF PIER CAP #1. MINOR SPALL ON WEST SIDE OF PIER CAP
#4.
60.17, 61.2 MINOR SCOUR AT PIER #3; MINOR EROSION AT PIER #4. MINOR
SLOUGHING OF NORTH CHANNEL BANK UPSTREAM AND
DOWNSTREAM OF BRIDGE.
61.4 MODERATE AMOUNT OF FLOOD DEBRIS ON UPSTREAM SIDE OF
PIER #2. TREES AND DEBRIS LODGED AGAINST UPSTREAM AND
SOUTH SIDES OF PIER #3; SMALL ISLAND FORMING IN SPAN #3.
222.4 MINOR TO MODERATE TRANSVERSE AND RANDOM CRACKING OF
APPROACH PAVEMENT.
222.5 MINOR EROSION AT NORTHEAST PARAPET END; EROSION
EXTENDS DOWN EMBANKMENT 15'.
222.7 TYPE 3 REFLECTIVE OBJECT MARKERS AT CORNERS OF
STRUCTURE. "BIG SWAN CREEK" SIGNS AT SOUTHEAST AND
NORTHWEST CORNERS OF STRUCTURE. TEMPORARY FLASHER
ON WEST RAILING AT NORTH APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-002P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 19 17 32 29
TYPE 3 18 16 29 26
TYPE 3S2 27 24 45 41
TYPE 3-3 33 30 55 50
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-002P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... BIG SWAN CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 101 - LEWIS
(204) STRUCTURE NUMBER: ..... 5570-002P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG SWAN CREEK
(207) ROAD SECTION NO: .......... 002P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570002P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES FROM TN ROUTE 9
(210) OPERATING UNIT: ............. M. LEWIS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1E3 (11) MILE POINT: ............................. 391.50 (KM PT 630.04)
(212) DRAWING NUMBERS: ....... 41908 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
6 - P/S CONCRETE CONTINUOUS
02 - STRINGER/MULTI-BEAM or GIRDER
50.1 FT (15.3 M)
300.5 FT (91.6 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 5 - EPOXY OVERLAY
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 19.0 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 3 - POSTING REQUIRED
(64) OPERATING RATING: ...... 32.0 TONS (29.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 3/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
o
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-002P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°34'43.90" (51) CURB TO CURB WIDTH: ........... 28.0 FT (8.5 M)
(17) LONGITUDE: ......................... 87°26'00.60" (52) DECK WIDTH: ............................ 32.4 FT (9.9 M)
(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 210 (34) SKEW ANGLE: ............................ 26 °
(30) YEAR OF ADT: ...................... 2011 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 231 (47) TOTAL HORIZ. CLEARANCE: .... 28.0 FT (8.5 M)
(115) YEAR OF FUTURE ADT: ..... 2031 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.50 FT (0.76 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable; scour above top of fo
1 - MAINTENANCE
C - MODERATE
$0
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1984-MAJOR RECONSTRUCTION/SUPERSTRUCTURE; 1997-EXPANSION JOINT REPLACEMENT.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:87�26'00.60 http:35�34'43.90
APPENDIX STRUCTURE NO. 5570-002P
PHOTOGRAPHS STRUCTURE NO. 5570-002P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD TUPELO
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO #4 - TYPICAL DETERIORATION OF LANE STRIPING; SPANS #4
AND #5 SHOWN
PHOTO #5 - RANDOM CRACKING OF WEARING
SURFACE IN EAST SHOULDER, SPAN #1
PHOTO #6 - TYPICAL TRANSVERSE CRACKING
OF WEARING SURFACE OVER PIERS #2 - #4;
WEARING SURFACE OVER PIER #2 SHOWN;
ALSO NOTE DECK CORES TAKEN IN THE PAST
PHOTO #7 - LOSS OF WEARING SURFACE IN NORTHBOUND LANE,
SPAN #6, NEAR PIER #5
PHOTO #8 - TYPICAL TRANSVERSE CRACKING OF APPROACH
PAVEMENT; NORTH APPROACH SHOWN
PHOTO #9 - TYPICAL RANDOM CRACKING OF
CONCRETE DECK HEADERS THROUGHOUT;
DECK HEADERS ALONG EXPANSION JOINT
OVER PIER #1 SHOWN
PHOTO #10 - TYPICAL DEBRIS ACCUMULATION
THROUGHOUT JOINTS; EXPANSION JOINT
OVER SOUTH ABUTMENT SHOWN
PHOTO #11 - TYPICAL DETERIORATION OF CURBS NEAR EXPANSION
JOINTS; EAST CURB, SPAN #2 NEAR PIER #1 SHOWN
PHOTO #12 - TYPICAL DETERIORATION OF RAILINGS NEAR
EXPANSION JOINTS; EAST RAILING, SPAN #3 NEAR PIER #3 SHOWN
PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING NORTH, SPAN #3
PHOTO #14 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK
UNDERSIDE IN SEVERAL LOCATIONS; EAST BAY, SPAN #2 SHOWN
PHOTO #15 - CRACKING WITH EFFLORESCENCE AND SPALLING ON
UNDERSIDE OF EAST OVERHANG AT PIER #5
PHOTO #16 - TYPICAL REPAIR FORMS LEFT IN PLACE ON DECK
UNDERSIDE; CENTER BAY, SPAN #6 SHOWN
PHOTO #17 - TYPICAL CRACKING AND DELAMINATION DEVELOPING
INTO SPALLS ON CLOSURE DIAPHRAGMS OVER PIERS #2 AND #4
ALONG GIRDER EDGES; EAST BAY, SPAN #5 AT PIER #4 SHOWN
PHOTO #18 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #19 - TYPICAL CRACKING WITH
EFFLORESCENCE ON EAST CORNER OF BOTH
ABUTMENT BACKWALLS, BREASTWALLS AND
WINGWALLS; SOUTH ABUTMENT SHOWN
PHOTO #20 - GENERAL VIEW OF PIER #3,
SOUTH FACE
PHOTO #21 - TYPICAL VINE GROWTH ON DECK UNDERSIDE,
DIAPHRAGMS, PIER STEMS AND CAPS; PIER #5, NORTH FACE SHOWN
PHOTO #22 - TYPICAL CRACKING WITH EFFLORESCENCE ON PIER
CAPS; PIER #3, SOUTH FACE SHOWN
PHOTO #23 - CRACKING WITH EFFLORESCENCE AT EAST SIDE OF
PIER CAP #5; NORTH FACE SHOWN
PHOTO #24 - EROSION AT PIER #4
PHOTO #25 - TYPICAL VEGETATION GROWTH UNDER BRIDGE; SPAN #2
SHOWN
PHOTO #26 - UPSTREAM CHANNEL
PHOTO #27 - DOWNSTREAM CHANNEL
PHOTO #28 - TREES AND FLOOD DEBRIS LODGED AGAINST UPSTREAM
AND SOUTH SIDES OF PIER #3
PHOTO #29 - SLOUGHING OF NORTH
UPSTREAM CHANNEL BANK