Plans_PRA-NATR_1E10.pdf
PDF 18 MB Posted
- Attached to
- Natchez Trace Parkway 1E10 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00005
About this file
Plans PRA-NATR 1E10
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006_-_PRA-NATR_1E10.pdf | ||
| Amendment_0005-_PRA-NATR_1E10.pdf | ||
| Amendment_0004_-_PRA-NATR_1E10.pdf | ||
| Amendment_0003_-_PRA-NATR_1E10.pdf | ||
| Amendment_0002-_PRA-NATR_1E10.pdf | ||
| Amendment_0001_-_PRA-NATR_1E10.pdf | ||
| Report_5_Soils_and_Foundation.pdf | ||
| Report_4_Bridge_Inspection_Big_Swan.pdf | ||
| Report_2_NEPA_Big_Swan.pdf | ||
| FP03_Eng_.pdf | ||
| IFB_Solicitation_Book_-_PRA-NATR_1E10.pdf | ||
| Report_6_Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| Report_1_NEPA_Little_Swan.pdf | ||
| Report_3_Bridge_Inspection_Little_Swan.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| FP03_Errata.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-100A-Form.pdf | ||
| Synopsis_PRA-NATR_1E10.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
SYMBOLS AND
R/W
R/W
P/E C/E
P
UD
W
P/E C/E
P or
UD
W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve centeral angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transision)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original groung OG
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transision)
Tangent distance Ts
(tangent length)
Tangent distance T
Vertical point of intersection VPI
Vehicle per hour vph
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fibre optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
Back BK
LCenterline C
No Symbol
TB or TP
P or
UD
W
No Symbol
TB or TP
P or
UD
W
R/W
R/W
A2
PAVEMENT REMOVAL/ROADWAY OBLITERATION
AREA PATTERN
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
NORTH ARROW
N
TEST PIT TP-1
BORING LOCATION B-1
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
DIVERSION CHANNEL
TURBIDITY BARRIER
WB
EB
PCMS
ESAL
NMSA
SACP
Drum
Traffic direction arrow
Advance warning arrow panel
Westbound
Eastbound
Portable changeable message sign
Equivalent single axle loads
Nominal maximum size aggregate
Superpave hot asphalt concrete pavement
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D a -n a tr
1e s y m .d g n
:3
:2
A
-S e p -2
:3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
SE
NPS
NO.
NO.PMIS
NATCHEZ TRACE PARKWAY
LOCATION MAP
PRA-NATR 1E10 A3
N
TN
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D a -n a tr
1e lo c .d g n
:0
:5
-S e p -2
:0
160232A
C e n te rv ille H ig h w ay
Linden H ig h w a y
Wayn esb oro Hi ghwa y
Summertow n H ighw ay
Bu ffalo
Road
T o p sy R o a d
Ga it he r H inson Road
Buffalo Road
Napier Lake Roa d
N a p ie r R o a d
20Railroad Bed Pike
S u m m e rto w n H ig hw ay
Mt Joy Road
Big Swan C re e k R o a d
D r y
C r e e k R o a d
E n te rp rise R oad
P isgah Ridge Road
C ol um bi a
Hi ghway
Ha mpsh ire Pike
Sheboss Road
T y s o n s S to re R o ad
L a w re n c e b u rg H ig hw ay
Lawr en ce bu rg H igh wa y
P u la s k i
H ig h w a y
Santa Fe Pike
W illiamsport Pike
Z E
H C
T A
N
Y A
WKRA
P
E C
A R
T MOUNT PLEASANT
M P
MP 390
HAMPSHIRE
COLUMBIA
M P 380
(125 miles)
TO TUPELO
(75 miles)
TO NASHVILLE
HOHENWALD
114,016
MP 391.50
CREEK
BIG SWAN
BRIDGE OVER
SCHEDULE B
MP 386.89
CREEK
LITTLE SWAN
BRIDGE OVER
SCHEDULE A
SCALE IN MILES
1.250 2.5
Message Sign
Changeable
Install Portable
Message Sign
Changeable
Install Portable
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D a -n a tr
1e s u r .d g n
:4
:5
-S e p -2
:4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A A4
(SCHEDULE A)
(CONTROL POINTS)
INFORMATION
SURVEY
NAIL717.9981538188.801434136.6384009
TBAR783.3621539163.662435138.1124008
TBAR749.9251538540.002434512.3254007
TBAR747.3711538317.454434339.4064006
NAIL711.7571538205.516434275.9734005
TBAR715.8631538170.912434204.8714004
TBAR744.5071538132.555434078.5864003
TBAR747.0491538105.756434102.7214002
TBAR753.9411537830.059433652.5824001
TBAR;NEAR PULLOFF771.0341537516.874432981.5984000
RemarksElevationEastingNorthingPoint
Survey Control Points Coordinate Listing
Vertical datum: NAVD 1988
Geoid: GEOID12 (Conus)
Zone: Tennessee 4100
Datum: NAD 1983 (Conus)
Name: US State Plane 1983
Coordinate System
A5
1.
A z
2.
.2
A z .8
N
.7
A z
.8
A z .7
.9
N
.6
A z
.0
.9
A z
.4
N
.3
A z
.8
.1
A z 1
.0
.1
A z
.5
NTS NTS NTS
N
T B A R
N A
IL
M il e s ig n
"M e ri w e th e r
L e w is
T B
A R
T B
A R
C re e k s ig n
L it tl e S w a n
PULLOFF
NEAR4
1T B
A R
T B
A R
T B A R
C re e k s ig n
L it tl e S w a n
T B A R
T B A R
(SCHEDULE A)
(REFERENCES)
INFORMATION
SURVEY
A z .0
.0
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D a -n a tr
1e s u r .d g n
:4
:1
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
SE TN
REG STATE PROJECT SHEET NO.
A6
NATCHEZ TRACE PARKWAY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
PRA-NATR 1E10
114,016
A
M S e p
A
M M P
R O J E
C T S n a tr e P r o j_
D e v C
A D
D a n a tr e h a l.
d g n
(SCHEDULE A)
(PARKWAY)
ALIGNMENT
HORIZONTAL
NO.
NPS
PMIS NO.
Ending chain LSWANCL description
Point 11 N 434,452.8268 E 1,538,455.3204 Sta 110+23.15
Course from ST C101A to 11 N 45° 30’ 36.33" E Dist 83.7013
CC 432,531.8307 1,540,133.9670
ST 434,394.1703 1,538,395.6101 109+39.45
PI 434,333.4337 1,538,333.7822 108+52.79
CS 434,302.2854 1,538,303.6526 108+09.45
Point North East Station
Spiral Coordinates
XS 129.9915 LC 129.9962 Deg 2° 15’ 00.00"
YS 1.1061 ST 43.3360 Defl 0° 29’ 14.99"
R 2,546.4800 LT 86.6696 CB N 45° 01’ 21.34" E
LS 130.0000 K 64.9986 AH N 45° 30’ 36.33" E
Angle 1° 27’ 45.00" (RT) P 0.2765 BK N 44° 02’ 51.34" E
Spiral C101A Type 2 Spiral Element
Chord Bear = N 37° 46’ 08.21" E
Ahead = N 44° 02’ 51.34" E
Back = N 31° 29’ 25.08" E
C.C. N 432,531.8307 E 1,540,133.9670
P.T. Station 108+09.45 N 434,302.2854 E 1,538,303.6526
P.C. Station 102+51.35 N 433,861.9953 E 1,537,962.5107
Mid. Ord. = 15.2743
Long Chord = 556.9858
External = 15.3665
Radius = 2,546.4800
Length = 558.1022
Tangent = 280.1735
Degree = 2° 15’ 00.00"
Delta = 12° 33’ 26.26" (RT)
P.I. Station 105+31.52 N 434,100.9072 E 1,538,108.8604
Curve C101
Curve Data
CC 432,531.8307 1,540,133.9670
SC 433,861.9953 1,537,962.5107 102+51.35
PI 433,805.1383 1,537,927.6819 101+84.69
TS 433,688.7851 1,537,862.5469 100+51.35
Point North East Station
Spiral Coordinates
XS 199.9692 LC 199.9863 Deg 2° 15’ 00.00"
YS 2.6177 ST 66.6765 Defl 0° 44’ 59.96"
R 2,546.4800 LT 133.3441 CB N 29° 59’ 25.04" E
LS 200.0000 K 99.9949 AH N 31° 29’ 25.08" E
Angle 2° 15’ 00.00" (RT) P 0.6545 BK N 29° 14’ 25.08" E
Spiral C101B Type 1 Spiral Element
Course from 10 to TS C101B N 29° 14’ 25.08" E Dist 51.3490
Point 10 N 433,643.9790 E 1,537,837.4642 Sta 100+00.00
Beginning chain LSWANCL description
NAIL
TBAR
TBAR
TBAR
NAIL
TBAR
NAIL
NAIL
NAIL
NAIL
NAIL
NAIL
Creek sig n
Little Swan
1 Mile" sign "Meriwether Lewis
Creek sign
Little Swan
In v . 7
.9
In v . 7
.9
’R x ’S x .2 ’ R
C B
C
S w a n
L it tl e
C r e e k
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D a -n a tr
1e s u r v p ln .d g n
:4
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A
N
A7
N
E
N
(SCHEDULE A)
PLAN
SURVEY
SCALE IN FEET
0 25 50
S C
.3
C S
.4
S T
.4
-S e p -2
:4
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D b 1-n a tr
1e ty p .d
TYPICAL SECTION
PARKWAY
No Scale
SE PRA-NATR 1E10 B1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NATCHEZ TRACE PARKWAY
TN
PMIS NO.
NO.
NPS
114,016 160232A
(SCHEDULE A)
(105+65 to 108+06.42)
BRIDGE
LITTLE SWAN CREEK
PARKWAY SUPERELEVATED SECTION
Travel LaneTravel LaneShoulder
PROPOSED:
CL
Profile grade
Shoulder of SACP
Lateral pay limits
11’ 11’6’-6" 6’-6"
8%
Type IV roughness (Surface course)
0.3-<3 million ESAL’s
1 1/2" SACP, 1/2" NMSA,
0.3-<3 million ESAL’s
2" SACP, 1/2" nmsa, Curb line (typ.)
Membrane
5"-9" HACP
11’6’
Travel LaneTravel LaneShoulder
Varies
Va rie s
PROPOSED:
EXISTING: CL
8" Aggregate base in locations as directed by the CO aggregate-topsoil course (typ.)
Variable depth and width topsoil course (typ.)
Existing aggregate-
11’
(e)
Slope stake variable
Shoulder
6’ (min.)
1V:1.5H
(103+75 to 104+54.45 and 109+39.45 to 110+00)
SHOULDER WIDENING
LITTLE SWAN CREEK
PARKWAY SUPERELEVATED SECTION
Notes :
5"-9" HACP
6’
Travel LaneTravel LaneShoulder
8%
Varies
Va rie s
PROPOSED:
EXISTING:
CL
8" Aggregate base topsoil course (typ.)
Existing aggregate-
(e)
Slope stake
Profile grade
Shoulder
Aggregate base, grading C or D, 10" depth
Roadway excavation
1V:1.5H
(104+54.45 to 105+65 and 108+06.42 to 109+39.45)
RECONSTRUCTION
LITTLE SWAN CREEK
PARKWAY SUPERELEVATED SECTION
Earthwork geotextile, type II-B
Conserved embankment (no pay) variable (6’ min.)11’ + 11’ + of SACP
Lateral pay limits
Lateral pay limits of aggregate base
Topsoil, 4-Inch depth (see note 2)
Type IV roughness (Surface course)
0.3-<3 million ESAL’s
1 1/2" SACP, 1/2" NMSA,
(two lifts of 2 1/2" depth)
0.3-<3 million ESAL’s
5" SACP, 3/4" NMSA,
bridge deck
Concrete
8% turf establishment on all other disturbed areas.
aggregate-topsoil. Provide topsoil, 4-inch depth, and Provide turf establishment on shoulder area receiving1.
ggregate-topsoil course (typ.)" A2 e p -2
:4
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D b 1-n a tr
1e ty p .d
TYPICAL SECTION
PARKWAY
No Scale
SE PRA-NATR 1E10 B2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NATCHEZ TRACE PARKWAY
TN
PMIS NO.
NO.
NPS
114,016 160232A
(SCHEDULE B)
5"-9" HACP
11’6’
Travel LaneTravel LaneShoulder
Varies
Va rie s
PROPOSED:
EXISTING:
CL
8" Aggregate base topsoil course (typ.)
Existing aggregate-
11’
(e)
(To 20’ beyond the end of each approach wall)
BIG SWAN CREEK
PARKWAY SUPERELEVATED SECTION
Type IV roughness (Surface course)
0.3-<3 million ESAL’s
1 1/2" SACP, 1/2" NMSA,
Asphalt pavement milling, 1 1/2" depth
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D c 1-n a tr
1e q n t.
d g n
:5
:4
P
M -S e p -2
:5
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
C1 PRA-NATR 1E10 160232A
114,016
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
QUANTITIES
OF
TABULATION
PMIS NO.
NO.
NPS
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D c 1-n a tr
1e q n t.
d g n
:1
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
C2 PRA-NATR 1E10 160232A
114,016
NATCHEZ TRACE PARKWAY
(SCHEDULE B)
QUANTITIES
OF
TABULATION
PMIS NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
SE
REG STATE PROJECT SHEET NO.
C3
NATCHEZ TRACE PARKWAY
PRA-NATR 1E10
S e p
A
M A
M M P
R O J E
C T S n a tr e P r o j_
D e v C
A D
D c n a tr e s ig n c .d g n
Sign Text LOCATION Height in
Area
PANEL SIZE
Corner
Radii Border
Width Width
Margin Numbers Upper
Case Case
Lower Series
Color
Combination RemarksQuantity
Total Area in
TEXT SIZE
sqft inin in inin sqft
24 12 See note 2 See note 3
24 12 See note 2 See note 3
1 M3-1
No.
Sign
No.
Text in
Width
3 24 12 See note 2 See note 3
222 44
M4-8a
M4-9L
24 12 See note 2 See note 3
202 40
24 12 See note 2 See note 3
42 8
White on
Black
232TOTAL (this sheet)
SHEET 1 OF 3
TN
ORTHN
OUTHSM3-3
TOM4-5
END
DETOUR
DETOUR
DETOUR
M4-9R
DETOURM4-8
160232A
PARKWAYM4-3
24 18 See note 2 See note 3
23 6
30 24 See note 2 See note 3
85 40
30 24 See note 2 See note 3
105 50
2 22
(SCHEDULE A)
SCHEDULE
CONSTRUCTION SIGNS
114,016
NO.
NOTES:
2. Adjust actual locations of signs as directed by the CO.
4. See Subsection 635.26 for additional information on construction signs.
and the MUTCD’s latest edition of "Standard Highway Signs".
3. Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
1. Install sign post supports according to Std. E635-01.
Orange on
Black
Orange on
Black
Orange on
Black
Orange on
Black
White on
Black
White on
Black
White on
Black
DETOURM4-10L
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
SE
C4
NATCHEZ TRACE PARKWAY
PRA-NATR 1E10
S e p
A
M A
M M P
R O J E
C T S n a tr e P r o j_
D e v C
A D
D c n a tr e s ig n c .d g n
Sign Text LOCATION Height in
Area
PANEL SIZE
Corner
Radii Border
Width Width
Margin Numbers Upper
Case Case
Lower Series
Color
Combination RemarksQuantity
Total Area in
TEXT SIZE
sqft inin in inin sqft
21 15 See note 2 See note 3
48 30 See note 2 See note 3
48 18 6 See note 2 See note 3
No.
Sign
No.
Text in
Width
W20-2
24 24 See note 2 See note 3
SHEET 2 OF 3
TN
14 W20-3
160232A
M6-3
ROAD
CLOSED
R11-2
MPH
W13-1P
48 48 See note 2 See note 3
16 32
48 48 See note 2 See note 3
216 32
2.1875
DETOUR
XXXX
White on
Black
13A
13B
13C
(SCHEDULE A)
SCHEDULE
CONSTRUCTION SIGNS
57 66 See note 2
57 66 See note 2
See note 2
13517
See note 2
135 35 sign
Special sign
Special sign
Special sign
Special
AHEAD
DETOUR
CLOSED
NORTH
PARKWAY
AHEAD
DETOUR
CLOSED
SOUTH
PARKWAY
26.125
26.125
6 2 1 6 6 -- E
E
E
E
78.375
114,016
NO.
4. See Subsection 635.26 for additional information on construction signs.
and the MUTCD’s latest edition of "Standard Highway Signs".
3. Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, TOTAL (this sheet)
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
See DETOUR PLAN sheets
XXXX = 500 FT
XXXX = 1500 FT
XXXX = 1 MILE
See DETOUR PLAN sheets
MPH
1. Install sign post supports according to Std. E635-01.
MILE2
CLOSED
ROAD
BEGINNING XX/XX/XX
TO US ROUTE 421
FROM STATE ROUTE 20
PARKWAY NORTH CLOSED
BEGINNING XX/XX/XX
TO STATE ROUTE 20
FROM US ROUTE 421
PARKWAY SOUTH CLOSED
8.75
78.3753
471.50
Orange on
Black
White on
Black
Orange on
Black
Orange on
Black
Orange on
Black
Orange on
Black
Orange on
Black
Orange on
Black
Orange
EASTERN FEDERAL LANDS HIGHWAY DIVISION
C5
NATCHEZ TRACE PARKWAY
PRA-NATR 1E10
S e p
A
M A
M M P
R O J E
C T S n a tr e P r o j_
D e v C
A D
D c n a tr e s ig n c .d g n
Sign Text LOCATION Height in
Area
PANEL SIZE
Corner
Radii Border
Width Width
Margin Numbers Upper
Case Case
Lower Series
Color
Combination RemarksQuantity
Total Area in
TEXT SIZE
sqft inin in inin sqftNo.
Sign
No.
Text in
Width
SHEET 3 OF 3
TN160232A
(SCHEDULE A)
SCHEDULE
CONSTRUCTION SIGNS
114,016
NO.
4. See Subsection 635.26 for additional information on construction signs.
and the MUTCD’s latest edition of "Standard Highway Signs".
3. Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, TOTAL (this sheet)
ROUNDING
TOTAL
SUBTOTAL (all sheets)
1. Install sign post supports according to Std. E635-01.
6 M4-9C 30 24 5 See note 2 See note 3
Orange on
Black
5 right
5 left
(not shown in plans)
Optional bike detour
3 24 12 See note 2 See note 3
52 10M4-3
Orange on
Black
BIKE
5 24 12 See note 2 See note 3
52 10DETOURM4-8
Orange on
Black
(not shown in plans)
Optional bike detour
(not shown in plans)
Optional bike detour
21 15 See note 2 See note 3
510 M6-3 2.1875
White on
Black
(not shown in plans)
Optional bike detour 10.9375
80.9375
784.4375
0.5625 w20-4
AHEAD
ONE LANE
ROAD
W20-7a
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
C6
NATCHEZ TRACE PARKWAY
PRA-NATR 1E10
S e p
A
M A
M M P
R O J E
C T S n a tr e P r o j_
D e v C
A D
D c n a tr e s ig n c .d g n
Sign Text LOCATION Height in
Area
PANEL SIZE
Corner
Radii Border
Width Width
Margin Numbers Upper
Case Case
Lower Series
Color
Combination RemarksQuantity
Total Area in
TEXT SIZE
sqft inin in inin sqft
48 48 16 See note 2 See note 3
2 32
No.
Sign
No.
Text in
Width
TN160232A
48 48 See note 2 See note 3
216 32
126.00
(SCHEDULE B)
SCHEDULE
CONSTRUCTION SIGNS
114,016
NO.
NPS
PMIS NO.
24 24 See note 2 See note 3
24 8
MPH
25W13-1P2
W20-1 48 48 See note 2 See note 3
216 32WORK
AHEAD
ROAD
3 24 18 See note 2 See note 3
23 6W16-2P
FEET
See Detail ET 635-6
See Detail ET 635-6
See Detail ET 635-6
See Detail ET 635-6
See Detail ET 635-6
4. See Subsection 635.26 for additional information on construction signs.
and the MUTCD’s latest edition of "Standard Highway Signs".
3. Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, G20-2 48 24 8 See note 2 See note 3
2 161
ROAD WORK
END
See Detail ET 635-6
TOTAL
1. Install sign post supports according to Std. E635-01.
Orange on
Black
Orange on
Black
Orange on
Black
Orange on
Black
Orange on
Black
Orange
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
NATCHEZ TRACE PARKWAY
-S e p -2
M9 :1
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D c -n a tr
1e s ig n p .d g n
No.
Sign
No.
Text Sign Text
TEXT SIZE
Station Side
LOCATION
in in in in in in
PANEL SIZE
Series
Color
Combination Quantity inin
Total
Area Remarks BorderCorner Margin
WidthWidthRadii Case
LowerUpper
Case NumbersAreaHeightWidth sqft sqft
NPS NO.
PMIS
OM-3L
OM-3R
See Remarks
See Remarks
5 16 0.555
5 16 0.555
Yellow on
Black
Yellow on
Black
C7160232A 114,016
PRA-NATR 1E10
2.22
2.22 of both Parkway bridges’ approach wingwalls
Place object markers at the ends
Totals 8 4.44
SCHEDULE
PERMANENT SIGN
e p -2
M9 :1
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D d 1-n a tr
1e ls p n p .d g n
SE
REG STATE PROJECT SHEET NO.
D1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
NATCHEZ TRACE PARKWAY
PRA-NATR 1E10 160232A TN
107+00 108+00 109+00 110+00106+00105+00104+00103+00
100500
SCALE IN FEET
(SCHEDULE A)
PROFILE
AND
PLAN
114,016
PMIS NO.
NO.
NPS
N
T ie t o e x is ti n g s h o u ld e r
L im it o f w o r k
T ie t o e x is ti n g s h o u ld e r
L im it o f w o r k
.1
.4
T ie t o e x is ti n g p a v e m e n t
.7
B e g in b r id g e
.1
.4
E n d b r id g e
.1
.4
T ie t o e x is ti n g p a v e m e n t
E L
.8
-0.522% +0.925%
485’ VC
K = 335
V P I
.9
760760
765765765
5 7
S w a n
P O
T
.0
T S
.3
S C
.3
C S
.4
S T
.4
P O
T
.1
L it tl e
C r e e k transition
.0
R ig h t)
.0
0 (8.00% Right)
108+09.45 Right
8.00%
Notes:
centerline Construction
Existing ground grade Profile
4.
3.
2.
1.
construction requirements.
See CONSTRUCTION PLAN (SCHEDULE A) for additional horizontal alignment information.
See HORIZONTAL ALIGNMENT (PARKWAY) sheet for Parkway bridge approaches.
See Detail 204-E for embankment and pavement transitions at
See bridge plans for proposed bridge structure and wing walls.
(see note 2) shoulder, 110+00 Tie to existing Limit of work(see note 2) shoulder, 103+75 Tie to existing Limit of work
ZEHCTAN ECART
YAWKRAP
109+39.45 existing pavement
Sawcut and tie to reconstruction
End parkway
(2.90% Right)
109+39.45
104+54.45 existing pavement
Sawcut and tie to
Begin parkway reconstruction
(typ.)
Treeline105+65 bridge
Begin reconstruction parkway
End
108+06.42 bridge
End reconstruction parkway
Begin
(typ) pavement edge of Existing and headwall
15-inch pipe culvert, Install type 5A modified inlet, In v . 7
.9
In v . 7
.9
’R x ’S x .2 ’ R
C B
C
720 7
72572
5 7
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D e 1-n a tr
1e ls p la n .d g n
:2
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A
N
E1
SCALE IN FEET
0 25 50
Notes:
(SCHEDULE A)
PLAN
CONSTRUCTION
barrier
Install Turbidity access construction
Install new bridge install a bridge and Remove existing footprint under bridge
Clear vegetation centerline
Construction
(typ) shoulder edge of
Proposed
ZEHCTAN
ECART YAWKRAP
C r e e k
S w a n
L ittle sign
"LITTLE SWAN CREEK"
Remove and reset sign
"MERIWHETHER LEWIS 1 MILE"
Remove and reset ssec ca n oitcu rtsn oC
See note 2 fence snow temporary
Install
(See note 3) wall rock stacked
Historic
Fill limit (typ) pavement (typ)
Proposed edge of
(typ.)
Treeline
S C
.3
C S
.4
S T
.4
(See note 4) washout concrete
Install4.
3.
2.
1.
sign
"LITTLE SWAN CREEK"
Remove and reset pavement (typ) edge of Existing pavement (typ) edge of Proposed
The CO must approve the washout device.
Locate concrete washout at locations designated by the CO.
disturbed stones to match the appearance of the existing wall.
Minimize disturbance to the historic stacked rock wall. Reset any higher than average water levels in Little Swan Creek.
proposed pier location prior to pier installation if necessary due to Remove the piers flush to proposed finished grade. Dewater around
The CO determines the number and location of construction accesses.
CONTROL NARRATIVE
EROSION & SEDIMENT
M1 construction limits.
does not leave the project site. Perimeter controls include silt fence and other specified measures outside the
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control measures.
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting
Contract Requirements.
for Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. Customary Units), and the Special measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
Runoff Coefficient prior to and after construction is 0.51.
construction is 0.51. The Little Swan Bridge Runoff Coefficient after construction will be 0.56. The Big Swan Bridge
No new impervious area is created by the Big Swan Bridge repair. The Little Swan Bridge Runoff Coefficient prior to
Approximately 0.035 acres of new impervious surface is created by the Little Swan Bridge replacement.
approximately 0.75 acres. The receiving waters are the Little Swan Creek and Big Swan Creek.
Soil disturbing activities include clearing and grubbing, and roadway grading. The total disturbed area for the project is pier cap concrete, repairing spalled areas on curbing and railing, and clearing vegetation and debris from under the bridge.
with a two span bridge with 11’ lanes and 6’-6" shoulders. Work on the Big Swan Creek Bridge includes repairing deteriorated
Work on the Little Swan Creek Bridge includes replacing the existing three span bridge with 11’ lanes and 3’ shoulders
Bridge (Milepost 391.50) located in Section 1E of the Natchez Trace Parkway.
This project consists of replacing the Little Swan Creek Bridge (Milepost 386.89) and repairing the Big Swan Creek
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
must be approved by the CO.
Concrete washout - Install and maintain as per manufacturer’s specifications. Concrete washout device prior to removing the barrier.
sediment deposited behind the barrier by hand if sediment impedes proper function of the barrier and
Turbidity barrier - Inspect turbidity barrier daily and repair or replace immediately if damaged. Remove it becomes 0.5 feet deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when
Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization
Install a conrete washout prior to construction.
areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade
Install inlet protection prior to diverting water through inlets.
runoff.
At the end of each day�s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 624 and 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days roadway.
culverts as called out in the Erosion and Sediment Control plans. Install filter berms in ditches along the
Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the
Phase II Intermediate Controls
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D m 1-n a tr
1e e s n a r .d g n
:2
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
In v . 7
.9
In v . 7
.9
’R x ’S x .2 ’ R
C B
C
720 7
72572
5 7
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D m -n a tr
1e e s ls p la n .d g n
:2
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A
N
SCALE IN FEET
0 25 50 barrier
Install Turbidity access construction
Install centerline Construction pavement
Edge of
(typ) shoulder edge of
Proposed
ZEHCTAN
ECART YAWKRAP
C r e e k
S w a n
L ittle ssec ca n oitcu rtsn oC fence snow temporary
Install
Fill limit (typ) pavement (typ)
Proposed edge of
(typ) fence silt
Install wall rock stacked
Historic dams check
Install
(SCHEDULE A)
PLAN
EROSION CONTROL
TEMPORARY
M2
S C
.3
C S
.4
S T
.4
Note:
1.Locate concrete washout at locations designated by the CO.
(See note 1) washout concrete
Install
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D m -n a tr
1e e s b s p la n .d g n
:4
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A M3
SCALE IN FEET
0 25 50
20’ pavement
Edge of
ZEHCTAN
ECART
YAWKRAP
B
IG
S W
A N
C R
E E
K
Sawcut pavement mill and overlay
-inch2 1Limit of 1 (typ) fence silt
Install
(SCHEDULE B)
PLAN
EROSION CONTROL
TEMPORARY
barrier
Install Turbidity
S S
E C
C A
N
OI
TCURT
SNOC
N
Sawcut pavement mill and overlay
-inch2 1Limit of 1
20’
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
SE
NPS
NO.
NO.PMIS
NATCHEZ TRACE PARKWAY
PRA-NATR 1E10 N2
N
TN
M
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D n 1-n a tr
1e d e to u r p la n .d g n
:3
-S e p -2
160232A
SHEET 2 OF 2
DETAIL A
DETAIL B
Notes:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(9)
(See note 1)
AHEAD
DETOUR
CLOSED
NORTH
PARKWAY
DETOUR
1 MILE
M P H.. .
ROAD
CLOSED
DETOUR
1500 FT
M P H.. .
DETOUR
500 FT
PARKWAY
NORTH
ROAD
CLOSED
NORTH
PARKWAY
DETOUR
TO
(9)
(10)
(12)
DETOUR
END
NORTH
PARKWAY
TO
DETOUR
DETOUR
(12)
(2)
(3)
(4)
(5)
(13)
(14)
(8)
(15)
(15)
(15)
(15) (11)
AHEAD
DETOUR
CLOSED
SOUTH
PARKWAY
(See note 1)
(13)
(12)
(11)
(10)
(9)
(8)
(7)
(6)
(5)
(4)
(3)
(2)
(1)
PARKWAY
DETOUR
SOUTH
PARKWAY
TO
DETOUR
SOUTH
z e h ct a N e c ar T n wo tr e m m u S ya wh gi H z e h ct a N yawkraP aibmul oC yawhgiH gi B nawS keerC
DETOUR
114,016
(SCHEDULE A)
DETAILS
DETOUR PLAN
SCALE IN FEET
5000 1000 t e ef
�MILE
e c ar T
0 fe et
BEGINNING XX/XX/XX
TO US ROUTE 412
FROM STATE ROUTE 20
PARKWAY NORTH CLOSED
BEGINNING XX/XX/XX
TO STATE ROUTE 20
FROM US ROUTE 412
PARKWAY SOUTH CLOSED
(15)
(14) y a w kr a P
See note 2
See note 3
3.
2.
1.
(16) (16)
(16)
(16)
(16)
ROAD
CLOSED
(On farm gate)
(10)
(17)
(1)
(18)
(17)
(17)
TO
PARKWAY
NORTH
DETOUR
(18)
(11)
TO
PARKWAY
DETOUR
SOUTH
Subsection 619.03 (a) and 619.11.
10 feet south of the existing pulloff that is 3500 feet south of State Route 412. See
Install a farm gate across the Parkway with two "ROAD CLOSED" signs mounted on it
Subsections 619.03 (a) and 619.11.
10 feet north of the existing pulloff that is 1200 feet south of the Little Swan Creek Bridge. See
Install a farm gate across the Parkway with two "ROAD CLOSED" signs mounted on it closure (signs (6) and (13)) at least seven calendar days prior to closing the Parkway.
Install the two construction signs providing advanced notification of the Parkway
(One per two barricades)
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D p 1-n a tr
1e s s p .d g n
:3
1:
-S e p -2
:3
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A P1
(SCHEDULE A)
STRIPING PLAN
PERMANENT
SCALE IN FEET
0 25 50
BRIDGE OVER LITTLE SWAN CREEK
Notes:
350’
350’
(Sta. 101+55) at 10-foot spacing, typ.
raised pavement markers white edge striping and
Limit of 4-inch solid yellow centerline striping
4-Inch double solid
(Sta. 111+95) at 10-foot spacing, typ.
raised pavement markers white edge striping and
Limit of 4-inch solid
See Detail E634-03 for striping.
See Detail E634-02 for raised pavement markers.
2.
1.
(Sta. 104+54.45)
Limit of double solid yellow centerline striping
Sawcut and tie to existing pavement
Begin parkway reconstruction
(Sta. 109+39.45)
Limit of double solid yellow centerline striping
Sawcut and tie to existing pavement
End parkway reconstruction at 10-foot spacing, typ.
white reflective material
Raised pavement markers, type D, white edge striping
4-Inch solid right approach (typ.)
on ends of approach walls for the
(OM-3R, 5" x 16", black on yellow)
Install object marker left approach (typ.)
on ends of approach walls for the
(OM-3L, 5" x 16", black on yellow)
Install object marker
P R
O J E
C T
S n a tr 1e
P r o j
D e v C
A D
D p 1-n a tr
1e s s p .d g n
:3
-S e p -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NATCHEZ TRACE PARKWAY
TN PRA-NATR 1E10SE
114,016
NO.
NPS
PMIS NO.
160232A P2
(SCHEDULE B)
STRIPING PLAN
PERMANENT
SCALE IN FEET
0 25 50
BRIDGE OVER BIG SWAN CREEK
20’
’053
20’ 350’ at 10-foot spacing, typ.
raised pavement markers white edge striping and
Limit of 4-inch solid
Limit of double solid yellow centerline striping
Sawcut and tie to existing pavement
-inch milling and overlay2 1Limit of parkway 1 yellow centerline striping
4- Inch double solid
Limit of double solid yellow centerline striping
Sawcut and tie to existing pavement
-inch milling and overlay2 1Limit of parkway 1 at 10-feet spacing, typ.
raised pavement markers white edge striping and
Limit of 4-inch solid
Notes:
See Bridge Plans for additional work required on the Big Swan Creek Bridge.
See Detail E634-03 for striping.
See Detail E634-02 for raised pavement markers.
3.
2.
1.
at 10-foot spacing, typ.
white reflective material
Raised pavement markers, type D, white edge striping
4-Inch solid left approach (typ.)
on ends of approach walls for the
(OM-3L, 5" x 16", black on yellow)
Install object marker right approach (typ.)
on ends of approach walls for the
(OM-3R, 5" x 16", black on yellow)
Install object marker
Structure Number
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T L
S W
A N
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
5570-004P
NATCHEZ TRACE PARKWAY
TNSE
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-1208JJO 29
PRA-NATR 1E10160232A
114016
Phillip BoinskeCN August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d
DRAWING TITLE
GENERAL NOTES
R01
No Scale
INDEX OF DRAWINGS
DRAWINGS NO.
Abut. 1 Abut. 2
Wingwall A
Wingwall B
Wingwall C
Wingwall D
KEY
JEG
A C
T U
A L F I L E R
N
A T
R
E
L S
G N .D
G
Reinforcing Steel:
Prestressed Concrete Girders:
Prestressing Steel:
GEOTECHNICAL REPORT:
MATERIALS:
Live loads:
Dead loads:
DESIGN LOADS:
Construction:
Design:
SPECIFICATIONS:
GENERAL NOTES:
Concrete: 150 pcf.
Future Wearing Surface: 25 psf.
Provide 2" cover for reinforcing steel unless otherwise noted.
f’c = 9,000 psi at 28 days
HL-93
Lap splices 30 bar diameters unless otherwise shown.
f’ci = 7,500 psi at release
Structural Concrete:
Furnish reinforcing steel conforming to AASHTO M 31 (ASTM A615), Grade 60 deformed.
For boring logs and other geotechnical information, see Geotechnical Report No. 15-13.
U.S. Customary Units.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 f’c = 5,000 psi at 28 days
", unless otherwise noted.4 3Chamfer exposed edges
Pre-tension each strand to a total load of 31,000 lb at which load fpi = 0.75 fpu = 202.5 ksi.
The final estimated effective prestress force per strand is 39,745 lb for interior beams and 39,800 lb for exterior beams; based on estimated losses of 19.35 ksi and 19.10 ksi, respectively.
conforming to AASHTO M 203.
Bearings:
Provide elastomeric bearing pads conforming to the requirements of Section 18.2 of the AASHTO
LRFD Bridge Design Specifications, with 60 durometer hardness. Follow AASHTO LRFD design Method A.
AASHTO LRFD Bridge Design Specifications, Sixth Edition, U.S. Customary Units, 2012, with 2013 Interim.
Use uncoated reinforcing steel in pier, abutments and wingwalls unless otherwise noted.
unless otherwise noted.
Furnish Class D(AE) concrete for precast deck panel and approach slabs.
Use epoxy coated reinforcing steel in precast deck panels and approach slabs and diaphragms
Furnish Ultra -high Performance concrete for closure pours and haunches.
Furnish Class P concrete for prestressed girders units
Furnish Grade 270, 0.6" diameter, seven-wire, uncoated, low-relaxation, prestressing strands and cast-in-place footings.
Furnish Class A(AE) concrete for precast pier, precast abutments, precast wingwalls
Boring Log
Reinforcing Bar List-4
Reinforcing Bar List-3
Reinforcing Bar List-2
Reinforcing Bar List-1
Prestressed Concrete Pile Details
Approach Slab
Expansion Joint Details
Bearing Details
Natchez Trace Railing Detail-2
Natchez Trace Railing Detail-1
Girder Detail
Deck Panels
Typical Section
Deck Elevations
Framing Plan
Pier Reinforcement
Pier Layout
Wingwall C and D Details
Wingwall A and B Details
Wingwall Layout
Abutment 2 Reinforcement
Abutment 2 Layout
Abutment 1 Reinforcement
Abutment 1 Layout
Foundation Layout
Plan and Elevation
Site Plan
General Notes
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
114016
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
JJO Phillip BoinskeCN
Structure Number
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-120829 August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
5570-004P
NATCHEZ TRACE PARKWAY
TNSE
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-1208JJO 29
PRA-NATR 1E10160232A
114016
Phillip BoinskeCN August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
R02
PLAN
106+00 107+00 Parkway
L Natchez TraceC
Bridge length = 241’-5"
5 7
SITE PLAN
Elev. 747.16
Sta. 108+06.42
End Bridge
Little Swan Creek
241’-4"
JEG As shown
A C
T U
A L F I L E R
N A
T R
E L S S I T
E .D
To Tupelo, MS
To Nashville, TN
L PierC
Elev. 746.75
Sta. 105+65
Begin Bridge
120’-8"120’-8" "4 131’-3"4
131’-3
Not to scale
R
(Typ.)
Deck drain
C
5’-0"
10’-0"
PLAN
" = 1’-0"4 1Scale:
A A superstructure
Outside face of
5’-0"
SECTION A-A
Riprap splash block
Groundline
Finished
Groundline
Finished 6" of Selected back fill to the outside face of superstructure
This side of splash block parallel
Riprap, Class 3
L Deck drain outlet
SPLASH BLOCKS FOR DECK DRAIN OUTLETS
(Typ.)
splash block
Deck drain
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
114016
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
JJO Phillip BoinskeCN
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
5570-004P
NATCHEZ TRACE PARKWAY
TNSE
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-1208JJO 29
PRA-NATR 1E10160232A
114016
Phillip BoinskeCN August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d
120’-8" 120’-8"
241’-4"
Elev. 746.75
Sta. 105+65
Begin Bridge
106+00 107+00
108+00 Elev. 747.16
Sta. 108+06.42
End Bridge
To Tupelo, MS To Nashville, TN
Litle Swan Creek
PLAN
120’-8" 120’-8"
241’-4"
-0.52%
1:2
Abutment 1 at 18’-0" left of L
Existing ground line C
Cat 18’-0" right of L
Existing ground line
Abutment 2
Cline at L
Existing ground
1:
ELEVATION
Fix FixEXP. EXP.
Pier
PLAN AND ELEVATION
R03
N
Low steel elevation: 739.80
Bridge Length = 241’-5"
A C
T U
A L F I L E R
N A
T R
E
L S P
E .D
G N
Parkway
L Natchez traceC
0.93%
JJO No scale 3
R
"4 131’-3 "4
330’-10
"2 130’-11"2
130’-11
(Typ.) (See Note 1)
Deck drain stationing.
1. See "DECK ELEVATION" sheet for deck drain
Note:
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
-S e p -2
1:
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
R
N A
T R -1
E
(L
S
F L .D
ELEVATION
Nominal Service bearing resistance
Sta. 108+06.42
End Bridge
Sta. 106+85.71
A C
T U
A L F I L E R
N A
T R
E
L S F L .D
G N
R04
FOUNDATION LAYOUT
JJO
Sta. 105+65.00
Begin Bridge
7’-6" 7’-6"
4’-6"
Elev. 736.32
PLAN
LC Footing
LC Footing
6"
6"
LC Footing
No scale 4
PIER
To Tupelo, M S
To Nashville, TN
Abutment 2
Pier
Abutment 1
Location
ABUTMENT 2ABUTMENT 1
C
Elev. 731.45
Elev. 723.80
Elev. 736.83
Elev. 708.30
Elev. 727.17
Elev. 730.17
10’-0"
5’-6"
Parkway
L Natchez Trace
S p a
S p a
°3 ’2
78°28 ’28"
3°14’52"
Sta. 105+41.38
T y p
2°44 ’39"
10’-0"
2°37’27"
2’-6"5’-0"2’-6"
2 2
8.00 ksf
8.00 ksf
8.00 ksf
235 kips
235 kips
235 kips
Required Ultimate pile capacity per pile
Test Pile
°5 ’2
°4 ’6
2°56’38"
Sta. 105+54.86
4. Prebore piles according to Subsection 551.07.
3. Furnish pile steel shoes according to Subsection 551.03(c)(7).
B DETAILS" or "WINGWALL C AND D Details", sheets.
2. For wingwall footing details, see "WINGWALL A AND immediately prior to placing concrete.
1. Verify the bearing capacity of the supporting strata
Notes:
Elev. 709.70*Elev. 709.70*Elev. 709.70*
*Estimated pile tip elevation.
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-120829 August 2014
"16
23’-7 "8
10’-1
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
5570-004P
NATCHEZ TRACE PARKWAY
TNSE
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-1208JJO 29
PRA-NATR 1E10160232A
114016
Phillip BoinskeCN August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d
Elev. H
Elev. G
Elev. F
Elev. E
(Typ.)
Elev. I
Elev. J
Elev. A
Level
CL Girder/Bearing
(Typ.)
Detail A plastic pipe @ 2% slope
1" Geocomposite
1’-0"
ELEVATION
Elev. Abutment 1
A
B
C
D
E
F
G
H
I
VIEW A-A
DETAIL A
" = 1’-0"2 1Scale: 1
" = 1’-0"8 3Scale:
ELEVATION
" = 1’-0"8 3Scale:
ABUTMENT 1 LAYOUT
As shownJJO 5
R05
748.14
746.34
745.35
743.55
741.33
740.71
740.08
739.46
738.83
Notes:
Elev. B
Elev. C
J 726.80
" = 1’-0"8 3Scale:
PLAN
Top of backwallElev. D
A C
T U
A L F I L E R
N A
T R
E
L S
A b u t
.D
G N
L sheet drain
1" Geocomposite sheet drain
(Collector pipe) plastic pipe7’-0" 7’-0" 7’-0" 7’-0"
A
A
L
C Bearings "4
33’-5 "2 17’-9
(Typ.)
L C Natchez Trace
Parkway
19’-0" 19’-0"
38’-0"
1°21’16"
"2 12 "2
"*4 3 Face of backwall
42’-0"
LC Abutment
"8 33’-4
"4 37’-3"2
17’-9
(Typ.) (Typ.)
10’-0"
2’-2" 3’-4"1’-2"
3’-4"
1’-0"
LC Bearing
1’-6"
1’-6" abutment stem.
non-perforated drain pipe through finish grade.
1. Adjust elevation of weepholes to outlet 6" above
C Footing
Level
S e e N o te of bearing/Natchez Trace Parkway
* Distance from centerline of footing to centerline sheet drain
1" Geocomposite
3’-4" footing
Cast-in-place
Cast-in-place footing
L WeepholeC abutment
Face of filter
Removable abutment
Face of
Not to scale
WEEPHOLE FILTER
GROUTED SPLICE COUPLER TOLERANCES
Shim pack height
Dowel height measured from a common reference point splice coupler, and foundation dowels
Location of column reinforcing grouted
Gap between dowels and column reinforcing
1+/-
3 +/- 4
Consult manufacturer
Consult manufacturer
Steel shim packDowels coupler Grouted splicecolumn
Precast
Non-shrink grout
(Typ.)
Grout ports
Not to scale
GROUTED SPLICE COUPLER DETAIL
foundation Cast-in-place
ESTIMATED QUANTITIES (ABUTMENT 1)
Item Unit Quantity
Reinforcement steel
Class A(AE) Concrete lb.
cu.yd.
filter
Weephole
21,808
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
5570-004P
NATCHEZ TRACE PARKWAY
TNSE
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-1208JJO 29
PRA-NATR 1E10160232A
114016
Phillip BoinskeCN August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d
C
T U
A L F I L E R
N A
T R
E
L S
A b u t
R e in f.
D G
N
ABUTMENT 1 REINFORCEMENT
R06
6JJO As shown
9 Spa. @ 12" = 9’-0"3"
(Typ.)
SECTION A-A
" = 1’-0"8 3Scale:
#9AF1
6"
=3’-0"
6 Spa.@ 6"
#5A17 n.f. f.f.
L BearingC
S p a
A e .f
#9AF2
C
" = 1’-0"8 3Scale:
ELEVATION
41 Spa. @ 21" = 41’-0" (#9AF1) (Top)3" 3"
6 Spa.@ 12"= 6’-0" 7 Spa.@ 12"= 7’-0"12" 12" 7 Spa.@ 12"= 7’-0" 12" 7 Spa.@ 12"= 7’-0" 6 Spa.@ 12"= 6’-0"12"4"
(Typ.)
34 Spa.@ 12" = 34’-0"
A e .f
L Structure
82 Spa. @ 6" = 41’-0" (#9AF1) (Bott.)
#5A16
A
A
#5A15
T y p
C
Parkway
L Natchez Trace
A
S p a
" #5A13 #
A
S p a
#5A13
34 Spa. @ 12" = 34’-0"
#5A14
" = 1’-0"8 3Scale:
PLAN
S p a
A
A
#5A17 (Typ.)
#5A17
#5A17
#9AF3
#9A6
#9A5 e .f T y p
A
S p a
#5A12
#9A5 (e.f), #7A7
A e .f
S p a
#9A1 or #9A2, or #9A3, or #9A4, or #9A5
#7A18
(e.f.)
#9A6 (e.f.)(Typ.)
#9A6 (e.f.)
37 spa. @ 12" = 37’-0" (9AF3) match w/ #9A6
(Typ.)
#9AF3
#9A1 (e.f.)
(Typ.)
#5A7
S p a
A e .f
A
(Typ.)
#5A10
#5A11
#5A11
#5A11
#5A9
S p a
A o r
A
#9A1 (e.f), #7A7 #9A2 (e.f), #7A7 #9A3 (e.f), #7A7 #9A4 (e.f), #7A7
#5A13
#5A12
#7A19
#7AF4
#9AF2 (Top & Bott.)
(Typ.)
#9A25
3-#9A25
S p a f.
f.
n .f
A n .f
S p a
A f.
f.
S p a
A n .f
S p a
A f.
f.
(f.f.)
#7A23
#7A7
#7A23 (f.f.)
#5A22 (n.f.)
(f.f.)
#7A21
(n.f.) (Typ.)
or #5A24 or 9A25
#5A20 or #5A22
(f.f.) (Typ.)
or #5A24 or 9A25
#5A21 or #5A23
(Typ.)
#9AF1
#5A14, or #5A26
#5A26
#5A14
NO.
REGION
NPS
NO.
PMIS NO.
TNSE PRA-NATR 1E10160232A
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
5570-004P
NATCHEZ TRACE PARKWAY
(SCHEDULE A)
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
5570-004P
NATCHEZ TRACE PARKWAY
TNSE
(SCHEDULE A)
LITTLE SWAN CREEK BRIDGE
BRP-1208JJO 29
PRA-NATR 1E10160232A
114016
Phillip BoinskeCN August 2014
-A u g -2
:2
P
M M
P R
O J E
C T
S n a tr 1e
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s L
IT
T
A N
P
R O J E
C T
S .d
ABUTMENT 2 LAYOUT
1’-6"
Elev. A
Elev. F
(Typ.)
Elev. BLevel
Level
Detail A plastic pipe plastic pipe
(collector pipe) plastic pipe @ 2% slope sheet drain
1" Geocomposite
1’-0"
ELEVATION
Elev. Abutment 2
A
B
C
D
E
F
G
H
I
VIEW A-A
DETAIL A
" = 1’-0"2 1Scale: 1
L BearingsC
" = 1’-0"8 3Scale:
" = 1’-0"8 3Scale:
PLAN
ELEVATION
" = 1’-0"8 3Scale:
Elev. E
Elev. G
Elev. H
Elev. I
CL Footing
7’-0" 7’-0" 7’-0" 7’-0"
Elev. D
Elev. C
Elev. J
(Typ.) (Typ.)
J
JJO As shown 7
R07
741.12
748.54
745.78
746.74
743.98
741.74
740.49
739.24
730.17
Notes:
A
C T
U A
L F I L E R
N A
T R
E
L S
A b u t
.D
G N
C
Parkway
L Natchez Trace
1’-6"
2’-2" 1’-2" 3’-4"
3’-4"
10’-0"
3’-4"
1’-0"
C BearingL
42’-0"
CL Abutment
Top of backwall
Top of backwall*"4
1°21’16"
(Typ.)
L Girder/Bearing
(Typ.)
C
(Typ.) (Typ.)
abutment stem.
non-perforated drain pipe through finish grade.
1. Adjust elevation of weepholes to outlet 6" above
739.86
"2 17’-9"2
17’-9"4 37’-3
"2 13’-4
"4 33’-5
38’-0"
19’-0"
1’-9""2
19’-0"
(Typ.)
1’-9" sheet drain
1" Geocomposite
A
A sheet drain
1" Geocomposite of…