ID FS ERFO 2016(1)‐27(1)
Idaho Panhandle Repairs 2016
# General Technical Question Answer Date 1 X Are there as built drawings for the concrete box culverts that need to be cleaned and reset?
Sorry, no. 3/20/18
2 x In SCR section 157 Soil Erosion & Sediment Control, Materials lists Filter Rock in Section
705.08. We are unable to locate this
material in the specifications. Please clarify.
An Amendment will be issued to clarify. 3/22/18
3 X Are there dirt runs available for RD 419 sites MP 12.1, MP 12.85 and MP 13.5? We are unable to determine if the roadway excavation at these locations is to embanked on site or hauled off.
No earthwork reports were prepared for these sites.
3/22/18
4 X Does anyone have any idea where this material will go?
See Subsections 204.06, 204.08, and 204.10.
3/22/18
5 X
Can you provide a weight of the Rattle Creek superstructure that is to be removed and reset on the new abutments?
We do not have the superstructure weight.
See Plan Sht. G.8 and the Physical Data for existing Rattle Creek Bridge information.
3/27/2018