Q&A_3-27-18.pdf

PDF 75 KB Posted

Attached to
ID FS ERFO 2016(1)-27(1), Idaho Panhandle Repairs 2016
Solicitation number
DTFH7017B00010
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID FS ERFO 2016(1)‐27(1)

Idaho Panhandle Repairs 2016

# General Technical Question Answer Date 1 X Are there as built drawings for the concrete box culverts that need to be cleaned and reset?

Sorry, no. 3/20/18

2 x In SCR section 157 Soil Erosion & Sediment Control, Materials lists Filter Rock in Section

705.08. We are unable to locate this

material in the specifications. Please clarify.

An Amendment will be issued to clarify. 3/22/18

3 X Are there dirt runs available for RD 419 sites MP 12.1, MP 12.85 and MP 13.5? We are unable to determine if the roadway excavation at these locations is to embanked on site or hauled off.

No earthwork reports were prepared for these sites.

3/22/18

4 X Does anyone have any idea where this material will go?

See Subsections 204.06, 204.08, and 204.10.

3/22/18

5 X

Can you provide a weight of the Rattle Creek superstructure that is to be removed and reset on the new abutments?

We do not have the superstructure weight.

See Plan Sht. G.8 and the Physical Data for existing Rattle Creek Bridge information.

3/27/2018

Check General or Technical

File details come from the government source that posted it.