Amendment_A004.pdf

PDF 3 MB Posted

Attached to
ID FS ERFO 2016(1)-27(1), Idaho Panhandle Repairs 2016
Solicitation number
DTFH7017B00010
Issued by

About this file

Amendment A004

View the file

Other files

File Type Posted
Bid_Opening_Summary_Idaho_Panhandle.pdf PDF
Q&A_4-3-18.pdf PDF
Q&A_3-30-18.pdf PDF
Amendment_A003.pdf PDF
Q&A_3-27-18.pdf PDF
Amendment_A001.pdf PDF
Plans_Request_form.pdf PDF
ID_FS_ERFO_2016_Plans_Signoff.pdf PDF
WellingtonInspection.pdf PDF
FDR419MP14.3_EW.pdf PDF
Vicinity_Map_-_Existing_contract_sites_and_possible_additional_sites.pdf PDF
FDR_419_MP_14.3_Cross_Sections.pdf PDF
FDR489MP0.1_EW.pdf PDF
FDR_489_MP_0.1_Cross_Sections.pdf PDF
phys_data_cover.pdf PDF
RattleInspection.pdf PDF
IFB_Panhandle.pdf PDF
FDR_314_MP_15.0_Cross_Sections.pdf PDF
FDR314MP15.0_EW.pdf PDF
SWPPP_ID_FS_ERFO_2016(1)-27(1)_Pandhandle_Repairs_2016.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A004 04/3/2018 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X DTFH7017B00010

9B. DATED (SEE ITEM 11)

03/05/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(_x_ ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A D OTHER (Specify type of modification and authority)

N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ID FS ERFO 2016(1)-27(1), Idaho Panhandle Repairs 2016

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

ID FS ERFO 2016(1)-27(1)

Idaho Panhandle Repairs 2016

Amendment No. A004, April 3, 2018 Solicitation No. DTFH7017B00010

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)

Page A-3, Block 13A. Revises bid opening date from 04/05/2018 to 04/10/2018.

PLANS

Plan sheet #C.2 Revises Typical Section C, Adds Footnote [4].

Plan sheet #D.2 Revises Section A-A

Plan Sheet #D.6 Revises Section A-A

Plan Sheet #D.9 Revises Section A-A

Plan Sheet #D.10 Revises Section A-A

Plan Sheet #E.2 Deletes Note.

ENCLOSURES

Plan Sheets:

C.2 D.2 D.6 D.9 D.10 E.2

New bid opening date: 04/10/2018 at 1400 local time

Embankment

4 REVISED BY AMENDMENT A004

REVISED BY AMENDMENT A0044

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001
Amendment A001.pdf
SF 1442, SOLICITATINO, OFFER, AND AWARD (Pen & Ink change)
Section H-fp14 A003.pdf
Section H Panhandle 2016.pdf
National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities
CONTENTS
1 HOW TO OBTAIN COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT (CGP)
1.1 ELIGIBILITY CONDITIONS
1.2 TYPES OF DISCHARGES AUTHORIZED
1.3 PROHIBITED DISCHARGES
1.4 SUBMITTING YOUR NOTICE OF INTENT (NOI)
1.5 REQUIREMENT TO POST A NOTICE OF YOUR PERMIT COVERAGE
2 TECHNOLOGY-BASED EFFLUENT LIMITATIONS
2.1 GENERAL STORMWATER CONTROL DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS
2.2 EROSION AND SEDIMENT CONTROL REQUIREMENTS
2.3 POLLUTION PREVENTION REQUIREMENTS
2.4 CONSTRUCTION DEWATERING REQUIREMENTS
3 WATER QUALITY-BASED EFFLUENT LIMITATIONS
3.1 GENERAL EFFLUENT LIMITATION TO MEET APPLICABLE WATER QUALITY STANDARDS
3.2 DISCHARGE LIMITATIONS FOR SITES DISCHARGING TO SENSITIVE WATERS
4 SITE INSPECTION REQUIREMENTS
4.1 PERSON(S) RESPONSIBLE FOR INSPECTING SITE
4.2 FREQUENCY OF INSPECTIONS.
4.3 INCREASE IN INSPECTION FREQUENCY FOR SITES DISCHARGING TO SENSITIVE WATERS.
4.4 REDUCTIONS IN INSPECTION FREQUENCY
4.5 AREAS THAT MUST BE INSPECTED
4.6 REQUIREMENTS FOR INSPECTIONS
4.7 INSPECTION REPORT
4.8 INSPECTIONS BY EPA
5 CORRECTIVE ACTIONS
5.1 CONDITIONS TRIGGERING CORRECTIVE ACTION.
5.2 CORRECTIVE ACTION DEADLINES
5.3 CORRECTIVE ACTION REQUIRED BY EPA
5.4 CORRECTIVE ACTION REPORT
6 STAFF TRAINING REQUIREMENTS
7 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
7.1 GENERAL REQUIREMENTS
7.2 SWPPP CONTENTS
7.3 ON-SITE AVAILABILITY OF YOUR SWPPP
7.4 SWPPP MODIFICATIONS
8 HOW TO TERMINATE COVERAGE
8.1 MINIMUM INFORMATION REQUIRED IN NOT
8.2 CONDITIONS FOR TERMINATING CGP COVERAGE
8.3 HOW TO SUBMIT YOUR NOT
8.4 DEADLINE FOR SUBMITTING THE NOT
8.5 EFFECTIVE DATE OF TERMINATION OF COVERAGE
9 PERMIT CONDITIONS APPLICABLE TO SPECIFIC STATES, INDIAN COUNTRY LANDS, OR TERRITORIES
9.1 EPA REGION 1
9.2 EPA REGION 3
9.3 EPA REGION 5
9.4 EPA REGION 6
9.5 EPA REGION 8
9.6 EPA REGION 9
9.7 EPA REGION 10
2017_cgp_final_appendix_a_-_definitions_508.pdf
Appendix A - Definitions and Acronyms
Definitions
Acronyms
2017_cgp_final_appendix_b_-_areas_of_permit_coverage_508.pdf
Appendix B - Permit Areas Eligible for Coverage and EPA Regional Addresses
B.1 EPA Region 1
B.2 EPA Region 2
B.3 EPA Region 3
B.4 EPA Region 4
B.5 EPA Region 5
B.6 EPA Region 6
B.7 EPA Region 7
B.8 EPA Region 8
B.9 EPA Region 9
B.10 EPA Region 10
2017_cgp_final_appendix_c_-_waivers_508.pdf
Appendix C - Small Construction Waivers and Instructions
C.1 Rainfall Erosivity Waiver
C.2 TMDL Waiver
C.3 Equivalent Analysis Waiver
C.4 Waiver Deadlines and Submissions
2017_cgp_final_appendix_d_-_endangered_species_reqs_508.pdf
Appendix D - Eligibility Procedures Relating to Threatened and Endangered Species Protection
D.1 Threatened and Endangered Species Protection Eligibility Criteria
D.2 Procedures for Determining Which Threatened and Endangered Species Protection Criterion Applies
2017_cgp_final_appendix_e_-_historic_properties_reqs_508.pdf
Appendix E – Historic Property Screening Process
Background
Instructions for All Construction Operators
2017_cgp_final_appendix_f_-_tier_3_tier_2_and_tier_2.5_waters_508.pdf
Appendix F - List of Tier 3, Tier 2, and Tier 2.5 Waters
2017_cgp_final_appendix_g_-_buffer_reqs_508.pdf
Appendix G – Buffer Requirements
G.1 SITES THAT ARE REQUIRED TO PROVIDE AND MAINTAIN NATURAL BUFFERS AND/OR EQUIVALENT EROSION AND SEDIMENT CONTROLS
G.2 COMPLIANCE ALTERNATIVES AND EXCEPTIONS
G.2.1 Compliance Alternatives
G.2.2 Exceptions to the Compliance Alternatives
G.2.3 Requirements for Providing and Maintaining Natural Buffers
G.2.4 Guidance for Providing the Equivalent Sediment Reduction as a 50-foot Buffer
G.3 SMALL RESIDENTIAL LOT COMPLIANCE ALTERNATIVES
G.3.1 Small Residential Lot Compliance Alternative Eligibility
G.3.2 Small Residential Lot Compliance Alternatives
ATTACHMENT 1
ATTACHMENT 2
ATTACHMENT 3
2017_cgp_final_appendix_h_-_storm_frequencies_508.pdf
Appendix H – 2-Year, 24-Hour Storm Frequencies
2017_cgp_final_appendix_i_-_standard_permit_conditions_508.pdf
Appendix I - Standard Permit Conditions
I.1 Duty To Comply.
I.2 Duty to Reapply.
I.3 Need to Halt or Reduce Activity Not a Defense.
I.4 Duty to Mitigate.
I.5 Proper Operation and Maintenance.
I.6 Permit Actions.
I.7 Property Rights.
I.8 Duty to Provide Information.
I.9 Inspection and Entry.
I.10 Monitoring and Records.
I.11 Signatory Requirements.
I.12 Reporting Requirements.
I.13 Bypass.
I.14 Upset.
I.15 Retention of Records.
I.16 Reopener Clause.
I.17 Severability.
2017_cgp_final_appendix_j_-_noi_fillable_508.pdf
Appendix J - Notice of Intent (NOI) Form and Instructions
I. Approval to Use Paper NOI Form
II. Permit Information
III. Operator Information
IV. Project/Site Information
V. Discharge Information
VI. Chemical Treatment Information
VII. Stormwater Pollution Prevention Plan (SWPPP) Information
IX. Historic Preservation
X. Certification Information
Instructions
2017_cgp_final_appendix_k_-_not_fillable_508.pdf
Appendix K - Notice of Termination (NOT) Form and Instructions
I. Approval to Use Paper NOT Form
II. Permit Information
III. Operator Information
IV. Project/Site Information
V. Certification Information
Instructions
2017_cgp_final_appendix_l_-_request_for_chemical_treatment_fillable_508.pdf
Appendix L – Suggested Format for Request for Chemical Treatment
I. Operator Information
II. Project/Site Information
IV. Responsible Personnel
V. Proposed Treatment
VI. Certification Information
Instructions for Submitting This Form
nationwide-permits-2017-401-certification-0317.pdf
Antidegradation Review
Pollutants of Concern
Receiving Water Body Level of Protection
Protection and Maintenance of Existing Uses (Tier I Protection)
Protection of High-Quality Waters (Tier II Protection)
Protection of Outstanding Resource Waters (Tier III Protection)
Conditions Necessary to Ensure Compliance with Water Quality Standards or Other Appropriate Water Quality Requirements of State Law
Best Management Practices
Notification
Waiver Consultation
TMDL Compliance
Outstanding Resource Waters
Fill Material
Turbidity
Mixing Zones
Culverts
Wood Preservatives
Reporting of Discharges Containing Hazardous Materials or Deleterious Materials
Projects for Which Certification Is Denied
NWPs partially denied
NWPs denied entirely
Other Conditions
Right to Appeal Final Certification
section_h.pdf
PERMITS
INDEX
section_h.pdf
PERMITS
INDEX

File details come from the government source that posted it.