WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
ID FS ERFO 2016(1)-27(1) A.2
U S
C c m y fi le s p w p r o d u c ti o n d id e f2 a b .d g n
P
M
M a y
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Sandpoint
Sagle
Troy
Priest River
IDAHO MONTANA
N
12 50
Scale in miles VICINITY MAP
Lake Pend Oreille
Pe nd O re ille R iv er
Boundary County
Bonner County
Long: -116.162014 Lat: 48.296653 ERFO Sites (9)
FDR 489 MP 0.1
FDR 419 MP 9.0 - 14.3
Lightning Creek Road
Long: -116.091264 Lat: 48.598302 ERFO Site
FDR 314 MP 15.0
Boulder Creek Road
Naples
Ferry
Bonners
Fork
Clark
Lake
Priest
Sandpoint, ID
35 miles to
Bonners Ferry, ID
24 miles to
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d id e f2 a c .d g n
ID FS ERFO 2016(1)-27(1)
A
S e p te m b e r
K
H A
R R
S I O
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
Sheet and Description
FDR 314
MP 15.0
FDR 419
MP 9.0
FDR 419
MP 10.2
FDR 419
MP 11.8
FDR 419
MP 12.1
FDR 419
MP 12.8
FDR 489
MP 0.1
FDR 419
MP 12.85
FDR 419
MP 13.5
FDR 419 MP
14.3 ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 595 500 60 550 55 1,760
A0160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.4 0.3 0.1 0.2 1.0
A0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0220 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS LPSM ALL ALL ALL
A0240 20401-0000 ROADWAY EXCAVATION CUYD 1,907 810 260 1,396 13 434 4,820
A0260 20403-0000 UNCLASSIFIED BORROW CUYD 100 1,482 158 1,740
A0280 20701-0200 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE B SQYD 114 314 280 175 47 930
A0300 20702-0200 GEOTEXTILE FILTER, CLASS 1,
TYPE B SQYD 1,050 86 86 86 670 86 178 267 1,634 390 207 4,740
A0320 20801-0000 STRUCTURE EXCAVATION CUYD 360 395 755 Contract Quantity
A0340 20820-0000 DEWATERING LPSM ALL ALL ALL
A0360 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 98 270 241 77 34 720
A0380 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 50 50 50 50 200
A0400 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 75 208 186 59 32 560
A0420 25101-0600 PLACED RIPRAP, METHOD A,
CLASS 6 CUYD 1,404 1,020 265 425 2,650 445 311 6,520
A0440 25102-0700 PLACED RIPRAP, METHOD A,
CLASS 7 TON 130 90 40 160 20 440
A0460 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 248 25 67 60 222 19 10 24 137 142 56 1,010 1.94 TON/CUYD
A0480 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 129 129
A0500 55401-1000 REINFORCING STEEL LB 17,000 17,000 Contract Quantity
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
8:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
ID
P an ha nd le _E st im at e-
.x ls x]
Sh ee t
STATE PROJECT
B.1FS ERFO 2016(1)-27(1)ID
SHEET
NUMBER
Sheet and Description
FDR 314
MP 15.0
FDR 419
MP 9.0
FDR 419
MP 10.2
FDR 419
MP 11.8
FDR 419
MP 12.1
FDR 419
MP 12.8
FDR 489
MP 0.1
FDR 419
MP 12.85
FDR 419
MP 13.5
FDR 419 MP
14.3 ALLOWANCE Bid
Schedule
A0520 55701-2000 STRUCTURAL TIMBER AND LUMBER,
TREATED MFBM 13 1 14
A0540 55720-0000 REPAIR STRUCTURAL TIMBER AND
LUMBER LPSM ALL ALL
A0560 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 5 5 Contract Quantity
A0580 60201-0800 24-INCH PIPE CULVERT LNFT 52 52
A0600 60702-1000 REMOVING, CLEANING, AND
RELAYING CULVERT LNFT 32 32 32 32 128
A0620 61704-2000 REPLACEMENT POST, WOOD EACH 5 5
A0640 61704-4000 REPLACEMENT BLOCKOUT EACH 5 5
A0660 61705-0100 REPLACEMENT GUARDRAIL W-BEAM
RAIL ELEMENT, TYPE 2, CLASS A LNFT 50 50
A0680 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40
A0700 62201-0700 BACKHOE LOADER, 1 CUBIC YARD
MINIMUM CAPACITY FRONTEND
BUCKET, 10 CUBIC FOOT MINIMUM
CAPACITY BACKHOE BUCKET, 90
HP MINIMUM FLYWHEEL HOUR 40 40
A0720 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40 40
A0740 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 40 40
A0760 62301-0000 GENERAL LABOR HOUR 60 60
A0780 62501-0000 TURF ESTABLISHMENT ACRE 0.3 0.2 0.1 0.2 0.8
A0800 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 12 12
A0820 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 112 112
A0840 64703-5000 MITIGATION, ROOT WAD EACH 13 9 4 16 42
A0860 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 120 562 1,252 175 1,330 341 3,780
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
8:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
ID
P an ha nd le _E st im at e-
.x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FS ERFO 2016(1)-27(1)ID
Travel Way
Ditch
Reconditioning
5'
5'
Turf establishment
Turf establishment
1:
Travel Way
TYPICAL SECTION
FOOTNOTE:
[2]
[1]
[3]
[3]
[4]
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 c a .d g n
ID FS ERFO 2016(1)-27(1)
N o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
[4]
Approximately match existing road profile, as directed by the CO.
distance of 50', or as directed by the CO.
Transition cross slope to match grade of box culvert over a
Ditch reconditioning as directed by the CO.
at a rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper
[1] [2]
[1]
NO SCALE
LC
Profile grade
T y p
1:3
C le a r in g l im it s
C le a r in g l im it s
1:3
4" compacted depth
Roadway aggregate, method 1, 4% Crown
Existing ground
TYPICAL SECTION B
18' min.
LC
Profile grade
1:
4" compacted depth
Roadway aggregate, method 1, 4% Crown
Existing ground
18' min.
FDR 419 MP 12.8
FDR 419 MP 11.8
FDR 419 MP 10.2
FDR 419 MP 9.0
FDR 419 MP 13.5
FDR 419 MP 12.85
FDR 419 MP 12.1
TYPICAL SECTION A
1:2
24" minimum depth
Placed riprap, method A, class 2, Existing ground
1' Shoulder
1' Shoulder
1' Shoulder 1' Shoulder
40" depth
Placed riprap, method A, class 5, 40" depth
Placed riprap, method A, class 5, Separation-stabilization geotextile, class 1, type B
1:
2 1:2
ROUNDING DETAIL
CUT SLOPE
Travel Way
Ditch
Reconditioning
5'
5'
Turf establishment
Turf establishment
Travel Way
Ditch
Reconditioning
5'
5'
Turf establishment
Turf establishment
1:
1:
[3] [3]
TYPICAL SECTION
[3] [3]
C le a r in g l im it
[3
[3
FOOTNOTE:
[2]
[1]
[3] Construct slopes as shown in the Staking Report.
Ditch reconditioning as directed by the CO.
at a rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 c a .d g n
ID FS ERFO 2016(1)-27(1)
N o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
[1] [2]
[1] [2]
[3]
[3]
LC
Profile grade
T y p
1:3
C le a r in g l im it s
C le a r in g l im it s
1:3
4" compacted depth
Roadway aggregate, method 1, TYPICAL SECTION C
FDR 489 MP 0.1
FDR 314 MP 15.0
Unclassified borrow
NO SCALE
LC
Profile grade
1:3
C le a r in g l im it s
C le a r in g l im it s
1:3
4" compacted depth
Roadway aggregate, method 1, TYPICAL SECTION D
Unclassified borrow
FDR 419 MP 14.3
Va ria ble
S lo p e s ta k e
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
5'5'
0.25D
D
Va ria ble
Existing ground
14' min.
16' min.
5'5'
Slope stake
0.25D
D
T y p ground
Existing
2550 2550 2550
5 2
BEGIN WORK
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
BOULDER CREEK ROAD
FDR 314 MP 15.0
Curve= BC2-1
D
R= 105.00'
T= 21.61'
L= 42.62'
Curve= BC2-2
D
R= 105.00'
T= 41.07'
Curve= BC2-3
D
R= 400.00'
T= 32.04'
L= 63.94'
Line to be constructed
Scarp
Slope stake limitsSlope stake limits
Profile grade
Existing ground
N
L= 78.29'
CUYD
EXC.
CUYD
EMB.
50+00 52+50 55+00 centerline
Existing roadway boulder placement log with root wad, and
See Sheet D.2 for riprap, (BC2)
50+00
FDR 314 MP 15.0
EL = 2,555.04
E = 2541921.501
N = 2527191.652
(BC2)
56+46.75
FDR 314 MP 15.0
EL = 2,539.33
E = 2542337.884
N = 2527643.119
END WORK
CP
CP
CP
CP
16107
P O
T
.7
P C
.7
P T
.7
P T
.6
P C
.3
P C
.2
P T
.8
16103
16105
16106
,5
.0
,5
.9
-4.5000%
100' VC
K = 29
,5
.3
-1.0000%
-2.8000%
50' VC
K = 28
SSD = 624'
,5
.5
-0.5540%
60' VC
K = 27
,5
.3
R
D F
36 11 1860
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d a .d g n
ID FS ERFO 2016(1)-27(1)
S e p te m b e r
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
Clearing limitsClearing limits
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
Flow
2560 2
2575 2
N
20 4001020
Scale in feet
D.2
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d b .d g n
16' to 20' Length
A
Riprap toe
NOTE:
centerline
Existing roadway
Line to be constructed of embankment
Approximate toe
Plan View
Sta. 56+10 Sta. 53+74
FD
R
Class 6
Placed riprap, method A, Section A-A
1H:1V
Existing ground streambed material
Backfill with conserved
(No Scale)
14' Traveled Way
6'
Placed riprap, method A, Class 6
1.5H:1V
Sta. 56+10, Top Elev. 2538.3
Sta. 53+74, Top Elev. 2544.6
Sta. 56+10, Toe Elev. = 2529.4
Sta. 53+74, Toe Elev. = 2538.3 at 15' (see note 1) with root wad, spaced
18" to 24" dia. logs
Place boulders around root wads
Boulders at root wad: class 7 riprap, loosely placed, 10 tons each location.
maximum of 5 feet total length from bank line.
Embed trunk completely, allowing only root wad to project into flow a
2.
1.
around root wads
Place boulders channel thalweg
Riprap toe to be extended 2' below with root wad (see note 1)
18" to 24" dia. logs
OHW
STATE PROJECT
NUMBER
SHEET
ID FS ERFO 2016(1)-27(1)
See Typical Section C
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
REVETMENT DETAILS
BOULDER CREEK ROAD
FDR 314 MP 15.0
Geotextile filter, class 1, type B
AFlow
LIGHTNING CREEK ROAD
FDR 419 MP 9.0
N
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
Roadway
Repair 55' of
35'
914 RDF
NO SCALE
concrete box culvert
Clean and reset existing 48" W x 32" H x 32' L Edge of gravelEdge of gravel
NOTE:
2.
1.
FOOTNOTE:
[1]
[1] reconstruction
Mitigation, streambed channel
(No Scale)
Place material from channel excavation
Existing ground
2 min.
[1]
TYPICAL DEFLECTION BERM DETAIL
6' class 5
Placed riprap, method A, m in
(No Scale)
PROFILE DETAIL
.5 post-damage
Existing ground pre-damage
Existing ground profile
Proposed road box culvert
Existing concrete
55'
Deflection berm
Deflection berm class 5
Placed riprap, method A, [1]
[1] excavated from the channel reconstruction.
directed by the CO. Berm length varies by the amount of material construction of deflection berms on each side of the creek, as
Excavated material from channel reconstruction to be used in LEGEND reconstruction
Mitigation, streambed channel
Deflection berm
Placed riprap, method A, class 5
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d c .d g n
ID FS ERFO 2016(1)-27(1)
N o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y embankment face. See Sheet C.1 for details.
Place riprap class 5 on the upstream and downsteam
Adjust fit to field conditions.
Site not surveyed. Horizontal alignment is a representation.
F lo w
FDR 419 MP 10.2
N
NO SCALE
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
60'
Edge of gravelEdge of gravel
FDR 419
concrete box culvert
Clean and reset existing 48" W x 32" H x 32' L Repair 145' of Roadway
[1] reconstruction
Mitigation, streambed channel
(No Scale)
Place material from channel excavation
Existing ground
2 min.
[1]
TYPICAL DEFLECTION BERM DETAIL
6' m in
(No Scale)
PROFILE DETAIL
post-damage
Existing ground pre-damage
Existing ground profile
Proposed road box culvert
Existing concrete
LEGEND
reconstruction
Mitigation, streambed channel
Deflection berm
Placed riprap, method A, class 5
Deflection berm [1]
Deflection berm [1]
NOTE:
2.
1.
FOOTNOTE:
[1] excavated from the channel reconstruction.
directed by the CO. Berm length varies by the amount of material construction of deflection berms on each side of the creek, as
Excavated material from channel reconstruction to be used in
.0
50'
Placed riprap, method A, class 5
Placed riprap, method A, class 5
[1] reconstruction
Mitigation, streambed channel
15'
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d d .d g n
ID FS ERFO 2016(1)-27(1)
N o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y embankment face. See Sheet C.1 for details.
Place riprap class 5 on the upstream and downsteam
Adjust fit to field conditions.
Site not surveyed. Horizontal alignment is a representation.
F
40'
LIGHTNING CREEK ROAD
FDR 419 MP 11.8
No scale
N Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
Repair 130' of Roadway concrete box culvert
Clean and reset existing 48" W x 32" H x 32' L
FDR 419
Edge of gravelEdge of gravel
115'
[1] reconstruction
Mitigation, streambed channel
[1] reconstruction
Mitigation, streambed channel
(No Scale)
Place material from channel excavation
Existing ground
2 min.
[1]
TYPICAL DEFLECTION BERM DETAIL
6' m in
LEGEND
reconstruction
Mitigation, streambed channel
Deflection berm
Placed riprap, method A, class 5
(No Scale)
PROFILE DETAIL
post-damage
Existing ground pre-damage
Existing ground profile
Proposed road box culvert
Existing concrete
.5
50'
Deflection berm [1]
Deflection berm [1]
NOTE:
2.
1.
FOOTNOTE:
[1] excavated from the channel reconstruction.
directed by the CO. Berm length varies by the amount of material construction of deflection berms on each side of the creek, as
Excavated material from channel reconstruction to be used in
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d e .d g n
ID FS ERFO 2016(1)-27(1)
N o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
Placed riprap, method A, class 5Placed riprap, method A, class 5 embankment face. See Sheet C.1 for details.
Place riprap class 5 on the upstream and downsteam
Adjust fit to field conditions.
Site not surveyed. Horizontal alignment is a representation.
F
N
CP
16007
CP
16006
SUSPEND WORK
RESUME WORK
20 4001020
Scale in feet
Section A-A
A
A
NOTE:
LIGHTNING CREEK ROAD
FDR 419 MP 12.1
Plan View
2.
1.
OHW
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d f.
d g n
ID FS ERFO 2016(1)-27(1)
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
Boulders at root wad: class 7 riprap, loosely placed, 10 tons each into flow a maximum of 5 feet total length from bank line.
Embed trunk completely, allowing only root wad to project
P C
.6
P R
C
.1
P O
T
.0
P T
.3
P C
.8
P R
C
.0
P O
T
.9
P T
.6
Curve= LC12.1-3
D
R= 105.00'
T= 22.44'
L= 44.22'
Curve= LC12.1-4
D
R= 105.00'
T= 23.71'
L= 46.63'
Curve= LC12.1-2
D
R= 105.00'
T= 25.04'
L= 49.16'
Curve= LC12.1-1
D
R= 105.00'
T= 22.60'
L= 44.51'
N o v e m b e r
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
16' to 20' Length centerline
Existing roadway
Line to be constructed of embankment
Approximate toe
Sta.21+60, 34' Lt
Sta. 22+10, 16' Lt Sta. 22+57, 16' Lt
Sta. 23+08, 27' Lt
Station and offset point
(No Scale)
20' Traveled Way
Varies
6'Placed riprap, method A, Class 6
Placed riprap, method A, Class 6 around root wads
Place boulders around root wads
Place boulders channel thalweg
Riprap toe to be extended 2' below at 15' (see note 2) with root wad, spaced
18" to 24" dia. logs
See Typical Section B
Unclassified borrow
(MP121)
20+00
FDR 419 MP 12.1
(MP121)
24+67
FDR 419 MP 12.1
Removal of 18" pipe culvertRemoval of 24" pipe culvert
E = 2524422.205
N = 2417288.269
E = 2524298.055
N = 2417732.043
18" to 24" dia. logs with root wad (see note 1)
Install 24" pipe culvert
21+90 Clearing limit
Sheet E.3 for details
Install fiber roll. See
Geotextile filter, class 1, type B
1H:1V
1.5H :1V
Existing ground streambed material
Backfill with conserved
Riprap toe
FDR 419
Fl ow
FDR 419 MP 12.8
N
NO SCALE
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
20'
Edge of gravelEdge of gravel
FDR 419
concrete box culvert
Clean and reset existing 48" W x 32" H x 32' L
25' 15'
[1] reconstruction
Mitigation, streambed channel
LEGEND
reconstruction
Mitigation, streambed channel
Deflection berm
Placed riprap, method A, class 5
(No Scale)
Place material from channel excavation
Existing ground
2 min.
[1]
TYPICAL DEFLECTION BERM DETAIL
6' m in
(No Scale)
PROFILE DETAIL
post-damage
Existing ground pre-damage
Existing ground profile
Proposed road box culvert
Existing concrete
.0
45'
Deflection berm [1]
Deflection berm [1]
NOTE:
2.
1.
FOOTNOTE:
[1] excavated from the channel reconstruction.
directed by the CO. Berm length varies by the amount of material construction of deflection berms on each side of the creek, as
Excavated material from channel reconstruction to be used in
Placed riprap, method A, class 5Placed riprap, method A, class 5
15'
[1] reconstruction
Mitigation, streambed channel
D.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d g .d g n
ID FS ERFO 2016(1)-27(1)
N o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y embankment face. See Sheet C.1 for details.
Place riprap class 5 on the upstream and downsteam
Adjust fit to field conditions.
Site not surveyed. Horizontal alignment is a representation.
F
CUYD
EXC.
CUYD
EMB.
32+0031+0030+00
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
SUSPEND WORK
RESUME WORK
20 4001020
Scale in feet
Line to be constructed
Profile grade
WELLINGTON CREEK BRIDGE
FDR 489 MP 0.1
CP
16010
CP
16011
EL = 3,288.29
E = 2523450.420
N = 2419899.246
(MP010)
30+00.00
FDR 489 MP 0.1
(MP010)
30+98.81
FDR 489 MP 0.1
EL = 3,288.89
E = 2523546.897
N = 2419919.565
+1.2190%
,2
.2
,2
.4
+0.5377%
Slope stake limits type 2, class A
W-beam rail element, Replacement guardrail type 2, class A
W-beam rail element, Replacement guardrail
.9
.9
0Wellington Creek Bridge
See G Sheets for details
Clearing limit
Remove existing abutment
FDR 489
See F Sheets for details
Placed riprap, method A, Class 6
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
See F Sheets for details
Placed riprap, method A, Class 6
D.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d h .d g n
ID FS ERFO 2016(1)-27(1)
o v e m b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
N
Wingwall B
Wingwall A
L
P O
T
.9
P O
T
.0
WELLINGTON CREEK BRIDGE
F lo w
F
NOTE:
50'
6'
20' Traveled Way
1H:1V
1.5H :1V
Existing ground
FDR 419
Section A-A
Plan View
A
A
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
NO SCALE
D.9
STATE PROJECT
NUMBER
SHEET
ID FS ERFO 2016(1)-27(1)
Roadway embankment loss
6'
16' to 20' Length
Toe of embankment
Roadway centerline embankment along edge of exiting riprap
Begin riprap placement streambed material
Backfill with conserved
Riprap toe
LIGHTNING CREEK ROAD
FDR 419 MP 12.85
at 12' (see note 2) with root wad, spaced
18" to 24" dia. logs
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d i.
d g n
Placed riprap, method A, Class 6 with root wad (see note 2)
18" to 24" dia. logs
Place boulders around root wads channel thalweg
Riprap toe to be extended 2' below
OHW
around root wads
Place boulders
3.
2.
1.
See Typical Section B
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y location.
Boulders at root wad: class 7 riprap, loosely placed, 10 tons each a maximum of 5 feet total length from bank line.
Embed trunk completely, allowing only root wad to project into flow
Adjust fit to field conditions.
Site not surveyed. Horizontal alignment is a representation.
N o v e m b e r
FDR 419 MP 13.5
Rilling
Roadway embankment lossFDR 491
N
No scale
Plan View
A
A
NOTE:
D.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d j.
d g n
ID FS ERFO 2016(1)-27(1)
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
Section A-A
1H:1V
Existing ground channel thalweg extended 2' below
Riprap toe to be streambed material
Backfill with conserved
16' to 20' Length
Riprap toe
Line to be constructed note 2) with root wad (see
18" to 24" dia. logs of embankment
Approximate toe
(No Scale)
20' Traveled Way
6'Placed riprap, method A, Class 6
Placed riprap, method A, Class 6 at 15' (see note 2) with root wad, spaced
18" to 24" dia. logs
285' around root wads
Place boulders around root wads
Place boulders
OHWUnclassified borrow
See Typical Section B
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
1.5H :1V
Boulders at root wad: class 7 riprap, loosely placed, 10 tons each location.
5 feet total length from bank line.
Embed trunk completely, allowing only root wad to project into flow a maximum of conditions.
Site not surveyed. Horizontal alignment is a representation. Adjust fit to field
3.
2.
1.
N o v e m b e r
3550 3
0 3
CUYD
EXC.
CUYD
EMB.
42+00
RATTLE CREEK BRIDGE
FDR 419 MP 14.3
41+00 43+00 44+00 45+00
Existing Roadway
(No Scale) pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAILLine to be constructed
Profile grade
Existing ground
RESUME WORK
Curve= MP143-2
D
R= 400.00'
T= 54.30'
L= 107.95'
CP
16014
CP
16015
(MP121)
41+90.00
FDR 419 MO 13.5 (MP121)
45+55.00
FDR 419 MP 13.5
Slope stake limitsSlope stake limits
END WORK
EL = 3,542.88
E = 2522094.899
N = 2428075.860
EL = 3,550.54
E = 2522105.023
N = 2428443.862
,5
.8
,5
.6
+4.84 91%
SSD = 304'
K = 12
48' VC
+1.0000%
,5
.6
-2.0000%
SSD = 378'
K = 12
36' VC
,5
.1
114' VC
K = 26
,5
.5
+2.3648
.0
.0
0Rattle Creek Bridge details See G Sheets for
Clearing limit
Slope stake limitsSlope stake limits
Clearing limit
See F Sheets
Placed riprap, method A, Class 6
See F Sheets
Placed riprap, method A, Class 6
F lo w
FDR 41
abutments
Remove existing timber abutments
Remove existing timber
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
Sheet E.3 for details
Install fiber roll. See
1011 471
Placed riprap, method A, Class 6 See F Sheets for details
Placed riprap, method A, Class 6
D.11
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id e f2 d k .d g n
ID FS ERFO 2016(1)-27(1)
O c to b e r
H A
R R I S
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
P C
.0
P T
.9
P O
T
.2
P O
T
.0
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1.
16001 2405685.475 2535141.498 2869.196 48°15'52.633183"N 116°07'03.237200"W 2816.0006 0.999808 5/8" IR W/FHWA ALUM CAP
16002 2405780.875 2534934.156 2881.443 48°15'53.564831"N 116°07'06.308543"W 2828.2443 0.99980746 5/8" IR W/FHWA ALUM CAP
16003 2405948.369 2534821.116 2881.521 48°15'55.212389"N 116°07'07.991210"W 2828.3256 0.99980748 5/8" IR W/FHWA ALUM CAP
16004 2406098.783 2534800.985 2880.065 48°15'56.695795"N 116°07'08.299440"W 2826.8728 0.99980755 5/8" IR W/FHWA ALUM CAP
16005 2417172.997 2524468.821 3213.659 48°17'45.462654"N 116°09'41.892452"W 3160.4668 0.99979387 5/8" IR W/FHWA ALUM CAP
16006 2417438.939 2524373.210 3217.389 48°17'48.082012"N 116°09'43.327586"W 3164.2001 0.99979371 5/8" IR W/FHWA ALUM CAP
16007 2417628.034 2524313.829 3221.671 48°17'49.944929"N 116°09'44.220824"W 3168.4854 0.99979352 5/8" IR W/FHWA ALUM CAP
16008 2417850.610 2524254.079 3225.043 48°17'52.138227"N 116°09'45.122200"W 3171.8574 0.99979337 5/8" IR W/FHWA ALUM CAP
16009 2419491.973 2523640.782 3270.294 48°18'08.303195"N 116°09'54.324051"W 3217.1183 0.99979135 5/8" IR W/FHWA ALUM CAP
16010 2419929.318 2523632.632 3288.905 48°18'12.618647"N 116°09'54.479595"W 3235.7391 0.99979047 5/8" IR W/FHWA ALUM CAP
16011 2419881.745 2523310.357 3288.891 48°18'12.131945"N 116°09'59.242686"W 3235.7087 0.99979054 5/8" IR W/FHWA ALUM CAP
16012 2420047.034 2523267.072 3292.899 48°18'13.760760"N 116°09'59.896207"W 3239.7167 0.99979036 5/8" IR W/FHWA ALUM CAP
5/8" IR W/FHWA ALUM CAP
16013 2427999.468 2522096.507 3538.414 48°19'32.175094"N 116°10'17.857096"W 3485.3465 0.99977891 5/8" IR W/FHWA ALUM CAP
16014 2428128.275 2522083.490 3540.432 48°19'33.445498"N 116°10'18.060197"W 3487.3645 0.99977881 5/8" IR W/FHWA ALUM CAP
16015 2428569.515 2522088.262 3551.105 48°19'37.800059"N 116°10'18.025476"W 3498.0474 0.9997783 5/8" IR W/FHWA ALUM CAP
16016 2428895.592 2521928.398 3560.028 48°19'41.009215"N 116°10'20.417755"W 3506.9704 0.99977791 5/8" IR W/FHWA ALUM CAP
16101 2527250.330 2541699.702 2558.315 48°35'52.563146"N 116°05'34.349374"W 2505.5395 0.99982154 5/8" IR W/FHWA ALUM CAP
16102 2527130.938 2541817.362 2555.958 48°35'51.390199"N 116°05'32.590947"W 2503.1825 0.99982163 5/8" IR W/FHWA ALUM CAP
16103 2527181.279 2541923.308 2555.116 48°35'51.891645"N 116°05'31.018116"W 2502.3372 0.99982165 5/8" IR W/FHWA ALUM CAP
16104 2527293.141 2541969.677 2548.839 48°35'52.997542"N 116°05'30.335718"W 2496.057 0.99982194 5/8" IR W/FHWA ALUM CAP
16105 2527475.912 2542275.433 2541.567 48°35'54.814593"N 116°05'25.798997"W 2488.7784 0.99982223 5/8" IR W/FHWA ALUM CAP
16106 2527706.513 2542359.912 2538.374 48°35'57.093867"N 116°05'24.557438"W 2485.5788 0.99982237 5/8" IR W/FHWA ALUM CAP
16107 2527812.943 2542469.231 2539.030 48°35'58.148915"N 116°05'22.938065"W 2486.2315 0.99982231 5/8" IR W/FHWA ALUM CAP
BOULDER1 2527349.337 2542023.848 2542.589 48°35'53.554472"N 116°05'29.533535"W 2489.807 0.99982223 5/8" IR W/FHWA ALUM CAP
BOULDER2 2527409.163 2542151.094 2540.362 48°35'54.150443"N 116°05'27.644418"W 2487.5767 0.99982231 5/8" IR W/FHWA ALUM CAP
Mile Posr 12 Washout
Wellington Creek Bridge
Rattle Creek Bridge
Boulder Creek
PROJECT : Idaho Panhandle Repairs
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : SPCS NAD83; WA South ZONE 4602
VERTICAL DATUM : NAVD88 based on Geoid 03
EPOCH DATE : 2010.000
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
Trapper Creek Culvert
C
M yF ile s\
Pr oj ec ts
\I da ho \P an ha nd le
_e rf o\ [I
D _P an ha nd le
_E R
FO
_c on tr ol sh ee t.
xl sx ]S he et
1- Ju n-
:5
A M
R
PA
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.12
SHEET
NUMBER
FS ERFO 2016(1)-27(1)ID
SURVEY CONTROL
NO SCALE
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
5.
4.
3.
2.
1.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with
When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of
Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.
See Erosion Control Section for temporary culvert
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
STATE PROJECT
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
A u g u s t
U
S C m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
DIVERSION CHANNELS
TEMPORARY
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
Water surface elevation
OPTION B
OPTION A
OPTION C
OPTION D
Existing ground
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Concrete barrier
Concrete barrier
Concrete barrier
Water surface elevation membrane
Waterproof
Water surface elevation membrane
Waterproof
Water surface elevation
Existing abutment or pier elevation (min.)
Top of berm
Existing ground at time of construction
Diverted water level at time of construction
Diverted water level
Existing ground at time of construction
Diverted water level
Limit of work zone
Limit of work zone
Limit of work zone elevation (min.)
Top of berm elevation (min.)
Top of berm at time of construction
Diverted water level
(anchoring method to be approved)
Waterproof membrane
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
m in
4'-6"
W157-17
METHODS
TEMPORARY DIVERSION BERM
m in m in
6" (min.) freeboard. Submit temporary stream diversion m in
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-27(1) ID
B o r d e r .U
S c m y fi le s p w p r o d u c ti o n d F L
H C e ll s .d g n li b
F e b r u a r y
NOTE:
1 4.
3.
2.
1.
membrane
Waterproof height of the sandbag barrier.
directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as
While in use, inspect and maintain the temporary diversion given time.
Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.
of bottom rows as there are vertical course. Overlap the
Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.
minimum height equal to the water surface elevation with
As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).
methods may be chosen (including any approved during construction operations. Alternate stream diversion
These options suggest configurations for diverting a stream
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
U S
C c m y fi le s p w p r o d u c ti o n d m s
W .d g n
J u ly
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
10.4 x 16 20301 -1900
20702 -0200
25101 -0400
25101 -0500
25101 -0600
25102 -0700
60201 -0800
60702 -1000
64703 -5000
64704 -1600
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
G
EO
TE
X
TI
LE
F
IL
TE
R
C
LA
S S
TY
PE
B
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
R
EM
O V
IN
G
C
LE
A N
IN
G
A
R
EL
A
YI
N G
C U
LV
ER
T
M
IT
IG
A
TI
O N
R O
O T
W A D
M
IT
IG
A
TI
O N
S
TR
EA
M
ED
H
A N
N
EL
R
EC
O N
S
TR
U C
TI
O N
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH SQYD CUYD CUYD CUYD TON LNFT LNFT EACH CUYD Lt Rt
FDR 314 MP 15.0 1050 1404 130 13
FDR 419 MP 9.0 86 50 75 32 120
FDR 419 MP 10.2 86 50 208 32 562
FDR 419 MP 11.8 86 50 186 32 1252
FDR 419 MP 12.1 2 670 1020 90 52 9 1, 2
FDR 419 MP 12.8 86 50 59 32 175
FDR 489 MP 0.1 178 265
FDR 419 MP 12.85 267 425 40 4
FDR 419 MP 13.5 1634 2650 160 16
FDR 419 MP 14.3 390 445 1330
PROJECT TOTAL 0 2 4533 200 528 6209 420 52 128 42 3439
Allowable Pipe Material
NOTE: A Aluminum
1. See Std. 602-1 for steel pipe culvert minimum wall thickness. AS Aluminized steel
2. End sections for all inlets and outlets are incidental to culvert pay item. C Concrete
GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
C
U se rs \b ra nd on .s to ke s\ D es kt op
D ra in ag e.
xl sx ]S he et
-F eb -2
:5
B
S
TO
K
ES
5/
K H
A R R
IS
O N
5/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
FS ERFO 2016(1)-27(1)ID
Note: The quantities shown hereon are approximate and are subject to field adjustments.
Q Vel.
500Q
100Q
50Q
2Q
SLOPE PROTECTION
WS ELEV.
29+50 30+00 30+50 31+00 31+50 32+00
TYPE: Riprap
SLOPE: 1.75(h):1(v)BOTTOM EL.: 3270.0
REMARKS: Scour includes abutment and long-term degradation. Riprap along face of wingwalls and roadway approach embankment along floodplain to be determined as part of the final hydraulic analysis.
CLASS: 6
TOP EL.: 3282.0 DEPTH: 5.0 ft.
)500); 3266.4 ft. (Q100TOTAL SCOUR EL: 3266.5 ft. (Q4350
15.0
13.8
13.5
9.9
3280.5
3279.3
3278.8
3275.5
RIPRAP LAYOUT
WELLINGTON ROAD BRIDGE
F.2
STATE PROJECT
NUMBER
SHEET
ID FS ERFO 2016(1)-27(1)
D A
T E
P
A T
H h e c k e d b y
J .N e ig h o r e s ig n e d b y
ELEVATION
SCALE IN FEET
402001020 stream channel
Centerline existing at road centerline
Existing ground 68' Waterway
Centerline
Proposed Roadway
Existing contour (typ.)
F lo w
L ig h tn in g C r
70'
F lo w
Finish grade at road centerline
1.75
El. = 3278.8
50-yr WS El. 3266.4
Begin bridge
Sta 30+27.9
End bridge
Sta 30+97.9
Channel Bottom El. = 3271.1
Sta 30+39.6 remain
Existing abutment to abutment set on reconstructed west
Existing bridge deck to be and wingwalls
Reconstruct west abutment
El. 3271.1 @ west abutment
Proposed channel bottom
El. 3282.0 abutment and wingwalls
Reconstruct west
6'
25'
6'
19'
Geotextile filter, class 1, type B
Placed riprap, method A, Class 6
Placed riprap, method A, Class 6
Finish grade contour (typ.)
Q Vel.
500Q
100Q
50Q
2Q
SLOPE PROTECTION
WS ELEV.
42+50 43+00 43+50 44+00 44+50 45+00
TYPE: Riprap
14.6
13.6
12.9
7.9
3543.5
3543.1
3543.0
3541.0
DEPTH: 5 ft.
SLOPE: 1.75(h):1(v)
TOP EL.: Varies
BOTTOM EL.: Varies
REMARKS: Scour includes abutment and long-term degradation. Riprap along face of wingwalls and roadway approach embankment along floodplain to be determined as part of the final hydraulic analysis.
CLASS: 6
)500); 3531.7 ft. (Q100TOTAL SCOUR EL: 3531.7 ft. (Q
F.3
STATE PROJECT
NUMBER
SHEET
ID FS ERFO 2016(1)-27(1)
D A
T E
P
A T
H h e c k e d b y
J .N e ig h o s ig n e d b y
RIPRAP LAYOUT
RATTLE CREEK BRIDGEELEVATION
SCALE IN FEET
402001020
Flow stream channel
Centerline proposed at road centerline
Existing ground
El. = 3543.0
50-yr WS
48' Waterway
Centerline
Proposed Roadway
1.75
Existing contour (typ.)
F lo w
Channel Bottom El. = 3537.0
N 2428354.01, E 2522085.43
Sta 43+76.00
El. 3537.0 @ centerline of road
El. 3536.6 @ downstream bridge face
Proposed channel bottom
60.8°
R a ttle C r.
@ downstream face of bridge
Channel Bottom El. = 3536.6
El. 3530.60 El. 3530.10
30' 30'
45'
48'
45'
5'
Placed riprap, method A, Class 6
Geotextile filter, class 1, type B
Placed riprap, method A, Class 6
Placed riprap, method A, Class 6
Top of riprap, Elev. 3544.0
Top of riprap, Elev. 3547.0
Top of riprap, Elev. 3544.0
Top of riprap, Elev. 3547.0 at road centerline
Finish grade
5' footing elevations shown on the profile elevation
Extend front edge of riprap below finish grade to the
Finish grade contour (typ.)
C L
Channel
Placed riprap, method A, Class 6
45 3545
03550
20 4001020
Scale in feet
F.4
STATE PROJECT
NUMBER
ID FS ERFO 2016(1)-27(1)
A g n e w
C h e c k e d b y
D e s ig n e d b y
CHANNEL GRADING
RATTLE CREEK BRIDGE
FDR 419 MP 14.3
in t_ ft m y fi le s p w p r o d u c ti o n d id e f2 fd .d g n
FOOTNOTE:
[1]
[1]
[1] construction of groins and cut-off berm.
Excavated material from channel reconstruction to be used in
[1]
S e p te m b e r
35553
A
B
C D E
F G H
I
N
L
J
K
M
O
POINT NORTHING EASTING ELEV.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
2428341.39 2522056.85 3535.89
2428381.57 2522148.56 3539.51
2428399.29 2522167.96 3540.56
2428408.09 2522186.89 3541.38
2428435.97 2522205.48 3542.74
2428457.76 2522213.21 3543.68
2428478.52 2522237.09 3545.00
2428509.83 2522273.09 3549.45
2428554.49 2522303.41 3554.40
2428351.78 2522183.33 3551.00
2428276.02 2522219.62 3551.00
2428396.03 2522256.16 3557.00
2428331.74 2522310.22 3557.00
2428461.38 2522316.03 3560.00
2428429.61 2522371.60 3560.00
GRADING CONTROL POINTS
(No Scale)
6' Place material from channel excavation
Existing ground listed per the grade control points
Construct berm to the elevation
3 min.
16'
Existing ground listed per the grade control points
Excavate channel to the elevations
1.75
(No Scale)
TYPICAL CHANNEL DETAIL
stream channel
Centerline of proposed
Rattle Cr.
Flo w
Centerline
Proposed Roadway berm
Construct ditch cut-off
Existing contour (typ.)
Finish grade contour (typ.)
TYPICAL FLOODPLAIN GROIN DETAIL
groin (typ.)
Proposed floodplain channel bottom
Proposed ege of groins and place along floodplain
Mitigation, streambed channel reconstruction. Excavate channel material channel reconstruction
Mitigation, streambed
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
F.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-27(1) ID
U S
C c m y fi le s p w p r o d u c ti o n d id e f2 fe .d g n
M a y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
602-2
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
COUPLING BAND
METAL PIPE CULVERT
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 corrugations on rerolled pipe ends.
STATE PROJECT
NUMBER
SHEET
F.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-27(1) ID
U S
C c m y fi le s p w p r o d u c ti o n d id e f2 ff .d g n
M a y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
> 54"
12" to 54"
6"
4"
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
STATE PROJECT
NUMBER
SHEET
F.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-27(1) ID
U S
C c m y fi le s p w p r o d u c ti o n d id e f2 fg .d g n
M a y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.