About this file

ATIS Section A (pdf)

View the file

Other files for this federal contract opportunity

Other files attached to Screening Information Request (SIR)/ Request for Offer-Automatic Terminal Information Service (ATIS) Amendment 000001, newest first.
File Type Posted
ATIS Section H.pdf PDF
ATIS Section D.pdf PDF
ATIS Section L Attachment L.1 Relevant Past Experience.pdf PDF
Section A_ Amendment 000001.pdf PDF
ATIS Section B.pdf PDF
ATIS Section C.pdf PDF
ATIS Section G.pdf PDF
ATIS Section A.pdf PDF
ATIS Section B.4 Price Schedule.xlsx XLSX spreadsheet
ATIS Section M.pdf PDF
ATIS Section K.pdf PDF
ATIS Section L Attachment L.2 Past Performance Questionaire.pdf PDF
ATIS Section F.pdf PDF
ATIS Section L.pdf PDF
ATIS Section I.pdf PDF
ATIS Section J.pdf PDF
ATIS Section E.pdf PDF
ATIS Questions and Answers_Amendment 000001.pdf PDF
ATIS Section L.pdf PDF
ATIS Section D.pdf PDF
ATIS Section C.pdf PDF
ATIS Section B.pdf PDF
ATIS Section E.pdf PDF
ATIS Section H.pdf PDF
ATIS Section B.4 Price Schedule.xlsx XLSX spreadsheet
ATIS Section I.pdf PDF
ATIS Section F.pdf PDF
ATIS Section J.pdf PDF
ATIS Section M.pdf PDF
ATIS Section G.pdf PDF
ATIS Section L Attachment L.2 Past Performance Questionaire.pdf PDF
ATIS Section K.pdf PDF
ATIS Section L Attachment L.1 Relevant Past Experience.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD

3. SOLICITATION TYPE1. CONTRACT NO. 2. SOLICITATION NUMBER

6. ISSUED BY CODE 7. ADDRESS OFFER TO (If other than Item 6)

5. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"

NEGOTIATED BID (RFP)

SEALED BID (IFB)

4. DATE ISSUED

PAGE OF PAGES

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

9. FOR

INFORMATION

CALL

CAUTION: LATE Submissions, Modifications and Withdrawals. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or if hand carried, in the

SOLICITATION

8. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTR., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICE/COST

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

10. TABLE OF CONTENTS

17. OFFER DATE16. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

14C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

14B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

15. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER14A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

13. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)12. DISCOUNT FOR PROMPT PAYMENT the designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above , to furnish any or all items upon which prices are offered at the price set opposite each item , delivered at

11. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted

NOTE: Item 11 does not apply if the solicitation includes Minimum Bid Acceptance Period .

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or by other authorized official written notice.

27. AWARD DATE

(Signature of Contracting Officer)

26. CONTRACT AUTHORITY

24. PAYMENT WILL BE MADE BY

25. NAME OF CONTRACTING OFFICER (Type or print)

CODE 23. ADMINISTERED BY (If other than Item 6)

ITEM

(4 copies unless otherwise specified)

22. SUBMIT INVOICES TO ADDRESS SHOWN IN21. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

20. ACCOUNTING AND APPROPRIATION19. AMOUNT18. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by CONTRACT AUTHORITY)

CODE

AWA

FAA AWA

800 Independence Avenue, S.W.

Washington DC 20591

1400 ES 07/27/2017

Ryan C. Thompson 202 ryan.thompson@faa.gov

267-4438

PAGE(S)

Wanda J. Mundy

DTFAWA-17-R-00032

X x x x x x x x x x x x x

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

The Automatic Terminal Information Service (ATIS)

Screening Information Request (SIR) provides instructions, conditions, and notices to Offerors for the Federal Aviation Administration (FAA) SIR number DTFAWA-17-R-00032.

Period of Performance: 09/29/2017 to 09/28/2022

0001 Firm Fixed Price (FFP)

ATIS Basic System: Includes production, spares, installation manual, operations manual, and maintenance manual orientation training, warranty, delivery of unit

Statement of Work (SOW) Section C.3.1 ATIS BASIC

SYSTEM

0002 Cost Reimbursement (CR) - ATIS Additional Spare

Parts

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.2 SPARE PARTS

0003 Time and Materials (T&M) - Site Survey

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.3 SITE SURVEY

0004 Time and Materials (T&M) - Installation Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.4

INSTALLATION SERVICES

0005 Time and Materials (T&M) - Unplanned Support

Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.5 UNPLANNED

SUPPORT SERVICES

0006 Firm Fixed Price (FFP)

"Hot" Standby Systems Upgrade

Statement of Work (SOW) Section C.3.7 HOT STANDBY

SYSTEM UPGRADE

0007 Firm Fixed Price (FFP)

Dual Broadcast System Upgrade

Statement of Work (SOW) Section C.3.8 DUAL

BROADCAST SYSTEM UPGRADE

Continued ...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

0008 Firm Fixed Price (FFP)

Dual Broadcast and Hot Standby Systems Upgrade

Statement of Work Section C.3.9 DUAL BROADCAST

AND HOT STANDBY SYSTEM UPGRADE

0009 Cost Reimbursement (CR) - Travel

Not to Exceed (NTE)

Statement of Work (SOW) Section C. 4.0 TRAVEL

1001 Firm Fixed Price (FFP)

ATIS Basic System: Includes production, spares, installation manual, operations manual, and maintenance manual orientation training, warranty, delivery of unit

Statement of Work (SOW) Section C.3.1 ATIS BASIC

SYSTEM

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

1002 Cost Reimbursement (CR) - ATIS Additional Spare

Parts

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.2 SPARE PARTS

(Option Line Item)

(Expected Exercise Date/Days After Award: )

1003 Time and Materials (T&M) - Site Survey

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.3 SITE SURVEY

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

1004 Time and Materials (T&M) - Installation Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.4

INSTALLATION SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

1005 Time and Materials (T&M) - Unplanned Support

Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.5 UNPLANNED

SUPPORT SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

1006 Firm Fixed Price (FFP)

"Hot" Standby Systems Upgrade

Statement of Work (SOW) Section C.3.7 HOT STANDBY

SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

1007 Firm Fixed Price (FFP)

Dual Broadcast System Upgrade

Statement of Work (SOW) Section C.3.8 DUAL

BROADCAST SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

1008 Firm Fixed Price (FFP)

Dual Broadcast and Hot Standby Systems Upgrade

Statement of Work Section C.3.9 DUAL BROADCAST

AND HOT STANDBY SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

1009 Cost Reimbursement (CR) - Travel

Not to Exceed (NTE) - $10,000.00

Statement of Work (SOW) Section C. 4.0 TRAVEL

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2001 Firm Fixed Price (FFP)

ATIS Basic System: Includes production, spares, installation manual, operations manual, and maintenance manual orientation training, warranty, delivery of unit

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

Statement of Work (SOW) Section C.3.1 ATIS BASIC

SYSTEM

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2002 Cost Reimbursement (CR) - ATIS Additional Spare

Parts

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.2 SPARE PARTS

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2003 Time and Materials (T&M) - Site Survey

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.3 SITE SURVEY

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2004 Time and Materials (T&M) - Installation Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.4

INSTALLATION SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2005 Time and Materials (T&M) - Unplanned Support

Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.5 UNPLANNED

SUPPORT SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2006 Firm Fixed Price (FFP)

"Hot" Standby Systems Upgrade

Statement of Work (SOW) Section C.3.7 HOT STANDBY

SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

2007 Firm Fixed Price (FFP)

Dual Broadcast System Upgrade

Statement of Work (SOW) Section C.3.8 DUAL

BROADCAST SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2008 Firm Fixed Price (FFP)

Dual Broadcast and Hot Standby Systems Upgrade

Statement of Work Section C.3.9 DUAL BROADCAST

AND HOT STANDBY SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

2009 Cost Reimbursement (CR) - Travel

Not to Exceed (NTE) - $10,000.00

Statement of Work (SOW) Section C. 4.0 TRAVEL

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3001 Firm Fixed Price (FFP)

ATIS Basic System: Includes production, spares, installation manual, operations manual, and maintenance manual orientation training, warranty, delivery of unit

Statement of Work (SOW) Section C.3.1 ATIS BASIC

SYSTEM

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3002 Cost Reimbursement (CR) - ATIS Additional Spare

Parts

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.2 SPARE PARTS

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3003 Time and Materials (T&M) - Site Survey

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.3 SITE SURVEY

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3004 Time and Materials (T&M) - Installation Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.4

INSTALLATION SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3005 Time and Materials (T&M) - Unplanned Support

Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.5 UNPLANNED

SUPPORT SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3006 Firm Fixed Price (FFP)

"Hot" Standby Systems Upgrade

Statement of Work (SOW) Section C.3.7 HOT STANDBY

SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3007 Firm Fixed Price (FFP)

Dual Broadcast System Upgrade

Statement of Work (SOW) Section C.3.8 DUAL

BROADCAST SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

3008 Firm Fixed Price (FFP)

Dual Broadcast and Hot Standby Systems Upgrade

Statement of Work Section C.3.9 DUAL BROADCAST

AND HOT STANDBY SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

Days After Award

3009 Cost Reimbursement (CR) - Travel

Not to Exceed (NTE) - $10,000.00

Statement of Work (SOW) Section C. 4.0 TRAVEL

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4001 Firm Fixed Price (FFP)

ATIS Basic System: Includes production, spares, installation manual, operations manual, and maintenance manual orientation training, warranty, delivery of unit

Statement of Work (SOW) Section C.3.1 ATIS BASIC

SYSTEM

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4002 Cost Reimbursement (CR) - ATIS Additional Spare

Parts

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.2 SPARE PARTS

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4003 Time and Materials (T&M) - Site Survey

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.3 SITE SURVEY

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4004 Time and Materials (T&M) - Installation Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.4

INSTALLATION SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4005 Time and Materials (T&M) - Unplanned Support

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFAWA-17-R-00032

Services

Not to Exceed (NTE)

Statement of Work (SOW) Section C.3.5 UNPLANNED

SUPPORT SERVICES

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4006 Firm Fixed Price (FFP)

"Hot" Standby Systems Upgrade

Statement of Work (SOW) Section C.3.7 HOT STANDBY

SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4007 Firm Fixed Price (FFP)

Dual Broadcast System Upgrade

Statement of Work (SOW) Section C.3.8 DUAL

BROADCAST SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4008 Firm Fixed Price (FFP)

Dual Broadcast and Hot Standby Systems Upgrade

Statement of Work Section C.3.9 DUAL BROADCAST

AND HOT STANDBY SYSTEM UPGRADE

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

Days After Award

4009 Cost Reimbursement (CR) - Travel

Not to Exceed (NTE) - $10,000.00

Statement of Work (SOW) Section C. 4.0 TRAVEL

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 0

File details come from the government source that posted it. Updated .