Drawing M001(I)_QYA ARSR.pdf

PDF 101 KB Posted

Attached to
QYA ARSR HVAC Replacement Federal contract opportunity
Solicitation number
697DCK-24-R-00106
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This solicitation requests proposals for an HVAC replacement project at the QYA ARSR facility in Bucks Harbor, Maine. The Federal Aviation Administration seeks to award a firm fixed-price contract to remove two existing HVAC units and associated components and install two new 25-ton packaged HVAC units with ductwork, controls, and related equipment. Offerors must be registered in the System for Award Management database. The project value is between $250,000 and $500,000 and work must be completed within 45 calendar days. Proposals are due by February 7, 2024. An optional site visit will be held on January 24, 2024, with advanced notice required. The NAICS code is 238220 and the opportunity is set aside for small businesses.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

42x24 32x24 24x20 18x12

24x42 S.A.

27x42 R.A.

1300 CFM

400 CFM

400 CFM2

C F

M

C F

M x

M

VD

VD

VD

VD

VD

VD

VD

VD

M

ACU

x

R

A

42x24 S.A.

x

S

.A

VD

VD

200 CFM

200 CFM

x x

M

ACU

1500 CFM 1500 CFM

1500 CFM

1500 CFM

1500 CFM

F

IL

E

S

D

A T

E

T

IM

E

N

A M

E

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

GENERAL NOTES:

NEW EQUIPMENT

INSTALLED; MODIFY EXISTING ICE GUARD, IF REQUIRED

FOUNDATION SHALL HAVE AN EXTRUDED STEEL ICE GUARD AND FRAME

ALL EXTERIOR HVAC EQUIPMENT BETWEEN THE BUILDING AND RADOME10.

APPROVED BY ONSITE FAA REPRESENTATIVE

RELOCATE INTERFERENCES AS-REQUIRED; ALL RELOCATIONS MUST BE9.

SOW

DUCTWORK SHALL BE INSULATED AND PROTECTED AS DETAILED IN THE

DUCT DIMENSIONS SHOWN ARE INTERIOR (AIRWAY) DIMENSIONS. ALL8.

DOORS AND PANELS; MANUFACTURER MAY REQUIRE MORE

NEW HVAC UNITS SHALL HAVE A MIN 18" CLEARANCE AROUND ALL ACCESS7.

POINT CAN BE PERFORMED TO ACCOMODATE GROUNDING.

OR BY MEANS OF MULTIPOINT. RELOCATION OF EXISTING MULTI-

NEW HVAC UNITS SHALL BE GROUNDED TO COUNTERPOISE DIRECTLY6.

EQUIPMENT

LOCKABLE, STAINLESS STEEL AND SIZED CORRECTLY FOR SERVICED

ALL NEW DISCONNECTS SHALL BE HEAVY DUTY, OUTDOOR RATED,5.

TO AIRFLOW SPECIFIED +/- 10%

ALL DIFFUSERS SHALL HAVE VOLUME DAMPERS; BALANCE DIFFUSERS4.

DETAILED IN THE SOW; EXTEND/REMOVE CIRCUITS AS REQUIRED

REPLACE ALL FLUORESCENT LIGHTS THROUGHOUT THE FACILITY AS 3.

IN THE SOW

REPLACE ALL CEILING TILES THROUGHOUT THE FACILITY AS DETAILED2.

PRIOR TO FINAL FABRICATION

CONTRACTOR SHALL FIELD VERIFY ALL ON-SITE MEASUREMENTS 1.

FAA PROVIDED OAS HVAC CONTROLLER2

FAA APPROVED EQUIVALENT)

2 EA - PACKAGED HVAC UNITS - YORK SUNLINE (OR1

M001(I)

MECHANICAL INSTALLATION DRAWING

QYA ARSR: HVAC REPLACEMENT PROJECT

NEW DISCONNECT (TYP)

OFF PAD (TYP)

ROUTE CONDENSATE

CONNECTION (TYP)

FLEXIBLE

HVAC CONTROLLER

NEW OAS

PAD

EXISTING CONCRETE

PAD

EXISTING CONCRETE

M001 SCALE: NOT TO SCALE

MECHANICAL PLAN

EXISTING ICE SHIELD (TYP)

File details come from the government source that posted it. Updated .