Drawing and Specifications.pdf
PDF 8 MB Posted
- Solicitation number
- 12339520R0001
About this file
This solicitation package describes a federal contract opportunity for bridge construction services. The United States Forest Service will award a firm-fixed price contract to demolish and rebuild the Jordan Bridge over the Pedlar River on Forest Service Road 76 in Virginia. The performance period is 210 days. This is a 100% small business set-aside requiring adherence to Davis-Bacon wage rates. Interested small businesses must register in SAM and monitor the beta.sam.gov website for solicitation documents and amendments. Questions are due by May 11th and site visits will be held that day. Offerors must submit representations and certifications. The estimated value lies between $500,000 to $1 million.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DocuSign Envelope ID: 6B5BFA5D-7597-4B71-919D-A463ACAA985F
2/13/2020
TES
TES
TES
TES
-L- POT 10+00.00
-L- POT 15+02.37
-L- STA 10+25.00
BEGIN PROJECT
END PROJECT
-L- STA 14+65.00
2 3.9'
7.6'0
5.1
7.9
10'10'
TYP. +
TYP.
50' TRANS. TO EXIST.
5 50' TRANS. TO EXIST.
REMOVE EXIST. BRIDGE
POSTS AND NO WIDENING FOR GUARDRAIL.
USE 8' EXTRA DEPTH GUARDRAILNOTE:
-L- STA 12+59.65
END BRIDGE
-L- STA 11+67.40
BEGIN BRIDGE
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
P
IP
E 18 " P
IP
E
SIGN POST
SIGN POST
S
IG
N
O L
D
R O
A D
B E
D
EXISTING TRUSS BRIDGE
EXISTING GRAVEL ROAD EXISTING GRAVEL ROAD
OVERFLOW AREA
O V E
R F
L O
W
A
E A
P E
D L
A
IV
E R
P E
D
LAR
R
IVE
R
TO B
LUE
RID
GE
P
ARKWAY
R E
M O
V E R
E M
O V E
R C
P
IV
" R
C P
IV
U.S.D.A. FOREST SERVICE
REGION 8
ENGINEERS
TGS
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
EROSION CONTROL PLAN 7
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS - FP-14
SPECIFICATIONS FOR CONSTRUCTION OF ROADS
ALL ACTIVITY SHALL ABIDE BY THE STANDARD
INSTALLED DURING CLEARING AND GRUBBING PHASE.
PERIMETER EROSION CONTROL MEASURES SHALL BE
Sta. 12+60 to Sta. 13+80 on Slope as Work Allows.
Place Matting for Erosion Control
D
24PEDLAR RANGER DISTRICT
GW/JEFF NATIONAL FORESTS
ALL EROSION CONTROL PAY ITEMS SHOWN IN BOLD
EROSION AND SEDIMENT CONTROL MEASURES
Temporary Silt Fence
Temporary Rock Silt Check Type-A
Temporary Silt Fence Description Symbol
Special Sediment Control Fence
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
U.S.D.A. FOREST SERVICE
REGION 8
ENGINEERS
TGS
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
DETAILS
EROSION CONTROL PLAN 8
TEMPORARY SILT FENCE SPECIAL SEDIMENT CONTROL FENCE
TEMPORARY ROCK SILT CHECK TYPE A
PEDLAR RANGER DISTRICT
GW/JEFF NATIONAL FORESTS
MATTING INSTALLATION DETAIL
NOTES:
THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION.
STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1
INCH AND NOT LESS THAN 6 INCHES IN LENGTH.
MATTING IN DITCHES
MATTING ON SLOPES
BACKFILL
MATTING SHALL BE
PLACED IN TRENCH
AND BACKFILLED
18"
(MIN.)
6" MIN
STAPLES ON
1' CENTERS
IN TRENCH
EXISTING
GROUND
6"
(MIN.)
S L O P E
STAPLES ON
1' CENTERS
IN TRENCH
NOT TO SCALE
A
B
A
B
A
4"
4"
10"
10"
10"
DIAGRAM B
DIAGRAM A
10"
6"
30'
C
4"
4"
30'
C
STAPLE
CHECK
10"
4"
4"
Staple Check
Staple
Staple Check Pattern
DIAGRAM c
6'
3'
3'
Staple
FLOW
A A
*T = 12" MIN., 18" MAX.
H
WIDTH
*T
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
2' MIN
2' MIN
L=3xH
12"
CONTROL STONE.
USE NO. 5 OR NO. 57 STONE FOR SEDIMENT
FOR STRUCTURAL STONE.
USE CLASS 'B' EROSION CONTROL STONE
NOTE
FILTER FABRIC
COMPACTED FILL
WIRE
NOTES
OF 6 LINE WIRES WITH 12" STAY
SPACING.
DIRECTED BY THE ENGINEER.
FILTER FABRIC
8"
4"
WIRE INTO TRENCH
EXTENSION OF FABRIC AND
8' MAX. WITH WIRE
(6' MAX. WITHOUT WIRE)
SHALL BE 12• GAUGE MIN.
MIDDLE AND VERTICAL WIRES
SHALL BE 10 GAUGE MIN.
TOP AND BOTTOM STRAND
STEEL POST - 2'-0" DEPTH
USE WIRE A MINIMUM OF 32"
IN WIDTH AND WITH A MINIMUM
USE FILTER FABRIC A MINIMUM
OF 36" IN WIDTH AND FASTEN
ADEQUATELY TO THE WIRE AS
PROVIDE 5'-0" STEEL POST OF THE
SELF-FASTENER ANGLE STEEL TYPE.
SEDIMENT CONTROL STONE
SEDIMENT CONTROL STONE
WATER FLOW
STEEL POST - 2 ft DEPTH
2:
*DIMENSION
VARIABLE
2 ft
3 ft
‚ WIRE MESH
1 ft min
‚ WIRE MESH
1 ft min
2 ft
‚ WIRE MESH
D
D
D
D D
SPACE POST A MAXIMUM OF 3 FT.
POST 2 FT. DEEP MINIMUM.
INSTALL 5 FT. SELF FASTENER ANGLE STEEL
WITH 1/4 INCH MESH OPENINGS.
USE HARDWARE CLOTH 24 GAUGE WIRE MESH
CONTROL STONE.
USE NO. 5 OR NO. 57 STONE FOR SEDIMENT
GENERAL NOTES:
| Jordan River_EC_Pset.pdf |
| Jordan River_Erosion Control |
| Jordan River_EC_Pset.pdf |
| Jordan River_Erosion Control |
| Jordan River 1-13-20.pdf |
| S-1 Jordan River xxxx 2019 Plan & Elevation |
| Jordan River 1-13-20.pdf |
| S-2 Jordan River xxxx 2019 Foundation Layout |
| Jordan River 1-13-20.pdf |
| S-4 Jordan River xxxx 2019 Superstructure Details |
| Jordan River 1-13-20.pdf |
| S-5 Jordan River xxxx 2019 Superstructure Details |
| Jordan River 1-13-20.pdf |
| S-6 Jordan River xxxx 2019 Superstructure Details |
| Jordan River 1-13-20.pdf |
| S-7 Jordan River xxxx 2019 Superstructure Details |
| Jordan River 1-13-20.pdf |
| S-8 Jordan River xxxx 2019 Superstructure Details |
| Jordan River 1-13-20.pdf |
| S-13 Jordan River xxxx 2019 End Bent 1 Details |
| Jordan River 1-13-20.pdf |
| S-14 Jordan River xxxx 2019 End Bent 2 Details |
| Jordan River 1-13-20.pdf |
| S-15 Jordan River xxxx 2019 End Bent Wing Details |
| Jordan River 1-13-20.pdf |
| S-16 Jordan River xxxx 2019 End Bent Details |
| Jordan River 1-13-20.pdf |
| S-17 Jordan River xxxx 2019 Rip Rap Details |
| Jordan River 1-13-20.pdf |
| S-18 Jordan River xxxx 2019 Approach Slab |
| 2020-02-13T13:38:13-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .