Drawing and Specifications.pdf

PDF 8 MB Posted

Attached to
Jordan Bridge Construction on George Washington & Jefferson NF
Solicitation number
12339520R0001
Issued by

About this file

This solicitation package describes a federal contract opportunity for bridge construction services. The United States Forest Service will award a firm-fixed price contract to demolish and rebuild the Jordan Bridge over the Pedlar River on Forest Service Road 76 in Virginia. The performance period is 210 days. This is a 100% small business set-aside requiring adherence to Davis-Bacon wage rates. Interested small businesses must register in SAM and monitor the beta.sam.gov website for solicitation documents and amendments. Questions are due by May 11th and site visits will be held that day. Offerors must submit representations and certifications. The estimated value lies between $500,000 to $1 million.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DocuSign Envelope ID: 6B5BFA5D-7597-4B71-919D-A463ACAA985F

2/13/2020

TES

TES

TES

TES

-L- POT 10+00.00

-L- POT 15+02.37

-L- STA 10+25.00

BEGIN PROJECT

END PROJECT

-L- STA 14+65.00

2 3.9'

7.6'0

5.1

7.9

10'10'

TYP. +

TYP.

50' TRANS. TO EXIST.

5 50' TRANS. TO EXIST.

REMOVE EXIST. BRIDGE

POSTS AND NO WIDENING FOR GUARDRAIL.

USE 8' EXTRA DEPTH GUARDRAILNOTE:

-L- STA 12+59.65

END BRIDGE

-L- STA 11+67.40

BEGIN BRIDGE

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

C

C

C

P

IP

E 18 " P

IP

E

SIGN POST

SIGN POST

S

IG

N

O L

D

R O

A D

B E

D

EXISTING TRUSS BRIDGE

EXISTING GRAVEL ROAD EXISTING GRAVEL ROAD

OVERFLOW AREA

O V E

R F

L O

W

A

E A

P E

D L

A

IV

E R

P E

D

LAR

R

IVE

R

TO B

LUE

RID

GE

P

ARKWAY

R E

M O

V E R

E M

O V E

R C

P

IV

" R

C P

IV

U.S.D.A. FOREST SERVICE

REGION 8

ENGINEERS

TGS

CORP. LICENSE NO.: C-0275

PH (704) 476-0003

SHELBY, NC 28150

804-C N. LAFAYETTE ST

TGS ENGINEERS

EROSION CONTROL PLAN 7

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS - FP-14

SPECIFICATIONS FOR CONSTRUCTION OF ROADS

ALL ACTIVITY SHALL ABIDE BY THE STANDARD

INSTALLED DURING CLEARING AND GRUBBING PHASE.

PERIMETER EROSION CONTROL MEASURES SHALL BE

Sta. 12+60 to Sta. 13+80 on Slope as Work Allows.

Place Matting for Erosion Control

D

24PEDLAR RANGER DISTRICT

GW/JEFF NATIONAL FORESTS

ALL EROSION CONTROL PAY ITEMS SHOWN IN BOLD

EROSION AND SEDIMENT CONTROL MEASURES

Temporary Silt Fence

Temporary Rock Silt Check Type-A

Temporary Silt Fence Description Symbol

Special Sediment Control Fence

SITE DESCRIPTION

SOIL STABILIZATION TIMEFRAMES

STABILIZATION TIME

7 DAYS

TIMEFRAME EXCEPTIONS

PERIMETER DIKES, SWALES, DITCHES AND SLOPES

HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE

SLOPES STEEPER THAN 3:1 7 DAYS

IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE

NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.

NONE

SLOPES 3:1 OR FLATTER 14 DAYS

14 DAYS

7 DAYS FOR SLOPES GREATER THAN 50' IN

LENGTH.

ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.

U.S.D.A. FOREST SERVICE

REGION 8

ENGINEERS

TGS

CORP. LICENSE NO.: C-0275

PH (704) 476-0003

SHELBY, NC 28150

804-C N. LAFAYETTE ST

TGS ENGINEERS

DETAILS

EROSION CONTROL PLAN 8

TEMPORARY SILT FENCE SPECIAL SEDIMENT CONTROL FENCE

TEMPORARY ROCK SILT CHECK TYPE A

PEDLAR RANGER DISTRICT

GW/JEFF NATIONAL FORESTS

MATTING INSTALLATION DETAIL

NOTES:

THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION.

STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1

INCH AND NOT LESS THAN 6 INCHES IN LENGTH.

MATTING IN DITCHES

MATTING ON SLOPES

BACKFILL

MATTING SHALL BE

PLACED IN TRENCH

AND BACKFILLED

18"

(MIN.)

6" MIN

STAPLES ON

1' CENTERS

IN TRENCH

EXISTING

GROUND

6"

(MIN.)

S L O P E

STAPLES ON

1' CENTERS

IN TRENCH

NOT TO SCALE

A

B

A

B

A

4"

4"

10"

10"

10"

DIAGRAM B

DIAGRAM A

10"

6"

30'

C

4"

4"

30'

C

STAPLE

CHECK

10"

4"

4"

Staple Check

Staple

Staple Check Pattern

DIAGRAM c

6'

3'

3'

Staple

FLOW

A A

*T = 12" MIN., 18" MAX.

H

WIDTH

*T

PLAN

SECTION A-A

SECTION B-B

B

B

2/3 CHANNEL

STRUCTURAL STONE

SEDIMENT CONTROL STONE

2' MIN

2' MIN

L=3xH

12"

CONTROL STONE.

USE NO. 5 OR NO. 57 STONE FOR SEDIMENT

FOR STRUCTURAL STONE.

USE CLASS 'B' EROSION CONTROL STONE

NOTE

FILTER FABRIC

COMPACTED FILL

WIRE

NOTES

OF 6 LINE WIRES WITH 12" STAY

SPACING.

DIRECTED BY THE ENGINEER.

FILTER FABRIC

8"

4"

WIRE INTO TRENCH

EXTENSION OF FABRIC AND

8' MAX. WITH WIRE

(6' MAX. WITHOUT WIRE)

SHALL BE 12• GAUGE MIN.

MIDDLE AND VERTICAL WIRES

SHALL BE 10 GAUGE MIN.

TOP AND BOTTOM STRAND

STEEL POST - 2'-0" DEPTH

USE WIRE A MINIMUM OF 32"

IN WIDTH AND WITH A MINIMUM

USE FILTER FABRIC A MINIMUM

OF 36" IN WIDTH AND FASTEN

ADEQUATELY TO THE WIRE AS

PROVIDE 5'-0" STEEL POST OF THE

SELF-FASTENER ANGLE STEEL TYPE.

SEDIMENT CONTROL STONE

SEDIMENT CONTROL STONE

WATER FLOW

STEEL POST - 2 ft DEPTH

2:

*DIMENSION

VARIABLE

2 ft

3 ft

‚ WIRE MESH

1 ft min

‚ WIRE MESH

1 ft min

2 ft

‚ WIRE MESH

D

D

D

D D

SPACE POST A MAXIMUM OF 3 FT.

POST 2 FT. DEEP MINIMUM.

INSTALL 5 FT. SELF FASTENER ANGLE STEEL

WITH 1/4 INCH MESH OPENINGS.

USE HARDWARE CLOTH 24 GAUGE WIRE MESH

CONTROL STONE.

USE NO. 5 OR NO. 57 STONE FOR SEDIMENT

GENERAL NOTES:

Jordan River_EC_Pset.pdf
Jordan River_Erosion Control
Jordan River_EC_Pset.pdf
Jordan River_Erosion Control
Jordan River 1-13-20.pdf
S-1 Jordan River xxxx 2019 Plan & Elevation
Jordan River 1-13-20.pdf
S-2 Jordan River xxxx 2019 Foundation Layout
Jordan River 1-13-20.pdf
S-4 Jordan River xxxx 2019 Superstructure Details
Jordan River 1-13-20.pdf
S-5 Jordan River xxxx 2019 Superstructure Details
Jordan River 1-13-20.pdf
S-6 Jordan River xxxx 2019 Superstructure Details
Jordan River 1-13-20.pdf
S-7 Jordan River xxxx 2019 Superstructure Details
Jordan River 1-13-20.pdf
S-8 Jordan River xxxx 2019 Superstructure Details
Jordan River 1-13-20.pdf
S-13 Jordan River xxxx 2019 End Bent 1 Details
Jordan River 1-13-20.pdf
S-14 Jordan River xxxx 2019 End Bent 2 Details
Jordan River 1-13-20.pdf
S-15 Jordan River xxxx 2019 End Bent Wing Details
Jordan River 1-13-20.pdf
S-16 Jordan River xxxx 2019 End Bent Details
Jordan River 1-13-20.pdf
S-17 Jordan River xxxx 2019 Rip Rap Details
Jordan River 1-13-20.pdf
S-18 Jordan River xxxx 2019 Approach Slab
2020-02-13T13:38:13-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .