Copy of SOI - FS 76 Jordan Br Replacemnt (002).xls

XLS spreadsheet 35 KB Posted

Attached to
Jordan Bridge Construction on George Washington & Jefferson NF
Solicitation number
12339520R0001
Issued by

About this file

This document contains a bid schedule and solicitation for a bridge construction project on National Forest lands. The United States Forest Service is seeking bids to demolish and rebuild the Jordan Bridge located on Forest Service Road 76 over the Pedlar River in Virginia. The project includes clearing, excavation, embankment work, riprap, concrete, rebar, prestressed beams, guardrails, drainage pipes, and approach work. The performance period is 210 days. The solicitation is set aside for small businesses with a NAICS code of 237310 and size standard of $36.5 million. Questions are due to the contracting officer by May 11th and a mandatory site visit is scheduled for that date. The estimated budget is between $500,000 to $1,000,000. Interested parties should monitor the beta.SAM website for amendments and award information.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE

NFSR # 76-0.3 JORDAN BRIDGE REPLACEMENT

Jordan Bridge Replacement - Amherst County - NFSR #76-0.3District:Pedlar
ITEM NO.SPEC NO.DESCRIPTIONMETHOD OF MEASUREUNITQUANTITYUNIT PRICETOTALS
1151MOBILIZATIONLump SumLSALL
2152CONSTRUCTION SURVEY AND STAKINGLump SumLSALL
3154CONTRACTOR SAMPLING AND TESTINGLump SumLSALL
4155SCHEDULES FOR CONSTRUCTION CONTRACTSLump SumLSALL
5157EROSION CONTROLLump SumLSALL
6201CLEARING AND GRUBBINGContract QuantityACRE0.5
7202ADDITIONAL CLEARING AND GRUBBINGContract QuantityACRE0.25
8203REMOVAL OF EXISTING STRUCTURELump SumLSALL
9204EXCAVATION AND EMBANKMENT (ROADWAY GRADING)Lump SumLSALL
10207EARTHWORK GEOSYNTHETICSContract QuantitySY250
11208STRUCTURE EXCAVATION AND BACKFILLLump SumLSALL
12251PLACED RIP RAP (VDOT DRY RIPRAP CLASS II)Actual QuantityTON240
13301AGGREGATE BASE COURSE (PAVEMENT SCHEDULE J)Actual QuantityTON50
14403ASPHALT BASE COURSE (PAVEMENT SCHEDULE E)Actual QuantityTON105
15403ASPHALT SURFACE COURSE (PAVEMENT SCHEDULE C)Actual QuantityTON125
16403ASPHALT BINDERContract QuantityTON15
17551HP 12X53 STEEL PILESContract QuantityLF328
18552STRUCTURAL CONCRETE (3000 PSI)Contract QuantityCY80.4
19553PRESTRESSED CONCRETE BOX BEAMSContract QuantityLF540
20554REINFORCING STEEL - UNCOATED (ABUTMENTS)Contract QuantityLB9490
21556BRIDGE RAILING (CONCRETE CURB, REINFORCING STEEL, STEEL BEAM GUARDRAIL, POSTS, SPACERS, HARDWARE, ETC.)Contract QuantityLF180
22564BEARING DEVICESLump SumLSALL
2360230" REINFORCED CONCRETE PIPE (CLASS IV)Contract QuantityLF48
2460218" REINFORCED CONCRETE PIPE (CLASS IV)Contract QuantityLF34
25617GUARDRAIL (APPROACH ROADWAY)Contract QuantityLF150
26617GREU TYPE TL-2 (APPROACH ROADWAY)Contract QuantityEACH4
27625TURF ESTABLISHMENT (PERMANENT)Contract QuantityACRE0.5
28635TEMPORARY TRAFFIC CONTROLLump SumLSALL
29SPPILE EXCAVATION IN SOILContract QuantityLF158
30SPPILE EXCAVATION NOT IN SOILContract QuantityLF60
31SPBRIDGE APPROACH SLABSLump SumLSALL
BASE BID TOTAL:$0.00