CTR075036_Contract_Amendment_Summary_7.pdf
PDF 10 MB Posted
- Attached to
- Master Agreement AZ|CTR075036
- Contract number
- CTR075036
- Issued by
- Arizona
About this file
This document set represents a contract amendment and change order for the Arizona Department of Transportation's (ADOT) Tucson North Motor Vehicle Division (MVD) Building Renovation project. The primary contractors include SD Crane Builders Inc. as the general contractor, with subcontractors such as Meridian Surveying, Complete Earthworks, Concrete Arizona, Lee's Asphalt, and RCD Demolition. The project involves architectural and engineering services by firms including Shive-Hattery and DOWL.
The contract amendment involves modifications to the existing contract, specifically increasing the Alternate Bid Tax line item from $27,077.77 to $35,362.12. The change orders detail various site work requirements, including curb removal and replacement, grading, and parking lot improvements. Specific scope items include removing existing extruded concrete curbs, installing new vertical curbs per municipal standards, grading and compacting sub-surfaces, and addressing parking lot edge conditions. Subcontractor proposals indicate work costs ranging from $2,519 to $51,043.75, with the total change order increasing the contract sum to $3,176,468.63. The project appears to be a comprehensive renovation of the ADOT Tucson North MVD facility, with careful attention to site infrastructure and parking lot improvements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: SD Crane Builders Inc. AMENDMENT NO.: Seven (7) DESCRIPTION: Tucson North MVD Remodel
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Line item CTR075036-4 Alternate Bid Tax increased from $27,077.77 to $35,362.12. See attached
CO.
2. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
Construction Contract Change Order Summary No. ____
Contract/APP No. Contract/APP Amendment No:
Project Name: Project No: Statutory Review No:
Design Professional: Contractor: ADOT Project Manager:
ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED
ACKNOWLEDGEMENT AND AUTHORIZATION
Page | 1 of 1
1. Check box(es) below best describing the Construction Change Order to the Contract:
☐ Contractor cost increase to Contract due to Additional Work.
☐ Contractor cost reduction to Contract.
☐ Contractor to increase number of calendar days to date of Substantial Completion of the Project.
☐ Contractor “no cost” change to Contract.
☐ Use of Contingency ☐ Other (Provide Description) _______________________________________________________________.
2. Contractor shall provide complete description of reduced or Additional Work, including documents in support of the Change Order (e.g., drawings, material substitution literature, cost reduction or increase detail including breakout of labor, materials, markup and tax). Contractor shall use the Construction Change Order Worksheet (Exhibit J1) to provide a detailed breakdown of any change to the Project Cost.
3. By signing and executing this Change Order, the Contractor and Agency agree to a price for the Additional Work, as detailed below. This price shall cover any and all Costs associated with the Additional Work including, but not limited to, Costs associated with delay of the Contractor's Work, if any.
Should the Additional Work impact the Schedule, the Agency and Contractor have agreed to extend the date for Substantial Completion as reflected below.
4. Contractor agrees that the payment authorized by this Change Order, if any, is in full settlement of any and all causes of action, including but not limited to, any claim resulting from delays to the time to Substantial Completion caused by this Change Order which Contractor or any of its Subcontractors, suppliers and the officers, agents, and employees of each of them, may now have or may assert in the future against the Agency, or its officers, employees and agents, arising out of, or associated with, this construction Change Order.
In accordance with the terms of the Contract, the following detailed changes are proposed (attach additional information as needed):
Original Contract Sum $
Previous Change Orders to Contract $
Net Change for this Change Order to Contract (attach Exhibit J1 for details as needed) $
New Contract Sum $
Number of Calendar Days for Time Extended for Substantial Completion for this Change Order Days
Revised Substantial Completion Date due to this Change Order
Contractor (Firm Name): Address: Authorized Signature and Date:
Design Professional (Firm Name): Address: Authorized Signature and Date:
ADOT Procurement Officer Name:
Agency Name and Address: Authorized Signature and Date: ADOT Project Manager Name:
Agency Name and Address: Authorized Signature and Date:
State of Arizona Department of Transportation
206 S 17th Ave Phoenix, AZ 85007
ADOA Chief Compliance Officer Name:
Agency Name and Address: Authorized Signature and Date:
This Change Order shall modify the Contract only upon the signed approval of the Contractor, Design Professional, ADOT Procurement Officer as specified in the signature block. When signed by all parties this Change Order becomes effective immediately and the Contractor shall proceed with the change(s) identified and approved.
3,021,688.18
154,780.45
3,176,468.63
N/A
CTR075036 01
CTR075036 HD-24-15
Shive-Hattery SD Crane Builders Inc. Andrew May
See attached J1.
SD Crane Builders Inc.
Shive-Hattery
Andrew May
Patrick Holt
Elizabeth Blakley
1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281 4330 N Campbell Ave Suite 268 Tucson, AZ 85718 1655 W. Jackson St.
Phoenix, AZ 85007 1400 W Washington St, #B200 Phoenix, AZ 85007 1655 W Jackson St.
Phoenix, AZ
ADOT Tucson North MVD Renovation
05/01/2025
05/01/2025
05/02/2025
05/02/2025
05/23/2025
COR No. 1
Date: 3/24/25
Item No.
Subcontractor Trades
Q ty
U n it s
Unit Price Extension Q ty
U n it s
Unit Price Extension Totals
1 Meridian Surveying -$ 0 2,775.00$ 2,775.00$ Surveying
2 Complete Earthworks -$ 17,980.00$ 17,980.00$ Backfill Around New Curb
3 Concrete Arizona -$ 96,991.29$ 96,991.29$ Grade & Install New Curb -$
4 Lee's Asphalt -$ 2,519.00$ 2,519.00$
Add Thicken Edge Where
There are not Curbs -$
5 RCD Demolition -$ 2,830.00$ 2,830.00$ Remove existing Curb
6 -$ -$ -$
123,095.29$
Owner Request 4.00% 4,923.81$
Hidden Condition 10.00% 12,801.91$
3.00% 4,224.63$
Prepurchase Materials 0.00% -$
Omission in Construction docs 1.00% 1,450.46$
Transfer to/from Contingency 5.655% 8,284.35$
Other 154,780.45$
Approval of this Change Order Request will increase (decrease) the Schedule by: 0 Calendar Days
Form 8.14. rev 8.10.2021 r5
Total Cost
Address Authorized Signature & Date
Construction Services Manager Address Authorized Signature & Date
Contractor
Design Professional Address Authorized Signature & Date
ADOA Project Manager Address Authorized Signature & Date
Fee
This Change will require Statutory Review: Yes No
General Conditions
Builders Risk
Tax
Insurance
Bond
Schedule of Values by Trade
The Contractor hereby requests a Change in the Contract Sum and/or Time, conforming to Article 1.2 of the Uniform Terms and Conditions, the Work described herein will not start until this Change Order Request has been signed by all parties.
Labor Material
Check the box best describing the Cause of this Change Subtotal
Exhibit J1
Change Order Request
State of Arizona General Services Division 1400 West Washington St
Phoenix, AZ 85007
Project Name: ADOT Tucson North MVD Renovation State Project No:CTR075036
Contractor Project No: 24-322Contractor: SD Crane Builders Inc.
SD Crane Contractors
Shive-Hattery Inc.
Andrew May
Elizabeth Blakley
1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281
4330 N Campbell Ave Suite 268 Tucson, AZ 85718
1655 W. Jackson St.
Phoenix, AZ 85007
1655 W. Jackson St.
Phoenix, AZ 85007
05/01/2025
05/01/2025
05/02/2025
05/23/2025
Land Surveying • GeoData
1684 S. Research Loop #530 Tucson, Arizona 85710 phone: 520-325-6990 fax: 520-325-7063 email:mdemple@meridian-surveying.com
March 10, 2025
SD Crane Builders
1215 W Rio Salado Pkwy, #109
Tempe, AZ 85281
Attn: Kyle Burns
Re: ADOT Tucson North MVD Building - Additional Work
SURVEY PROPOSAL
1) Calculations, coordination and control verifications
2) Perform vertical and header curbing as-builts to establish baseline for new curbing
TOTAL: $2,775.00
Option1: Add $250.00 for “Letter of Substantial Conformance” of associated curbs.
Exclusions: Landscaping/irrigation, control/property surveys, easements, rip-rap, gas/comm.
Sincerely, Luke Williams, President
PO Box 251
Cortaro, Arizona 85652
(520)235-3384
ROC 318634
3/5/2025
SD Crane:
MVD North Tucson Curb Grade CO
We propose the following:
1. Curb Grade: Cut grade for new curb and process compact sub grade below concrete. Cut SG for thickened edge pavement.—————————————————————————————————— $32,670.00
2. Curb Backfill: Import AB, backfill, and compact outside of islands for new paving. Place native fill inside islands and grade to 2” below top of curb.———————————————————————$17,980.00
Addenda: N/A
Material Sales Tax: $393.75
Soils report: N/A
Total:
Fifty-OneThousand Forty-Three Dollars and Seventy-Five Cents---------------------------------------------------$51,043.75
Exclusions (Unless stated above):
1. Surveying/staking/engineering.
2. Water costs.
3. Changes in design.
4. No import/export unless stated above.
5. Final adjustments unless stated above.
6. Permits or engineering.
7. Anchor Bolts/Templates
Michael Egurola
Sole Member michael@completeearthworx.com
520-235-3384
CONCRETE Arizona, LLC.
LICENSED * BONDED * INSURED
9240 West Missouri Avenue ROC CR-9 304959 CONCRETEAZ.COM
Glendale, AZ 85305 623-845-7070
REVISED BID
DATE: 03/06/2025
GENERAL CONTRACTOR: SD CRANE BUILDERS, INC.
1215 W. Rio Salado Pkwy., #109, Tempe, AZ 85281 480-832-1777-office, 480-466-1135-cell, 480-832-1798-fax
PROJECT: ADOT Tucson MVD Renovation PROJECT ADDRESS: 7330 N. Shannon Rd., Tucson, AZ 85741
FROM: Peter Diaz, Estimator / Superintendent, 623-341-1007 cell, pete@concreteaz.com
Reyna, Project Coordinator, 623-293-1986 cell, reyna@concreteaz.com
JOB DESCRIPTION
New curb:
Approx. 1,500 lnl. ft.
Excavate for new A curb and haul away excess soils.
Set grades.
Set forms.
Grade and compact.
Pour and finish.
Clean up.
$91,800.00 Cost $ 5,191.29 Taxes (if applicable)
$96,991.29 TOTAL COST
All work to be completed according to plans and specifications.
INCLUDES: All labor, materials, equipment, hauling and dump fees.
Travel time, lodging, and Per Diem.
Insurances
TAXES: 65% of job cost: $59,670.00 AZ State 5.6%: $3,341.52 Pima County .5%: $298.35 City of Tucson 2.6%: $1,551.42
TOTAL TAX 8.7: $5,191.29
LA INC, Incorporated Since 1980
PROPOSAL / CONTRACT
03/04/2025
SD Crane PROJECT: ADOT Tucson North MVD Building Remodel 7330 N Shannon RD PLANS: WSM Architects /Dowl ask to cost thickened edge grade and install per detail and plan Grading and drainage plan C200 per email
SCOPE OF WORK: Install grade and install a thickened edge per detail given in email on Page C200 per Pag 2 HV 70- 10 oil
1. Grade and install thickened edge per detail sent via email and per sheet C200 same email Pag 2 HV 70-10 oil 110 LF @ $ 22.90 LF Per LF $ 2,519.00*
*Taxes not added to price for each item please add 3.965% to come up with the taxes for each item *Based on 1 mobilizations per each section.
*Bond can be supplied at an added cost *Amendments 1-8 have been seen
Asphalt Material Escalation Clause: Due to the volatility of oil pricing, all suppliers will only quote for a 30-day period.
With a signed Contract, I can usually get the quote locked in for up to 90 days Pag 2 HV 70-10 is 82.00 per ton at the plant
EXCLUDES: Unless listed above
- Any and all Grading other than the driveway grading, Demo, Concrete,
- No cleanup and/or hauling of debris by others -Traffic control, Striping, Utility adjustments, Demo of any kind -Site Work grading, Fine or landscape grading, herbicide treatments, -Unforeseen conditions, obstructions, items not specifically mentioned in inclusions, Acts of God -Taxes, Bonds, Permits, Testing, Sampling, Engineering, Surveying, Staking, S.W.P.P.'s, N.P.P.P.'s, A.D.E.Q.'s
- More than one mobilization All other labor, equipment, and/or materials requested, will be extra charge above contract price
NOTE: This proposal may be withdrawn, if not accepted within 30 days.
WARRANTY: 2 year for Material and/or workmanship.
TERMS: Payment Due When complete
Submitted by _________________________________________________Jeremy Petroshus/ Estimator / (520) 360-8193
ACCEPTANCE: You are hereby authorized to furnish all materials, labor, and equipment necessary to complete this work, for which the undersigned agrees to pay the full amount, and according to the terms thereof. A service charge of 2% per month will be charged to all accounts over 30 days. Buyer also agrees to pay all fees incurred including but not limited to attorney’s fees, in collection of this account.
Accepted by _____________________________________________ Dated_________________
2640 East Ganley / Tucson, Arizona 85706 / (520) 294-0421 / Fax (520) 294-0448
ROC 351255 A-14 ROC 351227 R-13
,-./012��34056789:6:;<=>?6@>ABC6DE86F;GHIG?J6
K01� 015� � �LL0MLN4��.5OPQR
STUTVWXYZ[V\]̂_̀[XabVcZdTV efgeVhTViẐj[XâklVUX̂j[VS]̂k[VmVnngV o[aYbpX̂qrZYVstugnV v320wxyz{|}~�
,-./012��N4�0-5��������
,-./012��3M3�0-5������������
NK0-�M20ML0M25�����6D;AA��6�
N�4�220L� .5��>�H6D�=G��
�22M5��>�H6D�=G�
§̈©ª«¬®̄ª̈°±²³́²µ¶·
¦̧¹º»¼½¹»¾º¿ÀÁÂÃÄÅÆÇ»ÁÈ»¿ÈÉÁÂûÊ˺»¼½¹»¿È̽¿Í¼»Ì¿ºÉÁÂûÍ˼»¼Ë»Î¹»¾¹Ï˹¾»¿Â¾»Ê˺»¼½¹»ÐËÂк¹¼¹»ÐѺλË» ¼½¹»Ì¹ºÁϹ¼¹º»¿Â¾»¿»Ê¹À»ÁÈͿ¾Ȼ¿º¹¿È»¼Ë»º¹Ï¿ÁÂÒ»Ó½¹»Ð½¿Í͹Âù»ÀÁ¼½»¼½ÁÈ»ÁÈ»¼½¿¼»¼½¹»¹ÔÁȼÁÂûÐËÂк¹¼¹» ÐѺλË»¼½¹»ÌºË̹º¼Õ»ÁÈ»¹Ô¼ºÑ¾¹¾»ÐѺλÀ½Áн»ÁÈ»ÁÂȼ¿Í͹¾»Ë»¼ËÌ»ËÊ»¼½¹»¿È̽¿Í¼»ÑÂÍÁɹ»Ö×Ö»ÐѺλ À½¹º¹»¼½¹»¿È̽¿Í¼»ÀËÑ;»Î¹»Í¿Á¾»ÑÌ»¼Ë»Á¼Ò»Ø½¹Â»¾¹ÏËÁÂû¼½¹»¿È̽¿Í¼»Ì¿ºÉÁÂûÍ˼»Á¼È»Ï˺¹»¼½¿Â» ÍÁɹÍÕ»¼½¿¼»¼½¹»¹Ô¼ºÑ¾¹¾»ÀÁÍͻι»ÐËÏ̺ËÏÁȹ¾»¾Ë»¼Ë»¼½¹»Ê¿Ð¼»¼½¿¼»Á¼»ÁÈ»ÌËѺ¹¾»Ë»¼ËÌ»ËÊ»¼½¹»¿È̽¿Í¼Ò»Ø¹» ¿ÍÈË»Â˼Áй»¼½¿¼»Ï¿Õ»ÙÈͿ¾»ÐËÂк¹¼¹»ÐѺÎÈ»¼½¿¼»¿º¹»¼Ë»º¹Ï¿Á»¿º¹»¹Ô¼ºÑ¾¹¾»ÐѺλ¿Â¾»½¿Ú¹»Î¹¹Â» ÐËÏ̺ËÏÁȹ¾»ÎջпºÈ»½Á¼¼ÁÂû¼½¹»ÐѺλ˺»¼º¹¹»ºË˼ȻÑÌÍÁʼÁÂû¼½¹ÛÒ»Ó½¹º¹»ÁÈ»¿ÍÈ˻̿ºÉÁÂû¿º¹¿Ä»¼½¿¼» ¾Ë»Â˼»½¿Ú¹»ÐѺλ¿Â¾»ÈËϹ»¾º¿ÀÁÂÃÈ»¾ÁÊʹº»Á»ȽËÀÁÂû¼½¹»ÐѺλ¿Â¾»Â˼»È½ËÀÁÂû¼½¹»ÐѺÎÒ»
ÜËÍѼÁËÂÝ»ØËÑ;»Î¹»¼Ë»º¹ÏËÚ¹»¿ÍÍ»¼½¹»¹Ô¼ºÑ¾¹¾»ÐѺλÁ»¼½¹»Ì¿ºÉÁÂûÍ˼Ȼ¿Â¾»ÁÂȼ¿ÍÍ»¿»Ö×Ö»ÐѺÎÒ»×» ÐѺλÀËÑ;»Î¹»¿»ÏÑн»Î¹¼¼¹º»¿ÌÌÍÁп¼ÁË»Ê˺»¿»½Áý»¼º¿ÊÊÁл̿ºÉÁÂûÍ˼»Ê˺»¿Â»Þß໿¾»ÀÁÍͻͿȼ»ÍËÂùº»
¼½¿Â»¹Ô¼ºÑ¾¹¾»ÐѺÎÒ»
Ó½¹º¹»ÀËÑ;»Î¹»¿»ÐËȼ»¿ÈÈËÐÁ¿¼¹¾»ÀÁ¼½»º¹ÏËÚÁÂû¿ÍÍ»¹Ô¼ºÑ¾¹¾»ÐѺλ¿Â¾»ÁÂȼ¿ÍÍ»Ö×Ö»áѺÎÒ»
Í̧¹¿È¹»È¹¹»Ì½Ë¼ËÈ»¿Â¾»àº¿ÀÁÂÃÈ»¿¼¼¿Ð½¹¾»Î¹ÍËÀÒ» âãä忦çèéê¦ ëìííîïðñòíó
/01/ 2� 3$(4%"+(56 �"(4% �'(5% 7 881
9%+#, :"(;<$# =>?18
@%)%AB<$% CD=1E =8?F/GGG H#I CD=1E =8?F/G0=
!<JJ%".(#) K<.7/G>0>0 K%+�7KL!/0?M=M
+."#$%N+*."#$%O'()*%"+�.<J
PQRSQP
����� ���T���UVW
�TX
YZ�
� ���T��� ]Z�\ Y�̂��_̀abcdefghijfikl ]Z ���̂���mnopqrstuv ����\�̂Z������mnopqrstu��� wxyz{|yx}
DOWL Response: Remove and replace existing concrete extruded curb with new concrete vertical curb - type 2 per PAG Detail No 209 (H=6"), where occurs. For locations where a curb does not currently exist, provide a thickened pavement edge per MAG Detail No 201, Type 'A'. Locations without curb with head on parking stalls shall also include a precast safety curb per MAG Detail No 150 at each parking stall. Contractor to submit a proposal to perform the work.
January 21, 2025
DOWL
Erin O'Brien
| � | ����� |
| � | ������������� |
# � � % � � 0 1
�2
�1
3�
�1
%1!"0��"!1!!
%�1���6+'��67� &8*7� '8**'�� &.'*�#0� �9(*7.:���8.;(76�1�!!1
�2
| ������%!!! | �� | 4����$������� | $�� |
| ������ | �� |
�4�
| ���������� | ����� |
| ��$ | ������� |
4�
�� �����������4����� 4����� � ��������
| �������� | |
| ��� | ������� |
| ��� | � |
0� ��
| ��� | ������� | ||
| ������ | / | ||
| �� | �=� | ���#=#%���� | �=������ !#=� !�� |
1� ������
?@ABCDEAFGAHIFJAKDLKMAN@A
OLAGLLNAH@AFGJHKPPABCDEQ
RSTUVWXTYZT[\Y]T̂W_̂ T̀aST b_TZ__aT[STYZ][̂ccTUVWXd effghijklmnopqlrlsfjtuvutowuhpql mnoppupxlrlyhpqwgztwuhplsjgiutjq
!+#,-,. /#"-"#0,1-2(+
�6
����5������68���7
���������������6 947�����
9��;�<=��
6�
�4������������������ 6� �����������������������������:��7 �
�6
7�
9�
�����6
9��;�<=�
�6
9�
9�
�5�>�
�3
�3�3
�5�>�
�� �3
��8����������������������������������>�
��8�������������������
��8������������������
��9��;
�9��;
��3�
�@ABCDEF��DGHA�����
I� �J
I� �K
�L �8
�3
M N
HG
D M� D
GH
AO
B P Q
RO
M�
O O
N Q S S B S C O O Q
TP
EO
AA
E B S >T
GA
U U
TB
G D T
I�
I�
I� K
��;�V���9��;W
+)2#XY,Y#"-/Y,)-$X!"-Z-!X,-'Y+
��;�V����9��;[
#()0!XX-/Y,)-$X!"- \]̂-[
��4
��4
���4������� ������=8���8�5
���4��
���4������������� �5��8�����������4����������������� I��������
���4�������
���4����������� ��:���6�5�� ���7I��
�����I����� ���4�����������4������������������4��� �������5
�5��8�������������������� ������������������5
�����������4�� ���������5�>�
3 ������������������������������������� �������������4������
���4�����5��4������� �5�����:�� ��5��
�����������8�����:��������������� 8����������
5��� ��5���������������
�� �����������������4������
5��� ��5������������������
�3 ������������������
��������������������84������
���������������������I���:
���4����������:������
���4�������������4������������� :��������4 8��������5�����:
;����4����������I������������� ������8��4���8����4����������>��������������������������������������I��>�>
�� �����4�� ����8��������� ��������������������������4��������� �����>������4������>���
���4��
J _̀abcd̀e
�4��8��� f b̀̀ ghijk̀ lcimdmcbjemd̀jbcd̀e �4��8���>
�> �4������������:��� ���5� 8���������4������5��4����:��� ���5�������5I��4�����9��������:���������� ��������������4����� ���4�� �4�������������� ���4������ �����������4�������������������������������>
�> �4��� ���4����������� ���4�����������:����������� ���:��������4��8 �������>�����:����������5� �4��� ��������������5��4���
��������8��4� 8����� �������:���������������I���:
��8�������:
���I��
�4��8���>
����8��������� ����8��4����4������������
���4���������������>����������I���������4����I �4��8���>
�����4�������� ��������8���������� ���������I������������������I������������������I 8���������������� n op qp n n n
���5����������������� ��������������������r����:������ ��������s�
$!0tY"u-0)v.Y0)+w- 5�� ���������� �����4����:�� 5��I���� �����4�� :���5���4����
5����V�oqxyz{|}~yyx{������x�{��y� :���5���4�����V�ox�}z{��~x�y���|yx{������x�{��y ��� ���x�{��y�
�����4�������� op �I�3�����=�����V���>3��������x�����}�x�{��y�
����4������r��������������������������������������������� �> ��<�6����������=��7�V� >��������x���y����|yx�{��y� ��x���y����|yx�{��y�x��yx�y����y�x{y�x���x���|yxq��pq
$!0tY"u-$0#(Y+)+w- 5�� ����������������� �� � �3����������������6� ���������<�������������7
'Y % X)-$!0tY"u-0)v.Y0)+w ����4������r����������5��������������������������������������������> ��r����� ���<�6����������=��7�V�3>��������x���~�|yx�{��y�
������������������5����� �����������������x���~�|yx�{��y��
�hg_mbfjg̀��mg̀l b̀de�
ª
²³́µ
¶·̧¹º
¼
³́½ »°¾̄»¿À́
½¿ ½
½ Á́ ¿́¾½
Â
Ã
ÄÅ
³ÆÇÈÅÉ
¾
Ế¬Â¾ ˱ ³ ±¾
ÌÍÌ
ÍÎÏ
ÎÐ
ÑÒÓÔÓÕÖ×ÕÑÒÓÔÓÕÖØ ÑÒÓÔÓÕÖÙ ÑÒÓÔÓÕÖÚ
ÛÜÝÞÝßàá
ÛÜÝÞÝßàâãä
ÛÜÝÞÝßàå
ÛÜÝÞÝßàæ
ÛÜÝÞÝßàçè
ÛÜÝÞÝßàçç
ÛÜÝÞÝßàçé êëìíìîïðñ êëìíìîïðò óôôõö÷øùúûüýþÿú�ú�ôø�����ý��öþÿú ûüýþþ�þ�ú�ú�öþÿ�õ����öþú�øõ÷��øÿ
Date: 3/6/2025
C.O. #: 2502601
Client / Contractor: Project:
RFP #:
Contractor Project #:
Amount
$2,830.00
$2,830.00
Submitted By: Accepted By:
RCD Demolition LLC
Signature:
Eric Vazquez
Total:
Demolish, remove, and legally dispose of existing concrete curb (Approx. 1,225LF)
Includes: Applicable saw cuts
Attn: Kyle Burns, Jeff Murray
1215 W. Rio Salado Pkwy, Suite 109
7330 N. Shannon Road
Tucson, AZ 85741
SD Crane Builders, Inc.
CHANGE ORDER
Eric Vazquez, Project Manager
Tucson North MVD Building
Tempe, AZ 85281
Change Order Description: Concrete Curb Removal
24322-004
| CTR075036 Contract Amendment Summary 7 |
| ADOT Shannon Rd MVD Renovation CO 01 |
File details come from the government source that posted it. Updated .