Contract Amendment Summary
This document is an Amendment Eight (8) to a construction contract between the Arizona Department of Transportation (ADOT) and SD Crane Builders Inc. for the Tucson North Motor Vehicle Division (MVD) Remodel project located at 7330 N Shannon Road, Tucson, Arizona 85741. The contract is managed under ADOT's general procurement procedures, with design services provided by Shive-Hattery and project oversight by Andrew May (ADOT Project Manager). The work involves renovation of an existing MVD facility with associated site improvements.
Amendment Eight modifies the contract cost for Line Item CTR075036-1 (Tucson North MVD Remodel), increasing the project cost from $2,660,773.45 to $2,698,199.37, representing an increase of $37,425.92 in direct construction costs. Correspondingly, Line Item CTR075036-3 (Base Bid Tax) increases from $150,466.73 to $152,583.17. The amendment encompasses five separate change orders totaling $39,542.36 in additional work: RFI #48 (Driving Test Canopy Height Restriction Bar Support—$5,631.27), RFI #51 (Downspout Replacement—$2,712.00), RFI #52 (Canopy Parapet Cap and CMU Bump Out Repairs—$17,545.43 plus subcontractor proposals), RFI #57 (I-Beam Gap Grouting—$1,975.47), and RFI #58 (Drywall and Insulation Replacement—$3,427.00). All other contract terms, conditions, and provisions remain unchanged, with the amendments effective immediately upon execution by all authorized parties.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: SD Crane Builders Inc. AMENDMENT NO.: Eight (8) DESCRIPTION: Tucson North MVD Remodel
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Line item CTR075036-1 Tucson North MVD Remodel per the technical specifications & drawings, increased from $2,660,773.45 to $2,698,199.37 total cost. See attached CO.
2. Line item CTR075036-3 Base Bid Tax increased from $150,466.73 to $152,583.17. See attached CO.
3. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
Construction Contract Change Order Summary No. ____
Contract/APP No. Contract/APP Amendment No:
Project Name: Project No: Statutory Review No:
Design Professional: Contractor: ADOT Project Manager:
ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED
ACKNOWLEDGEMENT AND AUTHORIZATION
Page | 1 of 1
1. Check box(es) below best describing the Construction Change Order to the Contract:
☐ Contractor cost increase to Contract due to Additional Work.
☐ Contractor cost reduction to Contract.
☐ Contractor to increase number of calendar days to date of Substantial Completion of the Project.
☐ Contractor “no cost” change to Contract.
☐ Use of Contingency ☐ Other (Provide Description) _______________________________________________________________.
2. Contractor shall provide complete description of reduced or Additional Work, including documents in support of the Change Order (e.g., drawings, material substitution literature, cost reduction or increase detail including breakout of labor, materials, markup and tax). Contractor shall use the Construction Change Order Worksheet (Exhibit J1) to provide a detailed breakdown of any change to the Project Cost.
3. By signing and executing this Change Order, the Contractor and Agency agree to a price for the Additional Work, as detailed below. This price shall cover any and all Costs associated with the Additional Work including, but not limited to, Costs associated with delay of the Contractor's Work, if any.
Should the Additional Work impact the Schedule, the Agency and Contractor have agreed to extend the date for Substantial Completion as reflected below.
4. Contractor agrees that the payment authorized by this Change Order, if any, is in full settlement of any and all causes of action, including but not limited to, any claim resulting from delays to the time to Substantial Completion caused by this Change Order which Contractor or any of its Subcontractors, suppliers and the officers, agents, and employees of each of them, may now have or may assert in the future against the Agency, or its officers, employees and agents, arising out of, or associated with, this construction Change Order.
In accordance with the terms of the Contract, the following detailed changes are proposed (attach additional information as needed):
Original Contract Sum $
Previous Change Orders to Contract $
Net Change for this Change Order to Contract (attach Exhibit J1 for details as needed) $
New Contract Sum $
Number of Calendar Days for Time Extended for Substantial Completion for this Change Order Days
Revised Substantial Completion Date due to this Change Order
Contractor (Firm Name): Address: Authorized Signature and Date:
Design Professional (Firm Name): Address: Authorized Signature and Date:
ADOT Procurement Officer Name:
Agency Name and Address: Authorized Signature and Date: ADOT Project Manager Name:
Agency Name and Address: Authorized Signature and Date:
State of Arizona Department of Transportation
206 S 17th Ave Phoenix, AZ 85007
ADOA Chief Compliance Officer Name:
Agency Name and Address: Authorized Signature and Date:
This Change Order shall modify the Contract only upon the signed approval of the Contractor, Design Professional, ADOT Procurement Officer as specified in the signature block. When signed by all parties this Change Order becomes effective immediately and the Contractor shall proceed with the change(s) identified and approved.
3,021,688.18
295,458.61 39,542.36
3,356,689.15
CTR075036 07
CTR075036 HD-24-15
Shive-Hattery SD Crane Builders Andrew May
See attached J1.
SD Crane Builders, Inc.
Shive-Hattery, Inc.
Andrew May
Patrick Holt
Megan Walker
1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281 4330 N. Campbell Ave., Suite 268 Tucson, AZ 85718 1655 W. Jackson St.
Phoenix, AZ 85007 1400 W. Washington St., #B200 Phoenix, AZ 85007 1655 W. Jackson St.
1655 W. Jackson St.
ADOT Tuscon North MVD Renvoation
10/20/2025
10/20/2025
Docusign Envelope ID: AEE5211E-5F02-44E5-A25E-2A89BC08995F
10/23/2025
10/24/2025
COR No.7
Date: 9/27/25
Item
No.
Subcontractor Trades
Q ty
U n it s
Unit Price Extension Q ty
U n it s
Unit Price Extension Totals
Driving Test Canopy & Height
Restriction Bar R.F.I. #48 -$ 5,631.27$ 5,631.27$
Downspout On North Side of
Building R.F.I. #51 -$ 2,712.00$ 2,712.00$
Canopy Parapet Cap & CMU
Split Face Bump Outs ASI 1
R.F.I. #52 SK-17 -$ 17,545.43$ 17,545.43$
Existing I Beam Above Public
Restroom R.F.I. #57 -$ 1,975.47$ 1,975.47$
Attaching Drywall to Flat Strap-
Insulation R.F.I. #58 -$ 3,427.00$ 3,427.00$
6 -$ -$ -$
31,291.17$
Owner Request 4.00% 1,251.65$
Hidden Condition 10.00% 3,254.28$
3.00% 1,073.91$
Prepurchase Materials 0.50% 184.36$
Omission in Construction docs 1.00% 370.55$
Transfer to/from Contingency 5.655% 2,116.44$
Other 39,542.36$
Approval of this Change Order Request will increase (decrease) the Schedule by: 0 Calendar Days 20
Form 8.14. rev 8.10.2021 r5
Exhibit J1
Change Order Request
State of Arizona
General Services Division
1400 West Washington St
Phoenix, AZ 85007
Project Name: ADOT Tucson North MVD Renovation State Project No:CTR075036
Contractor Project No: 24-322Contractor: SD Crane Builders Inc.
The Contractor hereby requests a Change in the Contract Sum and/or Time, conforming to Article 1.2 of the Uniform Terms and Conditions, the Work described herein will not start until this Change Order Request has been signed by all parties.
Labor Material
Check the box best describing the Cause of this Change Subtotal
Fee
This Change will require Statutory Review: Yes No
General Conditions
Builders Risk
Tax
Insurance
Bond
Schedule of Values by Trade
Total Cost
Address
Construction Services Manager Address Authorized Signature & Date
Contractor
Design Professional Address Authorized Signature & Date
ADOT Project Manager Address Authorized Signature & Date
SD Crane Builders Inc. 1215 W. Rio Salado Pkwy #109 9/27/25
Shive-Hattery, Inc.
Andrew May
Patrick Holt
4330 N. Campbell Ave. Suite 268 Tucson, AZ 85718
1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281
1655 W. Jackson St.
Phoenix, AZ 85007
1400 W. Washington St. #B200 Phoenix, AZ 85007
10/20/2025
Docusign Envelope ID: AEE5211E-5F02-44E5-A25E-2A89BC08995F
10/23/2025
Project: HD-24-015 ADOT- Tucson North MVD Renovation
(HD-24-015)
7330 N Shannon Rd Tucson, Arizona 85741
P: 602-499-8871
RFI #48: R.F.I. #048 Driving Test Canopy & Height Restriction Bar
Status Open
To Joel Mesik (Shive Hattery) From Kyle Burns (SD Crane Builders Inc.)
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Jun 26, 2025 Due Date Jul 1, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of Transportation), Jeff Murray (SD Crane Builders Inc.)
Activity
Question Question from Kyle Burns SD Crane Builders Inc. on Thursday, Jun 26, 2025 at 09:05 AM MST Joel, For your review please see attached R.F.I. #048 Driving Test Canopy & Height Restriction Bar. Please advise.
Thank you, Attachments R.F.I. #048 Driving Test Canopy & Height Restriction Bar.pdf
Awaiting an Official Response
All Replies Response from Kyle Burns SD Crane Builders Inc. on Friday, Jul 18, 2025 at 05:13 AM MST Marcus, Thank you for the response regarding this RFI. We will move forward accordingly.
Response from Marcus Attson Shive Hattery on Wednesday, Jul 16, 2025 at 08:45 AM MST See attached PDF for response.
R.F.I. #048 Driving Test Canopy & Height Restriction Bar_S-H Response.pdf
Page 1 of 1 Printed On: Jul 18, 2025 05:13 AM MST
Docusign Envelope ID: AEE5211E-5F02-44E5-A25E-2A89BC08995F
REQUEST FOR INFORMATION
RFI #048
Subject: Driving Test Canopy & Height Restriction Bar
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:48
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 6/26/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the height restriction bar at the Driving Test Canopy. Please see the attached pictures or the angle iron frame and attachment. Our Roofing Contractor will need to remove the height restriction bar during the roofing demo and install at the canopy and have concerns of reattaching after the new roof is installed. Please provide direction on how we are to reinstall the height restriction bar after the new roof is installed so there are no penetrations through the new roofing. The other concern is how high the top through bolt is in the angle iron frame as it is through bolted at the top of the block and parapet cap. Please let me know if you have any questions
Please see photos attached below, Thank you, Response Date:
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Contractor shall provide height restriction bar support and attachment per attached sketches.
07/15/2025
Shive-Hattery
Marcus Attson
EXISTING CMU
REUSE EXISTING HEIGHT
RESTRICTION BAR - CLEAN
AND REPAINT BAR BEFORE
REINSTALLATION - SET BAR
FOR 13'-6" CLEARANCE
PROVIDE CHAIN - SIZE TO
MATCH EXISTING
ATTACH EYE BOLT TO
SUPPORT
STEEL ANGLE BRACKET SUPPORT,
TYP. OF 3 - PAINT SUPPORTS P5 -
SEE STRUCTURAL SKETCH FOR
SIZE AND ATTACHMENT - SPACING
OF SUPPORTS SHALL MATCH
SPACING OF EXISTING SUPPORTS
CL
OF CMU
18" TO FACE
1 1/2"
6" 45°
4330 N CAMPBELL AVE, STE #268
TUCSON, ARIZONA 85718
520.408.1044 | SHIVE-HATTERY.COM
DATE
DRAWN BY
APPROVED BY
SCALE
FIELD BOOK
REVISION
Au to de sk
R ev it
07-15-2025
PROJECT
NUMBER
7/
/2
5:
:0
PM
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
A M
O D
EL
_M ar cu s_ At ts on
.rv t
1 1/2" = 1'-0"
MA
JDM
ADOT TUCSON NORTH MVD REMODEL
7330 N SHANNON RD
TUCSON, AZ 85741
2172304350
SK-16
SHIVE-HATTERY
1 1/2" = 1'-0"1 CANOPY HEIGHT BAR SUPPORT
SCHNEIDERAv
STRUCTURL ENGINEERS
Job Namo
Job No.
By Rev
-CHAN
AX
Sheet
Dale
Dale
Date : 9/9/2025
Job #: 24463
CO #: 3
620 W. Commerce Ave.
Gilbert, AZ 85233 Phone: 480.926.6062 Fax: 480.926.6063
S&H Steel Co. LLC
ADOT Tucson MVD Renovation
Job Location: 7330 N SHANNON RD
TUCSON AZ 85741
Change Order Request Kyle Burns SD Crane 1901 E University Drive suite 330 Mesa, AZ 85203 Phone: 480-832-1777
To:
COR #003: Height Restriction Bar Supports
Change Requested By: Kyle Burns
Sent Via: E-mail
Description of Change:
Per the directive of Kyle Burns, additional work is required to provide supports for the height restriction bar at the driving test car port.
S&H Scope of Work:
- Furnish and install (3) steel angle bracket supports per structural sketch SK-16.
- Reset existing height restriction bar at 13'-6" clearance height.
- Provide chain sized to match existing.
- Anchor supports to existing CMU face per EOR's detail.
S&H Steel's scope is limited to fabrication and installation of the supports and re-installation of the bar.
Surface preparation and painting of the bar is excluded and shall be performed by others.
Cost Breakdown:
Detailing: $150.00 Materials: $302.72 Fabrication: $312.00 Erection / Installation: $2,926.00 Equipment: $750.00 Crew Mobilization: $456.00
OH/P: $734.55
Total Amount: $5,631.27
Date : 9/9/2025
Job #: 24463
CO #: 3
620 W. Commerce Ave.
Gilbert, AZ 85233 Phone: 480.926.6062 Fax: 480.926.6063
S&H Steel Co. LLC
ADOT Tucson MVD Renovation
Job Location: 7330 N SHANNON RD
TUCSON AZ 85741
Change Order Request Kyle Burns SD Crane 1901 E University Drive suite 330 Mesa, AZ 85203 Phone: 480-832-1777
To:
COR #003: Height Restriction Bar Supports
The change has added 2 Calendar Days to the project schedule and will cause an increase of $5,631.27 to the contract amount.
A signature below indicates acceptance of all changes shown herein. Any work associated with this change will begin upon receipt of a signed copy of this C.O. in our office. Please respond by 9/9/2025.
If the requested response time is not met, the project may be delayed.
Accepted By S&H Steel Co. LLC
7330 N Shannon Rd
RFI #51: R.F.I. #051 Downspout On North Side of Building
Status Open
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Jul 7, 2025 Due Date Jul 11, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of
Question Question from Kyle Burns SD Crane Builders Inc. on Monday, Jul 7, 2025 at 03:32 PM MST
For your review please see attached R.F.I. #051 Downspout On North Side of Building. Please advise.
R.F.I. #051 Downspout On North Side of Building.pdf
All Replies Response from Marcus Attson Shive Hattery on Tuesday, Jul 8, 2025 at 04:55 PM MST
R.F.I. #051 Downspout On North Side of Building_S-H Response.pdf
Page 1 of 1 Printed On: Jul 9, 2025 04:20 PM MST
RFI #051
Subject: Downspout on North Side of Building
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:51
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 7/7/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the downspout on the North side of the building where the existing canopy was removed. After the canopy was removed we exposed the downspout and found a section of the downspout with existing damage (see pictures attached). Please provide direction on if you would like to see this downspout section repaired or if we should replace the entire downspout to match. Please advise
See pictures attached
Thank you, Photos
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact:
Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
PROGRESSIVE ROOFING
Date:
To:
Attn:
Re:
Job #
PCO#: Total Value:
Based on AIA Contract Documentation. Quote Valid for 30 Days
15%
Contact: 0%
Contractor/ Owner
Approved by: Date:
Per Diem
Freight
Fuel Surcharge
2,358$
354$
Subtotal
OH & P
Bond Rate
0 -$
2,712$
Equipment/ Rental Cost -$
Total Change Order luis.cota@progressiveus.com Luis Cota (520)-697-1082
Reach Lift 0 Day $1,233.48 -$
-$ Boom Crane 0 Day $2,814.13
Misc. (Blades, Bits, Rags, Frames, Bags, Plastic Sheeting…)
Labor:
Description Qty Unit Cost / Unit
Description Qty Unit Cost / Unit Cost
Equipment / Rentals:
Hours
Safety - Hours
Hours
Metal Shop 6.50
Manager - Hours
Field Install
Replace Downspout & Conductor Box
This price includes the time material and equipment to remove downspout and conductor box and replace with new conductor box w/sealant and downspout
Inclusions:
Exclusions:
Contract exclusions apply. Indemnification of anyone for this work. Material is subject to availability. Additional work may impact original schedule.
9/24/2025
SD Crane Builders
Jeff Murray
ADOT Tucson North MVD
5103-5-022
93.50$
Qty Unit Cost / Unit
2,712$
Description galvanized 24ga 4x10 Flat Sheet
Material:
- 0-
Cost
1.00 4x10 flat 94$
-$ - 0
0 -$
5$
- 0 -$ -$
Driver
Labor Cost
Material Cost 98$
100.44$
100.44$
Cost
100.44$ -$
100.44$ 1,607$
2,260$
125.00$ -$
5%
653$
16.00 Hours
PROGRESSIVE SERVICES, INC. D.B.A. PROGRESSIVE ROOFING
23 N. 35th AVE * PHOENIX AZ, 85009
(602) 278-4900 * FAX (602) 278-6896
7330 N Shannon Rd
RFI #52: R.F.I. #052 Canopy Parapet Cap & CMU Split Face Bump Outs
Revision 0 Status Open
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Jul 15, 2025 Due Date Jul 18, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of
Question Question from Kyle Burns SD Crane Builders Inc. on Tuesday, Jul 15, 2025 at 02:27 PM MST
For your review please see attached R.F.I. #052 Canopy Parapet Cap & CMU Split Face Bump Outs. Please advise.
R.F.I. #052 Canopy Parapet Cap & CMU Split Face Bump Outs.pdf
All Replies Response from Marcus Attson Shive Hattery on Tuesday, Jul 29, 2025 at 08:13 PM MST
R.F.I. #052 Canopy Parapet Cap & CMU Split Face Bump Outs_S-H Response.pdf
Page 1 of 1 Printed On: Jul 31, 2025 01:51 PM MST
RFI #052
Subject: Canopy Parapet Cap & CMU Split Face Bump Outs
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:52
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 7/15/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the canopy parapet cap and existing roofing at the CMU split face bump outs at AL2, AL3,and AL5. The existing bump outs have a sloped concrete cap that is cracking and falling apart (see pictures). The parapet cap on the canopy is cracking and falling apart.
Please advise on how to repair the parapet cap and bump out roofs. Please let me know if you have any questions.
See pictures attached and Drawing A2.0
Thank you, A2.0, Photos
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
07/29/2025
Shive-Hattery
Marcus Attson
At canopy parapet, contractor shall remove and replace all unsound mortar crown. Coat over entirety crown and wrap down inside face of parapet to flashing with elastomeric paint.
At CMU bump outs, contractor shall remove existing stucco and remove and replace unsound mortar per sketch SK-17.
3"
24'-0" FULL LENGTH OF CMU
SK-17 REMOVE PORTION OF EXISTING STUCCO
D
1/2" / 12"
3"
REMOVE PORTION OF EXISTING
STUCCO - FULL WIDTH OF CMU LINTEL
REMOVE ALL UNSOUND
MORTAR - PROVIDE MORTAR
OVER EXISTING CMU, SLOPE
AWAY FROM BUILDING
EXISTING CMU LINTEL TO
REMAIN
EXISTING STUCCO TO REMAIN
PROVIDE ELASTOMERIC PAINT TO TOP OF
MORTAR - WRAP PAINT TO UNDERSIDE OF
STUCCO
D
AT
E D
R
AW
N B
Y
AP
PR
O
VE
D
B Y
SC
AL
E
FI
EL
D
B O
O K
R
EV
IS
ED
S H
EE
T
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
-2
2-
Revit Version
PROJECT NUMBER
ISSUED FOR
SK-17
7/22/2025 10:20:29 PM
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
A M
O D
EL
_M ar cu s_ At ts on
.rv t
As in di ca te d
2172304350
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
M A
JD
M
SK
-1
SH
IV
E- H
AT
TE
R Y
1/4" = 1'-0"1 SOUTH ELEVATION - CMU LINTEL
1 1/2" = 1'-0"2 TYP. DETAIL @ CMU LINTEL
WH
A
A
3 3
B
B
4 4
A4.0
C
C
D
D
E
E
5 5
1 1
2 2
ENTRY /
GREETER
SELF
SERVICE
OFFICE
OFFICE
MENS
WOMENS
MECH
JAN
SECURE
STOR
TRAINING
STORAGE
UTILITY
WOMENS
MENS
TESTING
MGR
OFFICE
IT
BREAK
RESTROOM
CSR
WORKSTATIONS
STAFF
CORRIDOR
CUSTOMER
QUEUE
SHED
OUTDOOR
BREAK
ROAD
TEST
CANOPY
OUTDOOR
WAITING
TYP 6
A4.1
A4.0
E2 8'-8"
18'-8"
'-8
6a
116c
6b
107 106
103a
103b
17 17
172'-0" 8'-0" 2'-0" 8'-0" 2'-0" 9'-8"
P1
'-2
" 99'-5"
A5.0 1
A5.0
A2.0E
A2.0E
A2.0E
AL07 AL08 AL09
AL02
AL03
AL04
AL05
AL06 AL01
SEE SHEETS A1.0 / A1.1 FOR SITE PLAN INFORMATION
2'-2" 2'-2"
2' -2
A2.0E
100'-0"
A8.3
SIM
A8.2
A8.3
TYP. OF 9
22 22
24 25
A8.2
A8.2
A8.2
5'-8"
2' -6
A5.0
4' -8
INFILL
3'-4"
IN
FI
LL
3'
-4 "28
A8.3
A8.3
A8.3
LOW
LOW
LOW
SEE 12/A8.2 FOR
HIGH CONDITION
AK
AK
INFILL
4'-8"28
5'-0"
'-0
5'
-0
'-4
DN
DN
NO WORK
THIS AREA
5' -0
TYP 3
CR
C R
C R
C R
CR
CR
C R
CR
9' -2
9'-0"
IN
FI
LL
3'
-4
P2
P2
DN
DN
MARK DESCRIPTION PLAN DETAIL
WALL TYPES AND SUBTYPES
P1 •
TYPICAL PARTITION WALL
5/8" GYPSUM BOARD TYPE 'X'
3-5/8" 20 GA. STEEL STUDS @ 1'-4" O.C.
3-1/2" SOUND ATTENTUATING BATT
INSULATION (SAB)
5/8" GYPSUM BOARD TYPE 'X' (EXTEND
6" PAST CEILING U.N.O.)
P2
TYPICAL PLUMBING WALL
5/8" GYPSUM BOARD TYPE 'X'
6" 20 GA. STEEL STUDS @ 1'-4" O.C.
3-1/2" SOUND ATTENTUATING BATT
INSULATION (SAB)
5/8" GYPSUM BOARD TYPE 'X' (EXTEND
6" PAST CEILING U.N.O.)
TYPICAL
TYPCIAL SITE WALL
3-COAT STUCCO SYSTEM, PAINTED W/
ELASTOMERIC PAINT
8" x 8" x 16" CONCRETE MASONRY UNITS -
VERTICAL REINFORCING AND GROUTED
AT 48" O.C.
M1
WALL SUBTYPE - FURRING
7/8" METAL FURRING STRIPS
5/8" GYPSUM BOARD
NOTE: EXTEND 6" PAST CEILING U.N.O.
a
EXISTING TYPICAL EXTERIOR WALL (R-15.7)
[E] STUCCO SYSTEM, REPAINT W/
ELASTOMERIC PAINT
[E] 8" X 8" X 16" CONCRETE MASONRY UNITS
[E] 2X4 STUD FURRING
[E] 5/8" GWB, REPAINT
E1
ENTRY ADDITION EXTERIOR WALL (R-18 MIN)
VERTICAL RIB KINGSPAN U-24 PREFINISHED
METAL PANEL
1/2" HAT CHANNEL @ 24" O.C. - HORIZONTAL
1" RIGID INSULATION (R-5ci)
VAPOR BARRIER
1/2" PLYWOOD SUBSTRATE
6" MTL STUDS @ 24" O.C.
5-1/2" BATT INSULATION (R-13 MIN)
5/8" GWB PAINTED
E2
EXISTING ENTRY EXTERIOR WALL - RECLAD
VERTICAL RIB KINGSPAN U-24 PREFINISHED
METAL PANEL
1/2" HAT CHANNEL @ 24" O.C. - HORIZONTAL
1" RIGID INSULATION
VAPOR BARRIER
[E] PLYWOOD SUBSTRATE
[E] 6" MTL STUD FRAMING
[E] 5/8" GWB, REPAINT
E3
5" 7"
9"
WALL SUBTYPE - ADD TILE TO PARTITION WALL
CERAMIC TILE WAINSCOT TO 5'-0" U.N.O.
*SEE WALL TYPES P1 / P2 FOR REST OF
ASSEMBLY. PROVIDE CEMENT
BACKERBOARD IN LIEU OF GYPSUM
BOARD AT FACE WITH TILE
CT
NOTE: GRAY LINEWORK INDICATES EXISTING WALLS TO REMAIN
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
6:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
FL
O
O R
P
LA
N
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
A2.0
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1 PROVIDE NEW CONCRETE FLOOR SLAB - SEE FINISH PLAN FOR FINISH
MATERIALS
2 EXISTING FLOOR SLAB TO REMAIN
3 EXISTING EXPOSED TUBE STEEL COLUMN, PTD
4 SEMI-RECESSED FIRE EXTINGUISHER CABINET, STAINLESS STEEL. FIRE
EXTINGUISHER BY OWNER.
5 TESTING FURNITURE STATION BY OWNER, PROVIDE POWER AND DATA PER
ELECTRICAL.
6 EXISTING SAFE TO BE RELOCATED
7 PROVIDE PLUMBING FIXTURES, PARTITION STALLS, AND ACCESSORIES FOR
RESTROOM, TYP. SEE FINISH PLAN FOR MATERIALS AND TOILET ACCESSORIES
SCHEDULE THIS SHEET
8 SOLID SURFACE COUNTER TOP LAVATORIES (PER PLUMBING), & ADA
COMPLIANT SENSORED FAUCETS
9 ALUMINUM STOREFRONT SYSTEM, CLEAR ANODIZED FRAMES - SEE
SPECIFICATIONS
10 COPY AREA MILLWORK: BASE AND UPPER CABINETRY WITH PLASTIC LAMINATE
EXTERIOR SURFACES, INTERIOR MELAMINE AND PLASTIC LAMINATE
COUNTERTOP WITH 4" BACKSPLASH
11 BREAK ROOM MILLWORK: BASE AND UPPER CABINETRY WITH PLASTIC
LAMINATE EXTERIOR SURFACES, INTERIOR MELAMINE AND SOLID SURFACE
COUNTERTOP WITH 4" BACKSPLASH
12 EXISTING PRINTER/COPIER, PROTECT IN PLACE, RELOCATED
13 18" DEEP STANDARD AND BRACKET SHELVING, 3 TIERS.
14 WALL MOUNTED DUCTLESS HVAC UNIT WITH ROOF CONDENSER - SEE
MECHANICAL
15 EXTERIOR SLAB ON GRADE - 4" CONCRETE OVER 4" A.B.C. - 6" X 6" MIN.
TOEDOWNS AT EDGES ADJACENT TO GRADE, TYP.
16 SLOPED WALKWAY (1:20 SLOPE MAXIMUM) - 4" CONCRETE OVER 4" A.B.C. - 5'-0"
CONTROL JOINTS, U.N.O. - 6" X 6" MIN. TOEDOWNS AT EDGES ADJACENT TO
GRADE, TYP.
17 EXISTING CONCRETE BENCH, RELOCATED
18 REPLACE METAL HANDRAILS AT SITE STAIR FOR ADA PER DETAIL 3/A1.1
19 POWER POLE, TO BE PROVIDED BY OWNER IN FURNITURE PACKAGE. BASIS OF
DESIGN: LEGRAND WIREMOLD VISTA ARCHITECTURAL COLUMN, SMALL SQUARE
TO BE PROVIDED AT EVERY OTHER WORKSTATION (SERVICE TO 2
WORKSTATIONS MAXIMUM)
20 NEW STRUCTURAL COLUMN AND BEAM ASSEMBLY PER STRUCTURAL
21 INFILL WALL TO MATCH EXISTING CONSTRUCTION - FINISH TO MATCH ADJACENT
SURFACES
22 ACCESSIBLE WALL MOUNTED WATER CLOSET - SEE THIS SHEET FOR MOUNTING
HEIGHT
23 EXISTING FIRE DEPARTMENT CONNECTION (FDC) TO REMAIN
24 EXISTING FIRE RISER - REPLACE 'STANDPIPE' SIGNAGE TO READ: 'FIRE RISER'
GENERAL FLOOR PLAN NOTES
A. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL QUANTITIES,
DIMENSIONS AND EXISTING CONDITIONS AS REQUIRED TO COMPLETE THE
CONTRACT. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO BID.
B. SEE ALL ENGINEERING DRAWINGS FOR ADDITIONAL REQUIREMENTS.
C. EXISTING FINISHES TO REMAIN SHALL BE PROTECTED FROM DAMAGE
DURING CONSTRUCTION. ANY DAMAGED FINISHES SHALL BE REPAIRED TO
LIKE/NEW CONDITION.
D. PROVIDE FIRE TREATED WOOD BLOCKING IN WALLS OR ALL WALL STOPS,
TYP.
E. PROVIDE ACCESS PANELS IN WALLS AND GWB CEILINGS AT VALVES AND
JUNCTION BOXES - SEE MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS FOR EXACT LOCATIONS. PAINT ACCESS PANELS TO MATCH ADJ.
SURFACES, TYP.
F. CONTRACTOR TO COORDINATE CONSTRUCTION WITH EXISTING
EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL, PLUMBING AND
ELECTRICAL DRAWINGS.
G. G.C. TO VERIFY ALL EXISTING BUILDING FINISHED FLOOR ELEVATIONS
PRIOR TO START OF WORK AND NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
1/8" = 1'-0"1 FLOOR PLAN
WALL TYPE NOTES
A. USE MOISTURE AND MOLD RESISTANT GYPSUM BOARD IN ROOMS SCHEDULED TO
RECEIVE CERAMIC WALL TILE, INCLUDING, BUT NOT LIMITED TO TOILET ROOMS.
B. ALL OUTSIDE CORNERS OF GYPSUM BOARD PARTITIONS SHALL HAVE METAL
CORNER BEADS.
C. TERMINATE ALL GYPSUM BOARD EDGES ABUTTING DISSIMILAR MATERIALS AND
EDGES EXPOSED TO VIEW, WITH NON-EXPOSED METAL CASING BEAD AND
ISOLATED BY BACK ROD AND SELANT FULL-LENGTH UNLESS OTHERWISE
INDICATED.
D. REFER TO REFLECTED CEILING PLANS FOR LOCATIONS AND EXTENT OF
PARTITIONS SEALED TO THE DECK ABOVE. SEAL ALL PENETRATIONS THROUGH
WALLS INTO IT AND MECHANICAL ROOMS.
E. DIMENSIONING OF GYPSUM BOARD AND METAL STUD PARTITIONS ON THE FLOOR
PLANS IS TO THE FINISHED FACE OF THE SURFACE UNLESS OTHERWISE INDICATED.
F. PROVIDE ACOUSTIC SEALANT AT BASE OF ALL STUD WALLS AND AT
PENETRATIONS.
G. PROVIDE GYPSUM BOARD ON FOUR SIDES OF OPENINGS FRAMED FOR DAMPERS.
USE SAME NUMBER OF LAYERS AND TYPE OF GYPSUM BOARD AS FOR SIDE
PARTITION WITH GREATER PROTECTION.
H. PROVIDE DEFLECTION TRACK AT ALL WALLS THAT EXTEND TO DECK.
I. PROVIDE BRACING FOR ALL INTERIOR PARTITIONS FOR SEISMIC DESIGN CATEGORY
"D" PER THE IBC.
J. PROVIDE STEEL STRAPPING OR FIRE TREATED WOOD BLOCKING IN PARTITIONS
FOR WALL-HUNG ITEMS INCLUDING CASEWORK, SHELVING AND EQUIPMENT.
K. PROVIDE CONTROL JOINTS IN PARTITIONS 30'-0" IN LENGTH OR GREATER.
L. DIMENSIONING IN PLAN OF ALL MASONRY PARTITIONS AND OTHER MASONRY
ELEMENTS IS TO THE FACE OF MASONRY.
M. SEE STRUCTURAL DRAWINGS FOR SHEAR AND BEARING WALLS.
N. SEE STRUCTURAL DRAWINGS FOR MASONRY WALL REINFORCING.
O. PROVIDE CONTINUOUS FIRE TREATED PLYWOOD BLOCKING IN BATHROOMS TO 5'-0"
A.F.F. FOR GRAB BARS AND ACCESSIBLE FIXTURE MOUNTING.
P. INTERIOR STEEL STUDS SHALL NOT BE LESS THAN 25 GAUGE AND NOT MORE THAN
1'-4" ON CENTER UNLESS OTHERWISE INDICATED. 20 GAUGE STUDS MINIMUM SHAL
BE USED TO FRAME ALL DOORS, BORROWED LIGHT, PASS-THRU AND CASED
OPENINGS. SEE SPECIFICATIONS FOR DESIGN AND ENGINEERING.
Q. PROVIDE DOUBLE STUDS AT EACH SIDE OF OPENINGS. EXTEND STUDS FROM
FLOOR TO UNDERSIDE OF STRUCTURE ABOVE.
R. PROVIDE ACCESS PANELS AT ALL VALVES AND JUNCTION BOXES IN WALLS AND
GWB CEILINGS. COORDINATE LOCATION W/ ARCHITECT PRIOR TO INSTALLATION.
PAINT TO MATCH ADJACENT SURFACES.
S. ALL PRIVATE OFFICES, AND TOILET ROOMS SHALL HAVE SOUND ATTENUATION
INSULATION IN WALLS.
N
# KEYNOTES
25 ELECTRICAL SERVICE ENTRANCE - REFER TO ELECTRICAL SHEETS FOR
SERVICE UPGRADE INFORMATION
26 EXISTING ELECTRICAL PANEL TO REMAIN
27 HEAVY DUTY STEEL UTILITY SHELF - 5-TIER - 60"W X 18"D X 72"H BY EDSAL
MODEL #UR-60BLK OR APPROVED EQUAL
28 INFILL EXTERIOR WALL AT DEMOLISHED DOOR - EXTERIOR STUCCO FINISH TO
MATCH ADJACENT WALL
29 DUAL HEIGHT COUNTER: STAND UP PORTION AND ACCESSIBLE HEIGHT
SECTION. TO BE PROVIDED BY OWNER WITH FURNITURE PACKAGE. GC TO
PROVIDE CONTINUOUS BLOCKING IN WALL TO ACCOMMODATE FUTURE
MOUNTING, AND ROUGH-IN FOR PANIC BUTTON.
30 PROVIDE 3/4" FIRE TREATED PLYWOOD W/ WHITE COATING AT 3 SIDES OF IT
ROOM, FULL LENGTH OF WALL UP TO 8'0"H
31 ALARM KEYPAD, BY OWNER. GC TO PROVIDE ROUGH-IN.
32 RECESSED ELECTRICAL PANEL IN EXISTING PARTITION WALL - SEE ELECTRICAL
33 RECESSED ELECTRICAL POWER/DATA FLOOR BOX
34 SOFFIT/HEADER ABOVE - SHOWN DASHED. SEE RCP SHEET A2.2
35 PROVIDE NEW PLUMBING WALL - MATCH EXISTING CONSTRUCTION OF
ADJACENT PLUMBING WALL - PATCH AND REPAIR EXISTING WALLS - FINISH PER
FINISH PLAN SHEET I2.0
36 THERE IS TO BE NO PLUMBING IN WALL SHOWN IN GRAY HATCH. ALL PLUMBING
LINES FOR BREAK ROOM ARE TO COME THROUGH SIDE WALL AND BE ROUTED
IN MILLWORK WHERE NECESSARY. SEE PLUMBING SHEETS FOR ADDITIONAL
INFORMATION.
-0 9-
PL
AN
R
EV
IE
W
C O
M M
EN
TS
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E
NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
Canopy Parapet Cap Repairs
CMU Split Face Bump Outs
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications Planning & Construction Services
04/22/2024 9:55:22 AM
Hansen-Kramer Stucco Inc.
Quality Since 1988
September 5, 2025
SD Crane
RE: Repairs above split-face block “bump outs” – ADOT North
Chip back stucco edge, install expanded flange casing for stucco stop. Work is ONLY 3” wide per discussion with super on site by Curt Hansen. If more is chipped out, price will increase accordingly.
Lath, brown coat and dash finish to resemble existing
ADD $2,450.00
2100 E. Beverly Drive, Tucson AZ 85719
Office: (520) 743-9611 // hansenkramer@aol.com Lic. CR36-079004
C-18 License Number 74204
B-2 License Number 75957
PROPOSAL
Hirschi Masonry LLC
4940 W. Watkins St, Phoenix, AZ 85043
Phone: (702) 399-2211 Fax: (702) 399-9344
Project Location: 7330 N. Shannon Rd., Tucson, AZ 85741 Block Manufacturer: Superlite
Plans By: WSM Architecture Structural Engineering: Ronald H. Schneider
JOB SPECIFIC INFO:
Scope of Work $10,520.43
Concrete 4500 psi, Block 2000 psi, Mortar 1800 psi, Grout 2000 psi
Project Name: ADOT Tucson North MVD Building Remodel Proposal #: P24-1314 R0A2
Description: Masonry Proposal Date: August 01, 2025
Per RFI # 52 repairing Parapet cap over drive through ramada, and sloped caps at split face pop outs.
Chisel/demo failing mortar cap to be replaced with new Type S mortar sloped/curved for drainage. Does not cover any chipped block, and chipped block may incur additional costs.
Page 1 of 2 _____/_____
Project: ADOT Tucson North MVD Building Remodel COR No: P24-1314 R0A2
Subcontractor: Hirschi Masonry Date: 5/13/2025
Units Amount Unit Cost Total ct 42 9.43$ 396.06$ ea 10 23.00$ 230.00$ ea 2 15.00$ 30.00$ ea 2 25.00$ 50.00$
Materials Subtotal: 706.06$
Sales Tax % 0.000% -$
Materials Total: 706.06$
Units Amount Unit Cost Total
Hrs 24 44.43$ 1,066.32$
Hrs 24 8.08$ 193.92$
Equipment Total: 1,260.24$
Units Amount Unit Cost Total
Man Hrs 24 48.39$ 1,161.36$
Man Hrs 24 42.63$ 1,023.12$
Man Hrs 24 33.41$ 801.84$
Man Hrs 24 44.74$ 1,073.76$
Labor Subtotal: 4,060.08$
Labor Burden 28.0% 1,136.82$
Labor Total: 5,196.90$
Units Amount Unit Cost Total ea 1 500.00$ 500.00$ days 3 495.00$ 1,485.00$ days 1 1,280.00$ 1,280.00$
Vendor Total: 1,985.00$
Subtotal: 9,148.20$
P&O Markup 15% 1,372.23$
Total: 10,520.43$
Out of town costs
Misc.
Description
Delivery of material to site
Boom Lift Rental
Crew Leader
Mason
Laborer
Operator
Mixer
Labor:
Description
Paint Tray
Equipment:
Description
Crew Truck
Type S Mortar
Concrete glue
Roller
CHANGE ORDER REQUEST
Description of Change: mortar cap repairs
Materials:
Description
7330 N Shannon Rd
RFI #57: R.F.I. #57 Existing I Beam Above Public Restrooms
To Marcus Attson (Shive Hattery) From Kyle Burns (SD Crane Builders Inc.)
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Jul 27, 2025 Due Date Jul 30, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of Transportation), Joel Mesik (Shive Hattery), Jeff Murray (SD Crane Builders Inc.)
Question Question from Kyle Burns SD Crane Builders Inc. on Sunday, Jul 27, 2025 at 03:44 PM MST
For your review please see attached R.F.I. #57 Existing I Beam Above Public Restrooms. Please advise.
R.F.I. #57 Existing I Beam Above Public Restrooms.pdf
All Replies Response from Marcus Attson Shive Hattery on Wednesday, Aug 6, 2025 at 07:29 PM MST
R.F.I. #57 Existing I Beam Above Public Restrooms_S-H Response.pdf
Page 1 of 1 Printed On: Aug 7, 2025 01:24 PM MST
RFI #057
Subject: Existing I Beam Above Public Restrooms
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:57
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 7/27/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: John Price Attn: John Price
Reference:
Information: Request:
During our progress and plumbing inspection with Ryan Paris State Inspector, he had brought up a concern of the existing 7.5”X16” I-Beam in the Public Restrooms above ceiling. The I-Beam does not appear to be attached and just sitting on 8”X8”X16” CMU pocket with ¼” flat plate steel the length of the beam and welded every 12”. It appears that the CMU above is not grouted, partially dry packed, and that the beam pocket was formed and grouted. He Ryan Paris request that we submit an RFI to see if the Structural Engineer has any concerns with this existing beam install. Please provide direction on if this will need to be addressed or if the Structural Engineer would like to set up a site visit to put eyes on this beam.
See photos attached below and Drawing A2.0
Thank you, A2.0
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Per the structural engineer, there is no structural concerns with the attachment of the steel I-beam. At the gaps between the CMU and steel, contractor shall fill with non-shrink grout.
08/06/2025
Shive-Hattery
A
A
3 3
B
B
4 4
A4.0
C
C
D
D
E
E
5 5
1 1
2 2
ENTRY /
GREETER
SELF
SERVICE
OFFICE
OFFICE
MENS
WOMENS
MECH
JAN
SECURE
STOR
TRAINING
STORAGE
UTILITY
WOMENS
MENS
TESTING
MGR
OFFICE
IT
BREAK
RESTROOM
CSR
WORKSTATIONS
STAFF
CORRIDOR
CUSTOMER
QUEUE
SHED
OUTDOOR
BREAK
ROAD
TEST
CANOPY
OUTDOOR
WAITING
TYP 6
A4.1
A4.0
E2 8'-8"
18'-8"
'-8
6a
116c
6b
107 106
103a
103b
17 17
172'-0" 8'-0" 2'-0" 8'-0" 2'-0" 9'-8"
P1
'-2
" 99'-5"
A5.0 1
A5.0
A2.0E
A2.0E
A2.0E
AL07 AL08 AL09
AL02
AL03
AL04
AL05
AL06 AL01
SEE SHEETS A1.0 / A1.1 FOR SITE PLAN INFORMATION
2'-2" 2'-2"
2' -2
A2.0E
100'-0"
A8.3
SIM
A8.2
A8.3
TYP. OF 9
22 22
24 25
A8.2
A8.2
A8.2
5'-8"
2' -6
A5.0
4' -8
INFILL
3'-4"
IN
FI
LL
3'
-4 "28
A8.3
A8.3
A8.3
LOW
LOW
LOW
SEE 12/A8.2 FOR
HIGH CONDITION
AK
AK
INFILL
4'-8"28
5'-0"
'-0
5'
-0
'-4
DN
DN
NO WORK
THIS AREA
5' -0
TYP 3
CR
C R
C R
C R
CR
CR
C R
CR
9' -2
9'-0"
IN
FI
LL
3'
-4
P2
P2
DN
DN
MARK DESCRIPTION PLAN DETAIL
WALL TYPES AND SUBTYPES
P1 •
TYPICAL PARTITION WALL
5/8" GYPSUM BOARD TYPE 'X'
3-5/8" 20 GA. STEEL STUDS @ 1'-4" O.C.
3-1/2" SOUND ATTENTUATING BATT
INSULATION (SAB)
5/8" GYPSUM BOARD TYPE 'X' (EXTEND
6" PAST CEILING U.N.O.)
P2
TYPICAL PLUMBING WALL
5/8" GYPSUM BOARD TYPE 'X'
6" 20 GA. STEEL STUDS @ 1'-4" O.C.
3-1/2" SOUND ATTENTUATING BATT
INSULATION (SAB)
5/8" GYPSUM BOARD TYPE 'X' (EXTEND
6" PAST CEILING U.N.O.)
TYPICAL
TYPCIAL SITE WALL
3-COAT STUCCO SYSTEM, PAINTED W/
ELASTOMERIC PAINT
8" x 8" x 16" CONCRETE MASONRY UNITS -
VERTICAL REINFORCING AND GROUTED
AT 48" O.C.
M1
WALL SUBTYPE - FURRING
7/8" METAL FURRING STRIPS
5/8" GYPSUM BOARD
NOTE: EXTEND 6" PAST CEILING U.N.O.
a
EXISTING TYPICAL EXTERIOR WALL (R-15.7)
[E] STUCCO SYSTEM, REPAINT W/
ELASTOMERIC PAINT
[E] 8" X 8" X 16" CONCRETE MASONRY UNITS
[E] 2X4 STUD FURRING
[E] 5/8" GWB, REPAINT
E1
ENTRY ADDITION EXTERIOR WALL (R-18 MIN)
VERTICAL RIB KINGSPAN U-24 PREFINISHED
METAL PANEL
1/2" HAT CHANNEL @ 24" O.C. - HORIZONTAL
1" RIGID INSULATION (R-5ci)
VAPOR BARRIER
1/2" PLYWOOD SUBSTRATE
6" MTL STUDS @ 24" O.C.
5-1/2" BATT INSULATION (R-13 MIN)
5/8" GWB PAINTED
E2
EXISTING ENTRY EXTERIOR WALL - RECLAD
VERTICAL RIB KINGSPAN U-24 PREFINISHED
METAL PANEL
1/2" HAT CHANNEL @ 24" O.C. - HORIZONTAL
1" RIGID INSULATION
VAPOR BARRIER
[E] PLYWOOD SUBSTRATE
[E] 6" MTL STUD FRAMING
[E] 5/8" GWB, REPAINT
E3
5" 7"
9"
WALL SUBTYPE - ADD TILE TO PARTITION WALL
CERAMIC TILE WAINSCOT TO 5'-0" U.N.O.
*SEE WALL TYPES P1 / P2 FOR REST OF
ASSEMBLY. PROVIDE CEMENT
BACKERBOARD IN LIEU OF GYPSUM
BOARD AT FACE WITH TILE
CT
NOTE: GRAY LINEWORK INDICATES EXISTING WALLS TO REMAIN
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
6:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
FL
O
O R
P
LA
N
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
A2.0
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1 PROVIDE NEW CONCRETE FLOOR SLAB - SEE FINISH PLAN FOR FINISH
MATERIALS
2 EXISTING FLOOR SLAB TO REMAIN
3 EXISTING EXPOSED TUBE STEEL COLUMN, PTD
4 SEMI-RECESSED FIRE EXTINGUISHER CABINET, STAINLESS STEEL. FIRE
EXTINGUISHER BY OWNER.
5 TESTING FURNITURE STATION BY OWNER, PROVIDE POWER AND DATA PER
ELECTRICAL.
6 EXISTING SAFE TO BE RELOCATED
7 PROVIDE PLUMBING FIXTURES, PARTITION STALLS, AND ACCESSORIES FOR
RESTROOM, TYP. SEE FINISH PLAN FOR MATERIALS AND TOILET ACCESSORIES
SCHEDULE THIS SHEET
8 SOLID SURFACE COUNTER TOP LAVATORIES (PER PLUMBING), & ADA
COMPLIANT SENSORED FAUCETS
9 ALUMINUM STOREFRONT SYSTEM, CLEAR ANODIZED FRAMES - SEE
SPECIFICATIONS
10 COPY AREA MILLWORK: BASE AND UPPER CABINETRY WITH PLASTIC LAMINATE
EXTERIOR SURFACES, INTERIOR MELAMINE AND PLASTIC LAMINATE
COUNTERTOP WITH 4" BACKSPLASH
11 BREAK ROOM MILLWORK: BASE AND UPPER CABINETRY WITH PLASTIC
LAMINATE EXTERIOR SURFACES, INTERIOR MELAMINE AND SOLID SURFACE
COUNTERTOP WITH 4" BACKSPLASH
12 EXISTING PRINTER/COPIER, PROTECT IN PLACE, RELOCATED
13 18" DEEP STANDARD AND BRACKET SHELVING, 3 TIERS.
14 WALL MOUNTED DUCTLESS HVAC UNIT WITH ROOF CONDENSER - SEE
MECHANICAL
15 EXTERIOR SLAB ON GRADE - 4" CONCRETE OVER 4" A.B.C. - 6" X 6" MIN.
TOEDOWNS AT EDGES ADJACENT TO GRADE, TYP.
16 SLOPED WALKWAY (1:20 SLOPE MAXIMUM) - 4" CONCRETE OVER 4" A.B.C. - 5'-0"
CONTROL JOINTS, U.N.O. - 6" X 6" MIN. TOEDOWNS AT EDGES ADJACENT TO
GRADE, TYP.
17 EXISTING CONCRETE BENCH, RELOCATED
18 REPLACE METAL HANDRAILS AT SITE STAIR FOR ADA PER DETAIL 3/A1.1
19 POWER POLE, TO BE PROVIDED BY OWNER IN FURNITURE PACKAGE. BASIS OF
DESIGN: LEGRAND WIREMOLD VISTA ARCHITECTURAL COLUMN, SMALL SQUARE
TO BE PROVIDED AT EVERY OTHER WORKSTATION (SERVICE TO 2
WORKSTATIONS MAXIMUM)
20 NEW STRUCTURAL COLUMN AND BEAM ASSEMBLY PER STRUCTURAL
21 INFILL WALL TO MATCH EXISTING CONSTRUCTION - FINISH TO MATCH ADJACENT
SURFACES
22 ACCESSIBLE WALL MOUNTED WATER CLOSET - SEE THIS SHEET FOR MOUNTING
HEIGHT
23 EXISTING FIRE DEPARTMENT CONNECTION (FDC) TO REMAIN
24 EXISTING FIRE RISER - REPLACE 'STANDPIPE' SIGNAGE TO READ: 'FIRE RISER'
GENERAL FLOOR PLAN NOTES
A. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL QUANTITIES,
DIMENSIONS AND EXISTING CONDITIONS AS REQUIRED TO COMPLETE THE
CONTRACT. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO BID.
B. SEE ALL ENGINEERING DRAWINGS FOR ADDITIONAL REQUIREMENTS.
C. EXISTING FINISHES TO REMAIN SHALL BE PROTECTED FROM DAMAGE
DURING CONSTRUCTION. ANY DAMAGED FINISHES SHALL BE REPAIRED TO
LIKE/NEW CONDITION.
D. PROVIDE FIRE TREATED WOOD BLOCKING IN WALLS OR ALL WALL STOPS,
TYP.
E. PROVIDE ACCESS PANELS IN WALLS AND GWB CEILINGS AT VALVES AND
JUNCTION BOXES - SEE MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS FOR EXACT LOCATIONS. PAINT ACCESS PANELS TO MATCH ADJ.
SURFACES, TYP.
F. CONTRACTOR TO COORDINATE CONSTRUCTION WITH EXISTING
EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL, PLUMBING AND
ELECTRICAL DRAWINGS.
G. G.C. TO VERIFY ALL EXISTING BUILDING FINISHED FLOOR ELEVATIONS
PRIOR TO START OF WORK AND NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
1/8" = 1'-0"1 FLOOR PLAN
WALL TYPE NOTES
A. USE MOISTURE AND MOLD RESISTANT GYPSUM BOARD IN ROOMS SCHEDULED TO
RECEIVE CERAMIC WALL TILE, INCLUDING, BUT NOT LIMITED TO TOILET ROOMS.
B. ALL OUTSIDE CORNERS OF GYPSUM BOARD PARTITIONS SHALL HAVE METAL
CORNER BEADS.
C. TERMINATE ALL GYPSUM BOARD EDGES ABUTTING DISSIMILAR MATERIALS AND
EDGES EXPOSED TO VIEW, WITH NON-EXPOSED METAL CASING BEAD AND
ISOLATED BY BACK ROD AND SELANT FULL-LENGTH UNLESS OTHERWISE
INDICATED.
D. REFER TO REFLECTED CEILING PLANS FOR LOCATIONS AND EXTENT OF
PARTITIONS SEALED TO THE DECK ABOVE. SEAL ALL PENETRATIONS THROUGH
WALLS INTO IT AND MECHANICAL ROOMS.
E. DIMENSIONING OF GYPSUM BOARD AND METAL STUD PARTITIONS ON THE FLOOR
PLANS IS TO THE FINISHED FACE OF THE SURFACE UNLESS OTHERWISE INDICATED.
F. PROVIDE ACOUSTIC SEALANT AT BASE OF ALL STUD WALLS AND AT
PENETRATIONS.
G. PROVIDE GYPSUM BOARD ON FOUR SIDES OF OPENINGS FRAMED FOR DAMPERS.
USE SAME NUMBER OF LAYERS AND TYPE OF GYPSUM BOARD AS FOR SIDE
PARTITION WITH GREATER PROTECTION.
H. PROVIDE DEFLECTION TRACK AT ALL WALLS THAT EXTEND TO DECK.
I. PROVIDE BRACING FOR ALL INTERIOR PARTITIONS FOR SEISMIC DESIGN CATEGORY
"D" PER THE IBC.
J. PROVIDE STEEL STRAPPING OR FIRE TREATED WOOD BLOCKING IN PARTITIONS
FOR WALL-HUNG ITEMS INCLUDING CASEWORK, SHELVING AND EQUIPMENT.
K. PROVIDE CONTROL JOINTS IN PARTITIONS 30'-0" IN LENGTH OR GREATER.
L. DIMENSIONING IN PLAN OF ALL MASONRY PARTITIONS AND OTHER MASONRY
ELEMENTS IS TO THE FACE OF MASONRY.
M. SEE STRUCTURAL DRAWINGS FOR SHEAR AND BEARING WALLS.
N. SEE STRUCTURAL DRAWINGS FOR MASONRY WALL REINFORCING.
O. PROVIDE CONTINUOUS FIRE TREATED PLYWOOD BLOCKING IN BATHROOMS TO 5'-0"
A.F.F. FOR GRAB BARS AND ACCESSIBLE FIXTURE MOUNTING.
P. INTERIOR STEEL STUDS SHALL NOT BE LESS THAN 25 GAUGE AND NOT MORE THAN
1'-4" ON CENTER UNLESS OTHERWISE INDICATED. 20 GAUGE STUDS MINIMUM SHAL
BE USED TO FRAME ALL DOORS, BORROWED LIGHT, PASS-THRU AND CASED
OPENINGS. SEE SPECIFICATIONS FOR DESIGN AND ENGINEERING.
Q. PROVIDE DOUBLE STUDS AT EACH SIDE OF OPENINGS. EXTEND STUDS FROM
FLOOR TO UNDERSIDE OF STRUCTURE ABOVE.
R. PROVIDE ACCESS PANELS AT ALL VALVES AND JUNCTION BOXES IN WALLS AND
GWB CEILINGS. COORDINATE LOCATION W/ ARCHITECT PRIOR TO INSTALLATION.
PAINT TO MATCH ADJACENT SURFACES.
S. ALL PRIVATE OFFICES, AND TOILET ROOMS SHALL HAVE SOUND ATTENUATION
INSULATION IN WALLS.
N
# KEYNOTES
25 ELECTRICAL SERVICE ENTRANCE - REFER TO ELECTRICAL SHEETS FOR
SERVICE UPGRADE INFORMATION
26 EXISTING ELECTRICAL PANEL TO REMAIN
27 HEAVY DUTY STEEL UTILITY SHELF - 5-TIER - 60"W X 18"D X 72"H BY EDSAL
MODEL #UR-60BLK OR APPROVED EQUAL
28 INFILL EXTERIOR WALL AT DEMOLISHED DOOR - EXTERIOR STUCCO FINISH TO
MATCH ADJACENT WALL
29 DUAL HEIGHT COUNTER: STAND UP PORTION AND ACCESSIBLE HEIGHT
SECTION. TO BE PROVIDED BY OWNER WITH FURNITURE PACKAGE. GC TO
PROVIDE CONTINUOUS BLOCKING IN WALL TO ACCOMMODATE FUTURE
MOUNTING, AND ROUGH-IN FOR PANIC BUTTON.
30 PROVIDE 3/4" FIRE TREATED PLYWOOD W/ WHITE COATING AT 3 SIDES OF IT
ROOM, FULL LENGTH OF WALL UP TO 8'0"H
31 ALARM KEYPAD, BY OWNER. GC TO PROVIDE ROUGH-IN.
32 RECESSED ELECTRICAL PANEL IN EXISTING PARTITION WALL - SEE ELECTRICAL
33 RECESSED ELECTRICAL POWER/DATA FLOOR BOX
34 SOFFIT/HEADER ABOVE - SHOWN DASHED. SEE RCP SHEET A2.2
35 PROVIDE NEW PLUMBING WALL - MATCH EXISTING CONSTRUCTION OF
ADJACENT PLUMBING WALL - PATCH AND REPAIR EXISTING WALLS - FINISH PER
FINISH PLAN SHEET I2.0
36 THERE IS TO BE NO PLUMBING IN WALL SHOWN IN GRAY HATCH. ALL PLUMBING
LINES FOR BREAK ROOM ARE TO COME THROUGH SIDE WALL AND BE ROUTED
IN MILLWORK WHERE NECESSARY. SEE PLUMBING SHEETS FOR ADDITIONAL
INFORMATION.
-0 9-
PL
AN
R
EV
IE
W
C O
M M
EN
TS
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E
NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
Existing I-Beam
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications Planning & Construction Services
04/22/2024 9:55:22 AM
C-18 License Number 74204
B-2 License Number 75957
PROPOSAL
Hirschi Masonry LLC
4940 W. Watkins St, Phoenix, AZ 85043
Phone: (702) 399-2211 Fax: (702) 399-9344
Project Location: 7330 N. Shannon Rd., Tucson, AZ 85741 Block Manufacturer: Superlite
Plans By: WSM Architecture Structural Engineering: Ronald H. Schneider
JOB SPECIFIC INFO:
Scope of Work $1,975.47
Concrete 4500 psi, Block 2000 psi, Mortar 1800 psi, Grout 2000 psi
Project Name: ADOT Tucson North MVD Building Remodel Proposal #: P24-1314 R0A3
Description: Masonry Proposal Date: August 26, 2025
Per RFI # 57 dry pack in gaps on I-beam over restrooms This will have to be completed with a different CO or the Trash Enclosure to eliminate out of town costs****
Page 1 of 2 _____/_____
Project: ADOT Tucson North MVD Building Remodel COR No: P24-1314 R0A3
Subcontractor: Hirschi Masonry Date: 8/26/2025
Units Amount Unit Cost Total ct 20 20.15$ 403.00$
Materials Subtotal: 403.00$
Sales Tax % 0.000% -$
Materials Total: 403.00$
Units Amount Unit Cost Total
Hrs 4 44.43$ 177.72$
Hrs 8.08$ -$
Equipment Total: 177.72$
Units Amount Unit Cost Total
Man Hrs 4 48.39$ 193.56$ Man Hrs 4 42.63$ 170.52$ Man Hrs 4 33.41$ 133.64$ Man Hrs 44.74$ -$
Labor Subtotal: 497.72$ Labor Burden 28.0% 139.36$
Labor Total: 637.08$
Units Amount Unit Cost Total ea 1 500.00$ 500.00$
Vendor Total: 500.00$
Subtotal: 1,717.80$
P&O Markup 15% 257.67$
Total: 1,975.47$
Misc.
Description
Delivery of material to site
Crew Leader Mason Laborer Operator
Mixer we will have to hand mix
Labor:
Description
Equipment:
Description
Crew Truck
Non-shrick grout
CHANGE ORDER REQUEST
Description of Change: mortar cap repairs
Materials:
Description
7330 N Shannon Rd
RFI #58: R.F.I. #058 Attaching Drywall to Flat Strap-Insulation
To Marcus Attson (Shive Hattery) From Kyle Burns (SD Crane Builders Inc.)
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Jul 27, 2025 Due Date Jul 30, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of Transportation), Joel Mesik (Shive Hattery), Jeff Murray (SD Crane Builders Inc.)
Question Question from Kyle Burns SD Crane Builders Inc. on Sunday, Jul 27, 2025 at 04:03 PM MST
For your review please see attached R.F.I. #058 Attaching Drywall to Flat Strap-Insulation. Please advise.
R.F.I. #058 Attaching Drywall to Flat Strap-Insulation.pdf
All Replies Response from Marcus Attson Shive Hattery on Wednesday, Aug 6, 2025 at 07:32 PM MST
R.F.I. #058 Attaching Drywall to Flat Strap-Insulation_S-H Response.pdf
Page 1 of 1 Printed On: Aug 7, 2025 01:25 PM MST
RFI #058
Subject: Attaching Drywall to Flat Strap/Insulation
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:58
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 7/27/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: John Price Attn: John Price
Reference:
Information: Request:
In RFI #34 the design team comments say that the gypsum wall board and rigid insulation are to remain at the N. wall of the lobby and E. wall in the copy room. Our Drywall team have concerns about attaching drywall to the flat strap holding the insulation and that it will not work or provide an acceptable finish product. Our Drywall team recommends replacing these areas similar to the detail of the RFI #34 response at the E. walls of offices 111,112, and 114 or with 3 5/8” fur out.
Please advise on how to move forward.
See attached Photos and RFI #34 below.
Thank you, RFI #34
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
The contractor shall remove and replace the existing drywall and rigid insulation with 5/8" drywall over 1-1/2" z-furring with 1-1/2" polyiso rigid insulation. See attached sketch SK-18.
08/06/2025
Shive-Hattery
W H
W H
OFFICE
STORAGE
UTILITY
RESTROOM
3a
AL06
5/8" G.W.B. OVER 1-1/2" Z-FURRING
CHANNELS @ 24" O.C. W/ 1-1/2"
POLYISO INSULATION
WALL MOUNTED TV/MONITOR -
TV/MONITOR AND MOUNTING
BRACKET BY OWNEREXISTING 5/8" G.W.G. OVER 1" RIGID
INSULATION TO REMAIN ON STORAGE
ROOM 108 - SURFACE MOUNT
OUTLETS AND CONDUIT
REMOVE EXISTING 5/8" G.W.B.
OVER RIGID INSULATION
1' -9
/2
WALL MOUNTED EQUIPMENT TO
BE REMOVED - COORDINATE W/
ADOT IT
REMOVE PORTION OF EXISTING
PARTITION WALL
EXISTING HM FRAME TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .