This document is a compilation of contract amendment and request for information (RFI) documents for the Arizona Department of Transportation's (ADOT) Tucson North Motor Vehicle Division (MVD) Renovation project. The primary parties involved include SD Crane Builders Inc. as the main contractor, Shive-Hattery as the design professional, and several subcontractors and specialty contractors such as Complete Earthworx and Concrete Arizona, LLC. The project is located at 7330 N Shannon Road in Tucson, Arizona, and involves renovations to an existing MVD building.
The contract amendments and RFIs address various technical modifications and clarifications, including storm drain rerouting, downspout repositioning, wall and footing modifications, and structural steel beam installations. The changes have financial implications, with several change orders detailing additional work and associated costs. For example, Complete Earthworx proposed a change order totaling $5,484.65 for storm drain and downspout work, while Concrete Arizona, LLC submitted a change order of $3,080.91 for footing modifications for a steel beam. The amendments incrementally increase the contract value, with one amendment showing an increase in the base bid from $2,610,544.50 to $2,640,222.85. The project appears to be in the course of construction, with ongoing technical adjustments to meet specific site conditions and design requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: SD Crane Builders Inc. AMENDMENT NO.: Five (5) DESCRIPTION: Tucson North MVD Remodel
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Line item CTR075036-1 Tucson North MVD Remodel per the technical specifications & drawings, increased from $2,610,544.50 to $2,640,222.85 total cost. See attached CO.
2. Line item CTR075036-3 Base Bid Tax increased from $147,626.28 to $149,304.59. See attached CO.
3. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
Construction Contract Change Order Summary No. ____
Contract/APP No. Contract/APP Amendment No:
Project Name: Project No: Statutory Review No:
Design Professional: Contractor: ADOT Project Manager:
ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED
ACKNOWLEDGEMENT AND AUTHORIZATION
Page | 1 of 1
1. Check box(es) below best describing the Construction Change Order to the Contract:
☐ Contractor cost increase to Contract due to Additional Work.
☐ Contractor cost reduction to Contract.
☐ Contractor to increase number of calendar days to date of Substantial Completion of the Project.
☐ Contractor “no cost” change to Contract.
☐ Use of Contingency ☐ Other (Provide Description) _______________________________________________________________.
2. Contractor shall provide complete description of reduced or Additional Work, including documents in support of the Change Order (e.g., drawings, material substitution literature, cost reduction or increase detail including breakout of labor, materials, markup and tax). Contractor shall use the Construction Change Order Worksheet (Exhibit J1) to provide a detailed breakdown of any change to the Project Cost.
3. By signing and executing this Change Order, the Contractor and Agency agree to a price for the Additional Work, as detailed below. This price shall cover any and all Costs associated with the Additional Work including, but not limited to, Costs associated with delay of the Contractor's Work, if any.
Should the Additional Work impact the Schedule, the Agency and Contractor have agreed to extend the date for Substantial Completion as reflected below.
4. Contractor agrees that the payment authorized by this Change Order, if any, is in full settlement of any and all causes of action, including but not limited to, any claim resulting from delays to the time to Substantial Completion caused by this Change Order which Contractor or any of its Subcontractors, suppliers and the officers, agents, and employees of each of them, may now have or may assert in the future against the Agency, or its officers, employees and agents, arising out of, or associated with, this construction Change Order.
In accordance with the terms of the Contract, the following detailed changes are proposed (attach additional information as needed):
Original Contract Sum $
Previous Change Orders to Contract $
Net Change for this Change Order to Contract (attach Exhibit J1 for details as needed) $
New Contract Sum $
Number of Calendar Days for Time Extended for Substantial Completion for this Change Order Days
Revised Substantial Completion Date due to this Change Order
Contractor (Firm Name): Address: Authorized Signature and Date:
Design Professional (Firm Name): Address: Authorized Signature and Date:
ADOT Procurement Officer Name:
Agency Name and Address: Authorized Signature and Date: ADOT Project Manager Name:
Agency Name and Address: Authorized Signature and Date:
State of Arizona Department of Transportation
206 S 17th Ave Phoenix, AZ 85007
ADOA Chief Compliance Officer Name:
Agency Name and Address: Authorized Signature and Date:
This Change Order shall modify the Contract only upon the signed approval of the Contractor, Design Professional, ADOT Procurement Officer as specified in the signature block. When signed by all parties this Change Order becomes effective immediately and the Contractor shall proceed with the change(s) identified and approved.
3,021,688.18
242,389.22
31,356.66
3,295,434.06
12/02/2026
CTR075036 05
CTR075036 HD-24-15
Shive-Hattery SD Crane Builders Andrew May
See attached J1.
SD Crane Builders
Shive-Hattery
Andrew May
Patrick Holt
Elizabeth Blakley
1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281 4330 N Campbell Ave Suite 268 Tucson, AZ 85718 1655 W. Jackson St.
Phoenix, AZ 85007 1400 W Washington St, #B200 Phoenix, AZ 85007 1655 W Jackson St.
Phoenix, AZ
ADOT Tucson North MVD Renovation
08/04/2025
08/05/2025
08/07/2025
08/07/2025
08/12/2025
COR No.5
Date: 6/23/25
Item
No.
Subcontractor Trades
Q ty
U n it s
Unit Price Extension Q ty
U n it s
Unit Price Extension Totals
Parapet Extenstion R.F.I.
#24 -$ 7,886.00$ 7,886.00$
Re Route Storm Drain R.F.I.
#33 -$ 950.00$ 950.00$
Existing Conditions of Walls R.F.I. #34 -$ 8,362.00$ 8,362.00$
Downspout Connected to Waste Lines R.F.I. #37 -$ 4,534.65$ 4,534.65$
Footings for Steel Beam R.F.I. #41 -$ 3,080.91$ 3,080.91$
24,813.56$
Owner Request 4.00% 992.54$
Hidden Condition 10.00% 2,580.61$
3.00% 851.60$
Prepurchase Materials 0.50% 146.19$
Omission in Construction docs 1.00% 293.85$
Transfer to/from Contingency 5.655% 1,678.31$
Other 31,356.66$
Approval of this Change Order Request will increase (decrease) the Schedule by: Calendar Days 15
Form 8.14. rev 8.10.2021 r5
Exhibit J1
Change Order Request
State of Arizona
General Services Division
1400 West Washington St
Phoenix, AZ 85007
Project Name: ADOT Tucson North MVD Renovation State Project No:CTR075036
Contractor Project No: 24-322Contractor: SD Crane Builders Inc.
The Contractor hereby requests a Change in the Contract Sum and/or Time, conforming to Article 1.2 of the Uniform Terms and Conditions, the Work described herein will not start until this Change Order Request has been signed by all parties.
Labor Material
Check the box best describing the Cause of this Change Subtotal
Fee
This Change will require Statutory Review: Yes No
General Conditions
Builders Risk
Tax
Insurance
Bond
Schedule of Values by Trade
Total Cost
Address Authorized Signature & Date
Construction Services Manager Address Authorized Signature & Date
Contractor
Design Professional Address Authorized Signature & Date
ADOT Project Manager Address Authorized Signature & Date
SD Crane Builders , Inc. 1215 W. Rio Salado Pkwy #109 6/23/25
Shive-Hattery
Andrew May
Patrick Holt
4330 N Campbell Ave Suite 268 Tucson, AZ 85718
1655 W. Jackson St.
Phoenix, AZ 85007
1400 W Washington Phoenix, AZ 85007
08/05/2025
Project: HD-24-015 ADOT- Tucson North MVD Renovation
(HD-24-015)
7330 N Shannon Rd Tucson, Arizona 85741
P: 602-499-8871
RFI #24: R.F.I. #024 Parapet Extension
Status Open
To Joel Mesik (Shive Hattery) From Kyle Burns (SD Crane Builders Inc.)
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Apr 18, 2025 Due Date Apr 19, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Adam Cherilla (SD Crane Builders Inc.), Melissa de la Gardelle (Shive Hattery) , Jeff Murray (SD Crane Builders Inc.)
Activity
Question Question from Kyle Burns SD Crane Builders Inc. on Friday, Apr 18, 2025 at 12:11 PM MST Joel, For your review please see attached R.F.I. #024 Parapet Extension. Please advise
Thank you, Attachments R.F.I. #024 Parapet Extension.pdf
Awaiting an Official Response
All Replies Response from Melissa de la Gardelle Shive Hattery on Thursday, May 29, 2025 at 09:07 AM MST See attached.
R.F.I. #024 Parapet Extension_S-H Response.pdf
Page 1 of 1 Printed On: May 29, 2025 08:17 PM MST
REQUEST FOR INFORMATION
RFI #024
Subject: Parapet Extension
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No: 024
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 4/18/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the masonry infill at the parapet extension on sheet S2.1 key note 12 and detail 213 on sheet S4.1. At this location where we are to infill the portion of the parapet, there is steel framing below ( see pictures and drawings attached ). Please provide direction and a new detail on how you would like us to address this parapet extension. Please let me know if you have any questions.
S2.1 & S4.1
Response Date:
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Contractor shall remove existing metal parapet framing and provide new metal stud framing to extend height to match adjacent parapet height. See revised structural detail 213 on provided sheet S4.1 and updated flashing detail on SK-09.
05/22/2025
Shive-Hattery
Marcus Attson
Shive-Hattery
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
50R S
R R
D
EC
EM
BE
R
, 2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
SCHNEIDER
CREATING ELEGANT SOLUTIONS
STRUCTURAL ENGINEERS
Project Number:
435 East 9th Street | Tucson, AZ 85705 | 520.512.8183 | www.sastructural.com
UNLESS THIS DRAWING IS SIGNED AND SEALED BY A LICENSED STRUCTURAL ENGINEER, IT IS A
PRELIMINARY DESIGN AND SHALL NOT BE USED FOR CONSTRUCTION.
121069
/0
9/
PL
AN
R
EV
IE
W C
O M
M
EN
TS
FR
AM
IN
G D
ET
AI
LS
S4.1
/0
7/
R
FI
#0
/0
7/
T h is E le c tr o n ic S ig n a tu re H a s B e e n A u th o ri z e d B y M e T h is
/0
/2
SPRINGLOK STUCCO FLASHING SYSTEM BY
ROOF MFR
SINGLE PLY TPO MEMBRANE
AIR
W
ELD
1 1 /2"
M
IN
. H
OT
8" M
IN
1/2" PLYWOOD SHEATHING
TERMINATION BAR PER ROOFING MFR
CONT. SEALANT ALONG TOP OF
TERMINATION BAR
PROVIDE STUCCO @ SIDES AND TOP OF
INFILL PARAPET TO MATCH EXISTING
HEIGHT OF PARAPET TO MATCH EXISTING -
CROWN TOP TO MATCH EXISTING
METAL STUD BRACING - SEE
STRUCTURAL FOR SIZING, SPACING,
AND ATTACHMENT
T.O. PARAPET
118'-0" A.F.F.
BUILDING WRAP
2 LAYERS OF #15 FELT
UNDERLAYMENT
3-COAT STUCCO ON
METAL LATH OVER
PLYWOOD SHEATHING
4330 N CAMPBELL AVE, STE #268
TUCSON, ARIZONA 85718
520.408.1044 | SHIVE-HATTERY.COM
DATE
DRAWN BY
APPROVED BY
SCALE
FIELD BOOK
REVISION
Au to de sk
R ev it
05-21-2025
PROJECT
NUMBER
5/
/2
4:
:1
PM
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
A M
O D
EL
_M ar cu s_ At ts on
.rv t
1 1/2" = 1'-0"
MA
JDM
ADOT TUCSON NORTH MVD REMODEL
7330 N SHANNON RD
TUCSON, AZ 85741
2172304350
SK-09
1 1/2" = 1'-0"1 ROOF FLASHING AT PARAPET INFILL
SHIVE-HATTERY
RFI #024
Subject: Parapet Extension
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No: 024
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 4/18/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the masonry infill at the parapet extension on sheet S2.1 key note 12 and detail 213 on sheet S4.1. At this location where we are to infill the portion of the parapet, there is steel framing below ( see pictures and drawings attached ). Please provide direction and a new detail on how you would like us to address this parapet extension. Please let me know if you have any questions.
S2.1 & S4.1
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
50R S
R R
D
EC
EM
BE
R
, 2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
SCHNEIDER
CREATING ELEGANT SOLUTIONS
STRUCTURAL ENGINEERS
Project Number:
435 East 9th Street | Tucson, AZ 85705 | 520.512.8183 | www.sastructural.com
UNLESS THIS DRAWING IS SIGNED AND SEALED BY A LICENSED STRUCTURAL ENGINEER, IT IS A
PRELIMINARY DESIGN AND SHALL NOT BE USED FOR CONSTRUCTION.
121069
/0
R
EV
IE
W C
O M
M
EN
TS
FR
AM
IN
G P
LA
N
S2.1
/1
4/
T h is E le c tr o n ic S ig n a tu re H a s B e e n A u th o ri z e d B y M e T h is
/1
/2
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications Planning & Construction Services
04/22/2024 9:55:25 AM
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
50R S
R R
D
EC
EM
BE
R
, 2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
SCHNEIDER
CREATING ELEGANT SOLUTIONS
STRUCTURAL ENGINEERS
Project Number:
435 East 9th Street | Tucson, AZ 85705 | 520.512.8183 | www.sastructural.com
UNLESS THIS DRAWING IS SIGNED AND SEALED BY A LICENSED STRUCTURAL ENGINEER, IT IS A
PRELIMINARY DESIGN AND SHALL NOT BE USED FOR CONSTRUCTION.
121069
/0
R
EV
IE
W C
O M
M
EN
TS
FR
AM
IN
G D
ET
AI
LS
S4.1
/1
4/
T h is E le c tr o n ic S ig n a tu re H a s B e e n A u th o ri z e d B y M e T h is
/1
/2
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications
04/22/2024 9:55:25 AM
405 S. CLARK DR.
TEMPE, AZ 85288
PHONE: 480-951-4169
AZ ROC #339524 KB-1
Page | 1
Delivering On-time, On-Budget, and On-Satisfaction Results—Always
Date: Tuesday, June 17, 2025
Proposal to: SD Crane Project: ADOT Tucson MVD North Kyle Burns 7330 N Shannon Rd.
1215 W. Rio Salado Pkwy. #109 Tempe, AZ 85281
Tucson , AZ 85741
Phone: 480-832-1777 Architect:
Fax: Plan Date: Tuesday, June 17, 2025
SCOPE OF WORK: Metal Stud & Drywall
▪ Scope Per RFI #24
▪ Metal framing with ½” plywood
▪ Added 2x support for parapet wall bracing
▪ Includes TPT tax as required
EXCLUSIONS:
▪ Hot mud or fast set mud and additional man hours required for its installation
▪ Prevailing Wages not used
▪ Payment of bonds premiums, permits & licenses
▪ Any WRAP insurance program premium that may be in place
▪ Dumpster for debris removal to be provided by others at no charge to Design
▪ Heat, lights, water, power, ventilation, and weather protection
▪ Responsibility for the drawings meeting requirements of codes, ordinances or design
▪ Shop drawings, engineering or laboratory testing
▪ State and local taxes; require AZ Form 5005 (AZ Dept. Revenue Prime Contractors Cert.)
▪ Overtime work and off hours work
▪ Supply, receiving and distribution of all frames, door and components
▪ Any and all fire safeing or caulking, except as noted above.
▪ Any and all acoustical caulking, except as noted above.
▪ Access panels, doors
▪ Backing for any & all trades, except as noted above
▪ Insulation, Vapor barriers, or Vapor Retarders, except as noted above.
▪ Any tape, sealant, caulking, or weather barrier at exterior sheathing
▪ Wood carpentry and substrates, except as noted above
▪ Painting or priming of drywall before texture
BASE BID AMOUNT (Metal Studs & Drywall) $7,886 TPT Tax $
Pricing effective on material and labor provided prior to .
Note: This proposal may be withdrawn by us if not accepted within 30 days.
Page | 2
Date: 6/17/2025
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specification involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen’s Compensation Insurance.
Authorized Signature
Victor Loera
Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. Acceptance constitutes Design Drywall West, Inc as sub-contractor, acceptor as responsible for all sales taxes.
Signature
Date:
7330 N Shannon Rd
RFI #33: R.F.I. #033 Storm Drain
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated May 14, 2025 Due Date May 20, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of Transportation), Jeff Murray (SD Crane Builders Inc.)
Question Question from Kyle Burns SD Crane Builders Inc. on Wednesday, May 14, 2025 at 08:57 PM MST
For your review please see attached R.F.I. #033 Storm Drain. Please advise.
R.F.I. #033 Storm Drain.pdf
All Replies Response from Marcus Attson Shive Hattery on Friday, Jun 13, 2025 at 08:50 AM MST Please see attached PDF for response.
R.F.I. #033 Storm Drain_S-H Response.pdf
Page 1 of 1 Printed On: Jun 15, 2025 06:45 PM MST
RFI #033
Subject: Storm Drain
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:033
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 5/14/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
We have potholed and shot grades and have found that the designed plans will not work with what is existing for the Storm Drain. Please see grade/elevations shot taken.
FFE Existing Building = 51.63 POC to Existing 4" Storm Drain = 51.43 Inlet of Existing Catch Basin on East of Existing Building = 50.69 Outlet of Existing Catch Basin on West of Existing Building = 50.54 Inlet of New Catch Basin Anticipated at = 49.89
Also see attached picture of existing outlet pipe that seems to be damaged from something previous.
Please advise on direction of work to achieve goal. See drawing C100 attached below
C100
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Contractor shall route storm drain pipe west and discharge into a water harvesting basin depression. See civil sketch SK-2.
NOTE: The RFI indicates there will be a cost impact. Contractor shall prepare a change order request for review and approval prior to commencing work outlined above.
06/11/2025
D
ADOT TUCSON NORTH MVD REMODEL
STORM DRAIN REVISION - RFI#33
480-753-0800
4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008 REF: C100 CIVIL SK-2
PROVIDE 10" NYLOPLAST INLINE
DRAIN WITH 4"Ø OUTLET. RIM
INVERT IS 51.25. OUTLET INVERT
IS 50.00.
CONSTRUCT SHALLOW WATER
HARVESTING BASIN.
BOTTOM ELEV = 49.70
TOP/OVERFLOW ELEV = 50.45
BASIN DEPTH = 9"
EXTEND 30 LF OF 4"Ø
SDR-35 PVC STORM
DRAIN @ SLOPE = 1.00%.
INVERT BEGIN = 50.00;
INVERT END = 49.70.
SK-2
51.80SW
51.80SW
50.98SW
51.04SW
51.28SW
51.31SW
51.25SW
50.73SW
STAIRS WITH 2 RISER
SECTIONS AT 5" HEIGHT
50.84SW1.
1.
1.
1.8 4%
1.12%
51.43SW
51.43SW
51.37TC
51.37C
51.35SW
51.33SW
51.33SW
51.33SW
51.12SW
50.89SW
51.72SW
51.40SW
51.36SW
51.49SW
51.37SW
51.33SW
2.
1.00%
2.
51.77SW
51.28SW
51.24SW
51.27SW
49.96SW
49.18AC
49.44AC
51.25TC
50.75AC
51.29TC
50.79AC
51.03TC
50.53AC
51.37TC
50.87AC
50.77AC
50.48AC
49.89AC
50.43TC
49.93AC
49.98TC
49.48AC
49.81TC
49.31AC
49.87TC
49.37AC
51.31SW
49.95SW
49.89SW
49.76TC
49.26AC
49.79SW
49.29AC
51.47SW
7.
ADOT TUCSON NORTH MVD
FFE VARIES
MATCH EXISTING GRADE ON
NORTH SIDE OF PLANTER WALL
PROVIDE 12" NYLOPLAST
AREA DRAIN WITH
PEDESTRIAN GRATE. RIM
ELEVATION IS 2351.10.
GRADE AREA TO DRAIN NEW
CATCH BASIN.
ROUTE NEW SDR-35 PVC STORM
DRAIN TO CONNECT INTO
EXISTING STORM DRAIN.
CONTRACTOR TO LOCATE AND
FIELD VERIFY TIE IN INVERT AND
PROVIDE POSITIVE SLOPE FROM
NEW CATCH BASIN. MATCH
EXISTING STORM DRAIN SIZE.
51.85SW
51.83SW
51.80SW
51.53SW
51.48SW
51.78SW
51.83SW
51.85SW
51.63TC
51.13AC
50.82SW
50.78SW
50.76SW
50.14SW
50.14SW
50.23SW
50.24SW
51.84AC
51.44AC
50.60AC
52.66TC
52.16AC50.79AC
51.39TC
51.08AC
51.37SW
51.73SW
51.78SW
51.78SW
51.63SW
51.73SW
51.56SW
51.59SW
51.80SW
52.70SW
51.86SW
51.59SW
51.63SW
51.79TC
51.79AC
51.74TC
51.74AC
1.75% 6.
3.
7.90%
1.
1.
1.
51.49AC
51.80AC
51.39AC
1.
1.
1.
5.56%
7.88%
1.19%
-0.77%-4.50%
51.43TC
50.93AC
51.49SW
51.44SW
3.
1.36%
1.
1.
3.64%
1.78%
2.00%
1.42%
-1.50%
1.58%
1.58%
3.79%
1.58%
2.
2.
2.3 4%
50.08AC
50.01AC
50.03AC
50.51AC
49.98AC
49.88AC
50.13AC
50.33AC
50.25TC
49.75AC
50.89TC
50.39AC
50.92TC
50.42AC
50.93TC
50.43AC
50.95TC
50.45AC
50.82TC
50.32AC
50.80TC
50.30AC
50.78TC
50.28AC
50.65TC
50.15AC
50.45TC
49.95AC
51.02AC 51.07AC 51.11AC 51.16AC
51.46TC
50.96AC
51.77TC
51.27AC
51.72TC
51.22AC
51.80TC
51.80AC
51.85SW
A
B C D E F
A B C D E F Autodesk Revit 2022
SEAL:
R
EV
IS
IO
N S:
1 2 3 4 5 6 7 8 9
N
C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N
, A R
IZ
O
N A
0.
8.
W
SM
AR
C
H .C
O M
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
IS
SU
ED
F
O R
IS
SU
E D
AT
E:
PR
O
JE
C
T N
U M
BE
R
A R
C H
I T E
C T
S A
D
IV
IS
IO
N O
F
SH
IV
E-
H
AT
TE
R
Y
FI
EL
D B
O O
K:
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
.4
.0
DE
CE
M
BE
R 5, ER
O
BA
P
480-753-0800
4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008
WWW.DOWL.COM
G R
AD
IN
G A
N D
D R
AI
N
AG
E
PL
AN
C100
CONTRACTOR TO FIELD
VERIFY AND TIE INTO
EXISTING GRADE AT A
REASONABLE SLOPE
CONTRACTOR TO FIELD
VERIFY AND TIE INTO
EXISTING GRADE AT A
REASONABLE SLOPE
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications
04/22/2024 9:55:21 AM
PO Box 251
Cortaro, Arizona 85652
(520)235-3384
ROC 318634
6/20/2025
SD Crane:
MVD North Tucson CO #2
We propose the following:
1. CO for RFI #033: Additional labor and equipment to grade for new retention basin and re-route storm drain from catch basin.--------------------------------------------------------------------------------------------------$950.00
2. CO for RFI #037: Additional labor, equipment and material to disconnect down spout from underground plumbing, route North to daylight and install rip rap.---------------------------------------------------------$4,500.00
Addenda: N/A
Material Sales Tax: $34.65
Soils report: N/A
Total:
Five Thousand Four Hundred Eighty-Four Dollars and Sixty-Three Cents------------------------------------------$5,484.65
Exclusions (Unless stated above):
1. Surveying/staking/engineering.
2. Water costs.
3. Changes in design.
4. No import/export unless stated above.
5. Final adjustments unless stated above.
6. Permits or engineering.
7. Anchor Bolts/Templates
Michael Egurola
Sole Member michael@completeearthworx.com
520-235-3384
7330 N Shannon Rd
RFI #34: R.F.I. #034 Existing Conditions of Walls
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated May 15, 2025 Due Date May 16, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of
Question Question from Kyle Burns SD Crane Builders Inc. on Thursday, May 15, 2025 at 04:23 PM MST
For your review please see attached R.F.I. #034 Existing Conditions of Walls. Please advise.
R.F.I. #034 Existing Conditions of Walls.pdf
All Replies Response from Melissa de la Gardelle Shive Hattery on Monday, Jun 9, 2025 at 11:13 AM MST See attached
R.F.I. #034 Existing Conditions of Walls_S-H Response.pdf
Page 1 of 1 Printed On: Jun 10, 2025 07:11 AM MST
RFI #034
Subject: Existing Conditions of Walls
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:034
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 5/15/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the existing North wall of the building the East walls in offices 111, 112, the printer room, and office 114 and the West wall from public men’s restroom to the storefront AL05.
These walls have 1” of foam held to the wall with flat strap and 5/8” drywall attached to the flat strap leaving the drywall finish 1 5/8” off of the block wall. This will not allow room for a 4 square box and a mud ring. The plans also call for 1 1’4” data conduit that will not fit into a standard 4 square box.
One option is to demo the existing drywall and foam in these areas and fur out the masonry walls with either 1 5/8” or 3 5/8” steel framing. Please let us know how you would like us to move forward with this issue and is it acceptable to run 1” conduit for data that can be accepted by typical 4 square boxes or can you please provide a spec on the box you are wanting to use to accept the 1 ¼” conduit at all data locations. Please let me know if you have any questions.
See drawing attached below
A2.0
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
In office 111, contractor shall remove a 6'-0" portion of existing 1" rigid insulation and GWB and provide 5/8" GWB over 3-5/8" metal studs @ 16" O.C. with R-13 batt insulation along the north wall, see SK-10.
At west walls of offices 111, 112, and 114, contractor shall replace existing rigid insulation and GWB with 5/8" GWB over 1-1/2" Z-Furring channels @ 24" O.C., see SK-10.
All other existing GWB over 1" Rigid insulation shall remain.
1�� conduit may be utilized with 4 square box. Provide (2) 1�� conduit to account for required data cable capacity required at each location.
06/06/2025
OFFICE
OFFICE
MGR
OFFICE
6' -0
EXISTING 5/8" OVER 1"
RIGID INSULATION WALL TO
REMAIN
5/8" GWB (PTD.) OVER 1-1/2"
METAL Z-FURRING
CHANNELS @ 24" O.C. W/
1-1/2" POLYISO RIGID
INSULATION
WALL MOUNTED TV BY
OWNER
3' -0
C L
EXISTING 5/8" OVER 1"
RIGID INSULATION WALL TO
REMAIN
INFILL WALL W/ 5/8"
GWB PVER 1" RIGID
INSUL. TO MATCH
EXISTING - PTD.
5/8" GWB (PTD.) OVER 3-5/8"
METAL STUDS @ 16" O.C. W/
R-13 BATT INSULATION
5/8" GWB (PTD.) OVER 1-1/2"
METAL Z-FURRING
CHANNELS @ 24" O.C. W/
1-1/2" POLYISO RIGID
INSULATION
D
AT
E D
R
AW
N B
Y
AP
PR
O
VE
D
B Y
SC
AL
E
FI
EL
D
B O
O K
R
EV
IS
IO
N
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
Autodesk Revit
PROJECT NUMBER
6/6/2025 10:21:12 AM
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
A M
O D
EL
_M ar cu s_ At ts on
.rv t
/4
'-0
2172304350
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
M A
JD
M
SK-10
1/4" = 1'-0"1 FLOOR PLAN - ROOM 111
N
SH
IV
E- H
AT
TE
R Y
PRINTER AREA
405 S. CLARK DR.
TEMPE, AZ 85288
PHONE: 480-951-4169
AZ ROC #339524 KB-1
Page | 1
Delivering On-time, On-Budget, and On-Satisfaction Results—Always
Date: Wednesday, June 11, 2025
Proposal to: SD Crane Project: ADOT Tucson MVD North Kyle Burns 7330 N Shannon Rd.
1215 W. Rio Salado Pkwy. #109 Tempe, AZ 85281
Tucson , AZ 85741
Phone: 480-832-1777 Architect:
Fax: Plan Date: Wednesday, June 11, 2025
SCOPE OF WORK: Metal Stud & Drywall
▪ Deck is based on 18’ AFF, if deck height is different, price may be affected
▪ Scope per RFI #34
▪ Demo as required.
▪ Includes TPT tax as required
EXCLUSIONS:
▪ Hot mud or fast set mud and additional man hours required for its installation
▪ Prevailing Wages not used
▪ Payment of bonds premiums, permits & licenses
▪ Any WRAP insurance program premium that may be in place
▪ Dumpster for debris removal to be provided by others at no charge to Design
▪ Heat, lights, water, power, ventilation, and weather protection
▪ Responsibility for the drawings meeting requirements of codes, ordinances or design
▪ Shop drawings, engineering or laboratory testing
▪ State and local taxes; require AZ Form 5005 (AZ Dept. Revenue Prime Contractors Cert.)
▪ Overtime work and off hours work
▪ Supply, receiving and distribution of all frames, door and components
▪ Any and all fire safeing or caulking, except as noted above.
▪ Any and all acoustical caulking, except as noted above.
▪ Access panels, doors
▪ Backing for any & all trades, except as noted above
▪ Insulation, Vapor barriers, or Vapor Retarders, except as noted above.
▪ Any tape, sealant, caulking, or weather barrier at exterior sheathing
▪ Wood carpentry and substrates, except as noted above
▪ Painting or priming of drywall before texture
BASE BID AMOUNT (Metal Studs & Drywall) $8,362 TPT Tax $
Pricing effective on material and labor provided prior to .
Page | 2
Date: 6/11/2025
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specification involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen’s Compensation Insurance.
Authorized Signature
Victor Loera
Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. Acceptance constitutes Design Drywall West, Inc as sub-contractor, acceptor as responsible for all sales taxes.
Signature
Date:
7330 N Shannon Rd
RFI #37: R.F.I. #037 Downspout Connected to Waste Lines
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated May 16, 2025 Due Date May 17, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of
Question Question from Kyle Burns SD Crane Builders Inc. on Friday, May 16, 2025 at 02:40 PM MST
For your review please see attached R.F.I. #037 Downspout Connected to Waste Lines. Please advise.
R.F.I. #037 Downspout Connected to Waste Lines.pdf
All Replies Response from Marcus Attson Shive Hattery on Friday, Jun 13, 2025 at 08:51 AM MST
R.F.I. #037 Downspout Connected to Waste Lines_S-H Response.pdf
Page 1 of 1 Printed On: Jun 15, 2025 06:57 PM MST
RFI #037
Subject: Downspout Connected to Waste Lines
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:037
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 5/16/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
During the underground plumbing install we found that the downspout on the North East corner is tied into the waste at the restroom (see photos attached) Please advise as to how we are to move forward with this tie in or if there is another route acceptable for the roof drainage at this location.
See drawing attached below.
A2.1
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Contractor shall disconnect storm water pipe at tie in and cap. 4" SDR-35 PVC storm water pipe shall be installed to drain north and discharge per civil sketch SK-1.
NOTE: The RFI indicates there will be a cost impact. Contractor shall prepare a change order request for review and approval prior to commencing work outlined above.
06/11/2025
MATCH EXISTING GRADE ON
NORTH SIDE OF PLANTER WALL
-0.77%-6.41%
0.
1.08%
51.53SW
51.48SW
51.78SW
51.83SW
51.85SW
C
50.97AC
51.65TC
51.15AC
51.61TC
51.11AC
51.57TC
51.07AC
CONNECT TO EXISTING ROOF
DOWNSPOUT AND ROUTE
APPROXIMATELY 30 LF OF 4"Ø SDR-35
PVC PIPE TO DAYLIGHT INTO
ADJACENT SLOPE. PROVIDE A MINIMUM
OF 1' OF COVER OVER PIPE. ROUTE
BETWEEN GUARDRAIL POST AND
PLANTER WALL.
PROVIDE 15 SF OF RIPRAP D50 = 4",
DEPTH = 8" AT END OF ROOF LEADER.
PLACE RIPRAP ON MIRAFI 140 FILTER
FABRIC OR EQUIVALENT.
ADOT TUCSON NORTH MVD REMODEL
NW ROOF LEADER ROUTING - RFI#37
480-753-0800
4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008 REF: C100 CIVIL SK-1
SK-1
PO Box 251
Cortaro, Arizona 85652
(520)235-3384
ROC 318634
6/20/2025
SD Crane:
MVD North Tucson CO #2
We propose the following:
1. CO for RFI #033: Additional labor and equipment to grade for new retention basin and re-route storm drain from catch basin.--------------------------------------------------------------------------------------------------$950.00
2. CO for RFI #037: Additional labor, equipment and material to disconnect down spout from underground plumbing, route North to daylight and install rip rap.---------------------------------------------------------$4,500.00
Addenda: N/A
Material Sales Tax: $34.65
Soils report: N/A
Total:
Five Thousand Four Hundred Eighty-Four Dollars and Sixty-Three Cents------------------------------------------$5,484.65
Exclusions (Unless stated above):
1. Surveying/staking/engineering.
2. Water costs.
3. Changes in design.
4. No import/export unless stated above.
5. Final adjustments unless stated above.
6. Permits or engineering.
7. Anchor Bolts/Templates
Michael Egurola
Sole Member michael@completeearthworx.com
520-235-3384
7330 N Shannon Rd
RFI #41: R.F.I. #041 Footing Detail for Steel Beam
Status Closed on 06/15/25
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Jun 3, 2025 Due Date Jun 5, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of
Question Question from Kyle Burns SD Crane Builders Inc. on Tuesday, Jun 3, 2025 at 07:41 AM MST
For your review please see attached R.F.I. #041 Footing Detail for Steel Beam. Please advise.
R.F.I. #041 Footing Detail.pdf
All Replies Response from Kyle Burns SD Crane Builders Inc. on Sunday, Jun 15, 2025 at 07:01 PM MST Marcus, Thank you for the response regarding this RFI. We will move forward accordingly and will work with our contract for the additional cost for this work.
Thank you Marcus, Response from Marcus Attson Shive Hattery on Friday, Jun 13, 2025 at 08:53 AM MST
R.F.I. #041 Footing Detail_S-H Response.pdf
Page 1 of 1 Printed On: Jun 15, 2025 07:01 PM MST
RFI #041
Subject: Footing Detail
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:041
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 6/3/25
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information: Request:
This RFI is regarding the existing footing and stem wall as it differs from the details 105 and 106 on sheet S3.0 (see pictures attached). After removing the concrete and locating the existing footing, we would like to get clarification and direction on how to move forward with the new footing for the new columns at the center masonry wall. The existing footing measures 6.5” to 8” and has an 8”X17” stem wall above. Please provide direction and dimensions on how we should move forward with the install the dowels and footing. We had our third party inspector on site and they would like something in writing from the engineer for their inspection report as the dimensions and existing footing do not match the detail on S3.0. Please let me know if you have any questions.
See drawing and photos attached below
S3.0
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact:
Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Per the structural engineer, contractor shall remove existing 8" x 17" stem wall and install base detail per provided structural sketches.
Detail 105 - Footing dimensions shall remain 4'-0" sq. centered on steel column. Contractor shall thicken existing concrete to 12" by pouring concrete on top of existing footing. Dowel spacing and sizing shall be per detail 105, embedment may be reduced to 6", giving a total dowel length of 24".
06/12/2025
Shive-Hattery
Marcus Attson
8"
2"
0'-6" pour on top of existing 6.5" thick footing
~5.5"
Detail 106 - Footing dimensions shall remain 4'-0" sq. centered on steel column as shown in construction documents. Contractor shall thicken existing concrete footing by pouring concrete on top of existing footing to a minimum of 12" thick. Dowel spacing and sizing shall remain as indicated on detail 106, dowel embedment may be reduced to 6", giving a total dowel length of 24".
center of combined footing eqeq
8"
2"
0'-6" pour on top of existing 6.5" thick footing
~5.5" at 12" o.c.
CONCRETE Arizona, LLC.
LICENSED * BONDED * INSURED
9240 West Missouri Avenue ROC CR-9 304959 CONCRETEAZ.COM
Glendale, AZ 85305 623-845-7070
CHANGE ORDER
DATE: 06/16/2025
GENERAL CONTRACTOR: SD CRANE BUILDERS, INC.
1215 W. Rio Salado Pkwy., #109, Tempe, AZ 85281 480-832-1777-office, 480-466-1135-cell, 480-832-1798-fax
PROJECT: 24-322 - ADOT Tucson North MVD Renovation PROJECT ADDRESS: 7330 N. Shannon Rd., Tucson, AZ 85741
FROM: Peter Diaz, Estimator / Superintendent, 623-341-1007 cell, pete@concreteaz.com Reyna, Project Coordinator, 623-293-1986 cell, reyna@concreteaz.com
DESCRIPTION
Footing for steel beam:
Saw cut.
Break out stem to existing footing.
Drill, dowel, and epoxy rebar.
Pour footing with 4,000 P.S.I. concrete.
Clean up.
2 men, 12 hrs. ea. (includes drive time) = 24 hrs. @ $85. per hr. = $2,040.00 Materials: $220.00 Equpment rental: $170.00
$2,430.00 Combined cost $ 243.00 10% Overhead $ 243.00 10% Profit
$2,916.00 $ 164.91 Taxes (if applicable) $3,080.91 Total cost
INCLUDES: All labor, materials, equipment, short load fees, travel time, lodging, Per Diem, and insurances.
TAXES: 65% of job cost: $1,895.40 AZ State 5.6%: $106.15 Pima County .5%: $9.48 City of Tucson 2.6%: $49.28
TOTAL TAX 8.7% $164.91