This document is a compilation of contract amendment, change order, and supplemental instruction documents for the ADOT Tucson North MVD Building Renovation project located at 7330 N Shannon Road in Tucson, Arizona. The primary parties involved include the Arizona Department of Transportation (ADOT), SD Crane Builders Inc. (prime contractor), Shive-Hattery (architecture and engineering firm), and several subcontractors such as Desert View Painting Inc., Hirschi Masonry LLC, Partitions & Accessories Co., RCD Demolition LLC, and Design Drywall West.
The project involves a comprehensive renovation of an MVD (Motor Vehicle Division) building, with multiple contract amendments addressing specific scope changes. Key modifications include raising wall heights in restrooms, adjusting ceiling heights, extending walls to the deck, installing new ceiling systems, and making accessibility improvements. The contract amendments authorize additional work totaling approximately $51,312.29, with individual change orders ranging from $3,569 to $4,834. The changes primarily involve architectural, structural, and finishing work, with subcontractors providing specialized services such as drywall installation, masonry reinforcement, painting, and demolition. The project appears to be a detailed renovation focused on improving the building's functionality, accessibility, and aesthetic qualities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: SD Crane Builders Inc. AMENDMENT NO.: Three (3)
DESCRIPTION: Tucson North MVD Remodel
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Line item CTR075036-1 Tucson North MVD Remodel per the technical specifications & drawings, increased from $2,537,623.85 to $2,586,189.74 total cost. See attached CO.
2. Line item CTR075036-3 Base Bid Tax increased from $143,502.62 to $146,249.02. See attached CO.
3. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
Construction Contract Change Order Summary No. ____
Contract/APP No. Contract/APP Amendment No:
Project Name: Project No: Statutory Review No:
Design Professional: Contractor: ADOT Project Manager:
ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED
ACKNOWLEDGEMENT AND AUTHORIZATION
Page | 1 of 1
1. Check box(es) below best describing the Construction Change Order to the Contract:
☐ Contractor cost increase to Contract due to Additional Work.
☐ Contractor cost reduction to Contract.
☐ Contractor to increase number of calendar days to date of Substantial Completion of the Project.
☐ Contractor “no cost” change to Contract.
☐ Use of Contingency ☐ Other (Provide Description) _______________________________________________________________.
2. Contractor shall provide complete description of reduced or Additional Work, including documents in support of the Change Order (e.g., drawings, material substitution literature, cost reduction or increase detail including breakout of labor, materials, markup and tax). Contractor shall use the Construction Change Order Worksheet (Exhibit J1) to provide a detailed breakdown of any change to the Project Cost.
3. By signing and executing this Change Order, the Contractor and Agency agree to a price for the Additional Work, as detailed below. This price shall cover any and all Costs associated with the Additional Work including, but not limited to, Costs associated with delay of the Contractor's Work, if any.
Should the Additional Work impact the Schedule, the Agency and Contractor have agreed to extend the date for Substantial Completion as reflected below.
4. Contractor agrees that the payment authorized by this Change Order, if any, is in full settlement of any and all causes of action, including but not limited to, any claim resulting from delays to the time to Substantial Completion caused by this Change Order which Contractor or any of its Subcontractors, suppliers and the officers, agents, and employees of each of them, may now have or may assert in the future against the Agency, or its officers, employees and agents, arising out of, or associated with, this construction Change Order.
In accordance with the terms of the Contract, the following detailed changes are proposed (attach additional information as needed):
Original Contract Sum $
Previous Change Orders to Contract $
Net Change for this Change Order to Contract (attach Exhibit J1 for details as needed) $
New Contract Sum $
Number of Calendar Days for Time Extended for Substantial Completion for this Change Order Days
Revised Substantial Completion Date due to this Change Order
Contractor (Firm Name): Address: Authorized Signature and Date:
Design Professional (Firm Name): Address: Authorized Signature and Date:
ADOT Procurement Officer Name:
Agency Name and Address: Authorized Signature and Date: ADOT Project Manager Name:
Agency Name and Address: Authorized Signature and Date:
State of Arizona Department of Transportation
206 S 17th Ave Phoenix, AZ 85007
ADOA Chief Compliance Officer Name:
Agency Name and Address: Authorized Signature and Date:
This Change Order shall modify the Contract only upon the signed approval of the Contractor, Design Professional, ADOT Procurement Officer as specified in the signature block. When signed by all parties this Change Order becomes effective immediately and the Contractor shall proceed with the change(s) identified and approved.
3,021,688.18
165,344.90
51,312.29
3,238,345.37
11/2/2026
CTR075036 03
CTR075036 HD-24-15
Shive-Hattery SD Crane Builders Inc. Andrew May
See attached J1.
SD Crane Builders Inc.
Shive-Hattery
Andrew May
Patrick Holt
Elizabeth Blakley
1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281 4330 N Campbell Ave Suite 268 Tucson, AZ 85718 1655 W. Jackson St.
Phoenix, AZ 85007 1400 W Washington St, #B200 Phoenix, AZ 85007 1655 W Jackson St.
Phoenix, AZ
ADOT Tucson North MVD Renovation
08/04/2025
08/05/2025
08/07/2025
08/07/2025
08/12/2025
COR No.3
Date: 5/19/25
Item
No.
Subcontractor Trades
Q ty
U n it s
Unit Price Extension Q ty
U n it s
Unit Price Extension Totals
Raise Ceiling Hieght in Gang Restroom ASI #3 -$ 13,140.00$ 13,140.00$
North Restroom Wall Extend Height R.F.I. #13 -$ 3,686.00$ 3,686.00$
Install Hallway Acoutstical Ceiling Per R.F.I. #21 -$ 12,430.00$ 12,430.00$
High Glulam Beams R.F.I.
#22 -$ 2,946.00$ 2,946.00$
Add Lintels & Repair Masonry R.F.I. #23 -$ 4,834.11$ 4,834.11$
Wall Heights & RCP Height Per R.F.I. #27 -$ 3,569.00$ 3,569.00$
40,605.11$
Owner Request 4.00% 1,624.20$
Hidden Condition 10.00% 4,222.93$
3.00% 1,393.57$
Prepurchase Materials 0.50% 239.23$
Omission in Construction docs 1.00% 480.85$
Transfer to/from Contingency 5.655% 2,746.40$
Other 51,312.29$
Approval of this Change Order Request will increase (decrease) the Schedule by: Calendar Days 60
Form 8.14. rev 8.10.2021 r5
Total Cost
Address Authorized Signature & Date
Construction Services Manager Address Authorized Signature & Date
Contractor
Design Professional Address Authorized Signature & Date
ADOA Project Manager Address Authorized Signature & Date
Fee
This Change will require Statutory Review: Yes No
General Conditions
Builders Risk
Tax
Insurance
Bond
Schedule of Values by Trade
The Contractor hereby requests a Change in the Contract Sum and/or Time, conforming to Article 1.2 of the Uniform Terms and Conditions, the Work described herein will not start until this Change Order Request has been signed by all parties.
Labor Material
Check the box best describing the Cause of this Change Subtotal
Exhibit J1
Change Order Request
State of Arizona
General Services Division
1400 West Washington St
Phoenix, AZ 85007
Project Name: ADOT Tucson North MVD Renovation State Project No:CTR075036
Contractor Project No: 24-322Contractor: SD Crane Builders Inc.
SD Crane Builders Inc. 1215 W. Rio Salado Pkwy #109 Tempe, AZ 85281 5/29/25
Shive-Hattery
Patrick Holt
Andrew May
4330 N. Campbell Rd. Suite 268 Tucson, AZ 85718
1400 W Washington Phoenix, AZ 85007
1655 W. Jackson St.
Phoenix, AZ 85007
08/05/2025
Project: HD-24-015 ADOT- Tucson North MVD Renovation
(HD-24-015)
7330 N Shannon Rd Tucson, Arizona 85741
P: 602-499-8871
RFI #13: R.F.I. #013 Existing North Restroom Wall Framed at 9'
Status Open
To Joel Mesik (Shive Hattery) From Kyle Burns (SD Crane Builders Inc.)
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Mar 31, 2025 Due Date Apr 1, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of Transportation), Jeff Murray (SD Crane Builders Inc.)
Activity
Question Question from Kyle Burns SD Crane Builders Inc. on Monday, Mar 31, 2025 at 07:39 AM MST Joel, For your review please see attached R.F.I. #013 Existing North Restroom Wall Framed at 9'. Please advise.
Thank you, Attachments R.F.I. #013 Existing North Restroom Wall Framed at 9'.pdf
Awaiting an Official Response
All Replies Response from Marcus Attson Shive Hattery on Wednesday, Apr 16, 2025 at 11:08 AM MST Please see attached file for response to RFI 13.
R.F.I. #013 Existing North Restroom Wall Framed at 9'_S-H Response.pdf
Page 1 of 1 Printed On: Apr 17, 2025 03:31 PM MST
REQUEST FOR INFORMATION
RFI #013
Subject: Existing North Restroom Wall Framed at 9'
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No:013
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 3/31/2025
Project Number: 24-322 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information Request:
The existing gang Womens & Mens restroom walls that are to remain are framed at 9’ and the new ceiling height in the lobby is to be at 9’11”. This will require additional demo, electrical, framing, and drywall work. Please provide detailed direction on how you would like us to rework the framing on the restroom walls to allow for the 9’11” ceiling height in the lobby. Please advise
See drawings and photos attached below
Thank you, A2.0, A2.2, D2.0, D2.2
Response Date:
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Contractor shall extend framing from the top of existing wall, size and spacing of studs shall match existing, see sketch SK-08. Attach wall extension to bottom of existing roof joist with slotted slip track, see detail 5/A9.0.Remove top portion of existing drywall to ensure 12" minimum from top of existing wall. Extend drywall 6" minimum past ACT ceiling, texture of drywall to match existing.
Remove all electrical in area of ceiling. All work in this area is indicated as new work on electrical drawings.
04/16/2025
Shive-Hattery
Marcus Attson
WH
A
A
3 3
B
B
4 4
A4.0
C
C
D
D
E
E
5 5
1 1
2 2
ENTRY /
GREETER
SELF
SERVICE
OFFICE
OFFICE
MENS
WOMENS
MECH
JAN
SECURE
STOR
TRAINING
STORAGE
UTILITY
WOMENS
MENS
TESTING
MGR
OFFICE
IT
BREAK
RESTROOM
CSR
WORKSTATIONS
STAFF
CORRIDOR
CUSTOMER
QUEUE
SHED
OUTDOOR
BREAK
ROAD
TEST
CANOPY
OUTDOOR
WAITING
TYP 6
A4.1
A4.0
E2 8'-8"
18'-8"
'-8
6a
116c
6b
107 106
103a
103b
17 17
172'-0" 8'-0" 2'-0" 8'-0" 2'-0" 9'-8"
P1
'-2
" 99'-5"
A5.0 1
A5.0
A2.0E
A2.0E
A2.0E
AL07 AL08 AL09
AL02
AL03
AL04
AL05
AL06 AL01
SEE SHEETS A1.0 / A1.1 FOR SITE PLAN INFORMATION
2'-2" 2'-2"
2' -2
A2.0E
100'-0"
A8.3
SIM
A8.2
A8.3
TYP. OF 9
22 22
24 25
A8.2
A8.2
A8.2
5'-8"
2' -6
A5.0
4' -8
INFILL
3'-4"
IN
FI
LL
3'
-4 "28
A8.3
A8.3
A8.3
LOW
LOW
LOW
SEE 12/A8.2 FOR
HIGH CONDITION
AK
AK
INFILL
4'-8"28
5'-0"
'-0
5'
-0
'-4
DN
DN
NO WORK
THIS AREA
5' -0
TYP 3
CR
C R
C R
C R
CR
CR
C R
CR
9' -2
9'-0"
IN
FI
LL
3'
-4
P2
P2
DN
DN
MARK DESCRIPTION PLAN DETAIL
WALL TYPES AND SUBTYPES
P1 •
TYPICAL PARTITION WALL
5/8" GYPSUM BOARD TYPE 'X'
3-5/8" 20 GA. STEEL STUDS @ 1'-4" O.C.
3-1/2" SOUND ATTENTUATING BATT
INSULATION (SAB)
5/8" GYPSUM BOARD TYPE 'X' (EXTEND
6" PAST CEILING U.N.O.)
P2
TYPICAL PLUMBING WALL
5/8" GYPSUM BOARD TYPE 'X'
6" 20 GA. STEEL STUDS @ 1'-4" O.C.
3-1/2" SOUND ATTENTUATING BATT
INSULATION (SAB)
5/8" GYPSUM BOARD TYPE 'X' (EXTEND
6" PAST CEILING U.N.O.)
TYPICAL
TYPCIAL SITE WALL
3-COAT STUCCO SYSTEM, PAINTED W/
ELASTOMERIC PAINT
8" x 8" x 16" CONCRETE MASONRY UNITS -
VERTICAL REINFORCING AND GROUTED
AT 48" O.C.
M1
WALL SUBTYPE - FURRING
7/8" METAL FURRING STRIPS
5/8" GYPSUM BOARD
NOTE: EXTEND 6" PAST CEILING U.N.O.
a
EXISTING TYPICAL EXTERIOR WALL (R-15.7)
[E] STUCCO SYSTEM, REPAINT W/
ELASTOMERIC PAINT
[E] 8" X 8" X 16" CONCRETE MASONRY UNITS
[E] 2X4 STUD FURRING
[E] 5/8" GWB, REPAINT
E1
ENTRY ADDITION EXTERIOR WALL (R-18 MIN)
VERTICAL RIB KINGSPAN U-24 PREFINISHED
METAL PANEL
1/2" HAT CHANNEL @ 24" O.C. - HORIZONTAL
1" RIGID INSULATION (R-5ci)
VAPOR BARRIER
1/2" PLYWOOD SUBSTRATE
6" MTL STUDS @ 24" O.C.
5-1/2" BATT INSULATION (R-13 MIN)
5/8" GWB PAINTED
E2
EXISTING ENTRY EXTERIOR WALL - RECLAD
VERTICAL RIB KINGSPAN U-24 PREFINISHED
METAL PANEL
1/2" HAT CHANNEL @ 24" O.C. - HORIZONTAL
1" RIGID INSULATION
VAPOR BARRIER
[E] PLYWOOD SUBSTRATE
[E] 6" MTL STUD FRAMING
[E] 5/8" GWB, REPAINT
E3
5" 7"
9"
WALL SUBTYPE - ADD TILE TO PARTITION WALL
CERAMIC TILE WAINSCOT TO 5'-0" U.N.O.
*SEE WALL TYPES P1 / P2 FOR REST OF
ASSEMBLY. PROVIDE CEMENT
BACKERBOARD IN LIEU OF GYPSUM
BOARD AT FACE WITH TILE
CT
NOTE: GRAY LINEWORK INDICATES EXISTING WALLS TO REMAIN
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
6:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
FL
O
O R
P
LA
N
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
A2.0
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1 PROVIDE NEW CONCRETE FLOOR SLAB - SEE FINISH PLAN FOR FINISH
MATERIALS
2 EXISTING FLOOR SLAB TO REMAIN
3 EXISTING EXPOSED TUBE STEEL COLUMN, PTD
4 SEMI-RECESSED FIRE EXTINGUISHER CABINET, STAINLESS STEEL. FIRE
EXTINGUISHER BY OWNER.
5 TESTING FURNITURE STATION BY OWNER, PROVIDE POWER AND DATA PER
ELECTRICAL.
6 EXISTING SAFE TO BE RELOCATED
7 PROVIDE PLUMBING FIXTURES, PARTITION STALLS, AND ACCESSORIES FOR
RESTROOM, TYP. SEE FINISH PLAN FOR MATERIALS AND TOILET ACCESSORIES
SCHEDULE THIS SHEET
8 SOLID SURFACE COUNTER TOP LAVATORIES (PER PLUMBING), & ADA
COMPLIANT SENSORED FAUCETS
9 ALUMINUM STOREFRONT SYSTEM, CLEAR ANODIZED FRAMES - SEE
SPECIFICATIONS
10 COPY AREA MILLWORK: BASE AND UPPER CABINETRY WITH PLASTIC LAMINATE
EXTERIOR SURFACES, INTERIOR MELAMINE AND PLASTIC LAMINATE
COUNTERTOP WITH 4" BACKSPLASH
11 BREAK ROOM MILLWORK: BASE AND UPPER CABINETRY WITH PLASTIC
LAMINATE EXTERIOR SURFACES, INTERIOR MELAMINE AND SOLID SURFACE
COUNTERTOP WITH 4" BACKSPLASH
12 EXISTING PRINTER/COPIER, PROTECT IN PLACE, RELOCATED
13 18" DEEP STANDARD AND BRACKET SHELVING, 3 TIERS.
14 WALL MOUNTED DUCTLESS HVAC UNIT WITH ROOF CONDENSER - SEE
MECHANICAL
15 EXTERIOR SLAB ON GRADE - 4" CONCRETE OVER 4" A.B.C. - 6" X 6" MIN.
TOEDOWNS AT EDGES ADJACENT TO GRADE, TYP.
16 SLOPED WALKWAY (1:20 SLOPE MAXIMUM) - 4" CONCRETE OVER 4" A.B.C. - 5'-0"
CONTROL JOINTS, U.N.O. - 6" X 6" MIN. TOEDOWNS AT EDGES ADJACENT TO
GRADE, TYP.
17 EXISTING CONCRETE BENCH, RELOCATED
18 REPLACE METAL HANDRAILS AT SITE STAIR FOR ADA PER DETAIL 3/A1.1
19 POWER POLE, TO BE PROVIDED BY OWNER IN FURNITURE PACKAGE. BASIS OF
DESIGN: LEGRAND WIREMOLD VISTA ARCHITECTURAL COLUMN, SMALL SQUARE
TO BE PROVIDED AT EVERY OTHER WORKSTATION (SERVICE TO 2
WORKSTATIONS MAXIMUM)
20 NEW STRUCTURAL COLUMN AND BEAM ASSEMBLY PER STRUCTURAL
21 INFILL WALL TO MATCH EXISTING CONSTRUCTION - FINISH TO MATCH ADJACENT
SURFACES
22 ACCESSIBLE WALL MOUNTED WATER CLOSET - SEE THIS SHEET FOR MOUNTING
HEIGHT
23 EXISTING FIRE DEPARTMENT CONNECTION (FDC) TO REMAIN
24 EXISTING FIRE RISER - REPLACE 'STANDPIPE' SIGNAGE TO READ: 'FIRE RISER'
GENERAL FLOOR PLAN NOTES
A. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL QUANTITIES,
DIMENSIONS AND EXISTING CONDITIONS AS REQUIRED TO COMPLETE THE
CONTRACT. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO BID.
B. SEE ALL ENGINEERING DRAWINGS FOR ADDITIONAL REQUIREMENTS.
C. EXISTING FINISHES TO REMAIN SHALL BE PROTECTED FROM DAMAGE
DURING CONSTRUCTION. ANY DAMAGED FINISHES SHALL BE REPAIRED TO
LIKE/NEW CONDITION.
D. PROVIDE FIRE TREATED WOOD BLOCKING IN WALLS OR ALL WALL STOPS,
TYP.
E. PROVIDE ACCESS PANELS IN WALLS AND GWB CEILINGS AT VALVES AND
JUNCTION BOXES - SEE MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS FOR EXACT LOCATIONS. PAINT ACCESS PANELS TO MATCH ADJ.
SURFACES, TYP.
F. CONTRACTOR TO COORDINATE CONSTRUCTION WITH EXISTING
EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL, PLUMBING AND
ELECTRICAL DRAWINGS.
G. G.C. TO VERIFY ALL EXISTING BUILDING FINISHED FLOOR ELEVATIONS
PRIOR TO START OF WORK AND NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
1/8" = 1'-0"1 FLOOR PLAN
WALL TYPE NOTES
A. USE MOISTURE AND MOLD RESISTANT GYPSUM BOARD IN ROOMS SCHEDULED TO
RECEIVE CERAMIC WALL TILE, INCLUDING, BUT NOT LIMITED TO TOILET ROOMS.
B. ALL OUTSIDE CORNERS OF GYPSUM BOARD PARTITIONS SHALL HAVE METAL
CORNER BEADS.
C. TERMINATE ALL GYPSUM BOARD EDGES ABUTTING DISSIMILAR MATERIALS AND
EDGES EXPOSED TO VIEW, WITH NON-EXPOSED METAL CASING BEAD AND
ISOLATED BY BACK ROD AND SELANT FULL-LENGTH UNLESS OTHERWISE
INDICATED.
D. REFER TO REFLECTED CEILING PLANS FOR LOCATIONS AND EXTENT OF
PARTITIONS SEALED TO THE DECK ABOVE. SEAL ALL PENETRATIONS THROUGH
WALLS INTO IT AND MECHANICAL ROOMS.
E. DIMENSIONING OF GYPSUM BOARD AND METAL STUD PARTITIONS ON THE FLOOR
PLANS IS TO THE FINISHED FACE OF THE SURFACE UNLESS OTHERWISE INDICATED.
F. PROVIDE ACOUSTIC SEALANT AT BASE OF ALL STUD WALLS AND AT
PENETRATIONS.
G. PROVIDE GYPSUM BOARD ON FOUR SIDES OF OPENINGS FRAMED FOR DAMPERS.
USE SAME NUMBER OF LAYERS AND TYPE OF GYPSUM BOARD AS FOR SIDE
PARTITION WITH GREATER PROTECTION.
H. PROVIDE DEFLECTION TRACK AT ALL WALLS THAT EXTEND TO DECK.
I. PROVIDE BRACING FOR ALL INTERIOR PARTITIONS FOR SEISMIC DESIGN CATEGORY
"D" PER THE IBC.
J. PROVIDE STEEL STRAPPING OR FIRE TREATED WOOD BLOCKING IN PARTITIONS
FOR WALL-HUNG ITEMS INCLUDING CASEWORK, SHELVING AND EQUIPMENT.
K. PROVIDE CONTROL JOINTS IN PARTITIONS 30'-0" IN LENGTH OR GREATER.
L. DIMENSIONING IN PLAN OF ALL MASONRY PARTITIONS AND OTHER MASONRY
ELEMENTS IS TO THE FACE OF MASONRY.
M. SEE STRUCTURAL DRAWINGS FOR SHEAR AND BEARING WALLS.
N. SEE STRUCTURAL DRAWINGS FOR MASONRY WALL REINFORCING.
O. PROVIDE CONTINUOUS FIRE TREATED PLYWOOD BLOCKING IN BATHROOMS TO 5'-0"
A.F.F. FOR GRAB BARS AND ACCESSIBLE FIXTURE MOUNTING.
P. INTERIOR STEEL STUDS SHALL NOT BE LESS THAN 25 GAUGE AND NOT MORE THAN
1'-4" ON CENTER UNLESS OTHERWISE INDICATED. 20 GAUGE STUDS MINIMUM SHAL
BE USED TO FRAME ALL DOORS, BORROWED LIGHT, PASS-THRU AND CASED
OPENINGS. SEE SPECIFICATIONS FOR DESIGN AND ENGINEERING.
Q. PROVIDE DOUBLE STUDS AT EACH SIDE OF OPENINGS. EXTEND STUDS FROM
FLOOR TO UNDERSIDE OF STRUCTURE ABOVE.
R. PROVIDE ACCESS PANELS AT ALL VALVES AND JUNCTION BOXES IN WALLS AND
GWB CEILINGS. COORDINATE LOCATION W/ ARCHITECT PRIOR TO INSTALLATION.
PAINT TO MATCH ADJACENT SURFACES.
S. ALL PRIVATE OFFICES, AND TOILET ROOMS SHALL HAVE SOUND ATTENUATION
INSULATION IN WALLS.
N
# KEYNOTES
25 ELECTRICAL SERVICE ENTRANCE - REFER TO ELECTRICAL SHEETS FOR
SERVICE UPGRADE INFORMATION
26 EXISTING ELECTRICAL PANEL TO REMAIN
27 HEAVY DUTY STEEL UTILITY SHELF - 5-TIER - 60"W X 18"D X 72"H BY EDSAL
MODEL #UR-60BLK OR APPROVED EQUAL
28 INFILL EXTERIOR WALL AT DEMOLISHED DOOR - EXTERIOR STUCCO FINISH TO
MATCH ADJACENT WALL
29 DUAL HEIGHT COUNTER: STAND UP PORTION AND ACCESSIBLE HEIGHT
SECTION. TO BE PROVIDED BY OWNER WITH FURNITURE PACKAGE. GC TO
PROVIDE CONTINUOUS BLOCKING IN WALL TO ACCOMMODATE FUTURE
MOUNTING, AND ROUGH-IN FOR PANIC BUTTON.
30 PROVIDE 3/4" FIRE TREATED PLYWOOD W/ WHITE COATING AT 3 SIDES OF IT
ROOM, FULL LENGTH OF WALL UP TO 8'0"H
31 ALARM KEYPAD, BY OWNER. GC TO PROVIDE ROUGH-IN.
32 RECESSED ELECTRICAL PANEL IN EXISTING PARTITION WALL - SEE ELECTRICAL
33 RECESSED ELECTRICAL POWER/DATA FLOOR BOX
34 SOFFIT/HEADER ABOVE - SHOWN DASHED. SEE RCP SHEET A2.2
35 PROVIDE NEW PLUMBING WALL - MATCH EXISTING CONSTRUCTION OF
ADJACENT PLUMBING WALL - PATCH AND REPAIR EXISTING WALLS - FINISH PER
FINISH PLAN SHEET I2.0
36 THERE IS TO BE NO PLUMBING IN WALL SHOWN IN GRAY HATCH. ALL PLUMBING
LINES FOR BREAK ROOM ARE TO COME THROUGH SIDE WALL AND BE ROUTED
IN MILLWORK WHERE NECESSARY. SEE PLUMBING SHEETS FOR ADDITIONAL
INFORMATION.
-0 9-
PL
AN
R
EV
IE
W
C O
M M
EN
TS
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E
NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications Planning & Construction Services
04/22/2024 9:55:22 AM
WALL TO EXTEND TO DECK
RECESSED CAN
DOWNLIGHT LED
RECESSED 2x4 LED
WALL PACK LIGHT
2' X 2' ACT DROP CEILING
2' X 4' ACT DROP CEILING
GWB CEILING
LINEAR SUSPENDED
FIXTURE
EXIT SIGN
WALL TO EXTEND 6" ABOVE
ADJACENT CEILING
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXHAUST AIR GRILLE
WALL-MOUNTED DUCTLESS
UNIT
RCP LEGEND
GYPSUM BOARD CONTROL
JOINT
CEILING TYPE
CEILING HEIGHT
1t
SURFACE MOUNTED LIGHT
FIXTURE
INTERIOR CEILING MOUNTED
CCTV DOME - BY OWNER
EXTERIOR WALL MOUNTED
CCTV - BY OWNER
INTERIOR WALL MOUNTED
CCTV DOME - BY OWNER
MD MOTION DETECTOR - BY
OWNER
G.C.J.
ROOF ACCESS HATCH
(EXISTING)RA
SURACE MOUNTED LINEAR
LED
WALL MOUNTED LINEAR LED
18" X 18" ACCESS PANEL
SOFFIT PANELS - SMOOTH
SOFFIT PANELS - VENTED
A
A
3 3
B
B
4 4
A4.1
A4.0
C
C
D
D
E
E
5 5
1 1
2 2
ACT
9'-11"
A4.1
A4.0
OPEN TO
ABOVE -
SEE
DETAIL
2/A2.2
5' -2
/2
ETR
7'-0"
ETR
7'-0"
ETR
14'-0"
ETR
7'-0"
ETR
7'-0"
ETR
7'-0"
GWB
8'-4"
GWB
8'-4"
ACT
8'-6"
GWB
8'-0"
GWB
8'-4"
GWB
8'-4"
ACT
8'-6"
ACT
8'-4"
ACT
8'-6"
GWB
8'-0"
GWB
8'-0"
ACT
8'-4"
GWB
8'-6"
ACT
8'-0"
DIGITAL DISPLAY INDICATORS AT EACH WORKSTATION
(ALIGN WITH LIGHTING)
WIREMOLD POWER POLES TO SERVE EVERY 1-2 WORKSTATIONS
REPLACEMENT METAL ROOF
CANOPY
GWB
11'-8"
A9.0
A9.0
2'-2"
2' -2
2'-2"
GWB
8'-4"
14'-1"
'-0
ETR
7'-0"
5"
C L
EQ
EQ
CL3'-1 1/2"
CLCL
TYP.
5'-9 1/2"
SURFACE MOUNTED EXTERIOR
LED DOWNLIGHT, TYP OF 4
G .C
.J
G .C
.J
G .C
.J
G .C
.J
A8.3
A8.3
A8.3
A8.23
A8.2
A8.2
A8.3
A8.3
SIM.
A8.2
GWB
8'-0"
A9.0
1' -9
ETR
A5.0
A5.0
CCTV MOUNTED BELOW CANOPY
ROOF
MD
MD
MD
MD
MD
15'-5"
NONE
ACT
8'-6"
ACT
8'-6"
A7.0
A7.0
RA
A2.1
CABLE TRAY ABOVE CEILING
SHOWN DASHED
ACT
8'-6"
2' -2
1'-4"
2' -6
@ STOREFRONT
A2.1
6@ MTL
AWNING
A2.2
A2.2
9' -2
/2
B
B
4 4
A4.1
A4.0
21'-8"
'-2
/2
PREFINISHED METAL
SOFFIT PANELS,
CONCEALED FASTENERS
GWB ATTACHED TO
UNDERSIDE OF ROOF
JOISTS
ALUMINUM STOREFRONT
CLERESTORY WINDOWS
GWB
VARIES
PREFINISHED METAL
GUTTER & DOWNSPOUT
A7.0
A7.0
A7.0
2' -0
A7.0
2' -0
A8.2
TYP. @
JAMBS
A8.2
A8.2
CLCL
4'-10" 7'-0" 4'-10"
G.C.J.
ALIGN LIGHTS TO
CENTER OF MULLIONS,
TYP
SIM. - NO GWB
IN CHASE
SOFFIT VENT CALCULATION
SOFFIT AREA: 183.94 SF
REQUIRED: 1.23 SF
PROVIDED: 59.10 SF
C L C L
C O
LU
M
N S
7' -6
" T
YP
EQUALLY SPACED
17'-2" - [3] COLUMNS
3' -9
/2
3"
FACE OF WALL
1'-9" DIM TO
1'-1"
CL17'-8"
2'-0" DIM TO FACE OF WALL
SAME CONDITION @
NORTH BOX BEAM
B
A4.1
A4.0
JUSTIFY CENTER OF WALL
PANEL TO CENTER OF WALL
15'-5"
EXISTING
GLULAM BEAMS
(HIGH AND
LOW - TYP. 6)
TO REMAIN
METAL AWNING BELOW -
SEE DETAILS A2.1
EXISTING STEEL COLUMN TO
REMAIN
EXISTING
MASONRY
PARAPET BELOW
P1
EXISTING STEEL
COLUMN/GLULAM BEAM
ASSEMBLY TO REMAIN
EXISTING STEEL
COLUMN/GLULAM
BEAM ASSEMBLY TO
REMAIN
O
VE
R [E
] P
AR
AP
ET
'-7
FU
R
R O
U T
OVER [E] PARAPET
18'-4" +/- FURROUT
WALL MOUNTED
SCONCE LIGHT
FIXTURE
(UP/DOWN LIGHTS)
@ 11'-0"
NOTE: NEW WALLS
SHOWN GRAY FOR
CLARITY
EXISTING STEEL
COLUMN TO REMAIN
EXISTING STEEL
COLUMN TO REMAIN
JUSTIFY CENTER OF WALL
PANEL TO CENTER OF WALL
EQ.
CL
DOWNSPOUT AND
PRECAST CONC
SPLASH BLOCK @
ROOF
EQ.
E2
E2
E3
E3
SEE DETAIL 2/A2.2 FOR
CLERESTORY RCP
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
6:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
A2.2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1/8" = 1'-0"1 REFLECTED CEILING PLAN
GENERAL RCP NOTES
A. ALL INTERIOR PARTITION WALLS TO EXTEND FULL HEIGHT TO DECK ABOVE, U.N.O.
B. ALL EXPOSED BEAMS, DUCTWORK, CONDUIT, PIPING, AND METAL DECK SHALL BE
PAINTED.
C. PROVIDE ACCESS PANELS IN GYPSUM BOARD CEILINGS AT ALL LOCATIONS OF
MECHANICAL UNITS, PLUMBING VALVES, AND ELECTRICAL JUNCTION BOXES AND
DISCONNECT SWITCHES. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS
FOR EXACT LOCATIONS AND QUANTITIES. PAINT TO MATCH CEILING.
D. IF ANY CONFLICTS IWTH SPECIFIED CEILING HEIGHTS ARISE FROM INSTALLED
LOCATIONS OF MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS OR IF CEILING
HEIGHTS ARE NOT SPECIFIED, CONTACT ARCHITECT IMMEDIATELY FOR
RESOLUTION, PRIOR TO COMMENCING ANY WORK.
E. PROVIDE SEISMIC BRACING FOR SUSPENDED CEILING SYSTEM.
F. ALL WALLS IN ROOMS WITH EXPOSED STRUCTURE SHALL BE FULL HEIGHT AND
SEALED TO DECK ABOVE.
G. PROVIDE CONTROL JOINTS IN GWB PARTITIONS EXCEEDING 30'-0" IN LENGTH
N
1/8" = 1'-0"2 REFLECTED CEILING PLAN - HIGH ROOF AT ENTRY N
1/8" = 1'-0"3 REFLECTED CEILING PLAN - HIGH ROOF AT ENTRY N
UP TO 18'-0" A.F.F.ABOVE 18'-0" A.F.F.
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E
NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications
A
A
3 3
B
B
4 4
C
C
D
D
E
E
5 5
1 1
2 2
9D
EM
O
LI
SH
W
AL
L
U P
TO
1' -3
'-9
/2
10 10
3 3
TYP. 6
TYP. 8
REFER TO SCOPE NOTES ON D2.1 ROOF
DEMO PLAN FOR HIGH PARAPET ROOF
& SHADE STRUCTURE DEMOLTION
INFORMATION
'-4
TYP. 3
LEGEND
SAWCUTS IN EXISTING FLOOR SLAB
4'-0"
32 32
'-4
4' -8
1' -4
135°
2'-5" +/-
8' -3
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
7:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
D
EM
O
LI
TI
O
N
FL
O O
R P
LA
N
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
D2.0
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
GENERAL DEMOLITION NOTES
A. ALL ITEMS ARE EXISTING UNLESS NOTED OTHERWISE.
B. GENERAL CONTRACTOR TO COORDINATE ALL DEMOLITION WORK (NOTED OR
OTHERWISE REQUIRED) WITH NEW CONSTRUCTION. GENERAL CONTRACTOR TO
COORDINATE ANY INTERRUPTIONS TO SITE UTILITY SERVICE (SITE ELECTRICAL,
MECHANICAL, PLUMBING, ETC.) WITH SITE OWNER (PIMA COUNTY; FACILITIES
MANAGEMENT) AT LEAST 72 HOURS IN ADVANCE.
C. DEMOLITION AREAS SHALL BE TERMINATED IN A NEAT & ORDERLY FASHION,
CLEANED & PATCHED TO ALIGN WITH NEW AND EXISTING CONSTRUCTION, AND
PREPARED TO RECEIVE NEW FINISHES.
D. PATCH AND REPAIR EXISTING WALLS, FLOORS, PARTITIONS, CEILINGS, SURFACES
AND OTHER AREAS WHERE DEMOLITION HAS OCCURED.
E. REMOVE ALL EXISTING INCIDENTAL CONDITIONS AS REQUIRED TO ACCOMMODATE
PROPOSED CONSTRUCTION WHETHER SHOWN ON PLAN, OR NOT. INCLUDING BUT
NOT LIMITED TO FASTENERS CLIPS, MOLDINGS AND OTHER SYSTEMS AS
REQUIRED.
F. PATCH ALL WALLS WHERE EXISTING STOREFRONT SYSTEMS ARE TO BE REMOVED.
ALL PATCHING FINISHES ARE TO MATCH EXISTING ADJACENT SURFACE.
G. PATCH ANY OPENINGS IN EXISTING FLOOR WALLS & STRUCTURE ABOVE, TO
MAINTAIN FIRE AND/OR SMOKE RATINGS. UTILIZE " UL" DESIGN CONSTRUCTION, OR
MATCH EXISTING RATED CONSTRUCTION.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY.
I. REMOVE ALL PROTRUSIONS FROM EXISTING WALLS TO RECEIVE A NEW FINISH.
J. CONTRACTOR TO FIELD VERIFY CONDITIONS OF ALL EXISTING CONSTRUCTION
MATERIAL AND SYSTEMS PRIOR TO STARTING CONSTRUCTION. NOTIFY ARCHITECT
OF DISCREPANCIES PRIOR TO DEMOLITION.
K. GENERAL CONTRACTOR SHALL CUT AND PATCH ALL WALLS, FLOORS, PARTITIONS,
CEILINGS, SURFACES AND OTHER AREAS AS REQUIRED FOR COMPLETION OF
WORK, THIS INCLUDES ELECTRICAL AND INFORMATION TECHNOLOGY CUTTING,
PATCHING OR RELOCATING.
L. DIMENSIONS ARE FROM FINISH FACE OF WALL, U.N.O.
M. GENERAL CONTRACTOR TO COORDINATE WITH OWNER AND PROVIDE ALL
NECESSARY MEANS AND METHODS OF KEEPING THE FACILITY SECURE AT ALL
TIMES THROUGH THE DURATION OF THE PROJECT. GENERAL CONTRACTOR SHALL
COMPLY WITH OWNER'S STANDARDS FOR CONSTRUCTION AND COORDINATE WORK
WITH OWNERS REPRESENTATIVES.
N. GENERAL CONTRACTOR TO VERIFY EXACT LOCATIONS, IDENTIFY, LABEL, AND
PROTECT ALL EXISTING MECHANICAL & ELECTRICAL SERVICES THAT ARE TO
REMAIN WHICH MIGHT BE AFFECTED DURING DEMOLITION.
O. REMOVE EXISTING FLOOR FINISH MATERIAL FROM ALL AREAS SCHEDULED TO
RECEIVE NEW FLOOR FINISHES. REMOVE ALL REMAINING FLOORING ADHESIVE
FROM CONCRETE FLOOR AS REQUIRED FOR COMPATIBILITY AND INSTALLATION OF
NEW FINISHES AND PREPARE CONCRETE FOR NEW FINISHES, INCLUDING FLOOR
LEVELING AND CRACK PATCHING.
P. IF CONFLICTS EXIST IN ANY PORTION OF THE DOCUMENTS - THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT PRIOR TO CONSTRUCTION.
Q. CONTRACTOR SHALL NOT SCALE DRAWINGS. DO NOT USED SCALE DIMENSIONS.
USE WRITTEN DIMENSIONS OR, WHERE NO DIMENSION IS PROVIDED, CONSULT THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH WORK.
R. CONTRACTOR AND SUNCONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS, CONSTRUCTION MATERIAL, SYSTEMS AND DIMENSIONS PRIOR TO
SUBMITTING BIDS AND BEGINNING CONSTRUCTION OR ORDERING ANY MATERIALS.
ANY DISCREPANCIES BETWEEN THE PLANS AND FIELD CONDITIONS SHALL
IMMEDIATELY BE BROUGHTTO THE ATTENTIONOF THE ARCHITECT PRIOR TO
BIDDING AND PROCEEDING WITH THE WORK. MINOR DIFFERENCES IN DIMENSIONS
AND CONFIGURATIONS BETWEEN THESE DOCUMENTS AND THE ACTUAL FIELD
CONDITIONS, AS DEFINED BY THE ARCHITECT, SHALL NOT BE CAUSE FOR CHANGE
ORDERS OR ADDITIONAL COMPENSATION. NO ALLOWANCE WILL BE MADE FOR
ADDITIONAL DEMOLITION WHICH COULD HAVE BEEN DETERMINED BY FIELD
INSOECTION PRIOR TO BID.
1/8" = 1'-0"1 DEMOLITION PLAN N
# KEYNOTES
1 REMOVE EXISTING MILLWORK CABINETRY AND MILLWORK WORK STATION
FURNITURE - DISCARD
2 COPY MACHINE, PROTECT IN PLACE. RELOCATE PER PLAN
3 DEMOLISH EXISTING DOOR & FRAME - SALVAGE TO OWNER
4 DEMOLISH EXISTING SAWTOOTH/ZIG-ZAG WINDOWS AND FRAMING ABOVE
5 DEMOLISH EXISTING ENTRY DOORS, GLAZING AND WALL FRAMING ABOVE
INCLUDING ROOF PARAPET
6 DEMOLISH EXISTING RESTROOM FIXTURES, TOILET PARTITIONS, TOILET
ACCESSORIES, COUNTERS AND CERAMIC TILE - PREPARE SURFACES FOR NEW
FINISHES PER FLOOR PLAN. SALVAGE PLUMBING FIXTURES AND ACCESSORIES TO
OWNER
7 DEMOLISH PORTION OF EXISTING PARTITION WALL
8 DEMOLISH EXISTING MILLWORK CABINETRY
9 DEMOLISH PORTION OF EXISTING MASONRY BEARING WALL - PATCH/REPAIR WITH
CONCRETE SLAB INFILL TO MATCH ADJACENT CONCRETE FLOOR- SEE STRUCTURAL
FOR REINFORCING
10 EXISTING TUBE STEEL COLUMN TO REMAIN
11 SERVER RACK EQUIPMENT, O.F.O.I.
12 DEMOLISH DRINKING FOUNTAIN, SALVAGE TO OWNER
13 DEMOLISH SINK
14 DEMOLISH EXISTING CHAIN LINK FENCE
15 DEMOLISH EXTERIOR SIDEWALK, OR PORTIONS OF SIDEWALK, LEAVE BASE COURSE
FOR REUSE. SEE ALSO D1.0 DEMO SITE PLAN AND A1.0 SITE PLAN
16 EXISTING CONCRETE SLAB TO REMAIN
17 EXISTING STORAGE SHED TO REMAIN
18 EXISTING REFRIGERATOR TO REMAIN, PROTECT IN PLACE
19 EXISTING ROOF ACCESS LADDER TO REMAIN
20 MAINTAIN WALL MOUNTED WATER HEATER SUPPORT. SALVAGE OTHER FIXED
CUSTODIAL ITEMS FOR REUSE.
21 DEMOLISH EXISTING CONCRETE COLUMNS (TYP OF 6), FOOTINGS, AND OVERHEAD
STEEL SHADE STRUCTURE IN THEIR ENTIRETY
22 EXISTING FIRE RISER - REPLACE 'STANDPIPE' SIGNAGE TO READ: 'FIRE RISER'
23 EXISTING ELECTRICAL PANEL TO REMAIN
24 EXISTING FIRE DEPARTMENT CONNECTION TO REMAIN
25 SAW CUT AND REMOVE PORTION OF EXISTING CONCRETE (SHOWN GRAY) FLOOR
FOR PLUMBING ACCESS, PIPING FOR RESTROOM FIXTURES TO BE EXCAVATED,
DEMOLISHED AND REPLACED PER PLUMBING - PATCH/REPAIR WITH CONCRETE SLAB
INFILL TO MATCH ADJACENT CONCRETE FLOOR
26 REMOVE EXISTING WATER HEATER, SALVAGE TO OWNER
27 ELECTRICAL SERVICE ENTRANCE - REFER TO ELECTRICAL SHEETS FOR SERVICE
UPGRADE INFORMATION
28 EXISTING FLAG POLE TO REMAIN - ELEVATION OF GRADE AT FLAGPOLE TO REMAIN
29 EXISTING ROOF LINE ABOVE TO REMAIN (SHOWN DASHED)
30 PREP FACE OF SPLIT FACE CMU FOR STOREFRONT INSTALLATION - SEE DETAILS
1,2,3, & 4/A8.3
31 EXISTING DOOR AND FRAME TO REMAIN, REPAINT FRAME AND PROVIDE NEW
HARDWARE PER DOOR SCHEDULE
32 LEAVE EXISTING DOOR FRAME IN PLACE - REPLACE DOOR PER DOOR/HARDWARE
ACCORDING TO DOOR SCHEDULE A8.0
33 DEMOLISH PORTION OF EXISTING MASONRY WALL UP TO 7'-4" A.F.F.
34 EXISTING PAVING/STRIPING TO BE REMOVED - REPLACE PER PLAN
35 DEMOLISH EXISTING HANDRAIL - REPLACE PER DETAIL 3/A1.1
36 REMOVE EXISTING BIKE RACK, DEMOLISH EXISTING METAL POLE
37 DEMOLISH EXISTING PLUMBING WALL
38 SAWCUT AND REMOVE PORTION OF EXISTING CONCRETE FLOOR SLAB - DRILL INTO
EXISTING SLAB AND PROVIDE REBAR REINFORCING PER STRUCTURAL DRAWINGS
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications
A
3 3
B
B
4 4
C
C
D
D
E
E
5 5
1 1
2 2
1 1
TYP. 7
NOTE: ALL ITEMS ARE EXISTING UNLESS NOTED OTHERWISE
SEE D2.0 DEMOLITION FLOOR PLAN AND D2.1 DEMO ROOF PLAN FOR ADDITIONAL NOTES
7 SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
7:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
D
EM
O
LI
TI
O
N R
C P
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
D2.2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1/8" = 1'-0"1 DEMOLITION REFLECTED CEILING PLAN
N
# KEYNOTES
1 DEMOLISH EXISTING ACT CEILING, LIGHTING AND HVAC DEVICES THIS AREA
2 DEMOLISH EXISTING METAL ROOFING AND STRUCTURE IN ITS ENTIRETY
3 EXISTING CEILING THIS AREA TO REMAIN, REMOVE LIGHTING AND HVAC
DEVICES, AND ANY ACCESS PANELS THIS AREA. PATCH AND REPAIR
DRYWALL AS REQUIRED.
4 DEMOLISH GWB CEILING, LIGHTING AND HVAC DEVICES, AND ANY ACCESS
PANELS THIS AREA
5 DEMOLISH EXTERIOR STUCCO CEILING AND LIGHTING THIS AREA
6 REMOVE EXISTING LIGHTING
8 EXISTING STORAGE SHED TO REMAIN
9 EXISTING FLAG POLE TO REMAIN - ELEVATION OF GRADE AT FLAGPOLE TO
REMAIN
10 DEMOLISH EXISTING GWB SOFFIT
GENERAL DEMOLITION NOTES
SEE 'GENERAL DEMOLITION NOTES' ON SHEET D2.0
DEMOLISHED DOOR BELOW - INFILL EXTERIOR WALL AT DEMOLISHED DOOR
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications
5/8" GWB, TEXTURE TO MATCH EXISTING
EXISTING INSULATION
TO REMAIN
PROVIDE CONT. 2" MIN. WIDE 20 GA. (0.032")
ALUM STRIP CENTERED OVER WALL JOINT -
ATTACH WITH #8 SCREWS TOP AND
BOTTOM @ 16" O.C.
ATTACH TRACK TO
EXISTING TOP TRACK
EXISTING STEEL STUDS AND
TRACK TO REMAIN
6" M
IN
LOBBY SIDERESTROOM SIDE
ACT CEILING
EX
IS
TI
N
G
D R
YW
AL
L
" M
IN
D R
YW
AL
L
EX
TE
N
SI
O
N
PROVIDE 2X WOOD
BLOCKING @ DRYWALL JOINT
3-1/2" S.A.F.B. - EXTEND 6"
PAST ACT CEILING - SECURE
INTO PLACE WITH WIRE TIES
EXISTING ROOF JOIST TO REMAIN
PROVIDE SLOTTED TRACK TO
BOTTOM OF EXISTING ROOF
JOIST - WHERE PARALLEL TO
JOIST, PROVIDE 6" WIDE 16 GA
PLATE OR STUD @ 4'-0" O.C.
METAL STUDS @ 16" O.C.,
SIZE TO MATCH EXISTING -
EXTENT TO BOTTOM OF
EXISTING STRUCTURE
4330 N CAMPBELL AVE, STE #268
TUCSON, ARIZONA 85718
520.408.1044 | SHIVE-HATTERY.COM
DATE
DRAWN BY
APPROVED BY
SCALE
FIELD BOOK
REVISION
Au to de sk
R ev it
04-14-2025
PROJECT
NUMBER
4/
/2
3:
:4
PM
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
A M
O D
EL
_M ar cu s_ At ts on
.rv t
1 1/2" = 1'-0"
MA
JDM
ADOT TUCSON NORTH MVD REMODEL
7330 N SHANNON RD
TUCSON, AZ 85741
2172304350
SK-08
SHIVE-HATTERY
1 1/2" = 1'-0"1 WALL EXTENSION @ PUBLIC RESTROOM
405 SOUTH CLARK DR
TEMPE, AZ 85288
480-951-4169
ROC#339524 KB-1 Date 4/25/2025
Code 950-A
To: From:
Att: Phone:
Project Name:
Project Number
Prepared By:
In Response to: x
RQST # Work Date Tracking # Ticket #
1 TBD Quote 950-A
Per Diem
Design
Drywall
1st SUB
(Trade)
2nd SUB
(Trade)
$525 688.00$ -$ -$
Base cost
+ Burden
Design
Drywall
1st SUB
(Trade)
2nd SUB
(Trade)
Labor $65.00 1,560.00$ -$ -$
OT Labor $97.50 -$ -$ -$
Total:
ADOT Tucson North MVD Building
DDW #25010, SDC #2025-016
Conner Cameron
Hang/2200 Tape/2300
$400.00 $75.00
Description
Extending the existing perimeter walls of bathrooms 106 & 107 (42LF) up to the bottom of the existing roof joists per the RFI #013 detail provided by the architect.
Material:
(attached sheets if necessary) $213.00
Frame/2100
# of Hours # of Hours
Frame/100 Hang/200
16 3
# of Hours
3,203.00$
Tape/300
2,773.00$
277.30$
152.52$
CHANGE ORDER REQUEST
SD Crane Design Drywall West
Tempe, AZ 85281
No Change (Initials):
1215 Rio Salado Pkwy #109
Credit:
Kyle Burns
405 S. Clark Dr.
Tempe, AZ 85288
(480) 951-4169
Owner Initiated Change: # Field Initiated Change:
Additional Cost:
Totals:
2nd-2nd Tier Sub
10% Overhead
5% Profit
5% Profit
0% Material Tax
10% Overhead
Labor & Material
10% Overhead
1st-2nd Tier Sub
5% Profit
7330 N Shannon Rd
RFI #21: R.F.I. #021 Ceiling
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Apr 17, 2025 Due Date Apr 22, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson (Shive Hattery), Melissa de la Gardelle (Shive Hattery), Andrew May (Arizona Department of
Question Question from Kyle Burns SD Crane Builders Inc. on Thursday, Apr 17, 2025 at 05:14 PM MST
For your review please see attached R.F.I. #021 Ceiling. Please advise.
R.F.I. #021 Ceiling.pdf
All Replies Response from Melissa de la Gardelle Shive Hattery on Tuesday, May 6, 2025 at 10:28 AM MST See Attached.
R.F.I. #021 Ceiling_S-H Response.pdf
Page 1 of 1 Printed On: May 7, 2025 04:00 PM MST
RFI #021
Subject: Ceiling
Project Name: ADOT Tucson North MVD Building
Spec Sec: Addendum No: 021
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203
Date: 4/17/25
Project Number: 23-361 Project Manager: Kyle Burns Superintendent: Jeff Murray
Submitted To: Joel Mesik Attn: Joel Mesik
Reference:
Information Request:
This RFI is in regards to the Ceiling between the lobby soffit at the CSR work stations and the offices, IT room, and the Employee Restrooms (at the cable tray location). There are two details (13 A9.0 and 12 A9.0) on the reflected ceiling plan that show ACT at both areas but no ceiling height shown or type of material to use in this area ( as the drawings appear to show the structure above). Can you please provide a ceiling height and material to be used in this location.
Please see drawing attached below and cloud area for reference
A2.2
Replying Company:
Name:
S.D. Crane Builders, Inc.
1901 E. University Drive Suite # 330
Mesa, Arizona 85203 Telephone (480) 832-1777 Fax (480) 832-1798 Commercial Roc#175959 Res.#ROC192686 scrane@sdcranebuilders.com
Cost Impact: Yes Schedule Impact:
Answer Required by: WSM Architects Request by: SD Crane Distribution: SD Crane
Response
Shive-Hattery
Ceiling in indicated area shall be installed at a height of 9'-0" A.F.F. as shown on sections 1 & 2 on sheet A4.1. The ceiling material and layout is shown on revised sheet A2.2 attached.
04/28/2025
DOWNLIGHT LED
RECESSED 2x4 LED
WALL PACK LIGHT
2' X 2' ACT DROP CEILING
2' X 4' ACT DROP CEILING
GWB CEILING
LINEAR SUSPENDED
FIXTURE
EXIT SIGN
WALL TO EXTEND 6" ABOVE
ADJACENT CEILING
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXHAUST AIR GRILLE
WALL-MOUNTED DUCTLESS
UNIT
RCP LEGEND
GYPSUM BOARD CONTROL
JOINT
CEILING TYPE
CEILING HEIGHT
1t
SURFACE MOUNTED LIGHT
FIXTURE
INTERIOR CEILING MOUNTED
CCTV DOME - BY OWNER
EXTERIOR WALL MOUNTED
CCTV - BY OWNER
INTERIOR WALL MOUNTED
CCTV DOME - BY OWNER
MD MOTION DETECTOR - BY
OWNER
G.C.J.
ROOF ACCESS HATCH
(EXISTING)RA
SURACE MOUNTED LINEAR
LED
WALL MOUNTED LINEAR LED
18" X 18" ACCESS PANEL
SOFFIT PANELS - SMOOTH
SOFFIT PANELS - VENTED
A
A
3 3
B
B
4 4
A4.1
A4.0
C
C
D
D
E
E
5 5
1 1
2 2
ACT
9'-11"
A4.1
A4.0
OPEN TO
ABOVE -
SEE
DETAIL
2/A2.2
5' -2
/2
ETR
7'-0"
ETR
7'-0"
ETR
14'-0"
ETR
7'-0"
ETR
7'-0"
ETR
7'-0"
GWB
8'-4"
GWB
8'-4"
ACT
8'-6"
GWB
8'-0"
GWB
8'-4"
GWB
8'-4"
ACT
8'-6"
ACT
8'-4"
ACT
8'-6"
GWB
8'-0"
GWB
8'-0"
ACT
8'-4"
GWB
8'-6"
ACT
8'-0"
DIGITAL DISPLAY INDICATORS AT EACH WORKSTATION
(ALIGN WITH LIGHTING)
WIREMOLD POWER POLES TO SERVE EVERY 1-2 WORKSTATIONS
REPLACEMENT METAL ROOF
CANOPY
GWB
11'-8"
A9.0
A9.0
2'-2"
2' -2
2'-2"
GWB
8'-4"
14'-1"
'-0
ETR
7'-0"
5"
C L
EQ
EQ
CL3'-1 1/2"
CLCL
TYP.
5'-9 1/2"
SURFACE MOUNTED EXTERIOR
LED DOWNLIGHT, TYP OF 4
G .C
.J
G .C
.J
G .C
.J
G .C
.J
A8.3
A8.3
A8.3
A8.23
A8.2
A8.2
A8.3
A8.3
SIM.
A8.2
GWB
8'-0"
A9.0
1' -9
ETR
A5.0
A5.0
CCTV MOUNTED BELOW CANOPY
ROOF
MD
MD
MD
MD
MD
15'-5"
NONE
ACT
8'-6"
ACT
8'-6"
A7.0
A7.0
RA
A2.1
CABLE TRAY ABOVE CEILING
SHOWN DASHED
ACT
8'-6"
2' -2
1'-4"
2' -6
@ STOREFRONT
A2.1
6@ MTL
AWNING
A2.2
A2.2
9' -2
/2
B
B
4 4
A4.1
A4.0
21'-8"
'-2
/2
PREFINISHED METAL
SOFFIT PANELS,
CONCEALED FASTENERS
GWB ATTACHED TO
UNDERSIDE OF ROOF
JOISTS
ALUMINUM STOREFRONT
CLERESTORY WINDOWS
GWB
VARIES
PREFINISHED METAL
GUTTER & DOWNSPOUT
A7.0
A7.0
A7.0
2' -0
A7.0
2' -0
A8.2
TYP. @
JAMBS
A8.2
A8.2
CLCL
4'-10" 7'-0" 4'-10"
G.C.J.
ALIGN LIGHTS TO
CENTER OF MULLIONS,
TYP
SIM. - NO GWB
IN CHASE
SOFFIT VENT CALCULATION
SOFFIT AREA: 183.94 SF
REQUIRED: 1.23 SF
PROVIDED: 59.10 SF
C L C L
C O
LU
M
N S
7' -6
" T
YP
EQUALLY SPACED
17'-2" - [3] COLUMNS
3' -9
/2
3"
FACE OF WALL
1'-9" DIM TO
1'-1"
CL17'-8"
2'-0" DIM TO FACE OF WALL
SAME CONDITION @
NORTH BOX BEAM
B
A4.1
A4.0
JUSTIFY CENTER OF WALL
PANEL TO CENTER OF WALL
15'-5"
EXISTING
GLULAM BEAMS
(HIGH AND
LOW - TYP. 6)
TO REMAIN
METAL AWNING BELOW -
SEE DETAILS A2.1
EXISTING STEEL COLUMN TO
REMAIN
EXISTING
MASONRY
PARAPET BELOW
P1
EXISTING STEEL
COLUMN/GLULAM BEAM
ASSEMBLY TO REMAIN
EXISTING STEEL
COLUMN/GLULAM
BEAM ASSEMBLY TO
REMAIN
O
VE
R [E
] P
AR
AP
ET
'-7
FU
R
R O
U T
OVER [E] PARAPET
18'-4" +/- FURROUT
WALL MOUNTED
SCONCE LIGHT
FIXTURE
(UP/DOWN LIGHTS)
@ 11'-0"
NOTE: NEW WALLS
SHOWN GRAY FOR
CLARITY
EXISTING STEEL
COLUMN TO REMAIN
EXISTING STEEL
COLUMN TO REMAIN
JUSTIFY CENTER OF WALL
PANEL TO CENTER OF WALL
EQ.
CL
DOWNSPOUT AND
PRECAST CONC
SPLASH BLOCK @
ROOF
EQ.
E2
E2
E3
E3
SEE DETAIL 2/A2.2 FOR
CLERESTORY RCP
SEAL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A
B C D E F
A B C D E F Autodesk Revit 2022
N C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N , A
R
IZ
O N
A
0.
8.
W
SM
AR
C H
.C O
M
4/ 9/
:0
6:
A M
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
EN
TR
AL
_M ar cu s_ At ts on
.rv t
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
Ap pr ov er
AM
L, M A
D
EC
EM
BE
R
, 2
A2.2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1/8" = 1'-0"1 REFLECTED CEILING PLAN
GENERAL RCP NOTES
A. ALL INTERIOR PARTITION WALLS TO EXTEND FULL HEIGHT TO DECK ABOVE, U.N.O.
B. ALL EXPOSED BEAMS, DUCTWORK, CONDUIT, PIPING, AND METAL DECK SHALL BE
PAINTED.
C. PROVIDE ACCESS PANELS IN GYPSUM BOARD CEILINGS AT ALL LOCATIONS OF
MECHANICAL UNITS, PLUMBING VALVES, AND ELECTRICAL JUNCTION BOXES AND
DISCONNECT SWITCHES. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS
FOR EXACT LOCATIONS AND QUANTITIES. PAINT TO MATCH CEILING.
D. IF ANY CONFLICTS IWTH SPECIFIED CEILING HEIGHTS ARISE FROM INSTALLED
LOCATIONS OF MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS OR IF CEILING
HEIGHTS ARE NOT SPECIFIED, CONTACT ARCHITECT IMMEDIATELY FOR
RESOLUTION, PRIOR TO COMMENCING ANY WORK.
E. PROVIDE SEISMIC BRACING FOR SUSPENDED CEILING SYSTEM.
F. ALL WALLS IN ROOMS WITH EXPOSED STRUCTURE SHALL BE FULL HEIGHT AND
SEALED TO DECK ABOVE.
G. PROVIDE CONTROL JOINTS IN GWB PARTITIONS EXCEEDING 30'-0" IN LENGTH
N
1/8" = 1'-0"2 REFLECTED CEILING PLAN - HIGH ROOF AT ENTRY N
1/8" = 1'-0"3 REFLECTED CEILING PLAN - HIGH ROOF AT ENTRY N
UP TO 18'-0" A.F.F.ABOVE 18'-0" A.F.F.
SEAL
JOEL D.
MESIK
23507RE
G ISTERED ARCHITECT
C
ERT I F I CA T E
NO
Da t e S i g n e d
A R
I Z O N A U . S . A
3/28/2024
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards no relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:_________________________04/19/2024
fmyers
Approved Plans & Specifications
DOWNLIGHT LED
RECESSED 2x4 LED
WALL PACK LIGHT
2' X 2' ACT DROP CEILING
2' X 4' ACT DROP CEILING
GWB CEILING
LINEAR SUSPENDED
FIXTURE
EXIT SIGN
WALL TO EXTEND 6" ABOVE
ADJACENT CEILING
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXHAUST AIR GRILLE
WALL-MOUNTED DUCTLESS
UNIT
RCP LEGEND
GYPSUM BOARD CONTROL
JOINT
CEILING TYPE
CEILING HEIGHT
1t
SURFACE MOUNTED LIGHT
FIXTURE
INTERIOR CEILING MOUNTED
CCTV DOME - BY OWNER
EXTERIOR WALL MOUNTED
CCTV - BY OWNER
INTERIOR WALL MOUNTED
CCTV DOME - BY OWNER
MD MOTION DETECTOR - BY
OWNER
G.C.J.
ROOF ACCESS HATCH
(EXISTING)RA
SURACE MOUNTED LINEAR
LED
WALL MOUNTED LINEAR LED
18" X 18" ACCESS PANEL
SOFFIT PANELS - SMOOTH
SOFFIT PANELS - VENTED
A
A
3 3
B
B
4 4
A4.1
A4.0
C
C
D
D
E
E
5 5
1 1
2 2
ACT
9'-11"
A4.1
A4.0
OPEN TO
ABOVE -
SEE
DETAIL
2/A2.2
5' -2
/2
GWB
8'-0"
GWB
8'-0"
GWB
14'-0"
GWB
7'-0"
GWB
7'-0"
GWB
7'-0"
GWB
8'-4"
GWB
8'-4"
ACT
8'-6"
GWB
8'-0"
GWB
8'-4"
GWB
8'-4"
ACT
8'-4"
ACT
8'-4"
ACT
8'-4"
GWB
8'-0"
GWB
8'-0"
ACT
8'-4"
GWB
8'-6"
ACT
9'-0"
ACT
8'-0"
DIGITAL DISPLAY INDICATORS AT EACH WORKSTATION
(ALIGN WITH LIGHTING)
WIREMOLD POWER POLES TO SERVE EVERY 1-2 WORKSTATIONS
REPLACEMENT METAL ROOF
CANOPY
GWB
11'-8"
A9.0
A9.0
2'-2"
2' -2
2'-2"
GWB
8'-4"
14'-1"
'-0
GWB
7'-0"
5"
C L
EQ
EQ
CL
3'-1 1/2"
CLCL TYP.
5'-9 1/2"
SURFACE MOUNTED EXTERIOR
LED DOWNLIGHT, TYP OF 4
G .C
.J
G .C
.J
G .C
.J
G .C
.J
A8.3
A8.3
A8.3
A8.23
A8.2
A8.2
A8.3
A8.3
SIM.
A8.2
GWB
8'-0"
A9.0
1' -9
ETR
A5.0
A5.0
CCTV MOUNTED BELOW CANOPY
ROOF
MD
MD
MD
MD
MD
15'-5"
NONE
ACT
8'-4"
ACT
8'-4"
A7.0
A7.0
RA
A2.1
CABLE TRAY ABOVE CEILING
SHOWN DASHED
ACT
8'-6"
2' -2
1'-4"
2' -6
@ STOREFRONT
A2.1
6@ MTL
AWNING
A2.2
A2.2
9' -2
/2
[E]7'-0"
[E]7'-0"
[E]7'-0"
5/8" GWB, PTD. ON 6" METAL
JOIST (30-MIL) @ 16" O.C.,
JOIST TO SPAN N/S 5
B
B
4 4
A4.1
A4.0
21'-8"
'-2
/2
PREFINISHED METAL
SOFFIT PANELS,
CONCEALED FASTENERS
GWB ATTACHED TO
UNDERSIDE OF ROOF
JOISTS
ALUMINUM STOREFRONT
CLERESTORY WINDOWS
GWB
VARIES
PREFINISHED METAL
GUTTER & DOWNSPOUT
A7.0
A7.0
A7.0
2' -0
A7.0
2' -0
A8.2
TYP. @
JAMBS
A8.2
A8.2
CLCL
4'-10" 7'-0" 4'-10"
G.C.J.
ALIGN LIGHTS TO
CENTER OF MULLIONS,
TYP
SIM. - NO GWB
IN CHASE
SOFFIT VENT CALCULATION
SOFFIT AREA: 183.94 SF
REQUIRED: 1.23 SF
PROVIDED: 59.10 SF
C L C L
C O
LU
M
N S
7' -6
" T
YP
EQUALLY SPACED
17'-2" - [3] COLUMNS
3' -9
/2
3"
FACE OF WALL
1'-9" DIM TO
1'-1"
CL17'-8"
2'-0" DIM TO FACE OF WALL
SAME CONDITION @
NORTH BOX BEAM
B
A4.1
A4.0
JUSTIFY CENTER OF WALL
PANEL TO CENTER OF WALL
15'-5"
EXISTING
GLULAM BEAMS
(HIGH AND
LOW - TYP. 6)
TO REMAIN
METAL AWNING BELOW -
SEE DETAILS A2.1
EXISTING STEEL COLUMN TO
REMAIN
EXISTING
MASONRY
PARAPET BELOW
P1
EXISTING STEEL
COLUMN/GLULAM BEAM
ASSEMBLY TO REMAIN
EXISTING STEEL
COLUMN/GLULAM
BEAM ASSEMBLY TO
REMAIN
O
VE
R [E
] P
AR
AP
ET
'-7
FU
R
R O
U T
OVER [E] PARAPET
18'-4" +/- FURROUT
WALL MOUNTED
SCONCE LIGHT
FIXTURE
(UP/DOWN LIGHTS)
@ 11'-0"
NOTE: NEW WALLS
SHOWN GRAY FOR
CLARITY
EXISTING STEEL
COLUMN TO REMAIN
EXISTING STEEL
COLUMN TO REMAIN
JUSTIFY CENTER OF WALL
PANEL TO CENTER OF WALL
EQ.
CL
DOWNSPOUT AND
PRECAST CONC
SPLASH BLOCK @
ROOF
EQ.
E2
E2
E3
E3
SEE DETAIL 2/A2.2 FOR
CLERESTORY RCP
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
N
C
AM
PB
EL
L
AV
E, S
TE
TU
C
SO
N
, A R
IZ
O
N A
0.
8.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A
B C D E F
A B C D E F Autodesk Revit 2019
4/
/2
4:
:4
PM
C :\S hi ve
\R ev it_ Lo ca l_
\2
0_
A2 2_
AD
O
T Sh an no n R d M
VD
_C
A M
O D
EL
_M ar cu s_ At ts on
.rv t
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
JD
M
AM
L, M A
D
EC
EM
BE
R
A2.2
AD
O
T
TU
C
SO
N N
O R
TH
M
VD
R
EM
O
D
EL
N S
H
AN
N O
N R
D
TU
C
SO
N , A
Z
1/8" = 1'-0"1 REFLECTED CEILING PLAN
GENERAL RCP NOTES
A. ALL INTERIOR PARTITION WALLS TO EXTEND FULL HEIGHT TO DECK ABOVE, U.N.O.
B. ALL EXPOSED BEAMS, DUCTWORK, CONDUIT, PIPING, AND METAL DECK SHALL BE
PAINTED.
C. PROVIDE ACCESS PANELS IN GYPSUM BOARD CEILINGS AT ALL LOCATIONS OF
MECHANICAL UNITS, PLUMBING VALVES, AND ELECTRICAL JUNCTION BOXES AND
DISCONNECT SWITCHES. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS
FOR EXACT LOCATIONS AND QUANTITIES. PAINT TO MATCH CEILING.
D. IF ANY CONFLICTS IWTH SPECIFIED CEILING HEIGHTS ARISE FROM INSTALLED
LOCATIONS OF MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS OR IF CEILING
HEIGHTS ARE NOT SPECIFIED, CONTACT ARCHITECT IMMEDIATELY FOR
RESOLUTION, PRIOR TO COMMENCING ANY WORK.
E. PROVIDE SEISMIC BRACING FOR SUSPENDED CEILING SYSTEM.
F. ALL WALLS IN ROOMS WITH EXPOSED STRUCTURE SHALL BE FULL HEIGHT AND
SEALED TO DECK ABOVE.
G. PROVIDE CONTROL JOINTS IN GWB PARTITIONS EXCEEDING 30'-0" IN LENGTH
N
1/8" = 1'-0"2 REFLECTED CEILING PLAN - HIGH ROOF AT ENTRY N
1/8" = 1'-0"3 REFLECTED CEILING PLAN - HIGH ROOF AT ENTRY N
UP TO 18'-0" A.F.F.ABOVE 18'-0" A.F.F.
-1 6-
AS
I #
-2
8-
R
FI
ESTIMATE
RG Interiors LLC
PO Box 11551
Tucson, AZ 85734
Admin@rgaz.com
+1 (520) 741-0887
Bill to
SD Crane Builders Inc
1215 West Salado Pkwy Suite #109
Tempe, Az 85281
Estimate details
Estimate no.: 3719
Estimate date: 05/15/2025
Expiration date: 06/15/2025
Project Manager: Andy Plett 520-609-7275
Job Name: ADOT Tucson N MVD
Renovation
Job Address: 7330 N Shannon Rd 85741
# Product or service Description Amount
1. Acoustic Ceiling We propose to furnish and install the acoustic ceiling to match the rest of the building in the hallway per RFI #021.
Includes sales tax of $750.00
$12,430.00
Note to customer
Excludes: dumpster
Total $12,430.00
Expiry date 06/15/2025
Accepted date Accepted by
7330 N Shannon Rd
RFI #22: R.F.I. #22 High Glulam Beams
1215 W Rio Salado Pkwy #109 Tempe, Arizona 85281
Date Initiated Apr 18, 2025 Due Date Apr 23, 2025
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings
Received From Kyle Burns (SD Crane Builders Inc.)
Copies To Tom Adamcik (SD Crane Builders Inc.), Marcus Attson…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .