This document is a Contract Amendment Summary from the Arizona Department of Transportation (ADOT) for HDR Engineering Inc., specifically for P3 Program Management Services funded through federal channels. The amendment is number 12 and involves adding multiple key personnel to the existing contract, including planners, senior planners, and administrative support staff. The document includes detailed resumes for each of the proposed new team members, demonstrating their professional backgrounds and relevant experience in transportation, engineering, GIS, cultural resources, and project management.
The contract appears to cover a range of professional services including program management, environmental planning, cultural resource assessment, traffic engineering, geotechnical analysis, and GIS support. The proposed team members have extensive experience working on transportation-related projects across Arizona and other southwestern states, with expertise in areas such as renewable energy infrastructure, highway and interchange design, historic preservation, and geospatial data management. The proposed billing rates for these professionals range from $100 to $270 per hour, depending on their role and level of seniority. The contract seems to be a comprehensive professional services agreement that supports ADOT's infrastructure and transportation planning initiatives.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: HDR Engineering Inc AMENDMENT NO.: 12 DESCRIPTION: P3 Program Management Services – Federal Funded
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. The following Key Personnel are hereby added:
HDR Engineering Inc:
Luke Wesnitzer, Senior Planner Todd Hogan, Planner Miranda Sundblom, Planner Mark Schneider, Planner Misty O’Connor, Administrative Support Jelena Dordevic, Administrative Support Lorena Piedrahita, Senior Program Manager Sterling Crandell, Senior Planner Scott Solliday, Planner Elizabeth Koch, Senior Planner Aditi Parihar, Planner
2. All other terms, conditions and provisions of this contract remain unchanged.
hdrinc.com
20 E Thomas Road, Suite 2500, Phoenix, Arizona, 85012-3118 T 602.522.7700 F 602.522.7707
SENT VIA EMAIL: bbrenden@azdot.gov
March 26, 2025
Arizona Department of Transportation Attn: Bambi Brenden, Senior Procurement Specialist 1655 W. Jackson Street, MD 100P Phoenix, AZ 85007
RE: ADOT P3 Program Management Services Contract No. CTR064771 (State Funded) and CTR064774 (Federal Funded)
HDR requests ADOT approval for additional staff on these contracts.
Firm Staff Contract Classification Proposed Rate ($)
Project Role/Responsibilities
HDR Luke Wesnitzer Senior Planner 195 Renewables Project
Manager
HDR Todd Hogan Planner 100 Cultural Resource
Specialist
HDR Miranda Sundblom Planner 155 Traffic Engineer
HDR Mark Schneider Planner 125 Environmental Planner
HDR Misty O’Connor* Administrative Support 145 Quality Assurance
HDR Jelena Dordevic* Administrative Support 120 Project Accountant
HDR Lorena Piedrahita Senior Program
Manager 270 Task Manager
HDR Sterling Crandell Senior Planner 210 Geotechnical
HDR Scott Solliday Planner 140 Cultural Resource
Specialist
HDR
Elizabeth (Erin) Koch
Senior Planner 170 GIS/Data Solutions
HDR Aditi Parihar Planner 110 Transpo Planner
*Note – resumes not provided for administrative support personnel
Resumes are attached for each individual. Please feel free to contact Ben Spargo at 602-770-6620 or ben.spargo@hdrinc.com if you have any questions.
Sincerely, HDR Engineering, Inc.
Aaron Meilleur, PE Senior Vice President/Area Manager
Attachments: Resumes
Lucas Wesnitzer
Renewables Project Manager
Luke has 14 years of experience in land development. He is a project manager who provides consulting and project management for renewable energy projects nationwide, with a focus in the Southwest and Northwest areas. Luke works with HDR Power Generation and Renewable Practice Leads to provide OE support across service lines and client asset types, including solar PV OE support, battery energy storage OE support, data center planning, and permitting support.
EDUCATION
Northern Arizona University, BS Civil Engineering, 2011
INDUSTRY TENURE
14 years
CERTIFICATIONS
Text
OFFICE LOCATION
Phoenix, AZ
RELEVANT EXPERIENCE
Arizona Public Service, Agave BESS OE | Maricopa, Arizona, United States Project Manager. Arizona Public Service Co. (APS) reached out to HDR for Owner's Engineering (OE) field support to observe and document the contractor activities associated with the upcoming construction of a Battery Energy Storage System (BESS) project at the Agave Solar Plant in Buckeye, Arizona. The project involves the new BESS, which is a 400 MW / 1600 MWh system, as well as a point of interconnect, isolation, and gen-tie. Luke oversaw the project delivery of the phase 2 & 3 design, managed financials, maintained schedules, and facilitated client communication.
esVolta, LP - Aliso Viejo, CA, Cactus Wren BESS_AZ | Pinal County, Arizona, United States Project Manager. The Cactus Wren Battery Energy Storage System (BESS) Project is an 800-megawatt (MW)/3200-megawatt hour (MWh) standalone, outdoor, container-based battery storage project. The project will be split into two (2) phases, each holding a capacity of 400 megawatts (MW)/1600-megawatt hour (MWh). The site for the proposed project is located within an approx. 40-acre plot alongside White and Parker Road in Maricopa, Arizona. The Project will include a new Collector Substation and 230 kV gen-tie line and will tie in at the Point of Interconnection at the Santa Rosa Substation. Luke led the project design, managed financials, maintained schedules, and facilitated client communication.
esVolta, LP - Aliso Viejo, CA, Pequin Crossing Design | United States Project Manager. This opportunity is to provide support on the Pequin BESS site. The esVolta development team tasked the HDR team to help understanding the pipeline crossing requirements and develop a crossing plan accordingly. Luke oversaw the project design delivery, and maintained schedules and budgets.
NV Energy, Sierra Solar & BESS OE | Churchill, Nevada, United States HDR PM Delegate or Deputy PM. HDR is supporting NV Energy’s Sierra Solar project with owner’s engineer services for a 500 MW solar and 400 MW/1600 MWh battery energy storage system (BESS). HDR, as the owner’s
Lucas Wesnitzer representative, provided permitting support including county and federal/ BLM permitting support; project schedule support; cost estimates; BESS technical specification review; EPC bidder evaluation; GSU technical support for long-lead time order support; and a 10% BESS design review, including electrical, civil, structural, and substation discipline support. Luke facilitated client and internal team collaboration and maintained schedules.
Pine Gate Renewables, MKT_PGR Foley | Baldwin, Alabama, United States Project Manager. HDR provided typical OE review services with 7-day turnarounds for 30/60/90 IFC design packages for all scopes as well as RFI supports for the construction duration. The team provided experienced project management and project controls to support the execution of each task throughout the development, design, and construction of the project. This included communications internal to the HDR team as well as project-related communications with the PGR project team and key stakeholders, such as EPC Contractor and equipment vendors, to facilitate technical and risk management support for PGR and its staff. Luke facilitated client and internal team collaboration, and maintained schedules.
Pine Gate Renewables, MKT_PGR Old Haynesville | Montgomery, Alabama, United States Project Manager. HDR provided typical OE review services with 7-day turnarounds for 30/60/90 IFC design packages for all scopes as well as RFI supports for the construction duration. The team provided experienced project management and project controls to support the execution of each task throughout the development, design, and construction of the project. This includes communications internal to the HDR team as well as project-related communications with the PGR project team and key stakeholders, such as EPC Contractor and equipment vendors, to facilitate technical and risk management support for PGR and its staff. Luke facilitated client and internal team collaboration and maintained schedules.
Salt River Project, CCERC Phase 2 Solar OE | United States 60MW site in AZ, asking for OE work – review, optimization, technical design review.
Role: HDR PM Delegate or Deputy PM
Todd Hogan 322 E. Pierson St
Phoenix, Az. 85012
480-251-8637 Toddhogan31@yahoo.com
Objective:
Project Manager, Cultural Resource Manager, Science Professional, and Archaeologist, committed to an organization’s success. Client engagement and development specialist supported by a blend of interpersonal savvy, strong communication and analytical skills. An experienced leader with the ability to initiate/manage cross-functional teams and multi-disciplinary projects. Hard worker who isn’t satisfied until the project is complete.
Education:
Bachelor of Science, Anthropology, Arizona State University, 2016 Master of Science, Biomimicry, Arizona State University, 2018
Professional Experience:
Cultural Resource Specialist / Archaeologist/ Consultant HDR / AECOM / Lazarus Corporation, Phoenix, AZ 10/2016 - Present
Running surveys and aerial photography to locate suitable excavation sites.
Planning surveys and excavations
Examining, documenting, and preserving artifacts Producing, compiling, and maintaining written, photographic, and drawn records and electronic databases Supervising and guiding staff
Collecting, analyzing, and interpreting data including construction vendors Writing reports, papers, and other articles for publication Dating and interpreting finds Mathematical, statistical, and computational modelling Trench surveys Feature mapping Cleaning of artifacts Assessing and planning applications for building developers
Monitoring and Data Recovery for AECOM, HDR, Paleowest, Logan Simpson, and Westland Worked at Perry Mesa, Pueblo Viejo, Pueblo Patricio, site excavating and mapping.
Parks service employment dreamy draw area Section 106 and NAGPRA compliance reports
Watching briefs and JCB scrape back the topsoil while looking for archaeology.
Using a variety of methods to locate suitable excavation sites, including geophysical surveys and aerial photography.
Survey equipment competence (TST, dumpy, GPS etc.), field recording methods, report writing, impact reports.
Photography, finds & sample processing, statistics, geography & geology, and IT skills, illustration, GIS and CAD programs.
Monitoring, Data Recovery, and Artifact removal and cataloguing.
Producing, compiling, and maintaining written, photographic and drawn records and electronic databases.
Collecting, analyzing, and interpreting data.
Assessing planning applications for building developers
Project Manager / Custom Home Builder Moore Family Revocable Living Trust, Phoenix, AZ, 10/2021 – 10/2024
Overseeing the entire construction process from inception to completion.
Developing project plans, schedules, and budgets.
Coordinating with architects, engineers, subcontractors, and vendors.
Procuring necessary permits and ensuring compliance with building codes and regulations.
Managing multi-project timelines and ensuring milestones are met.
Monitoring multiple construction site progress and addressing any issues or delays promptly.
Communicating regularly with clients to provide updates on project status and address any concerns.
Managing project finances, including tracking expenses and approving payments.
Conducting regular site visits to inspect work quality and safety compliance.
Resolving conflicts or disputes that may arise during the construction process.
Implementing quality control measures to ensure high standards of workmanship.
Collaborating with the design team to ensure client specifications are met.
Managing change orders and variations to project scope.
Providing leadership and direction to the project team.
Ensuring customer satisfaction and striving to exceed client expectations.
Examining, documenting, and preserving artifacts Producing, compiling, and maintaining written, photographic, and drawn records and electronic databases Supervising and guiding staff Collecting, analyzing, and interpreting data including construction vendors
Writing reports, papers, and other articles for publication Dating and interpreting finds Mathematical, statistical, and computational modelling
Trench surveys Feature mapping Cleaning of artifacts Assessing and planning applications for building developers Monitoring and Data Recovery for AECOM, HDR, Paleowest, Logan
Simpson, and Westland Worked at Perry Mesa, Pueblo Viejo, Pueblo Patricio, site excavating and mapping.
Parks service employment dreamy draw area
Section 106 and NAGPRA compliance reports Watching briefs and JCB scrape back the topsoil while looking for archaeology.
Using a variety of methods to locate suitable excavation sites, including geophysical surveys and aerial photography.
Survey equipment competence (TST, dumpy, GPS etc.), field recording methods, report writing, impact reports.
Photography, finds & sample processing, statistics, geography & geology, and IT skills, illustration, GIS and CAD programs.
Monitoring, Data Recovery, and Artifact removal and cataloguing.
Producing, compiling, and maintaining written, photographic and drawn records and electronic databases.
Collecting, analyzing, and interpreting data.
Assessing planning applications for building developers
Project Director/Project Manager/Environmental Scientist American Technologies Inc., Phoenix Arizona 10/2017 – 10/2019
Responsible for effectively supervising carpentry and structural work in the remodeling of residential, industrial, and commercial buildings.
This includes but is not limited to the following activities: reading plans or instructions, finish carpentry, framing, hanging crown moldings, installing board ups, installing window/door casings and baseboards, installing fixtures and hardware, using hand and power tools and checking the accuracy of completed work.
Also includes supervising work of in-house crews, examining the quality of workmanship of subcontractors and temporary employees.
Shoring erection, repair/replace patios, decks, doors, cabinets, appliances and necessary demolition to repair, drywall installation, tape and texture work.
Reviews projects to ensure that scope is clearly documented and understood by the customer.
Establishes a budget for each project that ensures completion at budgeted gross margins or
Assumes overall responsibility for project financials which include but are not limited to: pricing, costs, margins and budget creation.
Establishes payment terms, including progress billings and deductible payments in accordance with ATI best
Directs/Instructs Project Managers on project established payment terms and collection of outstanding amounts.
Assumes overall responsibility for collecting all project outstanding account receivable (A/R) payments - whether directly or indirectly through internal partnerships with the Legal and Collections
Manages and provides mentorship to Project Estimators, including but not limited to:
Reviews job financial performance and provides improvement insights.
Conducts joint job walks.
Administers 360 degree reviews at job Ensures compliance with TPA requirements and strong POM scores.
Conducts annual performance reviews.
Identifies and assigns training/developmental opportunities.
Rewards, motivates, and issues discipline as Note: the above sub-duties are limited to Senior and Executive PDs only
Establishes a completion schedule that is achievable and agreed to with the customer.
Acquires, directs and manages subcontractors to complete work as necessary. Prepares and negotiates subcontractor agreements within Company
Reviews and inspect work performed to ensure quality.
Communicates throughout the project with the customer via email, the assigned Project Manager, A/R and Works with customer to complete change orders as Prepares and complete punch list items at the end of the project if applicable.
Secures a certificate of satisfaction at the conclusion of Resolves conflicts, warranty issues and other complaints as Monitors compliance with OSHA regulations and all Company safety policies, as well as all other Participates in Company-sponsored marketing functions and events.
Upholds all Company policies, procedures, and safety policies.
Other related duties as
Mark Schneider Environmental Planner 1
Mark is an environmental and transportation planner with experience in environmental review, permitting, impact assessment, and transportation planning for infrastructure projects. His expertise includes regulatory compliance, NEPA documentation, GIS analysis, mitigation planning, and stakeholder coordination. Mark regularly works on projects in Tucson and throughout the Southwest. With three years of experience, he has contributed to projects across Arizona, Washington, Colorado, California, Nevada, and New Mexico for federal, state, and local agencies, as well as private clients. Mark holds a bachelor’s degree in Urban and Regional Development from the University of Arizona.
EDUCATION RELEVANT EXPERIENCE
B.S. Urban and Regional Development, University of Arizona, 2022
Arizona Department of Transportation (ADOT), Interstate 10 and Koli Road Traffic Interchange | Chandler, Maricopa County, Arizona The project involves constructing a new traffic interchange at Koli Road. Mark’s efforts with the project include supporting environmental analysis, preparing documentation, coordinating with agencies, and ensuring compliance with federal regulations for transportation and infrastructure projects
INDUSTRY TENURE
3 years
HDR TENURE
ADOT, State Route (SR) 30 (Tres Rios) 71st Avenue to SR 202L (South Mountain) | Phoenix, Arizona The project involves a new freeway between 71st Avenue and SR 202L. Mark’s efforts with the project include supporting environmental analysis, preparing documentation, coordinating with agencies, and ensuring compliance with federal regulations for transportation and infrastructure projects.
1 year City of Tucson (COT), Stone Avenue Bus Rapid Transit (BRT) | Tucson, Arizona
The project is a planned high-capacity BRT transit corridor Stone Avenue in Tucson, AZ. Mark’s efforts with this project include supporting environmental analysis, preparing documentation, coordinating with agencies, and ensuring compliance with federal regulations for transportation and infrastructure projects
COT, EV Charger Installation| Gila Bend, Maricopa County, Arizona The project involves expanding electric vehicle infrastructure by adding charging stations in the area. Mark was responsible for supporting environmental analysis, preparing documentation, coordinating with agencies, and ensuring compliance with federal regulations for transportation and infrastructure projects
Sound Transit, Everett Link Extension | Everett, Snohomish County, Washington, Arizona This project is a planned light rail expansion that will extend the Link system from Lynnwood to Everett, improving regional transit connectivity in the greater Seattle area. Mark’s efforts with this project included analyzing travel demand, developing alignments, assessing impacts on traffic and communities, coordinating with stakeholders, and ensuring regional mobility and sustainability goals.
EDUCATION
Bachelor of Science, Civil Engineering, Arizona State University (ASU), 2006
Master of Science in Engineering, Geotechnical Engineering, Arizona State University, 2010
REGISTRATIONS
Registered Professional Engineer (Civil), Arizona, US, #52004, Current
INDUSTRY TENURE
17 years
HDR TENURE
14 years
Sterling T. Crandell PE, Senior Geotechnical Engineer
Sterling is a geotechnical engineer with 17 years of local experience that includes managing planning and conducting geotechnical investigations for urban and rural design projects in Arizona and the southwestern U.S . His experience also includes preparing geotechnical investigation and design reports pavement design and materials design reports and shallow and deep foundation design recommendations for bridge and wall structures for various types of projects. In addition, he has performed analyses of slope stability settlement lateral loading of drilled shaft foundations and retaining walls and pavement loading and rehabilitation alternatives. His field experience includes inspecting spread-footing foundation excavations for bridge wall and box culvert foundations and providing subgrade preparation and improvement recommendations. He also has field experience inspecting drilled shaft excavations and construction of demonstration drilled shafts bridge foundations and a full-scale drilled shaft load test. In addition, he has field experience inspecting gabion walls, driven piles and soil nail walls.
RELEVANT EXPERIENCE
City of Phenix Zone 3D/4A Water System Improvements Phoenix, Arizona, United States The project involved the design for a new booster pump station (4A- B9) and pressure reducing valve (PRV) station (3D-R12) as part of the Zone 3D/4A Improvement Program. This program is an integral part of the City’s drought contingency planning strategy, providing added flexibility to the City under a variety of possible water supply scenarios. Booster station 4A-B9 will have 40MGD firm capacity initially, expandable to 60MGD, and is designed for bi-directional operation within Pressure Zone 4A. The vertical turbine pumps will be controlled with variable frequency drive to offer maximum operational flexibility. PRV 3D-R12 is designed to transfer up to 60MG from Pressure Zone 4A to Zone 3D. The station includes four 16-inch diaphragm-style PRV’s with accessory equipment and a magnetic flow meter to monitor flow transferred between the zones.
Special considerations associated with this project include tie-ins to two 60-inch prestressed concrete cylinder pipe in Deer Valley Road, easements, and environmental clearance coordination for construction of multiple pipelines within lands owned by the Arizona State Land Department. This project is being constructed under a Construction Manager at Risk (CMAR) contract. HDR performed
GREGG S. MITCHELL, RG
engineering services required to prepare construction documents which consisted of civil, structural, process piping, mechanical and electrical systems, instrumentation and control systems, security, landscape, and other project features requested by the City.
Tucson Water Roger Road Chemical Storage Facility/Tucson Reclaimed Water Treatment Plant Chemical Storage Upgrades Tucson, Arizona, United States Provided foundation design analysis and construction recommendations for the Tucson Water at the Roger Road facility with complete I&C design and integration services. The project entailed using Allen-Bradley Compact Logix PLC and PanelView OIT to automate the chemical storage, dosing and transfer operations.
HDR worked closely with Tucson Water staff and the contractor to ensure the Tucson Water preferred components and standards are maintained.
M.A. History/Public History, Arizona State University, 1993
B.A. History, Arizona State University, 1982
PROFESSIONAL
MEMBERSHIPS
Arizona Historical Society
Coordinating Committee for History in Arizona
Mesa Preservation Foundation
INDUSTRY TENURE
HDR TENURE
Less than a year
OFFICE LOCATION
Phoenix, AZ
Scott Solliday, MA
Senior Cultural Resources Specialist
Scott Solliday has been a historian, architectural historian, and archaeologist for more than 35 years, initially working in museums and archives, but for the past 25 years, focusing on cultural resource management and historic preservation.
Scott is experienced in all cultural resource programs and procedures, and highly qualified in applying the criteria of the National Register of Historic Places. He has worked with a broad range of residential, commercial, industrial, military, rural, and transportation-related property types. Areas of specialization include history of Arizona and the West, Mexican Americans, Native Americans, agriculture and irrigation engineering, and 20th Century America. Mr. Solliday meets the Secretary of Interior’s professional qualifications for History and Architectural History. He has authored or contributed to more than 250 technical reports and presented numerous professional papers.
SELECTED EXPERIENCE
Tucson Bus Rapid Transit Project, Tucson, AZ, for City of Tucson.
Architectural Historian for a transportation improvement project. Conducted a historic property survey and National Register eligibility assessment along a 5-mile corridor along Stone Avenue.
Pascua-Yaqui Indian Reservation Historic Survey, Pima County, AZ, for Pascua Yaqui Tribe. Historian for a historic preservation planning project.
Conducted a historic property survey and context study with recommendations for ongoing evaluation of historic resources.
US Route 60 Queen Creek HAER Report, Pinal County, AZ, for Arizona Department of Transportation (ADOT). Historian for a bridge replacement project. Completed a Historic American Engineering Record Report (HAER AZ-
106) for the Queen Creek Viaduct.
Capitol Extension Cultural Resource Inventory and Evaluation, Phoenix, AZ, for Valley Metro. Architectural Historian for a project to develop a new light rail route. Conducted a historic property survey and National Register eligibility assessment of buildings along the Capital Mall and the historic Neahr’s Addition subdivision.
Underground Railroad Resources in the United States - A National Historic Landmarks Theme Study, for National Park Service. Co-author of a revised theme study is to develop a new framework for understanding the history of the Underground Railroad and the abolition movement in United States history, including guidance on researching and preparing related National Historic Landmark nominations.
Roosevelt Irrigation District (RID) Centennial History, Buckeye, AZ, for RID.
Author of a commemorative illustrated history of the Roosevelt Irrigation District and the 20th century development of the cities of Avondale and Buckeye.
Apache Trail/Old US Route 60, Mesa, AZ, for ADOT. Historian for a for a street improvements project. Conducted a historic property survey and National Register eligibility assessment of automobile transportation and tourism-related properties along the Apache Trail near the Mesa-Apache Junction border.
SCOTT SOLLIDAY
Santa Fe Dam Evaluation; Los Angeles County, CA, for US Army Corps of Engineers. Historian for a project to record and evaluate the Santa Fe Dam and provide a technical inventory of the facility to assist the US Army Corps of Engineers in their ongoing efforts to comply with Sections 106 and 110 of the National Historic Preservation Act.
Glen Canyon Post-1955 Housing Survey, Page, AZ, for US Bureau of Reclamation. Architectural Historian for development of a Multiple Property Documentation Form to be used for ongoing evaluation and treatment of federal residential properties in Page, AZ.
Transmission Line Rating and Remediation Program, Kern River to Los Angeles Transmission Corridor, Los Angeles County, CA, for Southern California Edison. Senior Editor for a Historic-Era Built Environment Survey Report for a 65-mile transmission corridor in southern California.
Salome Emergency Airfield, Harquahala Valley, AZ, for 174 Power Global.
Historian and historic archaeologist for a privately developed solar energy project.
Developed a historic context for early airfields, provided documentation of historic and prehistoric sites and features for a Class III Survey, and completed historic artifact analysis.
Treat Avenue Bicycle Boulevard, Tucson, AZ, for City of Tucson.
Architectural Historian for a transportation improvement project. Conducted a historic property survey and National Register eligibility assessment for neighborhoods and commercial districts along a 5.5-mile corridor.
San Pedro Bridge, Benson, AZ, for ADOT. Historian for a bridge replacement project. Contributed to Section 4(f) analysis and completed a Historic American Engineering Record Report (HAER AZ-98) for the San Pedro Bridge.
Avenida del Yaqui, Guadalupe, AZ, for ADOT. Architectural Historian for a street improvements project. Conducted a historic property survey and National Register eligibility assessment of buildings along Guadalupe’s main street.
Sage Memorial Hospital Campus, Ganado, AZ, for Hoefer Wysocki Architecture. Architectural Historian for a cultural resources inventory and architectural assessment of the Sage Memorial Hospital campus, a National Historic Landmark on the Navajo Reservation.
Granite Reef Diversion Dam Southside Gatekeeper’s House, Maricopa County, AZ, for Salt River Project. Architectural Historian for a National Register Eligibility Assessment of the Gatekeeper’s House.
State Route 30 (East): SR 303L to SR 202L, South Phoenix, Avondale, Goodyear, and Buckeye, AZ, for ADOT. Architectural Historian for an environmental assessment of corridors for a new highway project. Completed a historic property survey and National Register eligibility assessment of agricultural and residential properties within a 15-square-mile study area.
Jokake Inn Main Building HABS Report, Phoenix, AZ, for Host Hotels, LLC.
Architectural Historian for documentation of one of the first resort hotels in central Arizona in a Historic American Building Survey Report (HABS No. AZ-232).
US Route 60 Pinto Creek Bridge Gila County, AZ, for ADOT. Historian for a bridge replacement project. Completed National Register eligibility assessment, project effects assessment, and Historic American Engineering Record Report (HAER AZ-97) for Pinto Creek Bridge.
Archaeology and Historic Properties Management Plan for Redevelopment of the Community Noise Reduction Program (CNRP) Project Area, Phoenix, AZ, for City of Phoenix. Historian for city planning project. Completed final historic property assessments and developed a management plan for historic properties in South Phoenix.
SCOTT SOLLIDAY
Charles Hayden House HABS Report, Tempe, AZ for Douglas Wilson Companies. Architectural Historian for documentation of the Charles Trumbull Hayden House/La Casa Vieja in a Historic American Building Survey Report (HABS No. AZ-228).
State Route 89 Hell Canyon Bridge, Yavapai County, AZ, for ADOT. Historian for a bridge replacement project. Completed Historic American Engineering Record Report (HAER AZ-96) for Hell Canyon Bridge.
Date Palm Manor Historic District, Tempe, AZ, for Date Palm Manor Neighborhood Association. Architectural Historian for a neighborhood enhancement project. Completed a historic property survey and National Register nomination. Listed on the National Register.
Tomlinson Estates Historic District, Tempe, AZ, for University Heights Neighborhood Association. Architectural Historian for a neighborhood enhancement project. Completed a historic property survey and National Register nomination. Listed on the National Register.
Interstate 10/State Route 303L Traffic Interchange, Goodyear, AZ, for ADOT.
Historian for a new traffic interchange project. Documented the Roosevelt Irrigation District Canal in a state-level HAER report and wrote historical documentation of the historic Waddell Ranch and Soil Conservation Service windbreaks in the West Valley.
Interstate 19/Ajo Way Traffic Interchange, Tucson, AZ, for ADOT.
Architectural Historian for a new traffic interchange project. Completed a historic property survey and National Register eligibility assessment of residential properties, and documentation of historic features associated with the Tucson Indian Training School.
South Mountain Transportation Corridor, Phoenix, AZ, for ADOT.
Architectural Historian for a new highway project. Completed a National Register eligibility assessment and project effects assessment for historic agricultural properties in Laveen Village, Phoenix.
Avenida Rio Salado/West Broadway Road Design, Phoenix, AZ, for City of Phoenix. Historian for a new parkway project. Completed a historic property survey and National Register eligibility assessment of historic wrecking yards and industrial sites in South Phoenix.
Borden Homes Historic District, Tempe, AZ, for University Heights Neighborhood Association. Architectural historian for a neighborhood enhancement project. Completed a historic property survey and National Register nomination. Listed on the National Register.
WACH Hospital and 11th ACR Headquarters Replacement, Fort Irwin, CA, for Fort Irwin National Training Center. Architectural historian for a capital improvements program. Completed a historic property survey and National Register eligibility assessment.
Jefferson Park Historical Review, Tucson, AZ, for City of Tucson.
Architectural Historian for a historic property survey and National Register nomination. Listed on the National Register.
Tony Ranch Homestead, Haunted Canyon, Pinal County, AZ, for Superstition Area Land Trust. Historian for a comprehensive environmental assessment and management plan for a National Forest Homestead in the Superstition Mountains.
Goodyear Airport Improvements, Goodyear, AZ, for City of Phoenix.
Architectural historian for a capital improvements program. Completed a historic property survey and National Register eligibility assessment of the former Litchfield Park Naval Air Facility.
Bachelor of Arts, Geographic Information Science, University of South Carolina, Columbia, 2001
REGISTRATIONS
Certified GIS Professional, US, #160881, JAN-2027
MEMBERSHIPS
National Association of Environmental Professionals (NAEP) GIS Working Group Co- Chair
SC Geological Survey STATEMAP Committee Member, since 2020
INDUSTRY TENURE
HDR TENURE
OFFICE LOCATION
Columbia, SC
Erin Elizabeth Koch, GISP GIS Team Leader
Ms. Koch is an accomplished GIS manager and IT professional with 17 years of experience supporting state agency environmental and natural resources-related objectives. Her areas of expertise include development, planning, and coordination of large multidisciplinary GIS projects, working with decision-makers to promote GIS use, project management, oversight and scheduling, diagnostics and resolution of software issues, and data management, as well as training/mentoring scientists and non-scientists in GIS. Erin developed and led workshops for advanced mapping instruction and GIS skills. Erin has created interactive mapping applications utilizing ArcGIS Online, Portal for Server, JavaScript API, and GIS map service technologies. She is proficient in spatial data management and map production, database development, and data analysis, and production of maps for publication and distribution to the public.
Since joining HDR 7 years ago, Erin has supported clients by advising on geospatial solutions, managing project geodatabases, improving field operations using modern mobile applications, and creating web mapping tools that support project managers and public outreach efforts. She supports all market sectors belonging to a cross sector services team at HDR. She serves as liaison between the Geospatial and Environmental Sciences and Planning cross sectors and provides advice on geospatial solutions for clients. Erin is currently HDR’s Routing and Siting PG Geospatial Working Group lead.
RELEVANT EXPERIENCE
Silicon Ranch Corp, Projects Nationwide Erin leads a team of GIS professionals supporting field investigators performing inspections and due diligence surveys of sites for potential renewables development. Her team developed a geodatabase schema and field maps forms for the standardization of collecting relevant data for each site. Reporting tools were enabled for fast and efficient creation of deliverables for the client. Web and mobile mapping applications are available for managers, clients, sub-contractors, and field investigators so that everyone has access to the best available information about the sites.
NC DOT, Biological Services Group, Bat Habitat Program Support, Raleigh, NC GIS Team Lead. HDR created an innovative approach to a long-standing North Carolina set of procedures for collecting data essentially was aimed at protecting bat species. Erin assembled a team of application developers who successfully deployed solutions on time and on budget.
Berkeley/Charleston/Dorchester Council of Governments, Lowcountry Rapid Transit (LCRT) - Phase 2, Charleston, SC Erin managed a team of GIS professionals to deliver solutions essential to project success including geodatabase schemas and web and mobile mapping applications needed to keep project managers, clients, sub-contractors, and field investigators up-to-date and moving forward.
| CTR064774 Contract Amendment 12 |
| Staff Approval Request - 20250328-Signed |