CTR064771_Contract_Amendment_11.pdf
PDF 3 MB Posted
- Attached to
- Master Agreement AZ|CTR064771
- Contract number
- CTR064771
- Issued by
- Arizona
About this file
This document is an Amendment to a Contract for P3 Program Management Services issued by the Arizona Department of Transportation (ADOT), involving HDR Engineering Inc. as the contractor. The amendment specifically covers state-funded contracts numbered CTR064771 and CTR064774, and involves adding seven new key personnel to the existing contract. The document includes detailed resumes for these new team members: Nandini Gopan, Jordan Monroe, Pronab Biswas, Brent Kirkman, Elise McGuire, TJ Pigeon, and Albrie Woeke, who will serve in various roles such as planners, engineers, and project controls specialists.
The amendment adds these professionals to support transportation and infrastructure projects across multiple states, including Arizona, New Mexico, California, Texas, and Utah. The new team members bring expertise in areas such as highway design, bridge inspections, traffic engineering, roadway design, transportation engineering, and project controls technology. Their experience spans projects including highway safety improvements, bridge inspections, transit infrastructure, parking lot designs, and corridor development. The proposed hourly rates for these new personnel range from $120 to $265, and they will be involved in various roles such as traffic analysis, bridge engineering, roadway design, and project controls management for state and federal transportation initiatives.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: HDR Engineering Inc AMENDMENT NO.: 11 DESCRIPTION: P3 Program Management Services – State Funded
Rev. 11/2024
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. The following Key Personnel are hereby added:
HDR Engineering Inc:
Nandini Gopan, Planner Jordan Monroe, Senior Planner Pronab Biswas, Senior Planner Brent Kirkman, Senior Planner Elise McGuire, Planner TJ Pigeon, Planner Albrie Woeke, Senior Planner
2. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
| CTR064771 Contract Amendment 11 |
| Staff Approval Request - 02.03.25-signed_unlocked |
File details come from the government source that posted it. Updated .