CR 15 Trail Specs.pdf
PDF 519 KB Posted
- Attached to
- CR 15 Trail
- Solicitation number
- TOW-PRC-2025-52
- Issued by
- Colorado
About this file
This document contains Special Provisions for the CR-15 Trail project by the Town of Windsor Parks, Recreation and Culture Department, utilizing the Colorado Department of Transportation's 2025 Standard Specifications for Road and Bridge Construction. The project involves trail infrastructure improvements, including trail extension, installation of a reinforced structural headwall, placement of a safety handrail, relocation of a signal pole, and median modifications on Harmony Road. The special provisions outline detailed specifications for various construction elements such as clearing and grubbing, excavation, concrete work, pipe installation, and force account items.
The project includes two primary force account items: Minor Contract Revisions estimated at $50,000 and Harmony Road Work estimated at $250,000. The town intends to negotiate unit costs with the contractor for the Harmony Road work instead of using standard force account methodology. The specifications provide extensive technical details for contractors, including requirements for concrete (such as fiber-reinforcing and sulfate exposure), pipe materials, backfilling procedures, and structural considerations. The project emphasizes precise technical standards, safety compliance, and infrastructure connectivity, with a focus on ensuring proper drainage, structural stability, and adherence to local and state construction guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CR 15 Trail Bid Schedule.xlsx | XLSX spreadsheet | |
| CR 15 Trail Bid Schedule.pdf | ||
| Project Manual - CR15.pdf | ||
| CR 15 Plan Set 09032025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF WINDSOR
PARKS, RECREATION AND
CULTURE DEPARTMENT
SPECIAL PROVISIONS
CR-15 TRAIL
TOWN OF WINDSOR PARKS, RECREATION AND CULTURE DEPARTMENT
CR-15 TRAIL
The Colorado Department of Transportation 2025 Standard Specifications for Road and Bridge Construction, controls construction of this project. The following special provisions supplement or modify the Standard Specifications and take precedence over the Standard Specifications and plans.
PROJECT SPECIAL PROVISIONS INDEX
Title Date Page
Index Pages August 2025 1 Revision of Section 101 Definitions and Terms August 2025 3 Revision of Section 102 Project Plans and Other Data August 2025 4 Revision of Section 107 Stormwater Construction Permit August 2025 5 Revision of Section 108 Prosecution and Progress August 2025 6 Revision of Section 201 Clearing and Grubbing August 2025 7 Revision of Section 203 Excavation and Embankment August 2025 8 Revision of Section 210 Reset Structures August 2025 11 Revision of Section 514 Pedestrian and Bikeway Railing August 2025 9 Revision of Section 601 Structural Concrete August 2025 10 Revision of Section 603 Reinforced Concrete August 2025 11 Revision of Section 603 Plastic Pipe August 2025 11 Force Account Items August 2025 12
STANDARD SPECIAL PROVISIONS
Title Date Pages
Revision of Section 105 – Dispute Resolution, Dispute Review Board and Claims for Unresolved Disputes
June 11, 2025 24
Revision of Section 106 – Conformity to the Contract of Hot Mix Asphalt (Less than 5,000 Tons)
July 1, 2025 3
Revision of 401 – Plant Mix Pavements – General (Subsection 401.17)
July 1, 2025 4
REVISION OF SECTION 101
DEFINITIONS AND TERMS
Certain terms utilized in the latest edition of the Colorado Department of Transportation Standard Specifications for Road and Bridge Construction shall be interpreted to have different meanings within the scope of this Contract. A summary of redefinitions follows:
Section 101 of the Standard Specifications is hereby revised for this project as follows:
Subsection 101.02:
“Department” or “CDOT” shall mean Parks, Recreation and Culture Department, Town of Windsor, Colorado.
“Engineer” or “Project Engineer” shall mean Town Engineer, Town of Windsor, Colorado or designated representative.
Holidays shall include:
Additional holidays recognized by Town of Windsor are:
Day after Thanksgiving Day Day before Christmas
Holidays not recognized by Town of Windsor are:
Martin Luther King Day President’s Day
Xavier Cabrini Day
“Project Engineer” shall mean Town of Windsor’s duly authorized representative who may be a Town of Windsor employee or an employee of a consulting engineer (consultant) under contract to Town of Windsor.
“CDOT Project Engineer” shall be replaced with “Project Engineer” within these specifications. When these documents reference a CDOT engineer, this reference shall be construed to mean Project Engineer.
“Consultant Project Engineer”. The consultant employee under the responsible charge of the consultant’s Professional Engineer who is in direct charge of the work and is responsible for the administration and satisfactory completion of the project. The Consultant Project Engineer’s duties are delegated by the Project Engineer in accordance with the scope of work in the consultant’s contract with the Town of Windsor. The Consultant Project Engineer is not authorized to sign or approve Contract Modification Orders.
“Region Transportation Director” shall mean Town Engineer, Town of Windsor, Colorado or designated representative.
“State” shall mean Town of Windsor, Colorado (where applicable).
REVISION OF SECTION 102
PROJECT PLANS AND OTHER DATA
Section 102 of the Standard Specifications is hereby revised for this project as follows:
Subsections 102.01, 102.02, shall be deleted.
Subsection 102.05 shall include the following:
Town of Windsor will provide electronic files of drawings, the sample contract document, the project technical specifications in PDF format, online at the designated internet bid advertisement site, and they will be considered as the official bid set and record set.
Upon contract execution, the Town of Windsor will provide one original signed and stamped set of plans and specifications. A copy of those original signed and stamped documents will be provided in electronic format as a PDF.
REVISION OF SECTION 107
STORMWATER CONSTRUCTION PERMIT
Section 107 of the Standard Specifications is hereby revised for this project as follows:
Subsection 107.06 shall be revised to include the following:
The Contractor and any subcontractor shall not require any laborer or mechanic employed in performance of the Contract to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health or safety, as determined under construction safety and health standards (Rules and Regulations of the Federal Occupational Safety and Health Act of 1970 (OSHA) and as amended).
All facilities and work conditions shall comply with Colorado and local Health Department Regulations and with OSHA requirements.
Subsection 107.25(c) shall include the following:
The Colorado Discharge Permit System Stormwater Construction Permit (CDPS-SCP) shall be obtained by The Contractor.
REVISION OF SECTION 108
PROSECUTION AND PROGRESS
Section 108 of the Standard Specifications is hereby revised for this project as follows:
Subsection 108.03 shall include the following:
Meetings will be required to review progress and plan upcoming activities. The Traffic Control Supervisor, the Erosion Control Supervisor and representatives from the Contractor and all active subcontractors shall attend the meetings as necessary. Such meetings will be required on a weekly basis at a time to be determined by the Engineer and the Contractor.
At the weekly progress meetings, the Contractor shall submit a written statement of planned activities and anticipated inspection, testing, and surveying requirements for the upcoming three (3) weeks. The Contractor shall provide a twenty-four-hour notice to the Engineer if the Contractor elects to change a planned activity.
The Contractor shall complete all aspects of the project including punch-list items within an approved not-to exceed period indicated in the Project Special Provision “Commencement and Completion of Work” or liquidated damages per the table included in Section 108.09 of the CDOT Standard Special Provisions shall incurred.
REVISION OF SECTION 201
CLEARING AND GRUBBING
Section 201 of the Standard Specifications is hereby revised for this project as follows:
Subsection 201.02 add the following:
It is the responsibility of the Contractor to visit the site and determine the resources necessary to clear and grub the project limits, per the design specifications, and no additional compensation will be allowed therefore.
Once all directed clearing is completed and accepted, no additional clearing will be allowed unless approved in writing by the Engineer.
Tree and tree stump removal greater than 6” at the base (at 1’ above the ground surface) are designated on the plans and shall be paid for separately.
REVISION OF SECTION 203
EXCAVATION AND EMBANKMENT
Section 203 of the Standard Specifications is hereby revised for this project as follows:
Subsection 203.07 shall include the following:
Where poor subgrade materials are identified beneath the trail, the detail shown on page 6 for unsuitable material shall be used. Additional Rockfill (Special) can be used and shall consist of 3-inch clean, coarse aggregate placed over compacted subgrade to establish a stable subbase. For structure backfill at Box Culvert E, Rockfill (Special) shall consist of 2.5 feet of 3-inch minus, coarse, washed rock to reduce the potential for long-term settlement. The contractor shall adhere to all recommendations provided in the geotechnical report.
REVISION OF SECTION 210
RESET STRUCTURES
Section 210 of the Standard Specifications is hereby revised for this project as follows:
Subsection 210.04 shall include the following:
The existing gate panels shall be removed, retained and installed on new posts. New timber posts shall be furnished and installed by the contractor per CDOT specification 607 and 710.07. Any wire fence that is needed to close any gaps or breaks created by this reset shall be furnished and placed by the contractor.
BASIS OF PAYMENT
Subsection 210.04 shall include the following:
All labor and material needed to reset the fence will not be paid for separately but shall be included in the work.
REVISION OF SECTION 514
PEDESTRIAN AND BIKEWAY RAILING
Section 514 of the Standard Specifications is hereby revised for this project as follows:
Subsections 514.02, 514.04, and 514.05 shall be deleted
Subsection 514.03 Steel Tube Railing shall include the following:
The contractor shall follow the Larimer County Urban Area Street Standards Drawing # 1101 for all handrails.
REVISION OF SECTION 601
STRUCTURAL CONCRETE
Section 601 of the Standard Specifications is hereby revised for this project as follows:
Subsection 601.03 shall include the following:
All concrete shall include fiber-reinforcing.
Subsection 601.04 shall include the following:
The sulfate exposure for all concrete shall be Class 0.
REVISION OF SECTION 603
REINFORCED CONCRETE PIPE
Section 603 of the Standard Specifications is hereby revised for this project as follows:
Subsection 603.02 shall include the following:
Reinforced concrete pipe shall be manufactured from concrete that meets the requirements for severity of sulfate exposure Class 0 specified in subsection 601.04.
Subsection 603.04 shall include the following:
Material excavated from pipe trenches may be used for backfill provided it does not contain unsuitable material or particles larger than 3 inches. Unsuitable material includes, but is limited to, topsoil, vegetation, brush, sod, trash, and other deleterious substances.
REVISION OF SECTION 603
PLASTIC PIPE
Section 603 of the Standard Specifications is hereby revised for this project as follows:
Subsection 603.02 shall include the following:
Plastic pipe shall be PVC pipe and meet the requirements shown in CDOT specification 712.13(b).
Subsection 603.09, Backfilling shall include the following:
Concrete shall be placed at the inlet and outfall of the pipe to fill in gaps between the existing irrigation lateral concrete and to armor the ends of the pipe.
All joints, elbows, concrete collars, additional concrete for protecting inlet and outfall and filling in gaps, connecting bands, and other connecting devices will not be paid for separately but shall be included in the work.
FORCE ACCOUNT ITEMS
DESCRIPTION
This special provision contains the Division's estimate for force account items included in the Contract.
The estimated amounts marked with an asterisk will be added to the total bid to determine the amount of the performance and payment bonds. Force Account work shall be performed as directed by the Engineer.
The Force Account Work (labeled as Future Work in construction plans) on Harmony Road will encompass a series of planned infrastructure improvements. These include the extension of the CR-15 Trail to establish connectivity with the existing pedestrian sidewalk north of Harmony Road, installation of a reinforced structural headwall designed to interface with the existing box culvert conveying stormwater beneath Harmony, placement of a code-compliant safety handrail, relocation of one signal pole on the SW corner, Harmony Road median modifications and execution of all associated grading operations to ensure proper drainage and structural stability.
Payment will be made in accordance with subsection 109.04. Payment will constitute full compensation for all work necessary to complete the item.
Force account work valued at $5,000 or less, that must be performed by a licensed journeyman in order to comply with federal, state, or local codes, may be paid for after receipt of an itemized statement endorsed by the Contractor.
Force Account Work on Harmony Road will be quantified and presented to the contractor so that unit costs can be negotiated for the work. It is the town’s intent to utilize agreed upon unit costs to compensate the contractor instead of using the force account methodology to pay for this work.
Estimated Force Account Item Quantity Amount
F/A Minor Contract Revisions F.A. $50,000* F/A Work on Harmony F.A. $250,000
STANDARD SPECIAL PROVISIONS